HomeMy WebLinkAboutAgenda - 04-16-2013 - 1ORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: April 16, 2013
Action Agenda
Item No. 1
SUBJECT: Northern Human Services Center Project Update
DEPARTMENT: Asset Management Services PUBLIC HEARING: (Y /N) No
( "AMS "), Department of
Environment, Agriculture,
Parks & Recreation ( "DEAPR ")
ATTACHMENT(S): INFORMATION CONTACT:
A. Site Locator Jeff Thompson, (919) 245 -2658
B. Renovation Cost Comparison David Stancil, (919) 245 -2522
C. Design Services Proposal from MBAJ
Architects
PURPOSE: To receive an update on the progress of the Northern Human Services Center
Project, gather feedback, and outline next steps with the project.
BACKGROUND: In November 2012 the Board of County Commissioners ( "BOCC ") authorized
the Manager to proceed with the development of a community center on the site of the Northern
Human Services Center. After significant public input and discussion, the Board approved the
adaptive re -use "Option 2" for development, allowing a partial deconstruction of the facility and
saving significant portions of the historic and culturally significant building. This will allow
important features of the structure to become integrated within a modern, efficient, 10,000
square foot community center (see Attachment B, "Renovation Cost Comparison "). The Board
decided against the option of deconstructing the existing structure in its entirety and
constructing an entirely new facility.
The Board also authorized the Manager to engage a professional design firm for the project
through a standard request for qualifications ( "RFQ ") process. Additional information from the
Board's November 8, 2012 consideration of this project (Agenda Item 7 -a — "Northern Human
Services Center Project — Next Steps ") is available at
http: / /www.co.orange. nc. us /occlerks /121108. pd f.
History
The former Cedar Grove Elementary school was built in 1950 to serve the African - American
community in northern Orange County (note Attachment A, Site Locator'). As a result of de-
segregation in public schools, the facility was transferred to County control in 1976, with a deed
restriction that the facility be used for a "public purpose ".
The 37,000 square foot facility housed numerous County services, including a branch library,
social services, educational offerings (including Durham Technical College classes), Head Start
programs, other child care services, and recreation programs.
As of December 31, 2012, the facility is vacant except for the office of the Cedar Grove Park
supervisor. All utilities have been disconnected, except for the needed conditioning to preserve
the plumbing lines and control humidity.
The County has limited its programming of the space over the past several years, due to a
combination of falling demand and high fixed costs to maintain the facility. Several studies have
examined potential uses of the building. However, no potential use overcomes the very high
operating cost of the facility (estimated at $100,000 annually, when fully conditioned) and
necessary capital improvements. The single most limiting factor for the facility is the lack of
conventional water and sanitary sewer service. The current well and septic system can
adequately service a low volume of flow — not a higher volume necessary to support the full
facility and its programming capacity. Such a single system renovation to the well and septic
system is estimated to cost between $500,000 and $800,000.
Recent Activities
County staff has recently concluded the RFQ process, recommending MBAJ Architects from
Raleigh, NC as the design firm for the project. Eleven firms submitted written proposals for
evaluation. Five firms were selected to interview with a staff panel consisting of Susan Mellott
(who has since retired from Planning and Inspections), David Stancil (DEAPR), Jeff Thompson
and Wayne Fenton (AMS), and Michael Talbert (Manager's Office). David Cannell of Finance
and Administrative Services managed the RFQ process.
The firms were evaluated based upon the quality of the collective presentation, specifically their
responses in the areas of relevant experience with adaptive re -use design, community center
design experience, and experience with historic and culturally significant projects.
Firms submitting RFQ proposals were:
ADW Architects, Charlotte NC
Building Technology Associates, Oak Park, MI
*Corley Redfoot Architects, Chapel Hill NC
Davis Kane Architects, Raleigh NC
HH Architecture, Raleigh NC
*Isley Hawkins Architecture, Durham NC
*MBAJ Architecture, Raleigh NC
*RND Architects, Durham NC
Robert W. Carr Architects, Durham NC
Summit Design and Engineering, Hillsborough NC
*Weinstein Friedlein Architects, Carrboro NC
*Firms invited to interview
Representatives from MBAJ Architects will be present during the work session and will be
available to answer questions from the Board. Staff will present a Professional Services
Agreement to the Board at the June 18, 2013 regular meeting for approval for the Chair to
execute.
The design will encompass all deconstruction work through final occupancy of the renovated
facility. This path ensures that a single general construction firm will be responsible for the
entire project to its finish and subsequent operation.
K
The design will also consider potential complementary uses such as an Emergency Services
base station and a communications tower to support both emergency communications and
other services such as wireless technology access and cellular connectivity.
Once the design process begins, the informal resident design and review advisory group will
convene to assist in the space programming and follow -on design process. This group is made
up of eight individuals who volunteered during the September 25, 2012 public meeting.
The general development timeline may be as follows:
TASK
PROPOSED
BEGINNING
DATE
END BY
DATE
BOCC Action: Approval for Designer Professional Services
Agreement est.
6/18/13
6/18/13
Project schematic design
6/18/13
10/20/13
BOCC Action: Approval of Schematic Design (est.)
10/15/13
10/15/13
Project final design, bid document preparation
11/1/13
1/31/14
Project Bid - abatement, deconstruction and adaptive re -use
construction est.
2/1/14
4/28/14
BOCC Action: Bid Award, Budget Approval for Construction
est.
