Loading...
HomeMy WebLinkAbout1999 NS Contract for Archeological Survey of St. Mary's Road Corridor N . CAROLINA CSA TEL :919-715-2671 Apr 26 '99 15 :58 2 PR(kWXT DESCUM TON AND CONTRACT for ARCIMEOLOGICAL UWESTIGATION OF THE SAINT MARY'S ROAD CORRIDOR FUm&d bar a National Park Servivo NnW and Plaudog Grw CWAU c Co dy FaWrowunt attd Resontve Coumervatioat Departuncat 'l'his Project Description and Contract xv havia sgreod to by Ormtge County on behalf of its Environment and Resource Cote DVgWWK het+ei B&r known as the Grantee;Dr. Linda F. Stine, hareittafier knom as the Pd odo Itwot actor(PI);atci, the Division of Arebbives and History, hcteinaftor known as dw Mvhim Dan of dw tJnage County Environment and Resource C'onservimm Department, stusfl saw ss Ow LacA Coatditistor for the project. Dolores A. l:Iall, Office of State Archwofogy, " sows as bite Ebbion's Project Specialist for the project. The project wiff be conducted womft to Stb and Federal taws, standards and procedures, and will be subject to the review, m pavuion, Mvim and fatal acceptance by the Division. This project description ad cofct stud attachmals specify the services and goods pnavided by the PI, standards to be followed, sad sav9,m trod gnarls pwvided by the(Grantee and dw!Division. SEC770N 1. PROJECT OBJECTIVES: The objective of this project is to kwodkpft the woEt#Od4gic 1 properties within the Saint Mary's Road Corridor as a part of the overan ot►1'oWw to deAkV a Prue vation Pram for the corridor. The archaaotogical component covered by this contract will be tcceaanplishod by t#trce tasks: 1. A thorough background study of rho kwm arc 'ations of awdin structures, historic doc nwaWy resomraw wid mo&M calagrspW Mum pertmning to the project cm►irons. 2. Creation of an arc;;hacolo&A contest for rim Ssiat,hWs Road Corridor dtrough itogration of the remits of an archaeoiogtcat site tits background inforculion resulting Arm Task 1. :3. Devek)pment of a research design Mid soopa ofworh fb.r flitrc=hateological studies in rite Saint Mary's.Road Corridor. Thu wil servo an a cent of the Orange C unty Prosavation Flan and direct titre ia+citaNN oaical iavasilak ions in ttto area. t 4 ORANGE COUNTY BOARD OF COMMISSIONERS Action Agenda Item No. ��.. ACTION AGENDA ITEM ABSTRACT Meeting Date: May 4, 1999 SUBJECT: Contract for Archeological Survey of the St. Mary's Road Corridor DEPARTMENT: Environment and Resource PUBLIC HEARING: (Y/N) Conservation ATTACHMENT(S): INFORMATION CONTACT: Proposed Contract and Project Proposal Donald R. Belk,Land Use& Preservation Planner TELEPHONE NUMBERS: --ext. 2594 Hillsborough 732-8181 Chapel Hill 968-4501 Durham 688-7331 Mebane 227-2031 PURPOSE: To approve a contract with L. F. Stine to conduct the archeological survey of the St. Mary's Road Corridor. BACKGROUND: In May, 1998, the BOCC accepted a $4,000 grant from the NC Division of Archives and History to begin a preservation planning study of the St. Mary's Road Corridor. The grant fiends will be matched by $6,000 in County funds and $2,000 in-kind services. The first phase of the planning study will consist of a historic architectural survey and an archeological survey of the Corridor. In February, 1999, the BOCC approved a Request for Proposals for the archeological survey, which was distributed to a list of qualified consultants certified by the State Historic Preservation Office. Two proposals were received. After review and discussion of the proposals at their March 24 meeting, the Historic Preservation Commission selected Linda F. Stine, Ph.D., an archeologist from Julian, NC. The attached contract will employ Dr. Stine to conduct a survey of the archeological resources along the corridor. This survey, coupled with a historical architecture survey to be performed by GAI Consultants, Inc., will be part of an eventual Preservation Plan for the St. Mary's Road Corridor. FINANCIAL IMPACT: None. Funding for the contract ($6,476) is provided by the aforementioned grant and a cash match in the FY1998-99 Environment and Resource Conservation Department budget. RECOMMENDATION: Administration Recommendation, The Manager recommends approval of the contract and recommends that the Board authorize the Manager to sign the contract on behalf of Orange County. r 3 SECTION 2. SERVICES AND GOODS PROVIDED BY THE PI: The PI will conduct the investigations in accordance with the objectives and work stages defined in Section 1 (see also Appendix A. Project Abstract). All work will be consistent with the Secretary of the Department of the Interior's standards and guidelines for archaeological projects. In addition, the PI shall insure that any personnel employed for field or laboratory supervisors must meet the professional qualifications criteria set forth by the National Park Service, Department of the Interior, in 36 CFR Part 66 (Federal Register 42(19), 1977). The PI shall prepare and submit reports to the Division in accordance with the following: (1) Interim Report. On or before July 1, 1999, the PI shall prepare and submit to the Local Coordinator and Division a brief-Interim -report on the grant activities to date. The report shall note any significant results or findings of the project, specific problems encountered during the work, recommendations or requests for any amendments to the terms of this agreement, and the projected schedule for project completion if different from that defined by this agreement. (2) Draft Final Report. On or before August 15, 1999, the PI shall prepare and submit to the Local Coordinator and Division a complete double-spaced draft report summarizing the analyses