HomeMy WebLinkAbout1999 NS Housing Rehabilatation Contract Award RESULTS OF BID OPENING
OWNER:_Page APPLICATION NUMBER:
ADDRESS: 107 Eugene Street COST ESTIMATE: $34, 640
Carrboro, NC
PERCENTAGE OF BID OVER 13% UNDER COST ESTIMATE
CHECK ONE: JOB BID—x JOB NEGOTIATED
COMPANY BID AMOUNT
1. CFW Construction Co. $39, 480
2. Diamond Builders $47, 315
3.
4.
5.
6.
BID OPENED BY: Jim Axelrod
TIME OF BID OPENING: 1:00 PM
DATE OF BID OPENING: 'April 8, 1999
WITNESSED BY: Donna Galloway
Lowest Acceptable Bid: $39, 480
Negotiated Amount:
Contractor: CFW Construction Company
NAME
P.O. Box 27466, Raleigh, NC 27611-7466
ADDRESS
(919) 834-6087
TELEPHONE NUMBER
CObVENTS:
Submitted by: Tara L. Fikes Date-04-08-99
Bid Approval Date
Proceed Order Issued
3
ORANGE COUNTY
HOUSING REHABILITATION PROGRAM
SPECIFICATIONS
FOR
109 Eugene Street
FOR
GERALDINE PAIGE
PHONE:
DATE: 313199
BY:JIM AXELROD
REHAB SPECIALIST
NOTE TO CON-IRA�'TQ$
CONTRACTOR SHOULD REFER TO THE BASIC SPECIFICATIONS,PROPERTY
REHABILITATION STANDARDS,GENERAL CONDITIONS,NORTH CAROLINA
BUILDING CODES MANUAL,AND ORANGE COUNTY MINIMUM HOUSING CODE
DOCUMENTS.
IT IS NOT THE INTENT OF THE WRITER.TO DIRECT ANY CONTRACTOR TO A
SPECIFIC SUPPLIER OF MATERIALS CALLER)FOR IN TH[S WORK WRITE-UP ONLY
TO SPECIFY A TYPE THAT WOULD BE ACCEPTABLE TO�HOMEOWNER AND
ORANGE COUNTY HOUSING REHABILITATION PROGRAM.
4
Geraldine Paige
107 Eugene St.
Carrboro,NC
3/3/99
FXIMOR:
1. Pressure wash the gutter siding,soffiitt and all trim.
2. Install furring strips on the block walls. Install 3/8 inch
stryofoam insulation and vinyl siding.Install aluminum window
and door trim.
3. Install a concrete splashblock under each downspout.
INTERIOR:
LIVING ROOM:
1. Remove the existing door, storm door,window,paneling,
carpet, ceiling tile and closet door,base and crown mold.
2. Cover all surfaces Katz.
3. Install VA inch sheetrock on the walls.Flat tape the sheetrock
to the window trim.Tape and finish the sheetrock smooth.
4. Install' inch sheetrock on the ceiling.Tape and finish
the sheetrock smooth.
5. Install a six panel,metal insulated door unit with lockset and
deadbolt to be keyed-the same.Install peephole and colonial style
trim.Fur jamb as necessary.
6. Install an aluminum clad storm door. Door to have a
pneaum,atic closure and vinyl sweep.
7. Install colonial style baseboard and casing.
8. Paint the ceiling with ceiling white latex paint.the walls
with flat latex and the trim with semigloss latex.Paint to cover
1
5
completely.
9. Install a prehung door wait and closet lockset on the
linen closet.
10. Install carpet and pad.Carpet allowance to be$14/yd.
11. Install two vinyl replacement windows 30 inches wide.
12. Cut and frame an opening for a 32 inch door unit next
to the front windows.
KITCHEN:
1. Remove the paneling,ceiling tile, cabinets, base and
crown mold,rear door and storm door.
2. Coves all surfaces completely with Kilz.
3. Install a six panel metal insulated door unit. Install a
lockset and deadbolt to be keyed the same. Install a peephole
and colonial style casing.
4. Install an aluminum clad storm door. Door to have a
pneaumadc closurer and vinyl sweep.
5. Install 'Ainch sheetrock on the walls.Fiat tape the windows
and door.Tape and finish the sheetrock smooth. -
6. Install '/3 inch sheetrock on the ceiling.Tape and finish
the sheetrock smooth.
7, install woes front,factory finish cabinets to match the
existing lineal footage.
8. Paint the ceiling with ceiling white latex,the wails with
flat.latex paint and the mini with semigloss latex paint.Paint
to cover completely.
9. Install colonial style baseboard and casing.
11. Install 1/4 inch loan plywod on the floor.Prepare the
surface for vinyl. Install vinyl, shoemold and metal trim.Vinyl
allowance to be$14/yd.
