HomeMy WebLinkAbout2013-085 Solid Waste - W L Bishop Construction Inc for CO4 Geo-Tech fabric $25,872 S a 1 s d LJ c'-3-L
Change Order No. 4
Projeci Name: Walnut Grove Convantence Center HDR Project No. 360207-142838-018
Expansion
Project Owner: Orange County Owner's Project No.:
Data of Issuance: March 15,2013
Project Contractor: Date of Contract: August 21,2012
W.L.Bishop Con3tntction Co. Original Contract Price: $887,092.00
2211 Leah Drive Original Contract Period: 120 days
Hdlshorou h.NC 21278
It is agreed to modify the Contract referred to above ae follow*:
Hera No. ltsm and Deacription of Changes Contract Price contract Time
Dooroasa Increase Dacreus Increase
i Place Goo Fabric under stone base on circle road 38,976.00 NIA MIA
2 Sops undercut based on Terra Con's report dated 121201112 _ Si,003.00 _ NIA NIA
3
Repaint exterior and replace roof on storage building 51,992.00 NIA - NIA
4 Add concrete ode at compactor areas-4 total _ $12,170.00 N/A NIA
b Add thresholds and utter to White Goods Building w $732.00 N/A WA
Sub-Total $26,872.00
Difference Net S26,872.00
Summary: It is agreed to modify the Contract referred to above as follows:
Contract Price prior to this Change Order Contract Time prior to this Change Order 1
J$951,928.00 1 120 Days i
Not Contract Price increase(Decrease)of this Change Order Net Contract Time Increase(Decrease)of this Change-e--Order
$25.872.00 1 NIA I
Revised Contract Price with all approved Change Orders Revised Contract Time with all approved Change Orders JJJ
1$877,800.00 NIA
The changes Included In this Change Order are to be accomplished in accordance with the terms,stipulations and
conditions o the original t; bract al.ihesrgh included therein.
2-4s /3
�ccepted Contfact<3 y Date
comniended for Approval F�pR Enron g.Inc of the Carolinas) Onto
f
Approved tot Owi inf b . Attest Dato
Distribution IX Owner 1X 1Contractor �X Office (Field Other
(�„j j t i CNANGORD DOG
Back-up Costs
Line item Description (Subs/Material) Bishop Costs/Labor Mark-up Mark-up% Bishop Total
1 Geotextile Fabric Attachment
$8,904.60 $0.00 $1,070.40 0.12 $9,975.00 John H Wilson Invoice
2 Soil Under Cut $1,003.00 $0.00 $0.00 0.00
$1,003.00 TerraCon Report#70121071.0042 Unit Cost Item
Collins Roof&Gutter 1,100-Reliant Paint 540-Bishop
3 Storage Building Repair $1,640.00
$185.00 $167.00 0.10 $1,992.00 Labor and Material 185-WL.Bishop Note Sheet
4 Concrete Pads W L Bishop Note Sheet,Email to Jerry Smith on rebar,
$9,117.00 $4,991.00 $0.00 0.00 $12,170.00 includes credit or 1938 for asphalt
5 White Goads Building $420.00 $312.00 $0.00 0.00
$732.00 W L Bishop Note Sheet,threshold print out
I
I
Au.
� av
Jahn H Wilson and Son Grading and Paving Inc.
3716 Mount Zion Church Road
Mebane, NC 27302
Phone (336) 578.1916 Fax(336) 578.0006
E-Mail:jhwilson @netpath-net
OWNER'S PHONE GATE
NAME - OIO
STREET JOB NAttC��-#4- ! 10C NUMBER
Yn dt
CITY - STAT£ STTt£CT
EXiSTfN6CONfRACT iYU}ABER BATE Of-EnlSiif;O CONUIT.CT CITY SPATE
You are authorized to perform the following specifically described additional work.
677F 2
1
�2-
31
1
I
ADDITICDNAL HARGE FOR ABOVE IfifOR K IS:
Payment wilt be made as follows:
i Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated.
t
Date __ Authorizing Signature
{ovniep saa,YS aaest}
Wo hereby agree to furnish labor and materials-complete in accordance with the above specifications,at abovo stated price.
i
Authorized Signature __ _ __ _ Date
!y S {CW;72UMCa s1Gh5t4GNE}
a 1, a,5.ay- I�cSa' ?-.a I, N... "Ci a`.} s.-'rte '.. - ...._ sea� ,x `i.¢ ...-.,-._......._. _...,...-,.... ._,__._•__.....__ ...-_._...__..... -.___...__......,.,-,-.
NOTE:This lie Fs'on bix:amos part of,and in eoalo—ance wipe,the eamlin0 Cori'act.