and results. The report shall include but not be limited to the following: (a) Abstract: containing summary information on the objectives and results of the project. (b) Introduction: including sponsorship of the project, the funding sources (with specific reference to the U.S. Department of the Interior, the North Carolina Division of Archives and History, and the Orange County Environment and Resource Conservation Department), project personnel, and project objectives. (c) Background: including a discussion of the background research conducted on the archaeological and historical context of the project, as appropriate. This section should also contain references to any professional or local consultations contributing to the background research. (d) Archaeological context development: including discussions of factors considered in determining potential site locations and descriptions of pertinent prehistoric and historic landscapes as well as associated themes, sites and landscape features. (e) Field methods: including discussions of the reconnaissance survey methods, procedures and results. (f) Project results: including a research design for future archaeological investigation as well as a regional context which can be used in determining the potential National Register eligibility of as yet unrecorded archaeological resources. (g) Conclusions evaluations, and recommendations: including a scope of work for future archaeological survey and testing within the Saint 1\viary's Road Corridor. 2 4 (h) Maps, charts and data tables: as necessary and appropriate. Detailed surveyed area maps should be included in the report(e.g., U.S.G.S Topographic Map sections). However, since the report may be distributed to the general public, detailed site locational maps should not be included in the Final Project Report. The digital map of suspected and confirmed archaeological site and landscape feature locations along the corridor should be submitted as a separate product [Note: All archaeological site references in the final report and data tables must employ official State Archaeological Site number designations. Under this grant, the PI may obtain State, Archaeological Site numbers for newly recorded sites prior to submission of site forms by sending a detailed location map(e.g., U.S.G.S. Topographic Map)for each site to the Office of State Archaeology. See also sections 2(4)and 4 below.] (3) Final Report. Following submission of the draft final report by the P4 the Division shall have 20 days to review the report and communicate all necessary or recommended changes to the PI prior to preparation of the final project report. On or before September 22, 1999, the PI shall submit five copies of the final report to the Division, at least one of which must be unbound. Three of the copies will be forwarded to the National Park Service by the Division. [Note: The Final Project Report must be single-spaced and fully paginated.] The Division retains all editorial, reproduction, publication, and distribution rights to the project report. However, the Division shall not restrict the use of the project information by the Grantee as long as any subsequent use of the report, documentation or results of the project include appropriate recognition of the funding sources for the project. [See also Appendix C. -Appendix for Sutigrant Agreements] (4) Archaeological Site Forms: Upon completion of the project, the PI shall submit to the Division copies of completed North Carolina Archaeological Site forms for each site recorded during the project. In addition, the PI shall submit updates for previously recorded sites investigated during the project Site forms should be submitted separate from and not included in the final report. SECTION 3. SERVICES TO BE PROVIDED BY THE GRANTEE: The Grantee shall provide local administration and accounting of the grant and shall make available to the PI copies of its relevant digital data files for use by the University of North Carolina at Greensboro geography students for preparation of the digital map. SECTION 4. SERVICES TO BE PROVIDED BY THE DIVISION. The Division shall make available to the PI any and all information currently available in its files which may be pertinent to the effective completion of the project. The Division shall also provide blank archaeological site forms for all sites identified during the project. 3 5 SECTION 5: PROPERTY ACCESS: It shall be the responsibility of the PI to acquire all necessary approvals for entering upon and conducting the archaeological investigations on private lands. In the case of publically-owned lands, appropriate permits must be acquired prior to the investigations. SECTION 6. CURATORIAL RESPONSIBILITIES: All artifacts, documents or other materials generated by this project remain the property of the State of North Carolina, except in the case of materials recovered from private lands and not otherwise donated by the rightful owner, and shall be curated by the Office of State Archaeology in accordance with accepted curatorial standards and guidelines. SECTION 7. TEME SCHEDULE: The project shall begin on or after the date of this contract and terminate no later than September 30, 1999. SECTION 8. PROJECT BUDGET AND ACCOUNTING PROCEDURES: The Project Budget and Time-Product-Payment Schedule (Appendix B)is to be followed throughout the course of the project. Each time reimbursements are requested from the Division by the Grantee project expenditures should be documented with canceled(or certified)checks and invoices, and attached to a cover letter addressed to: Ms. Linda