HomeMy WebLinkAboutAgenda - 05-21-2013 - 8bSUBJECT: S
ORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: May 21, 2013
Study Update
DEPARTMENT: Asset Management Services
Action Agenda
Item No. 8 -b
PUBLIC HEARING: (Y /N) No
1
ATTACHMENT(S):
INFORMATION CONTACT:
1) Department Locations, Space Study
Jeff Thompson, 919 - 245 -2658
Emphasis
Wayne Fenton, 919 - 245 -2628
2) Orange County Facility Report (To Be
Alan Dorman, 919 - 245 -2627
Provided Under Separate Cover Prior to
Michael Talbert, 919- 245 -2308
the Meeting — Will also be available at
http.//www. co. orange. nc. us/AssetMgmt/i
ndex. asp
3) PowerPoint Presentation (To Be
Provided Under Separate Cover at the
Meeting)
PURPOSE: To receive and comment on an update regarding:
1) The fulfillment of space study goals and the methodology for space need analysis;
2) Identified unmet space needs and the current space study initiatives that address these
needs; and
3) The consolidated property inventory for all County owned property.
BACKGROUND:
Space Study Charter & Methodolo_gy. After the development of the Link Government
Services Center (1992) and the Southern Human Services Center (1998), Orange County
developed a comprehensive space study to address departmental space requirements in 2000,
with major updates in 2002, 2004, 2005, 2006, 2008 and 2010. The initial space study was
developed and managed by the Space Needs Task Force. Links to the summaries of these
studies are located at http: / /www.co. orange .nc.us /AssetMgmt /index.asp.
The scope of the study encompassed all County functions whose space needs required a
solution identified by 2010. The basis of the study was comprehensive information gained from
a questionnaire completed by all County Departments, covering the identification of space,
space assessment, future space needs, storage needs, parking, security, and maximizing
customer service.
Departments were also grouped into functional categories according to their primary service
delivery. Options were developed to meet stated needs, either through expansion of existing
County buildings or construction of new ones. Through task force deliberation and BOCC
support, recommended options were selected for each functional classification through the
application of the following criteria: 1) facility overcrowding; 2) program growth outpacing space
growth; 3) increased service demand; 4) reduction of leased space and related costs; and 5)
demonstrated longstanding need with considerable public support.
The principles guiding contemplated development in response to identified space needs are as
fol lows:
• Co- location: Co- locating departments with similar functions and /or serve the same
customer base.
• Consolidation: Consolidating County operations to as few sites as practicable in an
attempt to gain operational efficiency and enhance the ease with which residents and
other interested parties may access County services.
• Ownership: Owning facilities in which County operations are located, as opposed to
leasing, except where there is a compelling business case to do so.
The space size and configuration was also governed on fundamental interior designs ratios for
conventional administrative activity and general customer service support. Special use facilities
such as an animal service facility, jail, library, or community center have more unique planning
factors that are more indicative of its peer group facility type. Conventional administrative facility
space planning generally applies the following factors:
Use:
Square Footage
General Office
120 -150
Supervisor Office
150 -180
Director Office
250 -300
Circulation /Common
Area /Conference /Utilities
30% of Office Area
Special Areas /Customer Service
As Needed
These factors are guidelines. Factors such as new construction, adaptive re -use, or renovations
of existing space are also considerations. Space programming also needs the right balance of
work space: focus work areas (offices, individual work spaces), collaboration and learning areas
(conference, group work, resource areas), and "community" areas (common areas, travel
areas).
Resulting Built Environment. Based upon the overall study, its methodology, and ultimate
recommendations, the County has completed several capital projects that fully addressed the
majority of the departmental requirements identified according to the study's guiding principles:
2007 Seymour Senior Center (Aging)
2008 Central Orange Senior Center (Aging)
Emergency Services Headquarters 1911 Center (Emergency Services)
Gateway Center (Tax Administration, Register of Deeds)
2009 Animal Services Center
Justice Facility Expansion (Courts, Sheriff); Renovation Phase Completed in 2010
Link Government Services Center (County Commissioners, County Manager,
County Attorney, Finance & Administrative Services, Human Resources)
West Campus Office Building (Planning & Inspections, Environmental Health,
Economic Development, Information Technology, Asset Management Services)
Government Services Annex Renovation (Board of Elections)
District Attorney
Sportsplex Ice Rink Mezzanine, Interior Renovations
K
2010 Orange County Library
Hillsborough Commons (Dept. of Social Services)
Environment and Agriculture Center (DEAPR (portion), Soil & Water, Cooperative
Extension, USDA Farm Service Agency)
Emergency Services Substation at Revere Road (former Animal Control facility)
2011 Whitted Center Renovation (Health Clinic, Dental Clinic, Health Department
Offices, Housing, Human Rights & Community Development)
129 King Street (Public Defender relocation from leased space)
Court Street Annex (Probation & Parole relocation from leased space)
Guardian Ad -Litem (501 West Franklin Street, Chapel Hill)
2012 Child Support Enforcement (Relocated to the West Campus Office Building from
leased space)
The associated "Orange County Facility Report" summarizes locations and pertinent information
for each facility that the County owns and serves as a baseline for future space study analysis.
