Loading...
HomeMy WebLinkAbout2000 NS IT - Contract for County Web Site Redesign ---------------- ----------------------- ------ ----------------------------------------------------------------------- ------------­-3----------- Orange County Web Redesign Project Background Inet Staff Committee has been meeting since 1997 to guide Web and Intranet development Current site assessment and needs analysis conducted Spring 2000 by NC Dept of Commerce Information Technology Services(ITS) Assessment study, coordinated by Inet Committee and with Department Directors, resulted in prototype Web site appearance, project plan and scope of work Web Redesign Project Objectives • Update and Streamline the Web Site 1. Review existing content and modify existing content accordingly to reflect the current services provided by the County 2. Establish a web presence for departments not now represented • Make the Web Site More Engaging and Easier to Use 1. Redesign the Web site to contain consistent appearance and navigation components but allow for each department to customize their"look and feel'to properly express the uniqueness of the service they provide.The"look and feel"for each departmental web site will be driven by color, graphics, and content. All departments will use standard site navigation and style sheets. 2. Define requirements for on-line access to and submission of forms(e.g.,volunteer applications) pertaining to specific departmental needs 3. Define technical and functional requirements to support a bilingual web site 4. Navigation of the sites(main and department pages)will be standardized, easy to use, and logical in flow. 5. Redesign to ensure the Orange County web site is compliant with the NC Technical Architecture and web design standards adopted by ITS that include both international Web standards and standards for accessibility for disabled persons. • Make the Web Site More Useful and Maintainable for County Staff 1. Identify tools to track standard web statistics to effectively monitor site activity 2. Simplify Web site maintenance and update for Orange County personnel Web Redesign Project Scope Expertise Provided by ITS Team-Graphic Designer, Process Analyst, Project Manager,Technical Architect,Web Developer(2),Technical Writer Project elapsed time between 16 and 24 weeks for entire project, first Web redesign results public within 8 weeks Three Phase Effort- Phase I-Current Web Site Conversion/Redesign (4-8 weeks, cost not to exceed$58,715-729 Hours) Phase 11- Departmental Web Site Development(8-12 weeks, cost not to exceed$58,983- 727 Hours) Phase III- Intranet Redesign (4 weeks, cost not to exceed$20,098-250 Hours) Total cost not to exceed$137,790, up to 1,706 person-hours, average rate of$646 per person-day 06/15/00 -------------------------------------------------------------------- ----------------------- ------------------------------------------------------- 4 . ei i*ComIS3lQTIBr: Own ���Caurtt �t� f��T�ctaC�g� �sory`C�mm�kte� w The ITC feels strongly that Orange County should have an effective Web presence that addresses the needs of all County stakeholders. This has been a fundamental part of the County's strategic plan for information technology, and this direction is wholeheartedly endorsed by the ITC. Web-enablement is for both Internet and intranet accessible resources; we believe that the County IT staff has done significant work in helping move the County forward in this area, especially given the limited resources for this type of work. Technology in Web delivery of information is progressing very quickly, however, and we feel that there is significantly more that can now be done to improve the effectiveness of the County's web presence for the citizenry as well as the County staff. The County IT staff, in conjunction with the Inet Staff Committee, has developed a proposal to be completed by the State ITS team to consolidate the gains so far and to redesign the County's web site. This work will update the Web site and make it more efficient, easier to use and more engaging, as well as make it more usable and maintainable by the County staff. It will position the County to Web-enable access to more dynamic data base:driven information. Additionally, this work will ensure that the County's Web site is congruent with the emerging State standards for Web and E-Commerce architecture. The ITC supports the three phases of the Web Redesign Project. We feel that this is a good use of resources with sound deliverables. The County IT staff has the ability to review these deliverables at each phase, and in the event that funding or resource difficulties are encountered, the County will have useful updates to its Web site in place at each step. The ITC