Edmiston, Grants-in-Aid Administrator, 109 East Jones Street, Raleigh, NC 27601-2807. Further details on reimbursement, administration of grant funds, audit requirements, and financial documentation are found in the Grantee Handbook for Federal Preservation Fund Grant Projects, which is incorporated by reference. SECTION 9. PERSONAL INCOME AND SELF-EMPLOYMENT TAX RESPONSIBILITIES OF THE PI: It is understood that this is a contract for the professional services of the PI, not an employee of the Division, and that payment for services constitutes a fee which excludes all employment taxes and related benefits. The Grantee will be responsible for filing appropriate IRS income statements(FORM 1099)for the PI. 4 6 SECTION 10. TERMINATION OF CONTRACT: Termination by Grantee of Prs Contract for Cause. If the PI fails to fulfill in a timely and proper manner hisiher obligations under this contract, or if the PI violates any of the stipulations of this contract, the Grantee, with the concurrence of the Division, shall have the right to terminate the contract for cause by giving written notice to the Contractor specifying the reasons for and effective date of termination. In such event, the PI shall cease work immediately upon receipt of such notice. The PI shall be entitled to receive just and equitable compensation for any satisfactory work completed prior to termination. Enforcement Remedies by Division for PI Nonperformance. If the PI fails to fulfill in a timely and proper manner, his or her obligation under this contract, or violates any of the provisions of this contract the Division may enforce the remedies for grantee or subgrantee compliance pursuant to section 43 of the Code of Federal Regulations(43 CFR 12.43, 12.44), incorporated by refcrcrico in this contract. SECTION 11. CHANGES IN PROJECT DESCRIPTION/CONTRACT: The Grantee should contact grants administrator Linda Edmisten by telephone if any changes are anticipated. If the change is minor, the grants administrator will advise the Grantee to proceed and to describe the change in the final financial report. If the change is major, the Grantee will be required to use the procedure outlined in the Grantee Handbook for Federal Historic Preservation Fund Grant Projects. Only minor changes may be made in the scope or budget without the approval of the Division. Minor changes are those changes that involve 5%or less of the project cost and that: do not alter the basic scope of the project; do not substitute unapproved materials or methods; do not add or delete work item. All other changes will be deemed to be major changes. Costs of major changes made without prior Division approval may be disallowed and the entire grant allocation of the project may be canceled. Major changes are to be approved in writing by the Division before changes are made. SECTION 12. NONDISCRE%UNATION ASSURANCES: In consideration of the signing of this Project Description and Contract for the performance of work and finishing of labor and materials as set forth herein, the parties hereto for themselves, their agents, officials, and employees or servants agree not to discriminate in any manner on the basis of age, handicap, sex, race, color, creed, sexual orientation,,or national origin with reference to the subject matter of this Contract. 5 7 SECTION 13. OTHER STIPULATIONS: The attached "Appendix for Subgrant Agreements" is hereby incorporated by reference and contains stipulations regarding procurement; retention of records; changes in scope;prohibition of lobbying; non-federal audit; publications; suspension or termination of subgrant; standards for final products; equal opportunity; and other requirements. We the undersigned, having read, understood, and agreed to the terms of this project description and contract, so affix our signatures this day of . 1999. Grantee: Division of Archives and History: John M. Link, Jr. David Brook, Deputy State Historic Orange County Manager Preservation Officer Linda F. Stine, Ph.D. Principal Investigator 6 8 APPENDIX A ARCHAEOLOGICAL INVESTIGATION OF SAINT MARY'S ROAD PROPOSAL 7 04/09/2999 09:14 9296443002 (R. CTy. PLANNING • 9 Proposal for Developing an Archaeological Context for the St. Mary's Road*Corridor, Orange County, North Carolina Linda France Stine, Ph.D. March 22, 1999 Orange County Is using a landscape perspective to create a preservation plan for the St. Mary's Road Corridor (SR 1002) (Belk 1999). A landscape approach is an integrative study of how people shape, and are "shaped by the land In dynamic cultural and natural contexts. A landscape approach in preservation guides intordleciplinary research and evaluation of historical propertl&s...[and] fosters a regional perspective for evaluating and managing a project's historic properties" (Stine and Stine 1997.189). Interdisciplinary researchers using this perspective will identify natural and farmland resource areas, scenic viewsheds, and above and below ground cultural resources (Belk 1999). The approximately 6.4.mile stretch of St. Mary's Road, beginning at its Intersection with Hwy 70 and continuing eastwards to the Durham County line, forms the baseline for the project area. Orange County's Preservation Plan for the St. Mary's Road Corridor will be predicated, in part, on the results of archaeological and historic structure resources surveys. This proposal addresses three major tasks associated with investigating the archaeological properties within the St Mary's Road Corridor (SR1402). The primary task is to conduct a thorough background study of the known archaeological sites, standing structures, historic