This report will be updated annually to coincide with annual County budget preparation as well
as the annual energy, fuel and water use scorecard presentation.
Current Initiatives to Address Identified Unmet Space Needs. The following BOCC
adopted initiatives are in progress to address unmet needs identified in the study, as well as
those needs identified since the last study update in 2010. These initiatives will continue to be
examined and developed in keeping with the same space study methodology. Staff will present
progress updates for feedback as well as recommendations for decision as these studies
develop.
County Magistrate's Office. A portion of the original jail building is being renovated for
use and will serve as a consolidated magistrate office and processing center. This need
was identified during the Justice Facility expansion project and subsequent occupation of
the facility. This project should be completed during the summer of 2013.
Permanent BOCC Meeting Facility in Hillsborough. The current Manager
recommended Capital Investment Plan ( "CIP ") contemplates providing a permanent
Board meeting facility within the former library space in the Whitted building. Should this
project be approved, staff will manage the design and construction of a permanent
meeting facility with potential areas for multi - purpose space and /or administrative office
space. A design presentation with upfit alternatives would be presented to the Board in
the fall, and could be completed and ready for occupancy in the spring of 2014. The
Board has affirmed its desire to allow shared use of this space for other government uses
of the Town of Hillsborough and the Orange County Schools. The Board is also
interested in sharing the space for arts, cultural enrichment, education, and economic
development activities during times where it is not being used for government activities.
Emergency Services Substations. Emergency services and supporting assets are
being improved to provide faster and appropriate response to all areas of the County.
Part of this effort is a study that contemplates identifying ideal locations for adequate
response as well as the prototype site and space plan for the facilities. Staff is currently
administering a Request for Qualifications ( "RFQ ") process to select a consultant for this
work. This process is funded through the FY2012 -13 CIP.
M
Southern Campus Master Plan. A comprehensive master plan for the 33.5 acre parcel
was adopted by the Board in 2012. Staff is currently working with Chapel Hill on a
development agreement that is intended to secure long -term development rights for
numerous government services that may be developed to serve the residents of southern
Orange County. Once these development rights are secured, the County will begin a
significant space study component on the short and long term space needs required at
this site. Potential expansions or re- configurations of the spaces within the Seymour
Senior Center and the Southern Human Services Center will be in this discussion.
County Jail. The County is currently in negotiations with the State Department of
Corrections and the State Attorney General on a long -term land lease that is
contemplated as the site for the jail facilities recommended in the study. The County is
also underway in studying alternative jail alternative programs that will join space uses for
the existing jail facility in programming and designing this future jail facility.
Southern Orange Library. On May 14, 2013, the Board received a State initiated
Strategic Plan report and is in the process of providing feedback in order to direct staff in
moving forward with a selecting a site for a potential southern branch library.
Cedar Grove Community Center. The Board will contemplate awarding a professional
services agreement for space programming and design services to MBAJ Architects
during its June 4, 2013 regular meeting. This action will initiate the space study &
programming (with public collaboration), and schematic planning for this facility that will
be presented to the Board for comment and potential action during the fall of 2013.
Durham Tech Classroom Spaces. The County will continue working with Durham Tech
to analyze its classroom space needs in various parts of Orange County.
Sportsplex Expansion. The current Manager recommended Capital Investment Plan
contemplates expanding the Sportsplex in order to accommodate significant member
growth since 2007.
Economic Development Small Business Incubator Space. Orange County served as
the fiscal agent and developer for the Piedmont Food and Agricultural Processing Center,
an intensively used agricultural business incubator located in Hillsborough. The County
will continue to work with its Economic Development Commission and partners on
analyzing and identifying other small business incubator opportunities.
Under - utilized & Stressed Facilities Requiring Space Study. The original study did not take
into account the age, physical status, operating costs, or the energy efficiency of the facilities.
This variable has been added to the methodology for space studies going forward and will assist
the underlying space study guiding principles in addressing the following areas of concern going
forward.