encourages the commissioners to fully support this initiative. • W/ a7 5 N.C.Department of Commmv Office of Information Technology Services ................................. Project Concept Department/Agency: Orange County Project Name: Orange County Web Site Redesign Project Sponsor: Dick Taylor/ Beverly Blythe Current Phase: Discovery Project Manager Name: Natalie McQueen Project Manager Phone: 733-6416 Project Manager Fax: 733-6570 Project Manager E-Mail: Natalie.McQueen @ncmail.net 1. Purpose Orange County requested BTS assess their current Internet and Intranet websites to determine how to redesign the content and appearance to better convey the image that Orange County wants to present to its citizens and employees. 2. Objectives The stated project objectives are: • Assess the existing Orange County internet and intranet sites to determine how to best redesign both web sites to reflect Orange County's vision and personality • Review existing content and modify the information accordingly to reflect the current services provided by the County • Establish a web presence for smaller departments • Streamline the update process and introduce the use of automated tools for maintenance • Design standard style templates and graphics • Define calendar update requirements • Define requirements for on-line access to and submission of forms (e.g., volunteer applications) pertaining to specific departmental needs • Provide hosting and maintenance support services for the internet site compatible with the existing IT infrastructure of Orange County • Define technical and functional requirements to support a bilingual web site • Identify tools to track standard web statistics to effectively monitor site activity PC516V4.DOC—OC Internet FINAL WTS 6 N.C.Department of Commerce Office of Information Tecmnoloff Services ................................. 3. Benefits • A redesigned web site will convey the true essence and mindset of Orange County-it will provide the first and, hopefully, lasting impression of the County. • Navigation of the sites (main and department pages) will be standardized, easy to use, and logical in flow. • Redesign of the sites will contain consistent components (e.g., navigation) but will allow for each department to customize their "look and feel' to properly express the uniqueness of the service they provide. The "look and feel' for each departmental web site will be driven by color, graphics, and content. Standard site navigation and style sheets will be used by all departments. • Orange County personnel will be able to maintain the pages via simple maintenance tools that BTS will identify and test. Training will be offered on selected tools. • Redesign will ensure the Orange County web site is compliant with the NC Technical Architecture and web design standards adapted by ITS that include the following: • NC GILS -North Carolina Government Information Locator Service Standards for Public Information • IEEE—Testing and Design Standards • American Disability Act (ADA)-Standards for the visually impaired • WK—World Wide Web Consortium design standards • Method/1 — Project Management and Development Methodology 4. Scope The scope of this engagement is to provide technical assistance to Orange County Information Systems (OCIS) for the redesign of the existing Internet and Intranet sites. Work will be executed in phases, and OCIS has the right to terminate this agreement at the end of each phase. Based on the recommended design approach and complexity of this project, the estimated duration for this project is 16-24 weeks. A high-level description of each phase is provided below. 4.1 Phase I -Current Internet Web Site Conversion & Redesign (4-8 weeks) ➢ Definition, design, and implementation of internet home page ➢ Design and development of standard style templates Hosting and maintenance strategy 4.2 Phase II - Departmental Web Site Development (8-12 weeks) ➢ Definition, design, and implementation of primary links from home page (departments and agencies) 4.3 Phase III -Intranet Redesign (4 weeks) ➢ Definition, design, and implementation of intranet home page Maintenance strategy ➢ Design and development of standard style templates PC516V4.DOC—OC Internet FINAL W/ S 7 N.C.Department of Commerce Office of Information Technology Services ................................. 