documentary resources, and modern cartographic sourcos pertaining to the project environs. This background research, Task One, forms the core of the study, providing information to develop a view of relevant past landscapes. Task One will also provide data on possible site locations, forming the basis for the second task, "ground-truthing" site locations. Possible sites Include traces of historic ivad-fled, artifact scatters, historic and/or prehistoric structural remnants, and/or other types of cultural remains. Task Two will entail archaeological site reconnaissance to verify the presence/absence of c ultliral remains in areas of high potential for prehistoric and historic sites. Part of this task will be to integrate the data from background and archaeological field reconnaissance to create an archaeological content for the St. Mary's Road Corridor. It will provide preservationists, planner's, and the public with a vision of past land-use patterns, settlement choices, and the cultural Interplay that occurred in this area. Task Three entail developing a research design and concomitant scope of work for future archaeological studies in the project area. This will ovontuaily serve as part of Orange County's Preservation Plan, enabling residents to place modern Issues (e.g., erosion, clean water, land-use) within a broader historic context. 1 04/09/1999 09:14 9196443002 OR. CTY. PLANNING 10 Proposed Archaeological Resources Survey St. Mary's Road is a curving two-lane blacktop that gently traverses Piedmont lands. These lands are primarily rural-agricultural, although this land-use pattern is changing with increasing residential development occurring in the area. The St. Mary's wrridor follows traces of an historic trade route that once connected prehistoric and historic inhabitants living In the bounds of present-day South Carolina, North Carolina, and Virginia. This great path was known by many names, such as the "Catawba Path," the "Trading Path," the"Virginia Path," and the "Occaneechi Trail," and later as the "Oxford Road" (e.g., Catawba Regional Planning Council 1975:46; Joy 1995:3; Stine 1990). A wealth of documentation exists for the study area in terms of historic maps, aerial photographs, primary and secondary documentary historic: sources, genealogical research results, and regional architectural and archaeological surveys. These data will be the initial focus of the archaeological investigations. Task One During the author's tenure at the South Carolina Institute of Archaeuiuyy and Anthropology she worked on a similar project for the Charleston County.Planning Office (Stine 1992). Using myriad sources she described the prehistoric and historic landscapes in the Charleston rhea, listed and discussed the known archaeological sites, and developed pertinent themes for future research within each pertinent cultural period. She found that reading general area histories and talking with kxal historians and preservationists gave a good indication of relevant regional themes. Primary documentary research (plats, maps, wills, deeds, memorials, etc.) uncovered changing patterns of land-use, tran3portation routes, and settlement patterning during the historic era. Maps of natural resources, used in tandem with known archaeological site locations, also provided data for describing probable changing prehistoric land- use in Charleston and environs. All sorts of informative historical maps and other resources were uncovered during the background search phase of the project from both state and regional repositories. The proposed project personnel (see below) already have a solid background in regional and local history and are familiar with the sources listed in the bibliography of the County's Request for Proposals (Belk 1999). Researchers will sift through primary and secondary sources found in pertinent repositories in Hillsborough, Chapel Hill, Durham, and Raleigh. An annotated bibliography will be prepared for all examined resources. Inventory files (archeological, architectural, cemetery, National Register) located at the Department of Culturai Resources in Raleigh will be the initial focus of research. In that manner the St. Mary's project will be building on previous work Instead of repeating earlier studies. A brief inspection of the archaeological site files at the Office of State Archaeology (OSA) in Raleigh revealed that no systematic surveys have been undertaken along this corridor. The aria previously iw;ufdod site In the vicinity is 31011228, consisting of 3 flakes noted on the surface of a plowed field. However a perusal of archaeological site locations on relevant United States Geologic Survey 2 04/0911999 9196443002 OR, CTy, PLANNING ► 11 (USGS) maps (l.o., Hillsborough, Northwest Durham, and Rougemont 7.5' quadrangle maps) revealed the presence of numerous prehistoric and historic sites in the general study region. Potentially eligible and/or eligible historic; pruperties located through architectural survey along St. Mary's Road also suggests that associated, contributing archaeological resources may be present in the study area (Belk 1999, study area map). As in the Charleston study, the St, Mary's project will have to facilitate communication between the architectural hislotiaris and the archaeologists. Valuable research time and resources should not be wasted through unnecessary duplication of effort, such as seeking the same plat or chain-of-title-information. If the two studies are on-going, personnel should have occasional meetings to share information, sources, and ideas about Important area research