HomeMy WebLinkAboutORD-2000-143 Stream Buffer Zoning Ordinance Amendments el ORANGE COUNTY BOARD OF COUNTY COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: December 4, 2000 Action Agen a Item No. — SUBJECT: Stream Buffer Zoning Ordinance Amendments DEPARTMENT: Planning and Inspections PUBLIC HEARING: (Y/N) NO ATTACHMENT(S): Administration Ordinance w/Attachment INFORMATION CONTACT: Post PH to Planning Board Ordinance Robert P. Davis, Planner III, Ext. 2580 Draft Minutes November 2, 2000 Planning Craig Benedict, Director, Ext. 2592 Board TELEPHONE NUMBERS: Public Hearing Ordinance Hillsborough 732-8181 Draft Minutes of August 28h Public Hearing Chapel Hill 968-4501 Durham 688-7331 Mebane 336-227-2031 PURPOSE: To make a decision on the proposed Stream Buffer Amendments. BACKGROUND; Reg-uest • Amend the Stream Buffer and related sections in the Zoning Ordinance • Provides clearer and language to users to help calculate stream buffers consistently • Adds new definition in Zoning Ordinance for Usable Lot Area • Adds new definition in Zoning Ordinance for Federal Emergency Management Agency • Sets minimum square footage of lots that must be unencumbered by stream buffers, easements, water bodies, wildlife corridors, etc. • Establishes minimum 50-foot(each side) stream buffers for perennial (blue line) and intermittent (dashed blue line) streams outside of Watershed Protection Overlay Districts • This zoning text amendment does not affect bona fide farming operations. N.C. General Statute 153A-340 specifically exempts bona.fide farms from zoning regulations. Stream buffers enforced through zoning ordinances will not apply to bona fide farms. As a contrast, the Neuse River Basin rules are not enforced through zoning and therefore do apply to bona fide farms. Location Amendments will apply to the entirety of Orange County lying outside the municipalities and their extraterritorial jurisdictions, if any. . Development Process Schedule and Action • First Action: Public Hearing was held on August 28, 2000 • Question raised as to whether these regulations will apply to farm operations • Bona fide farm exemption (N.C. General Statute 153A-340) applies as long as the County regulates stream buffers under the zoning ordinance • Referred amendment to the Planning Board for a recommendation back to th?,Board of County Commissioners 'wy' 2 • Second Action: Ordinance Review Committee on November 2, 2000 reviewed and recommended unanimously.that the Planning Board approve the stream buffers amendment • Third Action: Planning Board on November 2, 2000 recommended approval of the proposed amendments to County Commissioners • Recommended a maximum 65-foot stream buffer in situations where the average slope is 0.00 - 7.50% over a distance of 250 feet • Recommended a maximum 80-foot stream buffer in situations where the average slope is greater than 7.5%.over a distance of 250 feet • Recommended vesting procedure for three existing situations • 1) Lots with existing building permits 9 2). Septic system repair areas 9 3) Existing structures within the stream buffer • Clarified that the new, revised FEMA maps will not vest structures or situations within the new floodplain cross-sections FINANCIAL IMPACT: There is no direct financial impact associated with this decision. RECOMMENDATION(S): Administration Recommendation: Approval of the Administration Ordinance. Planning Board Recommendation: Approval of the Post Public Hearing to Planning Board Ordinance with changes as reflected above. 3 Administration Ordinance An Ordinance Amending the Zoning Ordinance of Orange County Bold = Proposed Text StFiketheugh = Deleted Text Section 1: Amend Article 22 DEFINITIONS by creating two new definitions as follows: Federal Emergency Management Agency (FEMA) —An independent agency of the federal government. Lot;Usable—The portion of a zoning lot unencumbered by stream buffers, conservation easements, drainage easements, public and private rights-of-way, access easements, and utility easements. Lot, Usable also excludes all areas within lots having slopes greater than 20%, all bodies of water including, but not limited to, ponds, lakes and reservoirs as well as the area within wildlife corridors as defined in the Land Use Element of the Orange County Comprehensive Plan. For calculation of Lot, Usable the maximum width of a wildlife corridor is 150 feet or the width of the stream buffer, whichever is greater. Section 2: Amend Section 6.23.7a and Article 22 DEFINITIONS of Stream Buffer to clarify that the stream buffer is not to be included within the floodplain. Stream Buffer—a stream buffer is an area of land adjacent to perennial and intermittent streams or FEMA identified floodplains,whichever is greater, which, except as permitted in Article 6.23.7 of this Ordinance, must remain undisturbed in its natural state. Perennial streams are shown as solid blue lines and intermittent streams as broken lines on the USGS Quadrangle maps. The stream buffer shall extend around the perimeter of all water bodies including ponds, lakes and reservoirs. Section 3: (page 6-41 —Zoning Ordinance) 6.23.7d. Calculating the Width of Stream Buffer Those streams identified by FEMA as having floodplains shall have stream buffers calculated from the outside edges of the floodplain. 