HomeMy WebLinkAbout1999 NS Housing - Housing Rehabilitation Contract Award RESULTS OF BID OPENII�
r
OWNER: English APPLICX
ADDRESS:-205 Efland Ave. COST ES'.
Efland, NC
PERCENTAGE OF BID OVER UNDER
CHECK ONE: JOB BID—x JOB NEGOTIATE
COMPANY
1 . Thames Construction Co.
2 .
3.
4 .
5.
6.
BID OPENED BY: Jim Axelrod
TIME OF BID OPENING: 1: 00 PM
DATE OF BID OPENING: January 7, 1999
WITNESSED BY: Donna Galloway
Lowest Acceptable Bid: $26, 925
Negotiated Amount: N/A
Contractor: Thames Construction Cc
NAME
834 Junction Rd. , Durh
ADDRESS
(919) 688-6815_
TELEPHONE NUMBER
COMMENTS: Bids were solicited on December
1999. Only one bid was received.
Submitted by: Tara L. Fikes
Bid Approval Date
Proceed Order Issued
' 1
ORANGE COUNTY
BOARD OF COMMISSIONERS
Action Agenda
Item No. g_
ACTION AGENDA ITEM ABSTRACT
Meeting Date: January 19, 1999
SUBJECT: Housing Rehabilatation Contract Award
DEPARTMENT: Housing and Community Development PUBLIC HEARING: (Y/N) "
BUDGET AMENDMENT: (Y/N)
ATTACHMENT(S): INFORMATION CONTACT:
Bid Results Tara L. Fikes
Work Specifications TELEPHONE NUMBERS: - -eat. 2490
Hillsborough 732-8181
Chapel Hill 968-4501
Durham 688-7331
Mebane 227-2031
PURPOSE:
To award one housing rehabilitation contract for the CDBG Housing Rehabilitation Program.
BACKGROUND:
The Housing and Community Development Department solicited bids from qualified housing
rehabilitation contractors participating in the County's Housing Rehabilitation Program. For the
English property, sealed bids were solicited from participating contractors on December 3, 1998 and
January 7, 1999. One bid was received and opened on this day. The informal bidding process is
governed by the North Carolina General Statues §143-131 and does not require a minimum number
of bids. Bid results are attached. Present program procedures provide that housing rehabilitation
contracts be awarded to the lowest responsible bidder.
In June 1998, a housing rehabilitation contract for this house was awarded to MDH Construction
Company for $37,140. However, since that time the contractor indicated that due to delays with
other jobs, he will not be able to perform this job. Thus, in the interest of timely program
implementation, new bids were solicited for the English property.
The one bidder for this job was James W. Thames of Thames Construction Company located in
Durham, NC. He is not related to the County Engineer, Paul Thames.
RECOMMENDATION(S):
The Manager recommends awarding the following housing rehabilitation contracts:
Dwelling Unit Bid Amount Contractor
English - 205 Efland Ave. $26,925 Thames Construction Co
w
t '
ORANGE COUNTY
HOUSING REHABILITATION PROGRAM
SPECIFICATIONS
FOR
215 SANDERS ROAD
FOR
PHEBE ENGLISH
PHONE:
DATE: 02!02198
BY:JIM AXELROD
REHAB SPECIALIST
NOTE TO CONTRACTOR
CONTRACTOR SHOULD REFER TO THE BASIC SPECIFICATIONS,PROPERTY
REHABILITATION STANDARDS,GENERAL CONDITIONS,NORTH CAROLINA
BUILDING CODES MANUAL,AND ORANGE COUNTY MINIMUM HOUSING CODE
DOCUMENTS.
IT IS NOT THE INTENT OF THE WRITER TO DIRECT ANY CONTRACTOR TO A
SPECIFIC SUPPLIER OF MATERIALS CALLED FOR IN THIS WORK WRITE-UP ONLY
TO SPECIFY A TYPE THAT WOULD BE ACCEPTABLE TO THE HOMEOWNER AND
ORANGE COUNTY HOUSING REHABILITATION PROGRAM.
Phebe English
215 Sanders Rd.
Efland,NC 27243
563-6795
2/2198
EXTERIOR:
1. Remove the gable window.
2. Install a crawl space,access door on the right rear of
the house.Door to be door of pressure treated lumber with
galvanized locking hasp and hinges.
3. Install three gable vents.
4. Close all holes in the foundation with block and mortar.
5. Install vinyl siding and trim.Install aluminum fascia
and soffitt. Install aluminum door and window trim.Extend
window trim as necessary for proper installation of aluminum
trim and siding.Install siding and trim on the porch ceiling.
ROOF:
1. Remove the roof covering to the sheathing. Install 151b.
felt, aluminum drip edge and three tab shingles on the front
side only. Flash and counter flash the chimneys.
2. Reframe the gable overhangs to accommodate a 6
inch soffitt.Install sheathing to match the existing.
3. Install new fascia on the new barge rafters
3. Prepare the rear sections of the roof for a rubberized
roof system. Install 3/4"insulation board a rubberized roof
system and all required flashing.
GUTTER AND DOWNSPOUTS:
1. Install aluminum,continuous gutter and downspouts.
Install concrete splashblocks under each downspout.
1
t
WINDO WS:
1. Install vinyl replacement windows and trim in the
living room,left rear bedroom and the rear addition.
EXTERIOR SURFACES:
1. Paint all surfaces not covered by vinyl siding or
Aluminum trim with exterior latex paint. Paint to cover
completely.
