HomeMy WebLinkAboutAgenda - 04-09-2013 - 7aORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: April 9, 2013
Action Agenda
Item No. 7 -a
SUBJECT: Rogers Road Community Center Schematic Design Review
DEPARTMENT: County Manager, Asset PUBLIC HEARING: (Y /N) No
Management Services
ATTACHMENT(S):
1) Area Locator
2) Architectural Schematic Design
Renderings
INFORMATION CONTACT:
Frank Clifton, (919) 245 -2306
Michael Talbert, (919) 245 -2308
Jeff Thompson, (919) 245 -2658
1
PURPOSE: To:
1. Review and comment on the schematic design of the Rogers Road Community Center
and authorize staff and consultant to move forward with construction document
preparation and construction bid process;
2. Authorize the Manager to award a bid for construction and any unforeseen conditions
change orders for the Rogers Road Community Center in an amount not -to- exceed the
Board appropriated amount of $650,000 approved within the FY2012 -13 Capital
Investment Plan in the event that the bid award occurs during the summer break. This
bid award and subsequent construction start would be contingent upon the execution of
a Lease Agreement between Orange County and Habitat for Humanity, as well as the
execution of an Operating Agreement between Orange County and the Rogers Eubanks
Community Association ( "RENA "); and
3. Authorize the Chair to send a letter to the Town of Chapel Hill requesting that the Town
expedite the site plan review, permitting and other associated processes for the project
as well as waive all associated Town fees related to those processes.
BACKGROUND: On January 24, 2013 the BOCC authorized Orange County staff to move
forward with the development and construction of the Rogers Road Community Center located
on two lots within the Phoenix Place neighborhood owned by Habitat for Humanity ( "Habitat ").
This site is depicted on Attachment 1, "Area Locator ". Habitat will lease the site to Orange
County for a term of approximately 25 years with $1 per year lease payments as consideration.
The lease between Orange County and Habitat is forthcoming, as well a facility Operating
Agreement between Orange County and the Rogers Eubanks Neighborhood Association
( "RENA "). Both Agreements will be executed prior to any construction bid award or actual
construction activity.
The County has engaged Perkins + Will Architects as the designer for the project. Perkins +
Will is performing these professional services for the County on a Pro Bono basis. Joe Wagner
and Patric LeBeau represent Perkins + Will in this project and will present the project
renderings to the Board.
Should the BOCC approve the schematic design renderings and principles, the following
timeline represents the delivery of the overall project:
TASK
PROPOSED
BEGINNING
DATE
END BY
DATE
BOCC Action: Schematic Space Plan Approval
4/9/13
4/9/13
Execution of the Habitat Lease Agreement and RENA Operating
Agreement
ongoing
5/31/13
Construction Document Design, Bid, Bid Award
4/10/13
6/18/13
Total Project Revenues
$500,000
$150,000
Construction 6 month schedule), Opening
7/1/13
12/31/13
0
1 $650,000
Staff hopes to have the construction bid award presented to the BOCC for approval prior to the
summer break. However, should the process be completed after the June 18, 2013 regular
meeting for such an authorization, staff requests that the BOCC authorize the Manager to
award the bid and any subsequent unforeseen conditions change orders not -to- exceed the
$650,000 capital project budget.