1) How to Calculate Slope (See illustration attached) a. Draw aline 250' length perpendicular to the GtFea ' lines, at 200-foot horizontal intervals along the entire length of the outside edges of the stream, te the GtFeam, or the outer edge of the FEMA floodplain, whichever is greater. b. Determine the elevation at either the stream bank itself(1) or the outer edge of the FEMA floodplain, whichever is highest, and at the point ,: , G:robert/august2000ph/StreamBuffer0rdinance(Administration Ordinance) 4 Administration Ordinance 250' from the stream or FEMA floodplain, whichever is applicable, along the perpendicular line (2). c. Subtract (1) from (2). d. Divide c. by 250. e. Multiply d. by 100. f. Perform this calculation for both sides of the stream or floodplain. (See Attachment A for example of how the calculations shall be performed) Hereafter, the number derived in e. will be referred to as "Slope value". 2) Method A—Stream Buffer Based on Slope and Groundcover The width of the buffer shall be a minimum of fifty (50) feet from each edge of the floodplain. , plus the slepe Yalue multiplied by In addition to the fifty (50) foot buffer, an additional IS feet shall be added to the 50-foot buffer(65 feet total)where the slope value is less than 7.5%, as measured 250 feet from the edge of the floodplain. For slope values 7.6% and greater, as measured 250 feet from the edge of the floodplain, an additional 30 feet shall be added to the 50-foot buffer (80 feet total). These calculations shall be made from each side of either the stream bank or floodplain, whichever is greater. Section 4: Amend Detailed Table of Contents Section 6.24 to read as follows: Stream Buffers Outside of Watershed Protection Overlay Districts Section 5: Amend new Section 6.24 to include a minimum stream buffer for areas outside of Orange County Watershed Protection Overlay Districts to read as follows: In areas not identified on the Official Zoning Atlas as Watershed Protection Overlay Districts, a stream buffer a minimum of 50 feet in width shall be established along both sides of perennial streams and intermittent streams, or along the FEMA identified floodplains, whichever is greater. Perennial streams are those streams shown as solid blue lines, and intermittent streams are those streams shown as broken blue lines on the USGS Quadrangle maps for Orange County. Section 6: Amend Detailed Table of Contents Section 6.25 to read as follows: Minimum Usable Lot Area for Lots that Utilize Ground Absorption Wastewater Systems G:robert/august2040ph1StreamBuffer0rdinance(Administration Ordinance) Administration Ordinance Section 7: Amend the new Section 6.25 to set minimum usable lot area when Ground Absorption Wastewater Systems are used to read as follows: The usable lot for parcels between 40,000 square feet and 1.99 acres in size shall be a minimum of 30,000 square feet. Zoning lots two acres and greater shall have a minimum usable lot area of at least 40,000 square feet. Section 8: For purposes of this of this ordinance the following stream buffer situations shall be vested: 1) Structures with valid building permits; 2) Septic system repair areas; 3) Existing structures within the stream buffer as of the adopted date of this amendment. (Signature) (Signature)' Clerk, Board of County Commissioners Chair, Orange County Commissioners Date and Seal G:robert/august2000ph/StreamBuffer0rdinance(Administration Ordinance) �| \ ` « ���< ���y: @ � a e ■ ���/��� �. . y. . : �?? ; �� \ � „ ■ , , . , \ : slog. a. \ � . . . $ ; . . ■ ■ LINE ■ LINE . ■ ee■- , 139 FLOODPLAIN 4■ ■ ■ 150 ■ =20 , ■ ■ = ■ ■4 , ■ ■ = ■ ` ■' e. ■ ■• X 100=4%SLOPEVALUE - 0.08 x 100 %SLOPE VALUE SLOP SLOPE STREAM BUFFER= ■ e ■ ■ ` W ' STREAM TOTAL e - ADDED e ee■- (TO - � ■■ ■ e ee■- 7 Post PH to Planning Board Ordinance An Ordinance Amending the Zoning Ordinance of Orange County Bold = Proposed Text StFiIEethew@Il}= Deleted Text Section 1: Amend Article 22 DEFINITIONS by creating two new definitions as follows: Federal Emergency Management Agency (FEMA)—An independent agency of the federal government Lot, Usable—The portion of a zoning lot unencumbered by stream buffers, conservation easements, drainage easements, public and private rights-of-way, access easements, utility easements. This definition also includes all areas within lots having slopes greater than 20% and all areas within wildlife corridors, ponds and lakes. Section 2: Amend Section 6.23.7a and Article 22 DEFINITIONS of Stream Buffer to clarify that the stream buffer is not to be included within the floodplain. Stream Buffer—a stream buffer is an area of land adjacent to perennial and intermittent streams, or FEMA identified floodplains,which, except as permitted in Article 6.23.7 of this Ordinance, must remain undisturbed in its natural state. Perennial streams are shown as solid blue lines and intermittent streams as broken lines on the USGS Quadrangle maps. Section 3: (page 6-41 —Zoning Ordinance) 6.23.7d. Calculating the Width of Stream Buffer Those streams identified by the Federal Emergency Management Agency (FEMA) maps to have floodplains shall have stream buffers calculated from the outside edges of the floodplain. 