themes. If one study Is completed before the other, that report should be made available to the other researchers. It should be noted that the quality of the state archaeological site files Is uneven, dependent on the standards of the time and the efficacy of the student, collector, or professional filling out the form. The St. Mary's study will entail rhw.king regional site file Information, contacting site owners and local collectors listed on older forms, and generally verifying the continued presence/absence of certain resources through field reconnaissance. One of the primary sources of Information In the Charleston study were interested local collectors and members of the local archaeological soriAtles. Orange, Durham, and Alamance counties hold a number of enthusiastic collectors, some members of the Tar Heel Archaeolugival Society, who will be contacted as part of the St. Mary's Project, These individuals may hold Important knowledge about site locations In the project area, and/or about others who would be more familiar with archaeological site locations in the fields along St. Mary's Road. Another important avenue of research are local landowners. One method to reach local landowners and other Interested Orange County residents will be to advertise (e.g., Durham and Orange county newspapers) a Town Hall" type of meeting one late afternoon or evening in the Hillsborough area Project personnel will be able to identify artifacts for local residents, help them fill out North Carolina OSA short arrchaeoingical forms„ map site locations, and help generate good will towards preservation of cultural resources. This should also enable the field crew to arrange permission(a) to access private Iands for "ground truthing" portions of the corridor as well as to further document private archaeological collections. Task Two Resewuh results should reveal locations of additional archaeological resources, such as remnants of the historic road bed and related historic structures (e.g., farmsteads, stores, and/or taverns). Historic maps research, in tandem with study of the modem topographic maps, should Indicate the prcohatAft location of the old trading path. These results will be compared to the existing alignment of St, Mary's Road to see il' trauss of the historic road might exist, perhaps by-passed by more recent road construction.activities. Previous work at Ayr-Mount Plantation In Hillsborough, and on Treybum development lands in Durham and Granville counties, 3 04/0911999 09:14 9196443002 OR. CTY. PLANNING 12 revealed that historic road-bed remnants do exist, usually appearing as a dAnpiy- eroded, linear clay feature. This feature"signature" should be visible in historic aerial photographs(e.g., 1930s soil survey) investigated during they tackground research phase of the project. Information on site locations and potential site locations gathered from review of maps, the various state site titer, secondary and primary historic sources, informant Interviews, and other kinds of research will be correlated. Pertinent prehistoric and historic landscapes will be described as well as associated themes, sites, and landscape features. This will form an archaeological context for the St. Mary's Corridor. One additional product of this research will be placement of site locations an USGS quadrangle maps. These maps and related site attribute Information will be placed in a compatible digital format for use by Orange County. Mr. Roscoe Reeves has stated that the County would provide, at no expense, copies of its relevant digital data files to University of North Carolina at Greensboro Geography students. Student members of the projoct will help in the analysis of site distributions and map production. Task Three After correlating the results of intensive background research, information gathered from local landowners and collectors, and initial field reconnaissancA, a research design for future archaeological Investigations will be produced. This research design will be incorporated as part of the project re poi I. It will include recommendations for future avenues of historical research. A scope of work will be included as an appendix to the report. This scope of work will include a comprehensive plan for systematic archaeological survey and testing of specific portions of the project area, and recommendations for laboratory analysis and Subsequent curatlonal responsibilities. As one of the preservation goals is determination of potential eligibility of future resources for nomination to the National Register of Historic Places, the criteria for such determinations will also be explained in a regional context. Products Two main products will result from this study. The first is a professional quality report that Includes an archaeological context for the St. Mary's Corridor. Prehistoric and historic landscapes will be described with relevant themes, site deacriptiona, and landscape feature descriptions noted within each cultural period pertinent to the project area. An annotated bibliography will Lm part of this report, helping to focus future historical research efforts. Background research and site reconnaissance will be synthesized to create a research design for future archaeological research in the area A scope of work will be appended to the report that details field methr ds, laboratory methods, and curational responsibilities stemming from the overarching research design. .. The second product of this study will be a digital map of suspected and confirmed archaeological site and landscape feature locations along the St. Mary's 4