5. Assumptions General • Links will be added as content becomes available throughout the project life cycle • If additional hours are needed for any role, a change request(that can be generated by either BTS or OCIS)will be submitted for both parties' signature. • It is the sole responsibility of OCIS to access and approve the funds in the change control budget. The change control budget should not exceed 15% of the estimated cost for each phase. • Cost projections for each subsequent phase will be included in the phase transition plan following a reassessment of the project scope. Phase II • A standard page layout template will be used for all departments. Departments will have the flexibility to change color, graphics, and fonts but cannot alter the functionality of the template. If a department wants a different web representation, the effort will be costed separately from this effort. • Departments will be responsible for compiling or developing site specific content • The client has not established the priority for designing the individual departmental websites. For simplicity, each department has been listed in alphabetical order in the high-level work breakdown structures. Assigning a priority to each department will insure that the most citizen critical sites are addressed first. Phase III • The hours estimated to create a new intranet site are based on the premise that all current information can be consolidated into three main areas—Employee, Government Administration, and IT/Systems. This will create a simplified and streamlined site that should be a relatively small effort on BTS' part. 6. Current Status Although functional, the existing Orange County web presence does not adequately convey Orange County's vision and personality. An initial assessment of the site(s)yielded the following conclusions: • Navigational links are inefficient and lack uniformity • Large majority of the pages are static • Multiple county departments and services lack a web presence • Site maintenance is labor intensive and inefficient • Site(s) lack the support and technical expertise of a dedicated web master • The site does not convey the true essence and mindset of Orange County • The site is not compliant with web design standards adapted by ITS such as: • NC GILS- North Carolina Government Information Locator Service Standards PC516V4.DOC–OC Internet FINAL NTS 8 N.C.Department of Commerce Office of Information 7echnolov Services ................................. • IEEE—Testing and Design Standards • American Disability Act (ADA) -Standards for the visually impaired • WK—World Wide Web Consortium design standards • Method/1 —Project Management and Development Methodology WebTrends was used to evaluate the overall integrity and size of the existing Orange County web site(s). The following table highlights the specific site statistics used to evaluate the existing site: Site Overview Total Site Size 77095K w N Total Number of Broken References 197 Total Number of Unique Broken Links 61 L Total Number of Other Errors ( including Invalid e-mail addresses) 33 m c m Total Number of URL Syntax Errors 0 Internal Links Verified OK 2394 Redirected Links Verified OK 43 URL Not Found 47 Other Errors(Too Many Redirects) 7 Unverified 172 m _ External Links Verified OK 132 Y External Invalid E-mail Address 2 J External Redirected Links Verified OK 25 External URL Not Found 14 Extemal Other Errors(Too Many Redirects) 8 External Unverified Links g7 PC516V4.DOC—OC Internet FINAL / �7 9 W N.C.Department of Commerce Office of Information Technology S—ces ................................. 7. Responsibilities 7.1 Business Technology Services The project team will be comprised of the following resources that will perform the specified tasks: Project Manager ' Develop and manage project schedule • Communicate with IS and Clerk's Offices, Commissioners, IT Committee and Inet Committee as appropriate • Complete status reports • Review deliverables • Determine approach and create work plan for next phase Business Process Analyst • Document goals, benefits, and scope • Review provided documentation • Document processes • Define and document business requirements • Conduct facilitated sessions with user community • Analyze risks and transition impact • Review software alternatives Graphic Designer • Designs visual components(everything from adhering to client's identity to graphic impact and style) • Performs routine graphics design and consultation work. Work involves site design and layout including graphic illustrations. • Constructs database design as needed (e.g., how does visual design integrate with and complement database-driven web sites?) • Ensures compatibility of graphics design with the technology of the web site(e.g., which browsers will work with the site?What is the lowest common denominator for screen resolution, colors etc.)