1) How to Calculate Slope a. Draw awe 250' length perpendicular to the "yam lines, at 200-foot horizontal intervals along the entire length of the outside edges of the stream,to"e GtFeaR, or the outer edge of the FEMA floodplain, whichever is greater. b. Determine the elevation at either the stream bank itself(1) or the outer edge of the FEMA floodplain,whichever is highest, and at the point 250'from the stream or FEMA floodplain, whichever is applicable, along the perpendicular line (2). c. Subtract (1)from (2). d. Divide c. by 250. e. Multiply d. by 100. f. Perform this calculation for both sides of the stream or floodplain. G:robert/august2000ph/StreamBuffer0rdinance(PostPHtoPB) 8 Post PH to Planning Board Ordinance Hereafter, the number derived in e. will be referred to as "slope value". 2) Method A—Stream Buffer Based on Slope and Groundcover The width of the buffer shall be a minimum of fifty (50) feet from each edge of the floodplain. , plus the slepe Yalue multiplied by In addition to the fifty (50)feet buffer, an additional 30 feet shall be added to the 50 feet buffer where the slope value is less than 7.5%, as measured 250 feet from the edge of the floodplain. For slope values 7.5% and greater, as measured 250 feet from the edge of the floodplain, an additional 50 feet shall be added to the 60 feet buffer(100 feet total). These calculations shall be made from each side of the stream bank or floodplain. Section 4: Amend Detailed Table of Contents Section 6.24 to read as follows: Stream Buffers Outside of Watershed Protection Overlay Districts Section 5: Amend new Section 6.24 to include a minimum stream buffer for areas outside of Orange County Watershed Protection Overlay Districts to read as follows: In areas not identified on the Official Zoning Atlas as Watershed Protection Overlay Districts, a stream buffer a minimum of 50 feet in width shall be established along both sides of perennial streams and Intermittent streams, or along the FEMA identified floodplains, whichever is greater. Perennial streams are those streams shown as solid blue lines, and intermittent streams are those streams shown as broken blue lines on the USGS Quadrangle maps for Orange County. Section 6: Amend Detailed Table of Contents Section 6.25 to read as follows: Minimum Usable Lot Area for Lots that Utilize Ground Absorption Wastewater Systems Section 7: Amend the new Section 6.25 to set minimum usable lot area when Ground Absorption Wastewater Systems are used to read as follows: The usable lot for parcels between 40,000 square feet and 1.99 acres In size shall be a minimum of 30,000 square feet Zoning lots two acres and greater shall have a minimum usable lot area of at least 40,000 square feet. Section 8: This ordinance shall be effective upon its adoption. G:robert/august2000ph/StreamBuffer0rdinance(PostPHtoPB) 9 Post PSI to Planning Board Ordinance (Signature) (Signature) Clerk, Board of County Commissioners Chair, Orange County Commissioners Date and Seal G:robert/august2000p4/StreamBuffer0rdinance(PostPHtoPB) 10 1 DRAFT 2 3 MINUTES 4 ORANGE COUNTY PLANNING BOARD 5 NOVEMBER 2,2000 6 7 8 MEMBERS PRESENT: Leo Allison(Chair),Crauford Goodwin,Karen Barrows,Howard 9 McAdams,Nicole Gooding-Ray,Runyon Woods,Rachel Preston,Bob 10 Strayhorn,Barry Katz 11 12 MEMBERS ABSENT: James Selkirk(out of town-excused)and Lynn Holtkamp(unexcused) 13 ' 14 STAFF PRESENT: Planning Director Craig Benedict,Carla Bateman,Joanna Bradshaw, 15 Eddie Kirk,Gene Bell,Robert Davis 16 17 AGENDA ITEM#1: CALL TO ORDER AND ROLL CALL 18 Chair Allison called the meeting to order. 19 20 AGENDA ITEM#2: CONSIDERATION OF ADDITIONS TO AGENDA 21 None 22 23 AGENDA ITEM#3: APPROVAL OF MINUTES-October 4,2000 24 25 MOTION: Katz moved approval of the minutes from October 4,2000 of the Orange 26 County Planning Board. Seconded by Gooding-Ray. 27 28 VOTE: Unanimous 29 30 AGENDA ITEM#4: COMMISSIONERS'MEETINGS ACTION REPORTS 31 (September 5,2000 and September 19,2000) 32 33 AGENDA ITEM#5: PUBLIC CHARGE 34 Chair Allison read the public charge. 35 36 AGENDA ITEM#6: CHAIR COMMENTS 37 None 38 39 AGENDA ITEM#7: COMMITTEE/ADVISORY BOARD REPORTS 40 a. Board of Adjustment-no meeting 41 b. Agricultural Preservation Board-Strayhorn reported that five new 42 members had been added to the board. 43 c. Ordinance Review-Chair Allison reported that they discussed 44 stream buffers and this would be dealt with later in the agenda. 45 d. Report on Comprehensive Plan Update-no report 46 47 AGENDA ITEM#8: SUBDIVISIONS 48 a. Concept Plans 49 50 1)Whisper Ridge 51 (Cheeks Township 15 Lots Conservation/Cluster 52 17 Lots Conventional) 53 11 I AGENDA ITEM#9: MATTERS HEARD AT PUBLIC HEARING(AUGUST 28,2000) 2 3 a. Zoning Ordinance Amendments 4 (1)Proposed Stream Buffer Amendments 5 6 Davis made the presentation. He said that this item was referred back to the Planning Board at the public 7 hearing for a recommendation. It was brought to the Ordinance Review Committee to make a 8 recommendation to the Planning Board. 9 10 The ordinance restricts the amount of unencumbered lot space on lots. In other words,there would have 11 to be a minimum lot size that could be built on for a particular lot. For any lot between 40,000 square feet 12 and 1.99 acres,there would have to be a usable area of 30,000 square feet. For any lot that is two acres 13 and greater in size,there would have to be a usable area of 40,000 square feet. The definition of a usable 14 lot area is the portion of a lot unencumbered by stream buffer,conservation easements,drainage 15 easements,public or private rights-of-way,access easements,and utility easements. It also includes the 16 portion of a lot unencumbered by slopes greater than 20 percent and wildlife corridors,ponds,lakes,and 17 other bodies of water. The stream buffer has also been clarified to be from the edge of the floodplain. 