�._....�:_�.._•_______.:,___......_ -x�ro-_._.:. '+.. J_; ..,�._...�._�.�T:.,_,,.__..._�_..__....—.....max:_-.:�..._...r,:c:- ___-...._ .._._..
Cabins RWfing&Met 5eivke
Specializing In Roofing F ,� s�:�;,
g &Seamless Aluminum Gutters ; r = $ C 3 1 7737
dX L-17-1 4004 Lattimore Drive
HILLSBOROUGH, NC 27275
(929)688.3385
TO
Al
u
UR3MS.
tTE5i72�P7tOtS�
77 FRIG' AMEWNT
}
I
1
}
}
,
}
1
1
3
t
i
i
t
i I
( i
1
i
I
}
i
r I
}
Thank You
I
DEC6FIAMNO
RELIANT
Painting Company
P,O.Box 61749 Phone-, (919)596-0790 1440 S.Briggs Avenue
Durham,NC 27715 Rix: (9 19).596-0770 Durham,NC 27703
reliantpainting@froiitier.com
February 5, 2013
Painting Proposal
To.Jerry Smith 1 W. L.Bishop Construction
Re: Walnut Grove Convenience Center
Propose to paint the exterior of relocated shed at the front of t relocated shed at the front of the
center:
$540.00
Any Questions please call Dennis Walsh (919)201-1802
t
•
LIGHT INDUS� C"MM�C� DESIGN-BUILD
CONSTRUCTION COMPANY
CO#4
Compactor Pads
WLB Labor—$4,991.00
Material—rebar, concrete, forms etc-7,148.00
Equipment—$1,475.00
Re-set stone-$494.00
Sub-Total$- 14,108.00
ASPHALT CREDIT_$1,938.00
Total $12,170.00
White Goods Building
Thresholds/Gutter Downspout
Material -$420.00
Labor$ 312.00
2211 Leah Drive Suite 1
+ Hillsborough, NC 2727E
Phone;919-732-2546
Fax:919-732-3049
v m Web: http://www.wlblshop.com
E-Mall: info@wlbishop.com
^ .
^ `
Jerry Smith Friday,March 1,2013 3:3#029M Eastern Standard Time
Subject: RE:Walnut Grove Pricing
Dote VVednasday,February 13,3O1311-Z6:24PK4 Eastern Standard Time
From: Ben Kelly
To: Jerry Smith
Jerry,
Sorry for the delay onthis. |t has been u busy week and|have been out oftown. I've been working atnight
to catch up.
Here's our quote based on the following conditions:
l. Price is Based on Pickup|n[raedmoor
2. 164 pieces of 95's are based on 20-0(is this correct?Please call me on the cell phone to confirm this)
$2,693.00 plus tax for pickup in[reedmoqr. Please confirm that the 164 pieces you need are ZU`D. Please
let me know ifwu are toproceed.
Thanks!
Ben
Ben Kelly
HanisRpbar
819'714'2865
From:Jerry Smith[no|ho:jerry@w[b|shop.cnm]
Sent:Wednesday, February 13, ZO13 10:02 AM
To: Ben Kelly
Subject. RW;Walnut Grove Pricing
Importance. High
Hey Ben,you have anumberfurth|syet77
Thanks,
JERRY SMITH |
mojectwanager �
)
VV.L Bishop Construction Co. |
(919)732'2546(p)
(919)73z-304 (R
(9i9)667'4zzz(]
_
From:Jerry |
Date Mon, 11 Feb ID131O54:57'06OO
To:Ben Kelly
Subject:Walnut Grove Pricing
Page 1mf2
...esnolds and Weatherstripping 1414S l Hager 2114/13 2:36 PM
r
w � R A' b i' ,. <. ..1�.� x 3 ...er iv':. .,.. nf,� _li., x•3)'_.s r�. i .... .. ..«
Home>Products>Thresholds&Weather stripping>Saddle Thresholds>414S
u�
Application: -Available with Sure-Step non-slip abrasive coating
5"Saddle Threshold
Saddle Thresholds
Print Specs add to My Jobs
t
v Finishes: -h4lL,D8A.Gl.O.MEB
S'(127 trim) i
s s Width:
518"(is,J min)
Height:
Fasteners:-910 x 1-V2"sheet metal screws.other screw types and anchors available upon request.
Notes: •tdtt.finish thresholds are supplied%An zinc plated screws
•Blass thresholds are supplied with brass screws
Color anodized thresholds are supplied with screws plated to malah
Stainless steel thresholds are supplied with stainless steel strews.
UB
v r r 987 CL w
PART tam
s► ► � i
hrip://www.hagerco.com/products/thresholds-and-weatherstripping/saddle/4145 Page 1 of 1