Loading...
HomeMy WebLinkAboutRES-1999-042 Resolution to approve Lawrence Park Class A Special Use Permit for a Planned Development - See S RES-1999-040. 9c g `? 9- d '�i�Z 15 RESOLUTION OF THE ORANGE COUNTY BOARD OF COUNTY COMMISSIONERS TO APPROVE A CLASS A SPECIAL USE PERMIT FOR LAWRENCE PARK PLANNED DEVELOPMENT Date June 1, 1999 Owner/Applicant Meadowmont Farms, LLC The Change County Board of County Commissioners hereby approves an application submitted by Meadowmont Farms, LLC, for Lawrence Park Planned Development Class A Special Use Permit and the preliminary plat dated September 28, 1998, and last revised November13, 1998, subject to the following conditions: 1. Existing and proposed vegetation shall be installed and/or maintained as indicated on the Landscape Plan. 2. The submitted draft homeowners association documents and restrictive covenants to address use and maintenance of the recreation and open space areas shall be reviewed and approved by the County Attorney. 3. Security shall be submitted by the applicant and approved by the County Attorney guaranteeing the construction of all improvements. Security may be posted on a Phase by Phase basis. However, all improvements in each phase must be complete before construction may begin on a new phase. The amount of the security shall be 110 percent of the estimate. 4. Water and Sewer improvements shall be constructed to Town of Hillsborough standards. g:\plandev\pd398\app_sup.res\5-26-99\kI 16 5. All road improvements shall be constructed to NCDOT standards. Improvements proposed for Lawrence Road shall be constructed in Phase One. Improvements proposed for US 70A shall be constructed in Phase Two. The extension of Lori Drive shall be constructed from Dunston Way to Lannie Drive in Phase Three. 6. Stringent erosion control measures shall tie installed where soil is disturbed and maintained until project completion. 7. A stormwater management plan must be developed and approved by the Division of Water Quality before construction activities begin. 8. A minimum 25 foot riparian buffer zone should be maintained along any small streams or wetlands identified on the site. 9. Unavoidable impacts to any wetlands or streams on the sight must be coordinated with the US Army Corps of Engineers and NC Division of Water Quality. Mitigation might be required for impacts to these areas. 10. The developer shall notify Planning staff when construction is to commence. 11. The Special Use Permit will automatically expire within 12 months from the date of approval if the use has not commenced or construction has not commenced or proceeded unless a timely application for extension of this time limit is approved by the Board of County Commissioners as provided in 8.4.11 of the Orange County Zoning Ordinance. 12. If any condition of this Special Use Permit shall be held invalid or void, then this Special Use Permit shall be void in its entirety and of no effect. g:\plandev\pd398\app_su p.res\5-26-99Vd