18 19 On page 58,under"Method A-Stream Buffer Based on Slope and Groundcover"the Ordinance Review 20 Committee recommended some changes. The width of the buffer shall be"a minimum of 50 feet. For 21 slope values less than 7.5 percent,the Ordinance Review Committee recommended that only an 22 additional 15 feet should be added to the 50-foot buffer. For slope values 7.5 percent and greater,the 23 Ordinance Review Committee recommended that only an additional 30 feet should be added to the 50- 24 foot buffer. 25 26 Regarding Section 8,which reads,"This ordinance shall be effective upon its adoption,"the Ordinance 27 Review Committee recommended that lots with building permits would be vested,septic system repair 28 areas would be vested,and any existing structures that are in the buffers would be vested. 29 30 Benedict said that if a FEMA floodplain is modified by the federal government,a rebuilding probably 31 would not be allowed. 32 33 Davis said that the Ordinance Review Committee agreed unanimously to recommend the ordinance 34 amendments to the Planning Board. 35 36 There was a question about the last sentence of the definition of"lot,usable",and it was changed to say, 37 "Usable lot also excludes all areas within lots having slopes greater than 20%and all areas within wildlife 38 corridors,ponds,and lakes." 39 40 Barrows asked about the definition of a wildlife corridor. Davis said that it should have been included in 41 the document to say,"as designated in the Land Use Element of the Comprehensive Plan." 42 43 McAdams asked if all of the people that would be affected by the ordinance amendment were notified of 44 the change and Davis said that they were not notified individually,but through the legal advertisement. 45 The main issue has to do with new lots that are encumbered and not usable. 46 47 Woods asked about farming activities in the floodplain and said that they should be exempt. Barrows 48 disagrees because of possible pesticides being used near the water. 49 50 Davis said that bona fide farms were exempt from zoning ordinances according to state rules. 51 52 Strayhorn would like it stated in the document that farms would be exempt. 53 12 1 Gooding-Ray is opposed to exempting all farms because of the pesticides in the water. 2 3 It was decided that the document would remain silent about the exemption of farms. 4 5 Goodwin is concerned about the wildlife corridor and that 330 feet on either side of the major waterways 6 is not usable. 7 8 Woods said that he supports a minimum usable lot size,but he thinks it is a bad idea to not count 330 feet 9 on either side of the major waterways. 10 11 Barrows said that people should be notified enough to come to a public hearing if they are going to be 12 affected. Davis said that for text amendments,people are not notified. 13 14 Benedict said that the wildlife corridors could be similar in width to the stream buffers. 15 16 The board agreed that along streams the wildlife corridor would be the same width as the stream buffer. 17 In areas where the wildlife corridor is not along a stream,it will be reduced to a total of 150 feet. 18 19 MOTION: Katz moved approval of the proposed Post Public Hearing to Planning 20 Board Ordinance as given in the Stream Buffer Zoning Ordinance 21 Amendments as revised above. Seconded by Woods. 22 23 VOTE: Unanimous 24 25 AGENDA ITEM#10: INFORMATIONAL ITEMS 26 27 a. Planning Calendar-November 28 b. Next Planning Board Meeting-November 16,2000 r@z 6:00 p.m. 29 30 Chair Allison reminded the board that he would not be at the public hearing on November 27,2000. 31 McAdams will be sitting in for him.. 32 33 Benedict indicated what would be on the quarterly public hearing-American Stone Company quarry 34 zoning and special use permit,school impact fee ordinance(Orange County system only), School 35 Adequate Public Facilities Ordinance,and subdivisions of non-residential land. The items on the 36 Economic Development District moratorium and the Pathways Preserve were taken off the agenda by the 37 Commissioners. 38 39 AGENDA ITEM#11: ADJOURNMENT 40 41 With no further items to discuss,the meeting was adjourned at 10:15 p.m. 42 43 Leo Allison,Chair 44 45 Becky Butler,Minutes Preparer 46 25 Pubiiic Hearing Ordinance An Ordinance Amending the Zoning Ordinance of Orange County Section 1: Amend Article 22 DEFINITIONS by creating a new definition as follows: Lot, Usable—The portion of a zoning lot unencumbered by stream buffers, conservation easements, drainage easements, public and private rights-of-way, access easements, utility easements. This definition also includes areas in lots affected by steep slopes, (i.e. greater than 15%),wildlife corridors, ponds, lakes and streams. Section 2: Amend Section 6.23.7a and Article 22 DEFINITIONS of Stream Buffer to clarify that the stream buffer is not to be included within the floodplain. Stream Buffer—a stream buffer is an area of land adjacent to perennial and intermittent streams, or identified floodplains, which, except as permitted in Article 6.23.7 of this Ordinance, must remain undisturbed in its natural state. Perennial streams are shown as solid blue lines and intermittent streams as broken lines on the USGS Quadrangle maps. Section 3: (page 6-41 —Zoning Ordinance) 6.23.74. Calculating the Width'of Stream Buffer d. Calculating Width of Stream Buffer Those streams identified by the Federal Emergency Management Agency (FEMA) maps to have floodplains shall have stream buffers calculated from the outside edges of the floodplain. 