INTERIOR PAINT:
1. Paint all interior wall surfaces with flat latex paint,the
ceilings with ceiling white and the trim, bath and kitchen with
semigloss latex. Paint to cover completely.Do not paint any
paneling.
LIVING ROOM:
1. Remove the existing door. Install a 3-0 metal insulated
door unit with weather stripping and threshold. Install a lockset
and deadbolt to be keyed the same. Install a peephole,matching
interior trim and a door bump.
2. Install an aluminum clad storm door, with pneumatic
closure and vinyl sweep.
3. Remove the floor covering to expose 6 floor joists.
4. Replace 5 floor joists with likesize lumber.
5. Replace 10 11 of sill with pressure treated lumber.
6. Replace 10 l.f. of plate with pressure treated lumber.
7. Install likesized plywood and trim to match the existing.
8. Install carpet and pad. Carpet allowance to be$14/yd.
FRONT/RIGHT BEDROOM:
2
G
t
1. Remove the existing cased opening.Reframe as necessary
Install a right hand,3-0, luan,flush door unit and privacy lock-
set. Install necessary trim to accommodate the oversize jam.
Install matching trim and a door bump.
2. Install carpet and pad. Carpet allowance to be$14/yd.
FRONT RIGHT BEDROM:
1. Install framing for a 3-0 door unit from the bedroom to the
rear porch. Install a 3-0,flush, luan door unit and passage lockset.
Install a beveled threshold and all necessary trim to accommodate
the oversize jam.Install a door bump.
2. Install carpet and pad. Carpet allowance to be$14/yd.
DINING ROOM:
1. Install carpet and pad. Carpet allowance to be$14/yd.
SMALL DINING ROOM:
1. Install I/a inch luan plywood on the floor.Prepare all
surfaces for vinyl.Install roll vinyl floor covering,shoe-
mold and metal trim.
2. Reframe the opening to the kitchen for a 3-0 door
unit.Install a 3-0 panel door unit and trim.
KITCHEN AND REAR PORCH:
1. Install 1/a inch luau plywood on the floor. Prepare all
surfaces for vinyl. Install roll vinyl floor covering.Install
shoemold and metal trim. Pattern to math the pattern in the
dining room.Vinyl to be installed in the kitchen only.
2. Install carpet and pad in the remaining area. Carpet
allowance to be$14/yd.
3. Install a sink base cabinet and wall cabinets to
match the existing lineal footage.
3
J
4. Install 31/4 inch baseboard.
BATH:
1. Reframe the existing door for a 3-0 door unit,Install a
3-0 flush,luan door unit with privacy lockset. Cut the door
to install in the existing opening height.Install matching
trim and a door bump. Stain and varnish the door.
2. Finish the sheetrock smooth on the ceiling.
3. Remove the wall covering to the studs. Install
insulation in the exterior walls.
4. Remove the linen closet door and wall. Repair the
sheetrock and floor.
5. Install MR sheetrock on the walls.Tape and
finish the sheetrock smooth.
4. Install a 5 piece tub enclosure kit with corner
shelves.
5. Install AC plywood to bring the floor level to the
porch floor.
6. Prepare the floor for vinyl floor covering. Install
vinyl floor covering, shoemold and metal trim.
8. Install 31/4 inch baseboard.
9. Install toilet guard rail.
10. Install a five piece accessory kit.
11. Install a transfer seat.
12. Install a medicine cabinet.
REAR BEDROOM:
4
1. Remove the existing exterior door. Install a six panel
exterior door unit. Install a lockset and deadbolt to be keyed
the same. Install matching trim and a door bump.
2. Remove the sheetrock on the ceiling to the ceiling joists.
Install V2 inch sheetrock.Tape and finish the sheetrock smooth.
3. Install bed mold.
ELECTRIC:
1. Install a 200 ANT service,weatherhead and mast. Make
all necessary connections for service.
2. Install GFI outlets in the kitchen and bath.
3. Install an electric doorbell at the front door with a
ringer in the back porch.
4. Install an exterior floodlight on the right hand rear
comer.
5. Install new fixtures in each room.
PLUMBING:
1. Install cutoffs and p-traps and supply lines on the kitchen
sink and vanity.
2. Install a handicapp commode. Install new supply line.
and cutoffs..
3. Install a double bowl. 7 inch sink. Install P-trap,
supply lines and cutoffs
4. Install a hand held shower with two clips to hold the
the shower.
MECHANICAL:
l
t
1. Install a propane,gas pack heat and air conditioning
system.Make all necessary electrical and mechanical
connections.Install insulated duct work.
2. Install an 18,404 BTU unvented gas space heater
in the rear porch rooms.Make all necessary electrical
and mechanical connections.
INSULATION:
1. Install R_30 insulation in the attic
2. Install R-19 under the floor.
3. Install a vapor barrier in the crawl space.
Provide a termite and powder post beetle inspection and
treatment. —
TOTAL -
6
e......•�r+�r�...w�L'�iAwr...���it Y��M1S.�.1'V.wy.Y/.n'niwlhw.llw«M �. - �.�ryYr.�-
1
:I
��
�yti
Y
..�
_ �._..�_�........ ..��... it'll'
t / O MC►
y_ ti �+'
� ♦��
--_---- . � _o
�.
,� -� -,
z � ��
1 � !
i ( ;
'- � f �
�`j � � i
i
-_ � !
i