FINANCIAL IMPACT: The BOCC has approved $650,000 for this project as part of the
FY2012 -13 Capital Investment Plan. Revenues and Estimated Expenses for this project are as
follows:
Rogers Road Community Center— Capital Project #10054
Revenues for this Droiect:
Appropriated for this groiect:
FY2012 -13
Amendment
FY 2012 -13
Revised
Professional
Arch. /Engineering
10,000
0
10,000
Construction
640,000
0
1 640,000
Total Project Revenues
$500,000
$150,000
$650,000
Appropriated for this groiect:
RECOMMENDATION(S): The Manager recommends that the Board:
1. Review and comment on the schematic design of the Rogers Road Community Center
and authorize staff and consultant to move forward with construction document
preparation and construction bid process;
2. Authorize the Manager to award a bid for construction and any unforeseen conditions
change orders for the Rogers Road Community Center in an amount not -to- exceed the
Board appropriated amount of $650,000 approved within the FY12 -13 Capital Investment
FY2012 -13
Amendment
FY 2012 -13
Revised
Professional
Arch. /Engineering
10,000
0
10,000
Construction
640,000
0
1 640,000
Total Project Appropriation
1 $650,000
0
1 $650,000
RECOMMENDATION(S): The Manager recommends that the Board:
1. Review and comment on the schematic design of the Rogers Road Community Center
and authorize staff and consultant to move forward with construction document
preparation and construction bid process;
2. Authorize the Manager to award a bid for construction and any unforeseen conditions
change orders for the Rogers Road Community Center in an amount not -to- exceed the
Board appropriated amount of $650,000 approved within the FY12 -13 Capital Investment
K
Plan in the event that the bid award occurs during the summer break. This bid award
and subsequent construction start would be contingent upon the execution of a Lease
Agreement between Orange County and Habitat for Humanity, as well as the execution
of an Operating Agreement between Orange County and the Rogers Eubanks
Community Association ( "RENA "); and
3. Authorize the Chair to send a letter to the Town of Chapel Hill requesting that the Town
expedite the site plan review, permitting and other associated processes for the project
as well as waive all associated Town fees related to those processes.
Attachment 1 : Area Locator 4
E
_ w U ANKS.RD f ' ',
t � r i „�
r d 14h47.0 40 * /ill 1
,600:,..-:,:,„:„,k,‘, ,,:::::,,, ,-,-
� xf. " ��il■■� �®:... ,./.: .., .,,,,,
�Y. 11,14.1,1„,:ti in 61.1411, -.74/11wil 0.., .
- ' '''': -• - ' **lib eisollet i
1
1IUI11lIAji), ,!♦ . vER DAIRY"RD-EXT �� -ris-'41, IN 44v,;siiii
iiiiiiii L.',;:',': ':,-..,, ,--:,.";:;; _ „ , ,...4 I I p4 .Al I 1444 I:4 1 ti Itik; 4 7114 I 14 c till"t4 P.its
..--- ., ,0 ''' ' -tr:-_,.,i, ', iv wria.tv 1. ... --*41Ilitt
C o i _ $ ig' : �������\��`��
1 W ■� O ® ■■■ ■!fJi1oad ®4'f/® : 1■4 •
•♦ �i■■ � .�■.. ���� � ��
1,411,041 <s�4 i IL Community House Parcels - �. = =.-i i..47,spa 54 Acres ► 411 2 IN f _� 4 ANN KIM ,411 Ill •
Is 011V
risilliolizerrwift, WI ■4�,4 =,III\ NEW PARKSIDE:DR t11111� i,1
�I ®,' ® r S D ■■■ ■■■■
�, , K� � g, :�� < , � ® � ■■■■■■■■■ � �� ►fir■1
1P
s >. = .III„'nll 1
I F�G psi S� /Iii �� -I ■1 Fir
Ili
-4 4111N ■w E Parcels � /\41,0t aOoN , ; „� nd I o vs pectoz os o Depaaooimo s
eeent
7 1111
fti' ll 1161:40 .ravap■sa --
Wimam '® ' . 'L_ Parcels of Interest � t , ' Oraangs e MCoaup nP ty ePpla a enn d ng aB an ncarton.ns/zs/zrtFt
. I I e I
5
ATTACHMENT2 PERKINS
+ W I L L
RENA
Community
Center
Orange
County
Chapel HUE NC
fir= v
rOUmn'an+ssiou T
'ill 0
/
e/ i eo•i eat ew as ear eo•r 80r sai as as 10,0 , ma• , CUT
a-
/ „•a 1
SETBACK m
,�a 1 LT 1 Revisions
H A ,
I
r' c
MEE
60 SIDEWALK I.DI OWE
Sheet Information
0.0. 09212019
MUM
PUREFOY DRIVE me.um nen
"1 g- cnarxea RIR
/wrova PL
Title
SITE PLAN
Sheet
A-0 1
CTOAee20191.1....