? • Determines levels and degrees of interactive design Web Developer(2) • Develop prototype design to establish look and feel of web site • Create templates for web page • Contribute on all technical/architectural decisions/documentation ' Participate in creation of client questionnaire ' Develop graphics and style sheets • Designs content(content developed for a static medium (such as print)often needs to be revised to work in an interactive medium). • Perform document conversions as needed PC516V4.DOC—OC Internet FINAL MTS 10 N.C.Department of Commerce Of ice of/nf—bon Tecnnolo�Services ................................. Technical Architect • Review business requirements • Aid in design requirements for technical architecture • Define potential technical architecture based on requirements Technical Writer • Create test plans • Perform acceptance testing • Assist in documentation process 7.2 Orange County • Assign subject matter experts to project in a dedicated capacity • Participate in facilitated sessions, as needed • Review documentation thoroughly and in a timely fashion • Provide all necessary documentation to process analyst • Provide timely signoff 8. Deliverables and Work Products Standard work products will be delivered in every phase. The following deliverables will be produced according to the schedule below: Discovery Project Initiation Agreement Project Concept Phase I Site Definition Document Prototype mock-ups and/or demo site Internet site Home Page Phase II Site Definition Documents for each department modified/created Prototype mock-ups Departmental intemet sites Phase III Site Definition Documents Prototype mock-ups Service Level Agreement Project Closure report Intranet site PC516V4.DOC—OC Internet FINAL W TS 11 N.C.Oepxtment of Commerce Office of Information Tecnnolov Services 9. Schedule The proposed schedule for completion of this project is 16-24 weeks following completion of the Discovery Phase. The high-level Work Breakdown Structure (WBS) for each phase is summarized in the following tables: Phase I Current Internet Web Site Conversion & Redesign Phase I Task/Deliverable Estimated Responsibility Duration(hrs) Project Planning and Management Project Planning & Management 60 Project Manager • Planning &Strategy Meetings • Status Meetings • Status Reports • Client Review/Approvals Site Definition and Prototyping Develop Site definition document 40 Process Analyst 8 Technical Writer Review/Select Tools 2 Technical Architect Develop Site Architecture 4 Technical Architect Design Design Graphics(20—30 pages) 81 Graphic Designer Design Templates&Graphics for Departmental 48 Graphic Designer Web Pages 24 Web Developer 8 Process Analyst Implement Home Page(1) 32 Web Developer Implement Welcome Center Page(2) 32 Web Developer Implement About OC Page (4) 16 Web Developer Implement Meet Your Local Government(6) 16 Web Developer Implement Search Page & Establish Site Index(2) 12 Web Developer Implement Resources Beyond Orange County (20 12 Web Developer + External Links) Implement News&Agendas Page(4) 16 Web Developer PC516V4.DOC—OC Internet FINAL WTS 12 N.C.Department of ComMme Of/ice of Information T-h—Off Services ................................. Phase I - Current Internet Web Site Conversion & Redesign Phase I Task-f Deliverable Estimated Responsibility Duration (hrs) Design & Implement News &Agendas Backend 80 Web Developer Functionality • On-line Updates • Content Queries Implement Calendar Page(3) 16 Web Developer Implement Employment/Personnel Page(s) (5) 4 Web Developer Design & Implement Personnel Backend 80 Web Developer Functionality • On-line Application (download only) • On-line Job Postings ( updating/creation) Database Development 16 Web Developer Implement Contact Us Page(2) 4 Web Developer Implement Kids Page(1) 4 Web Developer Implement Economic Development(2) 8 Web Developer Site Content Conversion 60 Web Developer Content Review& Modifications 24 Multiple Test Unit Testing 8 Web Developer Integration Testing 8 Multiple Site Modifications/Updates 24 Web Developer PC516V4.DOC—OC Internet FINAL WTS 13 N.C.Department of Commerce Office of Infamafian Tecnnoioff Services ................................. Phase II - Departmental Web Site Development Phase II Task/Deliverable Estimated Responsibility Duration (hrs) Project Planning Project Planning & Management 40 Project Manager • Planning & Strategy Meetings • Status Meetings • Status Reports • Client Review/Approvals Site Definition and Prototyping Departmental Interviews/Information 120 Process Analyst Gathering Develop Site Definition documents 32 Technical Writer Design Modify Graphics 40 Graphic Designer Implement Aging Home Page 16 Web Developer Implement Child Support Enforcement Home 16 Web Developer Page Establish link(s)to Orange County Schools, 3 Web Developer Courts, and other outside agencies Implement County Manager Home Page 16 Web Developer Implement Economic Development Home 16 Web Developer Page Implement Board of Elections