Attachment 7A
FEBRURARY 5th, 2012
TO: BOARD of COUNTY COMMISSIONERS - Chair Pelissier, Vice Chair Hemrninger, Commissioners
Foushee, Gordon, McKee, Jacobs and Yuhasz
FROM: Frank W. Clifton, Jr., County Manager
SUBJECT: WHITTED BUILDING FORMER LIBRARY SPACE REUSES ANALYSIS -- BACKGROUND
INFORMATION
In 2010 once the County moved its northern library operations to the new facility located off Margret
Street in Downtown Hillsborough the former library space in the Whitted Building became vacant.
Different approaches and considerations have been given to reuse of that space along with space in the
Whitted Building that formerly housed the County's Department of Social Services.
Discussions with the orange County School Board moved toward their evaluation of using'all' of the
vacated space in the Whitted Building for their use. However, State budget cuts led to a realization that
much of the need for the use of that space and the cost of renovation was negated by dour budget
projections at the State level. (Note: the school system has since entered into an agreement with the
County to reuse the former EMS headquarters located at New Hope and Highway 85.)
In the ensuing period, other County budget decisions and departmental needs for public services led to
actions that reused portions of the Whitted Building and incurred building modifications and
improvements to the County. The Community Development Department moved from its former offices
on the ground Boor to a location formerly housing DSS on an upper floor in the newer wing of the
facility.
Additionally, based upon budget driven operational considerations, the Health Department expanded
the Hillsborough dental clinic operations along with an extensive remodeling of the lower and second
floor Whitted Building space for Health Department needs. During this process, improvements and
building safety issues were addressed (inclusive of a fire sprinkler system installation).
The building is structurally sound. However, some uses may create added construction considerations
associated with needs (Le. major renovation to restroorn facilities based on public attendance volumes).
NON COUNTY USE REQUEST — Orange County Cultural Center
A private (yet to be incorporated) non- profit group gained a $10,000 seed money grant from the Town
of Hillsborough to pursue a private /public partnership to develop a proposal for the reuse of the former
Whitted Building library space as a community cultural facility. The group sought assistance from an
architect and worked on a plan /proposal for it to become an active programmer of artistic and cultural
activities within the Whitted Building (1F, the County would make the space available). The group's
"Strategic Business Plan" (9/8/11) is Attachment 1 to this memorandum.
14-
Based upon direction from the County Commission, County Staff analyzed these issues from several
important perspectives including but not limited to:
A. Compatibility with existing and future County uses /operations the proposed Cultural Center
would create.
B. Financial viability of a non - profit group given control of the facility would have to meet various
aspects of creating a sustainable operation NOT requiring an on -going subsidy from the County.
C. Viability and receptiveness of the Town to become a participant in this venture and assume
some level of financial commitment and operational liability for the facility.
D. The cost and type of modifications needed to bring the building into compliance with federal,
state and local codes required for activities and who /how those obligations would be met
E. The potential need for the County to use this space for governmental purposes in the future.
Without attempting to (within this memo) summarize each of the relevant points within the group's
strategic business plan, it is our opinion that as proposed it is unlikely this group (regardless of how well
intentioned their efforts) will successfully achieve their desired outcomes. The business plan depends
heavily on assumptions that are likely to be difficult to accomplish. There are elements of the planned
uses for the facility that would /could conflict with existing county operational functions at the facility.
More importantly, the County has heavily invested in this asset and potential conflicts of use could place
that investment at risk.
(These issues have been discussed with the group's leadership and they fully understand our concerns.)
TOWN INVOLVEMENT -- Staff level discussions
Overcoming some of the financial and liability issues that the non - profit group's operational control of
the former Whitted Library space presented was attempted to be addressed via some formalized
agreement with the Town of Hillsborough. Although no formal discussions have occurred among the
elected leadership of the Town and County on these issues, town and county staffs have discussed
various elements (subject to elected leaders formal actions at some point in the future).
ISSUES:
It is apparent the Town does not have available financial resources it would be willing to allocate toward
this project beyond the $10,000 seed money given the non - profit group that brought forth the proposal.
There seems to be some doubt that the Town wants to accept any formalized responsibility or liability
for the operational control of the allocated space. (Reminder, the initial assumption under which this
process went forward was that the Town and County would enter into a formal agreement where the
space would be leased to the Town under certain terms and the Town would then allocate use of the
space to this non - profit (or another) BUT the Town would retain the liability and responsibility for the
condition, use and upkeep within the walls of the space allocated via the terms of the County/Town
agreement. At the Staff level, that does not appear to be a realistic option.