6/20/14
6/20/14
Construction, Commissioning, Opening (est. 8 months duration)
7/1/14
3/1/15
FINANCIAL IMPACT: The Board - approved FY2012 -17 Capital Investment Plan ( "CIP ")
included $250,000 in FY 2012 -13 for deconstruction of sections of the facility in preparation for
the future use on the site. The Board also approved $2.0 million in FY2014 -15 for the
construction of the new facility. Since the project will be completed under one general contract,
these funds are currently available for professional services with regard to the selected
designer.
RECOMMENDATION(S): The Manager recommends the Board receive the progress update
and provide feedback for the Northern Human Services Project.
Attachment A: Site Locator 4
ATTACHMENT B
Northern Human Services Center Development Option Comparison
Abatement, Removal
Design, Construction, Equipment
Contingency
Schematic Budget Estimate
Schematic Budget per square foot
Considerations:
Development and Construction Cost
Design Flexibility
Programmed Use Flexibility
Unforeseen Conditions
Original Structure's Use?
Estimated Future Operating Costs
Option 1
New Construction, 10,000 square foot pre -
engineered metal building, standing seam
roof, masonry and /or block accented
exterior walls; standard interior upfit
Option 2
Removal of classroom wings, adaptive
re -use of 10,000 square foot center
portion; new roof and building systems;
standard interior upfit
$220K - $250K
$175K - $225K
$1.3M - $1.5M
$1.36M - $1.58M
$300K - $350K
$309K - $366K
$1.82M - $2.10M
$1.84M - $2.17M
$182-$210
$185-$217
Lower
Higher
Higher
Lower
No
Low to Mid -Range
Low to Mid -Range
Lower
Lower
Higher
Yes
Low to Mid -Range
5
il�
9131 Anson Way, Suite 204
Raleigh, North Carolina 27615
Office: 919- 573 -6400
Toll -free: 800 - 590 -MBAJ
Fax: 919- 573 -6495
April 1, 2013
Attachment C
Mr. Jeff Thompson
Orange County Director of Asset Management Services
200 South Cameron Street
P O Box 8181
Hillsborough, NC 27278
RE: Northern Human Services Center Renovation
COMM. NO.: FILE NO.: A -1.0
Dear Jeff:
We are excited to have been selected by Orange County for the design of renovations at the
Northern Human Services Center project. We look forward to developing a strong working
relationship with you through this project. As requested, below is our proposal for professional
services.
Project Scope
MBAJ Architecture will provide architectural and engineering design services for the Northern
Human Services Center Renovation. The scope of services will include Programming, Design and
Construction Observation for upgrades and renovation to the existing Cedar Grove facility. The
exact scope of the renovations will be determined during the programming phase utilizing a round
table format to gather input from the project committee. The project scope will include a
recognition of the cultural significance of this site. The exact nature of this recognition will be an
integral part of the programming process. The final proposed scope of the project will be balanced
against the funding available for the project.
MBAJ will engage independent engineering consultants to provide Structural evaluation for the
proposed demolition, along with Civil /Landscape, Plumbing, Mechanical, Electrical and
Technology design for the proposed facility renovation. Design services shall be provided in the
traditional phases of Programming, Schematic Design, Design Development, Construction
Documents, Bidding and Construction Administration. Based upon our pre - contract discussions,
our proposed fee does not include hazardous material abatement design, storm water BMP design,
fire protection design, surveying, geothermal conductivity test wells or geotechnical investigation
for the project.
The total budget for the facility including design, construction, and contingency is $2 million. The
fees proposed are based upon the scope of work as we understand it at this time and the project
durations outlined in the attached schedule.
M: \PROSPECT - CLIENT \Civic - Governmental \North Caro lina\ County\ Orange \Proposals \20130401jft_Revised Fee
Proposal.docx
MBAJ Architecture
Page 2of2
Letter to: Jeff Thompson
Apa 1, 2013
Proposed A/E Fees
Based upon the above outlined scope of professional services, and the terms of the Orange
County Professional Services Agreement, MBAJ proposes a lump sum fee of $160,000 with
additional reimbursable cost (printing, reproduction, shipping, fees paid to jurisdictional
authorities, renderings, etc...) not to exceed $7,500.
Engineers
MBAJ will be utilizing the following engineers for the project:
Structural Design
LHC Engineers
1015 Wade Avenue
Raleigh, NC 27605
Civil Engineering / Landscape Design
CLH Design
400 Regency Forest Drive, Suite 120
Cary, North Carolina 27518
Plumbing; Mechanical, Electrical; and Technology Design
Progressive Design Collaborative, LTD.
2900 Rowland Road, Suite 100
Raleigh, NC 27615
Schedule
7
Our preliminary schedule is attached. We recognize that the County will not have construction
funding available until July 2014 and we have formulated the proposed schedule to conform to
that parameter.
If there are any questions, please feel free to call. We look forward to hearing from you and
working with you to make the Northern Human Services Center project a success.
Sincerel
Jr.., AIA
cc: Vanda Hamrick
tz z
Orange County
Northern Human Services Center
Preliminary Project Design Schedule
3/20/13
8
a WC
1
1 �
111111111
BOCc
Presentation
d
Construction
Documents
�B•tion
linal
Docs
Construction
Package
Bid
Orange
County
Orange
Planning
County
Approval
Award
Abstract
Construction
(8
months)
8M