2
6 _
12. Clean the windows and storm windows.
FRONT BEDROOM:
I. Remove the charred fiming strips and replace with
likesize lumber
2. Remove the paneling,carpet,baseboard and entrance
and closet door
3. Cover all surfaces with Kilz.
4. Install U inch styrofoam insulation on the exterior
walls.
5. Install one vinyl repalcement window and trim.
6. Install'A inch sheetrock on the walls and ceiling.
Tape and finish the sheetrock smooth.
7. Remove the existing front window and frame in
the opening.
8. Install colonial style baseboard and casing.
9. Install a six panel entrance and closet door.Install
a privacy lockset and a closet lockset.
10. Install 1x12 shelf,closet rod and bracket in the
closet
11. Paint the ceiling with ceiling white latex paint.
paint the walls with flat latex paint and the trim with semigloss
latex paint.Paint to cover completely.
12. Install carpet and-pad. Carpet allowance to be$14%yd:
REAR BEDROOM:
1. Remove the wall and ceiling covering to the furring strips.
3
}
7
1
2. Install V4 inch strofoam insulation on the exterior walls.
3. Cover all surfaces with Kilz.
4. Install V2 inch sheetrock on the walls and ceiling.Tape and
finish the sheetrock smooth.
5. Paint the ceiling with ceiling white latex paint, the walls
with flat latex paint and the trim with semigloss latex paint. Paint
to cover completely.
6. Install a six panel entrance and closet door. Install a
privacy lockset and a closet lockset
7. Install a 1x12 shelf and closet rod in the closet.
8. Install colonial style baseboard.
9. Install carpet and pad. Carpet allowance to be$14/yd
10. Clean the windows and storm windows.
BATH:
1. Remove the fixtures,door,wall covering and ceiling
covering.
2. Cover all exposed surfaces with Kilz.
3. Install MR sheetrock on the walls and%inch sheetrock
on the ceiling.Tape and finish the sheetrock smooth.
4. Install colonial style baseboard.
5. Install a six panel entrance door and privacy lockset.
8. Paint the walls and trim semigloss latex and the ceiling
with ceiling white latex.Paint to cover completely.
9. Install LA inch Iuan plywood on the floor.Prepare 6
plywood for vinyl. Install roll vinyl floor covering,shoemold
and metal trim.
10. Install a five piece accessory kit, to include,tumbler,
4
8
paper holder, soap dish and two towel racks.
11. Clean the window and storm window.
PLUMBING:
1. Install a one piece fiberglass tub unit and washerless faucets.
Install all necessary waste and supply connections.
2. Install a 19 inch wood front vanity and molded marble
'fop.Install a washerless faucet.Install all necessary waste and
supply connections,including p-trap assembly and cutoffs.
3. Install a handicapp commode.Install new cutoff.
4. Install a seven inch, double bowl stainless steel sink
in the kitchen.Install a washerless faucet,p-trap assembly and
cutoffs.
5. Install a frosdice exterior faucet.
6. Install a washing machine box.
ELECTRIC:
1. Install a 150 amp service,including new mast and weather
head.
2. Install GFI outlets in the kitchen and bath.
2. Install an electric smoke detector in the hall and the new
addition.
4. Install washer and dryer outlets.
5. Install new outlets,switches and covers.
7. Install a dryer vent under the floor, extend to the exterior.
8. Install new fixtures in each room and each exterior
entrance
9. Remove all damaged wiring and receptacles in the
front bedroom and replacc.
5
9
MECHANICAL:
1. Remove the existing furnace and duct work.
3. Install an 85% or better efficient gas furnace with
electronic ignition. Install insulated duct work. Install all
necessary electric and mechanical connections.
INSULATION:
1. Install R-30 insulation in the attic.
2. Install R-19 insulation under the floor.
3. Install a 6 mil vapor barrier in the crawl space.
.ADDITION:
Addition to be 14x12
Remove dirt as necessary to provide adequate height fmm the ground to the bottom of the
floor joists.
Materials to be:
Footer
8x8x16 cinderblocks
termite shield
2x8 pressure treated sills
anchor bolts
2x8 pine floor joists and band
'A inch subfloor
5/8 inch finish
2x4 framing -
2,vinyl windows,size to match existing windows
plywood sheathing
2x$ceiling joists and rafters
'A inch roof sheathing
15 lb felt
20 year warranty three tab shingles
yenta ridge ventilation system
vinyl siding and soffitt,3/8 insulation, aluminum,fascia and trim
32 inch,six panel door unit with extended jambs and privacy lockset
'fz inch sheetrock for the walls and ceiling
6
i
10
G
colonial style baseboard
carpet and pad(carpet allowance to be$14/yd.)
paint the ceilings ceiling white the walls with flat latex and the trim with semigloss latex
136 inch,six panel door unit
1, privacy lockset
1,closet lockset
1x12 shelf,bracket and closet rod
fixture, switch and outlets to code
AMMON TOTAL
Provide a termite and powder post beetle inspection and treatment.
TOTAL