Loading...
HomeMy WebLinkAboutAgenda - 05-07-2013 - 5h 1 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: May 7, 2013 Action Agenda Item No. 5-h SUBJECT: Amendment Outline and Schedule for Upcoming Item — Eno Economic Development District Access Management Plan DEPARTMENT: Planning and Inspections PUBLIC HEARING: (Y/N) No ATTACHMENT(S): INFORMATION CONTACT: 1. Comprehensive Plan and Zoning Abigaile Pittman, Transportation/Land Use Atlas Amendment Outline Planner, 245-2567 (Other-2013-01) Tom Altieri, Comprehensive Planning 2. Eno EDD Vicinity Map Supervisor, 245-2579 3. Eno Future Land Use Map Craig Benedict, 245-2592 PURPOSE: To authorize staff to proceed with steps for the development and adoption of the Eno Economic Development District (EDD) Access Management Plan according to the schedule proposed in the Amendment outline (Attachment 1). BACKGROUND: The Eno Economic Development District (EDD) Area Small Area Plan (adopted June 24, 2008; amended February 3, 2009) recommended the approval of an access management program for US 70 and Old Highway 10 to provide better transportation systems and capacities as development proceeds in the area. Since adoption, several Plan recommendations have been implemented including: • Land Use Plan Map amendments designating the development potential categories of the Eno EDD; and • Unified Development Ordinance (UDO) amendments for the creation and regulation of uses and development standards for the Eno EDD. Additionally, there has been progress with the Plan's Water and Sewer recommendations: • An inter-local utility service agreement with the City of Durham was adopted in January 2012; • A consultant (CDM Smith) was hired to complete a preliminary engineering study for a public water and sewer master plan; • Other transportation topics; • Potential long-term commuter rail station planning; • New east-west bus route and planning for park and ride lots; • I-85/US 70 interchange design; • Private rail crossing closures; and • High speed rail potential issues. 2 These initiatives are in preparation for economic development in the Eno EDD area which comprises approximately 562 acres of land. Land development in the EDD is intended to occur under Orange County development regulations in coordination with Durham. As properties are developed for non-residential land uses, transportation interconnectivity and access will become increasingly important. In preparation, staff is recommending the BOCC initiate a process to formally adopt an access management plan for the area. Formally adopted transportation plans are necessary to procure federal and state funding for projects and to require developer action and contribution in providing transportation infrastructure consistent with a master plan. Adopted access management plans can also be incorporated into regional transportation plans, which will enhance Orange County's collaboration with the western and eastern Metropolitan Planning Organizations. A UDO amendment was adopted in August 2011 to further require integration of development proposals (whether through conditional zoning or site plans) to adopted access management plans. Attachment 1, for the Board's review and approval, is an Amendment outline providing the rationale, process, and implications of the development and adoption of the Eno EDD Access Management Plan. FINANCIAL IMPACT: Other than staff time, there is no financial impact associated with receiving, considering and authorizing the staff to proceed with for the development and adoption of the Eno EDD Access Management Plan. This work will be completed by existing Planning staff in the Department's Comprehensive Planning Division. Following development and adoption, Plan implementation will be performed by staff and coordinated with the City of Durham and the North Carolina Department of Transportation as warranted. RECOMMENDATION(S): The Manager recommends the Board: 1. Approve the attached Amendment form (Attachment 1) for the Eno EDD Access Management Plan; and 2. Direct Planning staff to proceed accordingly. Attachment 1 3 COMPREHENSIVE PLAN / FUTURE LAND USE MAP AND UNIFIED DEVELOPMENT ORDINANCE (UDO) AMENDMENT OUTLINE Other-2013-01 Eno Economic Development District Access Management Plan A. AMENDMENT TYPE Map Amendments Land Use Element Map: From: To: Zoning Map: From: To: Other: Text Amendments Comprehensive Plan Text: Section(s). UDO Text: UDO General Text Changes UDO Development Standards UDO Development Approval Processes Section(s). Other: Eno Economic Development District (EDD) Access Management Plan X p ( ) g B. RATIONALE 1. Purpose/Mission The Eno Economic Development District (EDD) Area Small Area Plan (June 24, 2008;Amended February 3, 2009) recommended the approval of an access management program for US 70 and Old Highway 10 (as described in the Plan) to provide better transportation systems and capacities as development proceeds in the area. Additionally, the I-85/US 70 interchange is under design by the North Carolina Department of Transportation (NCDOT). 1 4 2. Analysis ............................ .................................................................................................................................................................................................................................................................................................................................................................................................................................................................... The required analysis will be part of the subsequent evaluation, development and approval of project implementation actions. ....... .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ..................................................................................................................................................................................................................................................... 3. Comprehensive Plan Linkage (i.e. Principles, Goals and Objectives) ............................. .............................................................................................................................. ....................................................................... ............................................................................................................................................................................................................................................ Transportation Goal 3: Integrated land use planning and transportation planning that serves existing development supports future development, and is consistent with the County's land use plans which include provisions for preserving the natural environment and community character. Transportation Policy Statement: The intent was that the access management policy framework of the Orange Grove Road Project (2003) be applied in other areas of the County. 