1) How to Calculate Slope a. Draw a-line 250' length perpendicular lines, at 100-foot horizontal intervals along the entire length of the outside edges of the stream, *MFR, or the outer edge of the FEMA floodplain,whichever is . greater. b. Determine the elevation at either the stream itself(1) or the outer edge of the FEMA floodplain, whichever is highest, and at the point 250' from the stream or FEMA floodplain,whichever is applicable, along the perpendicular line (2). c. Subtract(1) from (2). d. Divide c. by 250. e. Multiply d. by 100. L Perform this calculation for both sides of the stream or floodplain. Hereafter,the number derived in e. will be referred to as"slope value". 14 Public Hearing Ordinance Section 4: Amend Detailed Table of Contents Section 6.24 to read as follows: Stream Buffers Outside of Watershed Protection Overlay Districts Section 5: Amend new Section 6.24 to include a minimum stream buffer for areas outside of Orange County Watershed Protection Overlay Districts to read as follows: In areas not identified on the Official Zoning Atlas as Watershed Protection Overlay Districts, a stream buffer a minimum of 30 feet in width shall be established along both sides of perennial streams and intermittent streams, or along the FEMA identified floodplains, whichever is greater. Perennial streams are those streams shown as solid blue lines, and intermittent streams are those streams shown as broken blue lines on the USGS Quadrangle maps for Orange County. Section 6: Amend Detailed Table of Contents Section 6.25 to read as follows: Minimum Usable Lot Area for Lots on Ground Absorption Wastewater Systems Section 7: Amend the new Section 6.25 to set minimum usable lot area when Ground Absorption Wastewater Systems are used to read as follows: The usable lot for parcels between 40,000 square feet and 1.99 acres in size shall be either 30,000 square feet or 40% of the total zoning lot,whichever is greater. Zoning lots two acres and greater shall have a minimum usable lot area of at least 40,000 square feet. Section 8: This ordinance shall be effective upon its adoption. (Signature) (Signature) Clerk, Board of County Commissioners Chair, Orange County Commissioners Date and Seal 1 15 1 MINUTES 2 ORANGE COUNTY BOARD OF COMMISSIONERS 3 AND 4 ORANGE COUNTY PLANNING BOARD 5 August 28,2000 6 7 The Orange County Board of Commissioners and the Orange County Planning Board met on Monday, 8 August 28, 2000 at 7:30 p.m. in the Judge Gordon F. Battle Courtroom in Hillsborough, North Carolina. 9 10 COUNTY COMMISSIONERS PRESENT: Vice-Chair Stephen H. Halkiotis and Commissioners 11 Margaret W. Brown,Alice M. Gordon, and Barry Jacobs 12 COUNTY COMMISSIONER ABSENT: Chair Moses Carey, Jr. 13 PLANNING BOARD MEMBERS PRESENT: Leo Allison, Chair and members Runyon Woods, Bob 14 Strayhorn, Crauford Goodwin, Karen Barrows, Howard McAdams, Barry Katz, and Rachel Preston 15 COUNTY ATTORNEY PRESENT: Geoffrey Gledhill 16 COUNTY STAFF PRESENT: County Manager John M. Link,Jr., Planning Director Craig Benedict 17 and Clerk to the Board Beverly A. Blythe(all other staff members will be identified appropriately below) 18 19 NOTE: ALL DOCUMENTS REFERRED TO IN THESE MINUTES ARE IN THE PERMANENT 20 AGENDA FILE IN THE CLERK'S OFFICE. ALL RECORDINGS OF THE MEETING WILL BE 21 KEPT FOR 5 YEARS. 22 23 A. OPENING REMARKS FROM THE VICE-CHAIR 24 He announced that Chair Carey was out of town and that he, Commissioner Halkiotis, would 25 be chairing this meeting along with Leo Allison, Chair of the Orange County Planning Board. The 26 Board of Commissioners agreed to address item C5 first-Shaping Orange County's Future 27 Report. 28 29 B. PUBLIC CHARGE 30 Commissioner Halkiotis read the public charge. 31 32 NOTE: Planning Board Chair Leo Allison chaired items C1 and 4 33 Commissioners'Vice-Chair Stephen Halkiotis chaired items 2, 3, and 5 34 35 C. PUBLIC HEARING ITEMS 36 1. Orange County Zoning Ordinance Text Amendments 37 a. Article 22 Definitions for Lot, Usable 38 b. Article 22 Definitions of Stream Buffer 39 c. Section 6.23.7 Stream Buffers 40 d. Detailed Table of Contents 41 e. Section 6.24 Stream Buffers Outside of Watershed Protection Overlay 42 Districts 43 f. Section 6.25 Usable lot areas when using Ground Absorption Septic Systems 44 45 Planner Robert Davis summarized this item. He said that these text amendments were 46 coming forward to clean up a section of the ordinance for better interpretation and to consistently 47 interpret what the stream buffer section means. He said that right now there was not a stream 48 buffer requirement unless the land was in a watershed. He explained a map showing the stream 49 buffers and the edge of the flood plain. On the calculation of the width, the ordinance indicates that 50 only a perpendicular line across the stream should be drawn, but it does not say how many times 51 this should be done along the stream. He said that the minimum feet that the staff is 52 recommending is 100 feet along the horizontal area. Also, the definition of a Usable Lot has been 53 clarified as, "the portion of a zoning lot unencumbered by stream buffers, conservation easements, 54 drainage easements, public and private right-of-ways, access easements, and utility easements." 