The County Agricultural Center is currently housed within the Environment and Agricultural
Center ( "EAC "), located at 306 Revere Road. The Department of Environment, Agriculture,
Parks and Recreation ( "DEAPR ") administrative (and Natural and Cultural Resources) division is
joined by Soil and Water, Cooperative Extension, Farm Services Agency, and County records
storage. The current site at 306 Revere Road requires significant structural, systems and site
repairs that could be invested in a more suitable facility for the group. These departmental
functions have "grown" into the space as opposed to having its space needs evaluated
independently of the available space). Other more robust county facilities with existing available
space may be candidates for the group as well as a potential Agricultural center located at
Blackwood Farm. The current Manager recommended CIP contemplates a thorough space
study occurring in early FY2013 -14 that can address all of the variables associated with the
Agricultural Group's current and future needs, the condition and prognosis of the Revere Road
site, and the analysis of the Blackwood Farm site housing a consolidated Agriculture, Parks and
Environment Center (a facility that could, for the first time, allow co- location of all parks,
agriculture, conservation and environmental offices).
The lower level of the Link Government Services Center includes approximately 5,000 square
feet of under - utilized space and a candidate for study in FY2013 -14, as is the 510
Meadowlands (Emergency Services headquarters) warehouse storage area.
The Board of Elections was originally slated to move into the Hillsborough Commons Complex
had the Board elected to exercise the purchase option on that building in 2012. Given that this
option was not exercised, the Board of Elections remains in its current location at the
Government Services Annex building, occupying approximately 5,000 square feet. The space
may not be optimal for the activities of the Board of Elections (a considerable amount of the
space is equipment and records storage) and may be a candidate for study in FY2013 -14.
Potential Space Re- purpose Opportunities. In addition to the re- purposing activities
involving the potential Whitted permanent meeting facility and the Cedar Grove Community
Center, the consolidation of Asset Management Services administration, facilities maintenance,
and facilities services division at the West Campus Office Building allows the re- purposing of the
former Public Works Administration Building located at the Highway 86 north site. This
2,400 square foot facility is a candidate to house the Orange Public Transportation ( "OPT ")
administrative and dispatch offices currently located in a leased modular building adjacent to
this facility, assuming that the discussed merger involving OPT and Chapel Hill Transit is a long
range proposition, rather than short term.
FINANCIAL IMPACT: None at this time. Depending upon the BOCC's feedback, impacts will
be presented with regular agenda items when and if they are scheduled.
RECOMMENDATION(S): The Manager recommends the Board receive and comment on an
update regarding:
1) The fulfillment of space study goals and the methodology for space need analysis;
2) Identified unmet space needs and the current space study initiatives that address these
needs; and
3) The consolidated property inventory for all County owned property.
Attachment 1
Department
Current Location
Former Location
Last Moved
Space Study Emphasis
Seymour Senior Center,
Galleria (Leased Space),
Seymour Senior Center programming
Chapel Hill; Central
Northside Building 1,
and potential expansion contemplated
Aging
Orange Senior Center,
Chapel Hill; Meadowlands,
2007 & 2009
as part of Southern Campus Master
Hillsborough
Hillsborough (Leased
Plan process.
Space)
Animal Services: Administration,
Eubanks Road, Chapel
Carolina North (Leased
Animal Control, Animal Shelter
Hill
Space); 306 Revere Road;
2009
501 W. Franklin, Ste. 105
Arts Commission
Visitor's Bureau, 501 W.
Court Street Annex
2010
Frankin St, Chapel Hill
AMS: (previously Purchasing and Central
West Campus Office
129 E. King Street; 600 Hwy 86 North
2009
Potential re- purposing of vacated 600
Services and Public Works)
Building
Maintenance Campus
Hwy 86 North Administration Building
AMS: Facilities Maintenance &
West Campus Office
600 Hwy 86 Maintenance
2013
Services Divisions
Building
Campus
AMS: Fleet Division, Warehouse,
600 Hwy 86
GovDeals Yard
Maintenance Campus
Board of Elections
Govt. Services Annex
Court Street Annex
2009
Potential space study candidate for
FY13 -14
Child Support Enforcement
West Campus Office
110 N. Churton Street
2012
Building
(Leased Space)
Child Support Enforcement
Southern Human
Expansion of facility contemplated in
(Southern Campus)
Services Center
FY2016 -17; Southern Campus Master
Plan
Coo erative Extension
306 Revere Road
ISpace Needs Programming FY13 -14
Page 1
Attachment 1
Department
Current Location
Former Location
Last Moved
Space Study Emphasis
Permanent meeting room being
addressed at Whitted Facility, space
County Commissioners
Link Center
2009
planning to continue through summer,
2013; schematic plan to be presented
to BOCC in fall of 2013
County Manager
Link Center
2009
Courts: Clerk of Courts, Judge's
Justice Facility
New Courthouse; 112 N.