4. New Statutes and Rules .................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... N/A ....... .. ......................................................................................................................................................................................................................................................................................................................................................................................................................................................................... C. PROCESS 1. TIMEFRAME/MILESTONES/DEADLINES a. BOCC Authorization to Proceed ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................. May 7, 2013 b. BOCC Public Hearing ... ... ... ... ... ........ ... ........ .. ......................................................................................................................................................................................................................................................................................................................................................... September 9, 2013 (quarterly public hearing) October 15, 2013 (adoption consideration) c. BOCC Updates/Checkpoints ... ... ... ... .. ... .. .. .... .. .. .. .. .. ..... .. .................................................................................................................................................................................................................................................................................................................... d. Other 2. PUBLIC INVOLVEMENT PROGRAM Mission/Scope: Public involvement from all stakeholders helps to ensure that decisions are made in consideration of the view and concerns on issues pertaining to transportation access needs in the Eno EDD. a. Planning Board Review: ........................................... .................................................................................................................................................................................................................................................................................................................................................................................................................................. August 7, 2013 b. Advisory Boards: OUTBoard — September 18 2013 2 5 c. Local Government Review: d. Notice Requirements This item will be included in the Quarterly Public Hearing legal ad which will be published on August 28 and September 4, 2013 e. Outreach: ......................................................................................................................................................................................................................................................................................................................................................: ® General Public: Public Information Meeting August 2013 ❑ Small Area Plan Workgroup: ❑ Other: 3. FISCAL IMPACT Existing Planning staff will accomplish the work required to develop the Eno EDD Access Management Plan. The required legal ad will be paid with Departmental funds already budgeted for this purpose. D. AMENDMENT IMPLICATIONS ...................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... The Eno Economic Development District (EDD) Access Management Plan will implement a recommendation from the Eno EDD Small Area Plan, adopted by the BOCC in 2008. An adopted access management program will provide for improved transportation systems and capacities as development proceeds in the area. Formally adopted transportation access management plans are necessary to procure federal and state funding for projects, and to require developer compliance with the plan. Adopted access management plans can also be incorporated into regional transportation plans, which will enhance the County's collaboration with the Durham-Chapel Hill-Carrboro Metropolitan Planning Organization (DCHC MPO). ....... ... ...... .. .. ......... .. ..... .. .. ..... ... .. .. .. ..... .. .... .. .. ... ... ... ... .. ................................................................................................................................................................................................................................ E. SPECIFIC AMENDMENT LANGUAGE Eno Economic Development District (EDD) Access Management Plan map(s) and text will be available as part of the May Quarterly Public Hearing materials. ................................................................................................................... ........................................................................ .................................................. ............................................................................... ....................................................................................................................................................................... Primary Staff Contact: Abigaile Pittman, AICP Planning Department (919) 245-2567 abpittman @orangecountync.gov 3 Eno EDD Vicinity Map Attachment2 6 I I I 1 j 1 1 II 1 49 I 157 1 I I II I I 1 II m I I I I I I 1 I j I I I 1 hi �'I`�° I I I 1 1 1 I 1 70A 1 `.`y I ' 1 61 1 ur . 1' 1 86 5i I I I I ' I I 1 1 1 I I 1 I I • m' 1 I I I 1111 rap' In i I I I 54 I I .- I 1 I 1 54 ' I ' I I I iig i I r 501 1 Eno EDD - - - - - - — �I _ -- - - - _ - -I _ City Limits r v /‘,""rsz t 1 in=3 miles k ETJ I —.Miles r Township Boundary Orange County Planning and Inspections Department J \_ GIS Map Prepared by Brian Carson.4/8/2013 , Future Land Use Map 7 Attachment 3 of the Orange County Comprehensive Plan i � � Yiltr*Ab I�L � � iiiici) _,..w... ■ � ,/ � � „Air il iii it Si i o Irr4 P Illr* I r v Wq 107 A #"3- / - i- , ■„ ‘ 0 ditt.e 1, r-- . ,3 , . 4 „,.._ 1 EY u- , P A y dm i 0 --___-_ _;:-_ -.1.4.1 ____ ,= ■galike 1 44*;- -cte , ,9' 1� \I--401, —44%;,,- „,..44006 0,...., -1— , 0' � lei• 7iiil 1 M Ii_ co_______,.._ _ __9L-D NC 0 1 ,'_! III • w �� •s,-- .�ti ---- _. ' -=���-...��'A: 1 ,'- BB UGH RD � HILLS Fr � ' wit I��It...7p �t�1,1111�ow ►�i� 1,1,444 ,_ MN i' / , umsr-, -1 Maw 40 wil la 1 (I mow v 4041k- ,h d.��1__A� 7-)kt_iiir! / 0�� ILO_ ♦ 4/1 i ., i N _ Adoption Date:Nov 18,2008 10 Year Transition Rural Buffer City Limits W E Amended through September2012 Water Supply Watersheds — 3 mnge ounOC/CH/CA Joint Planning Area Rural Residential Agricultural Residential Activity Nodes 0 1,000 his copy printedApnl08,2013. �Feet Map is for reference use only. Economic Development Transition 1 in=2,000 feet Contact Planning staff for verification of tlata.