55 The definition also includes areas affected by steep slopes, which are slopes greater than 15%, 56 wildlife corridors, ponds, lakes, and streams. This item will be going back to the Planning Board ^ ' 2 16 ' i with a recommendation back to the Commissioners no earlier than October 3rd. The Ordinance 2 Review Committee will also review these amendments. 3 Commissioner Gordon made reference bo the statement on page four, Section 7, 4 "Usable lots for parcels between 40,000 square feet and 1.99 acres in size shall be either 30,000 5 square feet or 40%of the total zoning lot,whichever is greater. Zoning lots two acres and greater 0 shall have a minimum usable lot area ofet least 4O.00O square haet." She asked if some kind of 7 usable lot area could bm settled on and required for everybody instead cf stepping itup. Robert 8 Davis said that the 40%was adde'd because there was quite a gap between 40,000 and two acres. 9 Commissioner Gordon said that her point was that the amount of square footage should lO be justified. Her question ia why more should Ue added to the justified amount. I Craig Benedict said that 30.OD0 square feet was the definite minimum because it would l% accommodate the house site, driveway, septic area, and repair area with a margin for some | � 13 accessory structures. With zoning lots of two acres or more,the people who are going to have a 14 two-acre lot would most likely have other accessory structures that would need additional usable 15 area. He agrees that the 4096 is not critical on the smaller lot size. 10 Commissioner Jacobs suggested that it would nice boinclude an illustration onthe 17 definition mfm steep slope. He asked about Section one and the Usable Lot. Ha asked about l& conservation easements. Craig Benedict said that they were definitely not trying bodiscourage ig conservation, but that stream buffers or conservatio6 easements should not be included in the 2O accomplishment of the minimum lot size. 31 Rachel Preston asked if there was any verbiage on what a homeowner could do to 22 streams and vegetation. Craig Benedict said that it was handled by the Erosion Control and 23 Sedimentation Ordinance,which says that natural water courses are not supposed to be diverted. 24 There io encroachment to some degree but changing woteroournes\o |bnitedintbamajority of 25 ueaea. If there is any disturbance of this nature,there has to be some kind of mitigation. 26 Commissioner Brown asked if this establishes a3O-foot buffer and Craig Benedict said 27 that it did establish s3O-fomt buffer in areas that are not part ofthe protected watershed. 28 Bob Strmyhomm and Runyon Woods mfthe Planning Board made comments, but 29 they were not speaking into the microphone,so8could not hear them. 30 31 PUBLIC COMMENT 32 Mr. Joe Phelps said that he did not know that his subdivision request would cause so 33 much work and sP many drastic changes inthe rules and regulations ofthe Zoning Ordinance. He 34 feels that the changes in the rules and regulations are very drastic. He feels that most ofthese 35 amendments are not necessary. He questioned why the County Commissioners would want toput 36 stream buffers on areas that are in the non-protected watershed. He supports affordable housing 37 and thinks that with these new rules on development, no one could afford to buy land in Orange 38 County. His main concern is what is being taken away from present landowners with regard to the 39 3396of required open space with nocompensation. He said that these new regulations would 40 greatly reduce the number of people that would ba coming into Orange County|n the next 30 41 years. 42 Scott Radway had some questions on what was meant bvthe proposals. 43 SectionmI -UsabUe Lot Area-steep slopes(ie.. greater than 1S%). He prefers a25Y6 44 grade. . 45 Wildlife Corridors-as identified by whom, when,where, and for what purpose 46 Section 2~Stream Buffer-who identifies the floudp|aina 47 Minimum buffers that are not in protected watersheds-why 30 feet and not more 48 Section 6-Minimum Usable Lot Areas-should say minimum usable lot area for lots 49 that utilize ground absorption 50 30,000 or 40,00@ square feet lot'much easier to say 30.00Oor4O,DOO and not 4096 51 � 52 Bobby Nichols said that ha has stream buffers on his land that he is concerned about. 53 He made reference bn page three, section two, which . ^nmuotnammain undisturbed in �enatural 54 etate.^ and asked for ade�ndUmn. Craig ReMadi` �' idthmtifn#nmeonmowned |andthotm/aom/ithin - - ` / 7 3 I the floudpiain and wants to have any type of agricultural production or forestry,they are exempted 2 bv the majority 3 With no further public comment, Chair Allison closed the public hemr 4 A motion was made bvCommissioner Gordon, seconded bv Commissioner Jacobs to 5 refer the proposed zoning text amendments to the Planning Board for a recommendation bobe 6 returned to the Board ofCountv��ommiaoion�ran0000n�rth�n(]�o��r� 2OOO ' ' ' i 7 VOTE: UNANIMOUS � X ! 