. I . I I
fi
e e • PERKINS
+ W I L L
PO BOX14747
RIP NC 27709
)5.3 parlbswlcom
10.0. IVU'• ICY 17 10'4' 10,Cf ICY 17 10.17 5 5'-a 10'0' no RENA
Community
Center
® R Orange
� -d� - ,� — / ❑ I ❑1 County
\� '1L \— �� CL CL IM�HI w'�,I I I -a %� Chp.I HIS NC
1 ,a Sr 4 k. n ❑
I 'CLASSROOM' IcusseooMl ImorsnGEl Iwoo e,w31 "` ^^� _
',. O• ® ]-T -n 1. ]1 2 ® •- 3'M 2•-0" 3'-IPa 4'¢P ❑ //0
CL a //'
a
Ali $ 'MOMENS ' Nan' wm IITCHBJI y f
CCP
12 I a ❑ ❑
9 _ -I e
a
9 ua u-0- ,2 i sa• sa sa• sa• s0• r s-0- so' IleHmrl 12 101
® _ PERSONAL STORAGE PaeoHUnORAGE _ ___ ®� •___ -
r 3 1
IrJ ❑ ❑
\I /A .! IJMJ CLI a 1'S' % — y—�
y
p+
CL R CL CL
310f S .��0 2-T ] 91tl
❑ ' Revisions
.�..
0 1CLASSROOMI II83RARr/CCMPO)Pe1 771. IGRL31 1501,1 W 2�•I InARI
/ _� _
_ on 0
NOT FOR
/� CONSTRUCTION- /4 0 I , le°. , — /� Sheen
!
®1 11 I�®I�b�b�®I�==..�I u= 1 m M . , , ,a
Information
❑
ere 082530,3
Job limber fW%.09
A..C [ww ,{ Ip)/ o
4 'MN
HV
Checked .
AM.,. 0.
'ilia
5d s'0• ¢ Io0' l0'0' 5.5 ` 5'-0 10'-0- 10.0' ` 10-0 f IV a• 10'0' 10•-0- FLOOR
PLAN
80.@
J L L
eDI FLOOR PLAN Sheet
2
1/4"=1•C• A-02
CeprIpM11e3„3P. 0,
J I 3 I 8 I ,
PERKINS
+ WILL
PP.PC277219
PO BOX19792
RENA
Community
Center
Orange
County
_ Chapel Hill,NC
ili ili q i ili ili p i qi ili p i ili ili p ili ili p ili ili q ili ili q i ili ili
V1-q
00
EEM
NORTH ELEVATION
1/4"=1'0'
Revision.
NOT FOR
CONSTRUCTION
IE oar
Sheet Information
nnziw1e
00 20191Iumber
Tkb
ELEVATIONS
EAST ELEVATION
Sheet
A-03
Cep 11me2nen...e
6
PERKINS
+ WILL
PO eo.,ee
I
RENA
Community
o Center
Orange
County
Chapel NIII,NC
" 11 101 41 11 11 101 101 4 101 111 101 4 101 111 101 10 11 41 111 10 11 41 1111 11 11 101 41 11 11 101 101 4 , ;
LLH
l•4 o•a•�, � �� as__
=___ _____
_ _
m m
_ —
SOUTH ELEVATION
1/4'1O
v
0 'Ohl Revision.
NOT FOR
,IIIIIIIIIIIIII� �IIIIIIIIIIIIII, ' CONSTRUCTION
Sh
a8 aef Infonnatlol n
00 °_
Tide
ELEVATIONS
WEST ELEVATION
1/a°=VO
Sheet
A-04
C&c,,*ea,SP.NwaN