15
In addition and possibly more relevant, it appears the Town's parking regulations present a significant
hurdle to the proposed uses envisioned by the non - profit group's efforts to develop a cultural center.
The activities and participation generation sought by the non - profit and currently available parking
spaces are in conflict and prevent occupancy as envisioned by the group. Suggestions to reduce County
related activities or convert existing recreational fields into parking areas does not seem to mesh with
the County's continued use of the facility and /or the visions held by the cultural center supporters.
(Note: This effort initially gained financial support from the Town. if parking restrictions severely limit
or eliminate most of the intended uses proposed in conceptual plans for the development of a cultural
center at the Whitted site then the agreement between the Town and County is moot.)
FURTHER CONSIDERATIONS —A possible alternative
Assuming that the Town and County `might' (in some agreeable manner) find a way to either mitigate
or overcome the hurdle presented by the Town's parking regulations, there may be a_ method to address
several community needs while addressing a continuing County need. (The following example is offered
as an option and not aimed settle all elements of the issues discussed, but rather to stake out how the
County, Town and non - profit might move forward to address common interests.)
A. The County has a planned enhancement to the Link Center to construct a fixed meeting space
for the BOCC and other community meeting needs including Grange County Schools along with
the Town of Hillsborough. That project, although designed is on hold due primarily to the
associated cost of upgrading restrooms to meet code requirements for large public gatherings.
B. That project could be shifted to the Whitted Building former library space and accommodate
many of the previous needs for public meeting space along with most of the activities imagined
by the non -profit cultural center group. (We have discussed with the group's organizers this
possibility and found them acceptable to pursuing the concept.)
C. Shifting the public meeting facility (and associated expense) to the Whitted Building allows basic
enhancements to move forward that would (with additional contributions by the nonprofit for
up fits) allow multiple private and public uses of the former library space. The County's Tourism
Staff prepared a brief report (Attachment 2) which outlines some uses /users and highlights how
they might be involved in marketing the space. (The Town and County must still address the
parking issues if any of the proposed uses outlined above are to move forward.)
D. If this project moves forward, the County would have options it could choose associated with
the Annex Building next to the Link Center. That building now houses only the Board of
Elections (4 employees and equipment storage). Those functions could be relocated to former
space in the Link Center planned for the meeting room. The area has ample space to
accommodate all of their needs. Modifications to the building would be less expensive than the
meeting space. Restrooms would not require the same upgrades as the meeting space option.
E. If we proceed as proposed in D above, we could decide on how to deal with the Annex Building.
(1) An option may be to deconstruct the building. If done, this option would assist in addressing
parking issues with the Town in two manners. one the reduction in building floor space would
reduce parking demand (town rules are based on building square footage). The 1958 building
has one usable floor (main), some attic storage and a lower level that sits below flood level.
16
Removing the building reduces parking demand by 1 space per each 300 SF of building space
and allows the area of the building to be expanded parking for the courts and Link Center.
(2) A second option could be to move some other governmental function to that space (state or
county). This option further negatively impacts parking issues downtown.
(3). Third, we can continue the current activities as they are. However, the building space far
exceeds the needs of the Board of Elections with utility and maintenance costs being duplicative
of vacant space in the Link Center.
SUMMARY
It is difficult to look out into the future with any degree of certainty (especially, as the role of county
government is in continuous change). We make effort to extract as many uses out of county buildings
and facilities as possible (county needs as well as others). The Whitted Building appears to have a never
ending lifecycle. Existing County uses and investments ensure the facility will continue to be a
governmental asset for many years to come. Someday, it may move to other non - governmental use and
ownership; that does not appear to be in the near future. However, if the County Commission sees
merit in the proposals discussed within this report we can move that process forward.
Finally, it is recognized the Town of Hillsborough's parking requirements will play a key role to whatever
future uses are employed at the Whitted Building. If the Town and County can find agreeable methods
to address that issue, the future of Whitted' s use to support cultural and community related activities
will be brightened. otherwise, those options remain elusive.
ATTACHMENTS
I. orange County Cultural Center -- Strategic Business Plan
2. Visitor Bureau Input: Whited Building
3.. Whitted Building Library Space Plan
4. Arts Commission Sprinkler and Structure Reimbursement Proposal
S. Notes From County Commissioners Building Walk Through (1- 23 -12)