9 2- lO AND ll Craig Benedict made a correction to the agenda abstract that this item was apublic | 12 hearing. The abstract indicated that it was not a public hearing. 13 Craig Eenadictmade this presentation. He said that it had been four years since the 14 inception of the telecommunication rules in Orange County. /\lot of improvements have been 15 made since that time. He explained |n detail the following issues and suggestions. A section of 18 definitions could be added that describes the different types of antennae arrays that can be on the 17 towers. He explained the possibility of putting towers on existing structures such as hote|o, stn. lO One of the suggestions ia for the County hm put together a master plan where the County has more 19 involvement in the placement of telecommunications towers. Another suggestion is allowing 20 telecommunication facilities bnbeinelectrical transmission lines. Another suggestion iothe 21 development of utility corridors across the County. There are minimum standards that can be 22 augmented within the County's code to promote more co-location and multi-use. At this time, the 23 standards for telecommunications towers is that anything 200 feet and above is aQlass A Special 24 Use and |t goes to both the Planning Board and County Commissioners. |fitiw189 feet, |tiso 25 Class B and just goes tmthe Board ofAdjustment. The staff provided the County Commissioners 26 with a report over the last year, and all of the towers were Class B with a height of 195 feet and 27 above. |fe said that the County Commissioners could change the height od which the tower would 28 require a Class}\Special UaePemnit. Ha said that there were other counties and towns that were 29 putting together master telecommunication plans. The reaction tp these plans has been favorable 30 so far. He said that the Commissioners did not have to make any decisions tonight. 31 Commissioner Gordon made reference to page 7, Telecommunications Facilities, and 32 asked Craig Benedict why the facilities would be permitted as an accessory use in parks and 33 recreation greater than 1.25 acres and in community facilities. Also, at the top ofpage 9, Section 34 C, it says "it shall not be permitted within 200 feet of any residential district or residential portion of 35 aPUC} unless a property|a designated aspadofthenpecia| uti|Uxovedaydi*thct. She asked if 36 that could sometimes negate the placement in parho, recreation oneas, and community facilities. 37 Craig Benedict said that, in regards to the parks and community facilities, they were zoning 38 designations that may qr may not beon the zoning map ot this time. He said that there was 39 enough latitude in the regulations so that there were no conflicting provisions. 40 Commissioner Gordon said that community facility needed tobe defined. Craig 41 Benedict said thmtimhis previous experience. towers were located in parks where there vve*na 42 lights. He said that towers could be incorporated in parks and could sometimes reduce the cost of 43 sports lighting poles. 44 Commissioner Jacobs suggested having a differential fee structure, which would 45 encourage people to do the things that the County prefers, such as co-location. Also, regarding 46 the issue of the height of the poles, he would like for the County Commissioners to review all of the 47 applications. He said that if the requests for towers were going to the Board ofAdjustment,then 48 the County Attorney should be present ad the meetings. Craig Benedict will do some research with 49 the present ordinance and look at the rationale for the height number, which causes the application 50 bogoto the Board mf Adjustment instead mfto the County.Commissioners. Commissioner Jacobs 51 made reference to the$4,000 application fee and asked if the County's legal representation vxam 52 included in that. Craig Benedict will take s look ot the fee structure, County staff time, attorney 53 time, etc. 54 Commissioner Halkictis made reference to co-loc"'�on and said that it seemed like the ` Commissioner Carey asked about the new floodplain designations and the FEMA maps done in 1981. Robert Davis said that the maps showed established floodplains done by the FEMA. The County Engineer is in the process of working with FEMA to update the maps and to determine whether the floodplains have become wider or narrower. He said that this would not be a vesting regulation because it would be a State or Federal change. Craig Benedict said that when the new FEMA maps are available, any development that exists now would be subject to those Federal regulations. Geoffrey Gledhill made reference to the definition of usable lots and said that it appears that conservation easements are excluded. One of the uses for conservation easements is to reduce density. If conservation easements are excluded altogether from usable lots, it will prohibit the use of conservation easements to reduce density. He recommends striking "conservation easements" from the definition of"usable lot". The issue regarding septic system repair areas in Section 8, number two will be clarified and brought back