HomeMy WebLinkAboutORD-2000-140 Non-residential Approval Procedure for Subdivision, Zoning and Economic Development Ordinance Amendments ORANGE COUNTY
BOARD OF COMMISSIONER'S
AND
PLANNING BOARD
PUBLIC HEARING AGENDA ITEM ABSTRACT
Meeting Date: November 27, 2000
Action Agenda
Item No.
SUBJECT: Non-Residential Approval Procedure for Subdivision, Zoning and Economic
Development Ordinance Amendments
DEPARTMENT: Planning and Inspections PUBLIC HEARING: (Y1N) YES
ATTACHMENT(S): INFORMATION CONTACT:
Proposed Ordinance Robert P. Davis, Planner III Ext. 2580
Craig Benedict, Director Ext. 2592
TELEPHONE NUMBERS:
Hillsborough 732-8181
Chapel Hill 968-4501
Durham 688-7331
Mebane (336)227-2031
PURPOSE: To receive public comment on the proposed Approval Procedure Amendments for the
Economic Development, Commercial and/or Industrial Districts Amendments in the Subdivision,
Zoning Ordinance and Economic Development Districts Design Manual.
BACKGROUND
Request
• Amend the Approval Procedures and related sections in the Subdivision, Zoning Ordinance and
Economic Development Design Manual.
Provides for initial review by the Planning Staff of proposed subdivisions in the Economic
Development, Commercial, and/or Industrial Districts.
• Sets up all subdivisions (minor and major) in these districts to follow the preliminary plan approval
process in the Subdivision Ordinance.
• Requires all roads in these subdivisions to be public and constructed to NCDOT standards.
• Provides for a minimum lot size of 4 acres in the Economic Development Districts.
• Requires dedication of right-of-way and construction of master planned roadways in Economic
Development districts.
• Promotes service and/or frontage.road interconnectivity.
• Limits road cuts to major roadways.
• Provides for non-conforming lot development standards.
Location
Amendments will apply to the entirety of Orange County lying outside the municipalities and their
extraterritorial jurisdictions, if any.
Development Process, Schedule and Action
• Public Hearing on November 27, 2000.
• Refer amendment to the Planning Board for a recommendation back to the Board of County
Commissioners no sooner than January 18, 2001.
g:\eddielamend-sredd-abstract\ll-10-00ldg
2
RECOMMENDATION(S): Planning Staff Recommendation: Approval of the proposed
amendments as given in the attached documents.
Administrative Recommendation: Refer proposed amendments to the
Planning Board for a recommendation to be returned to the Board of
Commissioners no sooner than January 18, 2001.
g:\eddie\amend-sredd-abstract\11-10-00\dg__
Public Hearing Ordinance 3
An Ordinance Amending the Subdivision Ordinance of Orange County
Bold = Proposed Text
StFikethF9"4= Deleted Text
Amend Article 111-1)APPROVAL PROCEDURES FOR MAJOR SUBDIVISIONS by
creating a new section as follows:
III-D-1-j Approval Procedures for Subdivisions in the Economic
Development, Commercial and Industrial Districts
Initial review of all subdivisions in the Economic Development, Commercial
and/or Industrial districts shall be performed by the Orange County Planning
Staff. Following review by the Orange County Planning Staff all subdivisions
shall follow the preliminary plan major subdivision approval procedures as
specified in Section III-D-3. All subdivisions shall submit the application
requirements as specified in Section 111-1)-3-a. All roads in these zoning districts
are required to be public and constructed to North Carolina Department of
Transportation standards.
Final plat approvals shall follow the final plat approval procedures in Section III-
D-4 of the Orange County Subdivision Regulations.
(Signature) (Signature)
Clerk, Board of County Commissioners Chair, Orange County Commissioners
Date and Seal
gAeddie\W-d-1-j11 1-10-001dg
4
Public Hearing Ordinance
An Ordinance Amending the Zoning Ordinance of Orange County
Bold = Proposed Text
6tFikethFGU0= Deleted Text
Amend Article 6.29.2 DESIGN REVIEW PROCESS as follows:
Before any new site development may be undertaken in an Economic Development
District, a site plan must be approved and a zoning compliance permit issued in
accordance with the_ provisions of Article 14 (Site Plan Approval Procedures) of this
Ordinance. Prior to submission of an application for site plan approval, applicants will be
required to meet with representatives of the Planning and Inspections, and Economic
Development Departments to identify policies, procedures, regulations, and fees
applicable to development proposals.