Home Page 16 Web Developer Implement Emergency Management Home 16 Web Developer Page Implement Environment and Resource 16 Web Developer Conservation Implement Finance Home Page 16 Web Developer Implement Health Dept 40 Web Developer ■ Animal Control • Dental ■ Environmental • Personal ■ Health Education (new) PC516V4.DOC—OC Internet FINAL t =TS 14 N.C.Department of Commerce Office of In/wmatron Technology Semces ................................. Phase II - Departmental Web Site Development Phase II Task/Deliverable Estimated Responsibility Duration (hrs) Implement Housing/Community Development 16 Web Developer Implement Human Rights and Relations 16 Web Developer Implement Planning Home Page 16 Web Developer Implement People and Places (6) 36 Web Developer Implement Libraries Home Page 16 Web Developer Implement Public Works Home Page 16 Web Developer Implement Purchasing Home Page 16 Web Developer Implement Recreation & Parks Home Page 16 Web Developer Implement Register of Deeds Home Page 16 Web Developer Implement Sheriffs Office Home Page 16 Web Developer Implement Social Services Home Page 16 Web Developer Implement Tax Assessor- Home Page 16 Web Developer Implement-Arts Commission Home Page 16 Web Developer Implement Solid Waste/ Recycling Home 16 Web Developer Page Test Testing 40 Technical Writer Site Updates/Modifications 40 Web Developer PC516V4.DOC—OC Internet FINAL WTS 15 N.C.Department of Commerce Office of Information recbnology Se ce ................................. Phase III -Intranet Redesign Phase III Task/ Deliverable Estimated rr Responsibility Duration(hrs) Project Planning and Management Project Planning &Management 22 Project Manager • Planning & Strategy Meetings • Status Meetings • Status Reports • Client Review/Approvals Site Definition and Prototyping Joint Application Design (JAD) Session 20 Process Analyst • Information gathering and consensus building for the look, feel, and functional requirements for the intranet site Information Gathering 16 Technical Architect Site Definition 8 Technical Writer Develop site look&feel/Screen Shots 8 Graphic Designer Design Design Graphics(10-15 pages) 8 Graphic Designer Implement Home Page(s) 8 Web Developer Implement OC- Employee Page 6 Web Developer Implement News& Notes Page 2 Web Developer Implement Directories Page 4 Web Developer Implement Personnel Page 4 Web Developer Implement OC-Information Technology & Systems 6 Web Developer Page Implement miscellaneous links 8 Web Developer Implement Data Inventory 4 Web Developer Implement OC-Government Administration Page 8 Web Developer PC516V4.DOC—OC Internet FINAL N/ a7 16 N.C.Department of COmmerce Office of Information recnnoiogy Services ................................. Phase III - Intranet Redesign Phase III Task/Deliverable Estimated Responsibility Duration (hrs) Forms 16 Web Developer On-line Scheduling 16 Web Developer Boards &Commissions 4 Web Developer Minutes Index 4 Web Developer Data Conversion 40 Web Developer Content Review& Modifications 4 Process Analyst 8 Web Developer Test Integration Testing 10 Technical Writer Phase Transition & Documentation Complete Site Documentation 8 Technical Writer Service Level Agreement 8 Technical Writer PC516V4.DOC—OC Internet FINAL Io . TS 17 N.C.Department of Commerce Office of In/wmation Technology Services ................................. 10. Budget The cost estimate(s) for each phase are based on contract bill rates for the Project Manager, Process Analyst, Technical Architect, Graphic Designer, and Web Developer(s). The project will be tracked via ABT Workbench against the defined task. Phase I Role Estimated Rate Cost Hours Graphic Designer 129 $67.00 $8,643.00 Process Analyst 53 $95.00 $5,035.00 Project Manager 60 $95.00 $5,700.00 Technical Architect 6 $92.00 $552.00 Web Developer(2) 473 $81.00 $38,313.00 Technical Writer 8 $59.00 $472.00 Estimated Cost— Phase I 729 ---- $58,715.00 Phase II Role Estimated Rate Cost Hours Graphic Designer 40 $67.00 $2,680.00 Process Analyst 120 $95.00 $11,400.00 Project Manager 40 $95.00 $3,800.00 Technical Architect 0 $92.00 0 Web Developer(2) 455 $81.00 $36,855.00 Technical Writer 72 $59.00 $4,248.00 Estimated Cost—Phase II 727 ---- $58,983.00 PC516V4.DOC—OC Internet FINAL 1 O/ a7 18 N.C.Department of Commerce Office of lnfwm h-7ecnn.Off Services ................................. Phase III Role Estimated Rate Cost Hours Graphic Designer 16 $67.00 $1,072.00 Process Analyst 24 $95.00 $2,280.00 Project Manager 22 $95.00 $2,090.00 Technical Architect 16 $92.00 $1,472.00 Web Developer(2) 138 $81.00 $11,178.00 Technical Writer 34 $59.00 $2,006.00 Estimated',Cost—Phase III 250 --- $20,098.00 All Phases Role Estimated Rate Cost Hours Graphic Designer 185 $67.00 $21,239.00 Process Analyst 197 $95.00 $26,220.00 Project Manager 122 $95.00 $11,970.00 Technical Architect 22 $92.00 $5,152.00 Web Developer(2) 1,066 $81.00 $104,976.00 Technical Writer 114 $59.00 $3,304.00 Estimated Cost—All phases 1,706 ---- $137,796.00 PC516V4.DOC—OC Internet FINAL wTS 19 N.C.Department of Commerce Office of Inf—at—TmhnoloV Services 11. Change Request Process Change Management should be invoked when a change occurs to process, approach, roles, as well as scope. The essential purpose of the change control process is to identify every situation that is different from the original understanding and agreements and determine how the changes may impact functionality, schedule, or cost. If additional hours are needed for any role, a change request (that can be generated by either BTS or OCIS)will be submitted for both parties' signature. It is the sole responsibility of OCIS to access and approve the funds in the change control budget. The change control budget should not exceed 15% of the estimated cost for each phase. Based on the estimated cost projections for Phase I the change control budget is approximately$8.800.00. 12. Issues / Risk Risk management is an important component of any project. Risks tend to fall in one or more of the areas defined below. While risks will be assigned to a single category, clearly many risks cross multiple categories. Expected risks associated with the redesign of the Orange County web site are: Category Risk Mitigation Strategy w Cost ■ Failure to approve Project Concept/ • Obtain OCIS approval and funding Statement of Work based on Project Concept • Failure to properly manage project • Provide information to OCIS early in schedule and deliverables the process to determine if the cost ■ Failure to identify and acquire resources is feasible for development and implementation • Develop alternative solutions and contingency plans • Utilize proven project management strategies and frameworks to insure the Quality, Cost and Delivery Schedule Schedule ■ Failure to develop a project plan/WBS • Manage by the 80-hour rule to that adequately addresses risk, ensure the slippage is not significant dependencies, and miscellaneous ■ transition issues Institute an effective change procedure • Development window may exceed window of opportunity for customer PC516V4.DOC—OC Internet FINAL W TS 20 N.C.Department of Commerce Office of Information TecnnoloV Senr ................................. Category Risk Mitigation Strategy Technical ■ Failure to close critical technology, • Identify standards and design/ function, standards, and information gaps develop system architecture based • Backward browser compatibility beyond on approved standards version 4.51 Netscape and 4.0 IE will • Identify and obtain buy-in on prevent use of DHTML in overall design of functional and business site. requirements • Hire skilled and experienced contract personnel as needed • Develop plan and manage knowledge transfer • Provide links to download newer versions of browers Operational ■ Failure to properly assess OCIS • Review processes to optimize information systems to determine the resources and identify functions to required level and method of integration be included in enhancement • Develop a detailed design specification that includes a detailed data model and maps all required data interfaces Organizational ■ Failure to obtain organizational/agency • Establish consensus among agency buy-in senior management • Develop effective communication plans 13. Technologies Employed and/or Application Architecture The technical architecture, as mandated by IRMC, must accommodate rapid rates of change in both business and technical environments. The proposed web design should support standard browsers as the interface for the user. In addition, standard developmental tools for accessing and updating the site(s) must be defined. The site architectural requirements should effectively address the site life cycle. This includes navigation, data submission and acquisition, and authentication. Specifically, the site must also include the architecture to support shared or common applications; GroupWise communications tools, and secure transactions. Lastly, the architecture should include the necessary components to effectively manage the site long term. This includes technical support, operation and storage management, performance monitoring and tuning, security services, and disaster recovery. Reference the IRM Technical Architecture Standards website for the detailed technical architecture requirements. PC516V4.DOC—OC Internet FINAL t W TS 21 N.L.Department of Commerce Office of Information technology Services ................................. 