to the Board. It was decided that this item would be revised in accordance with the comments made above and brought back for Board approval on a subsequent agenda. e. Chapel Hill-Carrboro City Schools Elementary School #9 Planning Funds This item was postponed to Saturday, December 5115-- 10. REPORTS - NONE 11. APPOINTMENTS - NONE 12. MINUTES - NONE 13. CLOSED SESSION A motion was made by Commissioner Gordon, seconded by Commissioner Jacobs to go into Closed Session "To discuss the County's position and to instruct the County Manager and County Attorney on the negotiating position regarding the terms of a contract to purchase real property," NCGS § 143-318.11(a)(5) Pursuant to GS § 143-318.11(a)(3) "to consult with an attorney retained by the Board in order to preserve the attomey-client privilege between the attorney and the Board." VOTE: UNANIMOUS 14. ADJOURNMENT With no further items to consider, Chair Halkiotis adjourned the meeting. The next meeting is scheduled for Wednesday, December 6, 2000 at 7:30 p.m. at the Chapel Hill Town Council Room in Chapel Hill, North Carolina. Stephen H. Halkiotis, Chair Beverly A. Blythe, CMC of assistance to him when his equipment caught fire and also when he had bugs in his pine trees. He feels that if the County Commissioners put restrictions on forestry that it will impact the people who are selling the timber. A motion was made by Commissioner Carey, seconded by Commissioner Jacobs to approve and authorize the Chair to sign the annual agreement with the N.C. Department of Environment and Natural Resources and the accompanying Memorandum of Understanding. VOTE: UNANIMOUS C. Contract for Limited Site Assessment of Underground Storage Tank (UST) The Board considered contracting with Quantum Environmental, Inc. in the amount of $20,645, to provide technical services for preparation of a limited site assessment report to the Groundwater section of the state Division of Water Quality. Public Works Director Wilbert McAdoo said that a proposal was sent out and three responses were received. This assessment will be sent to the State to identify the remaining soil contamination in the immediate vicinity of where the tanks were removed. The contamination should not be extensive. A motion was made by Commissioner Gordon, seconded by Commissioner Jacobs to contract with Quantum Environmental, Inc. in the amount of$20,645 to provide technical services for preparation of a limited site assessment report to the Groundwater section of the state Division of Water Quality. VOTE: UNANIMOUS d. Stream Buffer Zoning Ordinance Amendments The Board considered proposed stream buffer amendments. Planner Robert Davis outlined the changes as suggested by the Ordinance Review Committee and approved by the Planning Board. This item went to public hearing on August 28, 2000 and was referred back to the Ordinance Review Committee. The Ordinance Review Committee recommended to the Planning Board to approve the stream buffer ordinance. The Planning Board also recommended approval with some changes to the ordinance. The purpose of the amendments is to provide clearer language for stream buffer calculation; add new definitions for Usable Lot Area and Federal Emergency Management Agency; set minimum square footage of lots that must be unencumbered by stream buffers, easements, water bodies, wildlife corridors, etc.; and establish a minimum of 50-foot (each side) stream buffers for perennial and intermittent streams outside of Watershed Protection Overlay Districts. The zoning text amendment does not affect bona fide farming operations. If the amendments are approved, they will apply to the entirety of Orange County. Commissioner Gordon made reference to page five and the added section and asked if number two should be septic system repair areas for existing structures. Commissioner Jacobs questioned a situation where a subdivision has been approved but has not been platted. He does not think that where the septic system repair area is vested is a very clear cutoff point (i.e., upon issuance of a building permit, or platting of the property). Geoffrey Gledhill asked that section 8 be excluded from the approval and that he bring it back with a more clear explanation (i.e., at what point the vesting would occur). Commissioner Gordon pointed out that the vesting portion did not go to public hearing. She thinks the staff is going to have to come back with some possibilities and some pros and cons. Commissioner Jacobs said that it sounds like the definition of"wildlife corridor"would have to be changed to 150 feet. He said that if the County Commissioners believe that 110 meters is a valid width for a wildlife corridor, then there may need to be some recognition in the process by the person purchasing the lot that an additional amount of land would constitute a wildlife corridor. Robert Davis said that"wildlife corridors" are not mapped on the plat. Commissioner Jacobs also questioned how a buffer could be set around a body of water that may at some point in the future be eliminated (i.e., filling in a pond). Robert Davis said that if a pond were in the middle of the field, it would not be included because it would not be in the same area of the stream buffer. If the pond were adjacent to the floodplain, then the buffer would be included.