Plans for development proposals in an Economic Development District will be reviewed by
the Planning and Inspections Department staff for compliance with the standards
contained in the following section. Such review will also be carried out in accordance with
the provisions of Article 14.3 (Site Plan Review) of this ordinance. Any proposed
subdivision in the Economic Development District shall follow, the approval
procedures as specified in section Ill-D-1-j of the Orange County Subdivision
Regulations and have a minimum lot size of 4 acres.
(Signature) (Signature)
Clerk, Board of County Commissioners Chair, Orange County Commissioners
Date and Seal
g.\eddie\6-29-2\1 1-1 3-00\dg
Public Hearing Ordinance 5
An Ordinance Amending the Economic Development Districts Design
Manual of Orange County
Bold = Proposed Text
StFikethF9tifi#= Deleted Text
Amend Part One -A CASE STUDY APPROACH as follows:
To assist landowner, developer, and citizen alike in understanding how to use this
manual, a local site was selected and "developed" in accordance with the performance
standards and design criteria contained in this document. Although the "case study"
presents a range of design considerations, it does not attempt to portray every situation.
Neither does it represent the only approach to site evaluation and design. Each site is
different; and the land owner/developer should discuss his/her ideas with the Planning &
Inspections Department and Economic,Development Commission staff to assure the
"best fit" between the site, performance standards, and design criteria.
It should be noted,as well that this Design Manual is not to be used as the only source
of information. All subdivision activity in the Economic Development District shall
follow the review and approval process as specified in Section III-D-1-j of the
Orange County Subdivision Regulations. Also, Appendix A contains a list of
ordinances, technical reports, and other information which must be used in combination
with the Manual. In addition, Appendix B contains provisions from the Orange County
Zoning Ordinance which explain the site plan approval process. A thorough knowledge
off, this information will assure the preparation of acceptable plans as well as an
expedited approval process.
(Signature) (Signature)
Clerk, Board of County Commissioners Chair, Orange County Commissioners
Date and Seal
g-.\eddie\edd-casestudy\1 1-13-00\dg
6
A Case Study Approach
To assist landowner, developer, and
citizen alike in understanding how to use
The Case Study -Site Conditions: this manual, a local site was selected and
"developed" in accordance with the
The basic premise of the "case study" is performance standards and design
that a developer has acquired a two-acre criteria contained in this document.
site and wishes to build a small office Although the "case study" presents a
complex. A prototype plan has been range of design considerations, it does
successfully used in other communities, not attempt to portray every situation.
but adjustments must be made for the Neither does it represent the only
complex to fit the site. approach to site evaluation and design.
. Each site is different, and the land
As shown on the following page, the site owner/developer should discuss his/her
is - a rectangular-shaped ` lot with ideas with the Planning & Inspections
extensive frontage (440 feet) on a major Department and Economic Development
thoroughfare leading to an interstate Commission staff to assure the "best fit"
highway interchange. Although the site between the site, performance standards,
terrain is level, the floodplain of a and design criteria.
drainage tributary flowing through the
southwest corner of the property covers It should be noted as well that this
almost half the site. Coupled with the Design Manual is not to be used as the
shallow lot depth (200 feet) and the only source of information. All
presence of a bottomland hardwood subdivision activity in the Economic
forest, the site presents formidable Development District shall follow the
building constraints. review and approval process as
specified in Section III-D-1 j of the
Orange County . Subdivision
Regulations. Also, Appendix A
contains a list of ordinances, technical
reports, and other information which
must be used in combination with the
Manual. In addition, Appendix B
contains provisions from the Orange
County Zoning Ordinance which explain
the site plan approval process. A
thorough knowledge of this information
will assure the preparation of acceptable
plans as well as an expedited approval
process.
--zAcraL-\eaa\man,ahi i_10-0o\ae