HomeMy WebLinkAboutORD-2000-012 Glenwood Elementary School Major Renovations CHCCS Capital Project Ordinance 13
ORD -
Glenwood Elementary School Major Renovation
Chapel Hill-Carrboro City Schools
Capital Project Ordinance
Be it ordained by the Orange County Board of County Commissioners that pursuant to Section 13.2
of Chapter 159 of the General Statutes of North Carolina, the following capital project is hereby
adopted.
Section 1. The project authorized provides funds for a major renovation of Glenwood Elementary
School that was originally constructed 1952. Other buildings were added to the campus in
1954 and 1959. This project is financed with proceeds from the 1997 Local Bonds and
savings from the Scroggs Elementary School Construction Capital Project.,
Section 2. The officers of the County are hereby directed to proceed with the project within the budget
contained herein.
Section 3. The following revenue is anticipated to complete phasesl and 2 of this project:
Through FY 1999-00 ThroughFY
1998-99 Appropdadon 1999-00
Sales Tax $0 $o
ftmadFew $0 $0 $0
PSBF $0 $0 $0"
1992 Bond Fends $0 $0 $0
1997 Bald Fw&q $0 $950,000 $950,000
Transfer from ScroW Elanmfty
cmStuction*#0 $47.176 7.17G
Total Project Fumft $0 $1,177,176 $1,177,176
Section 4. The following amount is appropriated for this project:
Througri FY 1999-00 -TR—ro—ug-fi FY
1998-99 Appropriation 1999.00
Planning/Arch/EngiE 0 100,000 100,000
Land/Assoc Fees 0 0 0
Construction 0 1,077,176 1,077,176
Equipment/Furnishings 0 0 0
Other 0 0 0
Contingency Q 0. 0
Total 0 1,177,176 1,177,176
Section 5. This ordinance supersedes all previous Glenwood Elementary School Major Renovations
Capital Project Ordinances.
Section 6. This ordinance shall remain in effect until June 30,2000.
Adopted this fourth day of April 2000.
0?J�1999-2000 CaWital Projects Update and Approval of Ordifiances d. /� _�
� 4�
The Board received an update on the funding status of approved capital projects for the County
and the school systems, and considered approval of capital project ordinances for the Chapel Hill-Carrboro
schools and Orange County.
Assistant County Manager Rod Vkoaer said that the staff ie asking the Board tm take two specific
sets ofactions. The first action relates to funding for Chapel Hill-Carrboro City School projects,specifically
providing an appropriation mo that the Glenwood Elementary renovation project con8atinh»fuUsxvng. The
Chapel Hill-Carrboro Board of Education has approved construction contracts for this project, ondthenevwae
already$950,000 worth of 1997 bonds that were programmed with the understanding that the Chapel Hill-
Carrboro Board of Education would have to look at some of its other projects and come up with some savings
ho fund the full construction costs. The Chapel Hill-Carrbmro Board of Education has identified some savings
and ie proposing tm transfer$277.00D+in savings from the @ Elementary project to cover the
renovation. The action for the Board is to adopt the project ordinance to appropriate the funds for the
Glenwood Elementary renovations and adopt the project ordinance that would reallocate funds and reduce
the project mUmcatmnforthmS Elementary project.
The second set of actions is to implement the County capital projects that were approved in the
C|P last summer,
Commissioner Brown questioned the costs on Scroggs Elementary and Pathways Elementary.
She said that it was important to keep track of the new schools and the full cost. She also asked for a final
figure on East Chapel Hill High School. Rod Visser will provide this information.
Commissioner Gordon wants the 1,000 student figure to be included in the materials giving the
final costs for East Chapel Hill High School.
Commissioner Jacobs asked for final figures on some of the schools built in both systems. He
made reference to page three and asked if the County owned the animal shelter. Rod Visser said that the
County owns the building and the land is leased.
Commissioner Jacobs asked about the Equipment and Record Storage item.
Budget Director Donna Dean said that the first allocation of$69,975 would be for the outside
storage facility for Public Works. The funds left over would be used for record storage for departments that
have not been specified.
Commissioner Jacobs asked if the space study group would look at record storage and John
Link said that they would-
Commissioner Jacobs made reference to page 4 and the protective ground covers at existing
parks and suggested that the County coordinate with the Solid Waste Department to do this in-house.
Commissioner Brown asked for figures on school technology and how much has been spent by
each school system.
Commissioner Gordon made reference to page three and corrected"Environmental Resources
Conservation"to"Environment and Resource Conservation." In regards to the Equipment and Vehicles she
suggested that it be underscored that they be energy efficient and/or alternative fueled vehicles. She said
that she would like some basic information about the schools(i.e.,the sizes, how many students,the
capacities, comparisons of new schools and old schools, etc.). She will submit her requests for this
information in writing.
John Link said that he would send the material that has been developed to the Board of County
A motion was made by Commissioner Gordon,seconded by Commissioner Jacobs to adopt the
capital project ordinances for Chapel Hill-Carrboro City Schools and Orange County.
VOTE: UNANIMOUS -
e. Proposed Contract for Student Generation Rate and Impact Fee Studies
The Board was to consider awarding a contract to Tischler and Associates Inc. in an amount not
to exceed$53,400 for student generation rate and impact fee studies. However,this item was postponed.
f. N.C. Health Choice Coordinator Position—Conversion from Time-limited to Permanent
Status
The Board was to consider converting the existing Health Choice coordinator position to a regular
permanent position. However,this item was postponed.
10. REPORTS
a. Report on Travel and Tourism/Economic Development Promotional Event
The Board received a report on possible support of a North Carolina travel and tourism/economic
development promotional event on July 4,2000 in Ottawa, Ontario,Canada.