14. Business Requirements Site redesign is the primary objective of this project. The intent is to provide a standard "look and feel'for the Orange County web site that reflects the progressiveness and diversity of the community. .-An doing so, BTS will develop standard style templates and graphics that will: • Convey the true essence and mindset of Orange County. • Standardize and increase efficiency of the site navigation (main and department pages). • Facilitate timely and efficient updates and maintenance. • Ensure compliance with the NC Technical Architecture and web design standards adapted by ITS. Item Business Requirements 1 Develop standard web style templates for the home page and departmental web sites. This includes but is not limited to Site Navigation and supporting graphics for the home page, departments, and intranet site(s). 2 Review existing content and modify the information accordingly to reflect the current services provided by the County 3 Ensure smaller departments establish a web presence on the internet site 4 Streamline maintenance process and introduce the use of automated tools for ongoing support 6 Provide mechanism for calendar updates 7 Allow for on-line access to and submission of forms(e.g., volunteer applications) S Provide hosting and maintenance support services for the internet site compatible with the existing IT infrastructure of Orange County 9 Identify and track standard web statistics to effectively monitor site activity 10 Define technical and functional requirements to support a bilingual web site PC516V4.DOC—OC Internet FINAL T�+ t W T a7 22 N.C.Department of Commerce Office of Information Technologf 5ennces ................................. 15. Conceptual Design A detailed summary of the site design and layout is included in the site definition document. The proposed site design is illustrated in the screen shots below: ' Jill NW/Mswebt0!sips stale nc.udod . .. ......... ....... ___ _... .. .. ... .... Orange County Census Rate C Iwan Exceeds the National Average N O R r N C A R O L I N A HomeWelcome to orange county,drkft Visions , of tommarrow with technobW of today � r Welcome Center Departments 6 Services A TX ' NEM. About Orange County ` C Meet Your local Government Economic Dm1oplitent a N People and Places Frequently Asked Questions Search } Contact Us C.yvdrM$20M OUer.C-nty.N.nA Corolla.USA PI.as —d.ommeband.rr..aoo.t.webrnaS2er@co.orange.nc.us �illillimillillilillillll 011 m PC516V4.DOC—OC Internet FINAL 1 MTS 23 N.C.Department of Commerce Office of Information Technology Serves ................................. 14 �f Ftip://blsvrtbl02.sipa.state.rc.us/ocM/ekmmMm ' range oUJ219F (Dim ftOR00 NOarN GAaO tINA �; CJeetogpMaYVarctimefarptar.- \ t ri 7 AVaBable Land ; Welcome Center Econandc,Devallopmelt a Local Econony Business Citizen Purtataelt srttar Busitaae Resource code The"ciBusiness,Carter poful in Orange _._ Courty ctlxnr a wet helpful ut the ctwn �raiegic Goals WW vaMebb reaalaces abort the ooutY 9.v wrieh they N"n. Business M Butnses • t qWEducation C*pydeht 4s000 Orange count/,Node Carolina,USA Pl.—send romm.nb and sulig.M..to webmaster@co.orange.nc.us 3 16. Next Steps The recommended next steps for this project as defined include: Item Next Steps 1 Review and Acceptance of Project Concept 2 Authorization of Funding 3 Approval/Acceptance of Preliminary Design 4 Review/Approval of Site Definition Document PC516V4.DOC—OC Internet FINAL WT 24 N.C.Department of Commerce Office of Information Technology Serves ................................. 17. Project Signature The signature below indicates understanding of and agreement with the project approach outlined above. BTS and Orange County Agree that: • The estimated cost is detailed in the table below. Should the size or complexity of the project change, or in the event that the scope or schedule changes, BTS will create a change request. Orange County will be billed for all additional expenditures and will be required to remit payment to BTS for services rendered. • This document represents BTS'commitment to create the deliverables set forth in this document. • This document represents Orange County's financial commitment to this project. • Orange County agrees to provide billing information to BTS. Orange County Information Systems Richard J. Taylor(please print) Director Signature Date Orange County Clerk to Board County Beverly Blythe (please print) Commissioners Signature Date PC516V4.DOC—OC Internet FINAL r WTS 25 N.C.Department of Commerce Office of Information Technoiogy Services ................................. BTS Project Manager (please print) Signature Date Additional Information Required Bill Code: Full Cost Center: Department: Primary Contact PC516V4.DOC—OC Internet FINAL t