2009/2010
chambers, courtrooms
(expanded)
Churton
Courts: Judge's Chambers,
Courthouse
Historic Courthouse
Courts: District Attorney
144 E. Margaret Lane
New Courthouse
2009
Courts: Public Defender
129 King Street
Carr Mill Mall, Carrboro
2011
Courts: Guardian ad Litem
501 W. Franklin St., Ste.
Moody Building, Carrboro
2011
104, Chapel Hill
Courts: Probation & Parole
Court Street Annex
Moody Building, Carrboro
2011
Courts: Juvenile Justice
Court Street Annex
Moody Building, Carrboro
2011
Historic Jail (Jailer's living quarters)
Courts: Magistrate's Office
Jail
currently scheduled for renovation for
Magistrate's office, summer 2013
DEAPR: Administration (previously
306 Revere Road,
Environment & Resource Conservation
1306
Hillsborough
Space Needs Programming FY13 -14
Department)
DEAPR: Soil & Water
Revere Road,
Hillsborough
DEAPR: Farm Service Agency (FSA)
306 Revere Road,
Hillsborough
lWhitted
DEAPR: Parks & Recreation
Central Recreation,
Space Needs Programming FY13 -14
Campus
DEAPR: Parks Operations
Blackwood Farm
Cornerstone Drive (leased
Space Needs Programming FY13 -14
space)
Economic Development
West Campus Office
Court Street Annex
2009
Building
Page 2
Attachment 1
Department
Current Location
Former Location
Last Moved
Space Study Emphasis
Emergency Services - 911 Center,
510 Meadowlands Drive
County Substation Space Needs
Administration
Hillsborough
1914 New Hope Road
2008
Programming FY13 -14
Financial Services Department
Link Center
Govt. Services Annex
2009
(Budget, Finance, Purchasing, Risk Management)
Health Department: Administration,
Dental expanded in
Whitted renovated space as interim
Personal Health and Dental (Whitted
Whitted Building
Hillsborough with
2011
solution; long term solution to be
Center)
relocation from Carr Mill
studied
Mall in Carrboro
Health: Environmental Health
West Campus Office
306 Revere Road,
2009
Building
Hillsborough
Health: Personal Health (Southern
Southern Human
Expansion of facility contemplated in
Campus)
Services Center
FY2016 -17; Southern Campus Master
Plan
Housing, Human Rights & Community
Human Rights relocated
Development (Whitted Center)
Whitted Building
from 501 W. Franklin
2011
Street
Housing, Human Rights & Community
Southern Human
Expansion of facility contemplated in
Development (Southern Campus)
Services Center
FY2016 -17; Southern Campus Master
Plan
Human Resources
Link Center
Govt. Services Annex
2009
Information Technology
West Campus Office
Govt. Services Annex
2009
Building
Library - Main Branch
Main Branch, West
Whitted Building
2010
Campus
Library Strategic Plan presented to
Library - Southern Branch
TBD
BOCC on 05/14/2013; site selection
criteria due diligence, 2013
Planning and Inspections
West Campus Office
306 Revere Road
2009
Building
Planning: Transportation
600 Hwy 86
Whiffed Building
Maintenance Campus
Page 3
Attachment 1
Department
Current Location
Former Location
Last Moved
Space Study Emphasis
Reciister of Deeds
Gateway Center
Link Center, Lower Level
2008
Sheriff: Administration, Operations
Justice Facility
144 East Margaret,
2009
Hillsborough
Sheriff: Jail
125 Court Street,
New Jail programming and planning
Hillsborough
expected to begin in FY2013 -14
Social Services (Hillsborough)
Hillsborough Commons
Whitted Building
2010
Leased space
Southern Human
Expansion of facility contemplated in
Social Services (Southern Campus)
Services Center
FY2016 -17; Southern Campus Master
Plan
Social Services (Skills
503 West Franklin
Development Center
Street, Chapel Hill
Eubanks Road, Chapel
Martin Luther King Drive,
Solid Waste Operations Center
Hill
Chapel Hill (Leased
2008
Space)
Renovated and expanded in 2009;
Sportsplex
101 Meadowland Drive,
contemplated expansion and related
Hillsborough
space study presented in current
Manager's recommended CIP
Visitors Bureau
501 West Franklin
Street, Chapel Hill
Tax Administration (previously Assessor
Gateway Center
Link Center, Upper Level
2008
and Revenue
Page 4