HomeMy WebLinkAboutAgenda - 11-20-2012-13 (4) Information Item
ORANGE COUNTY PLANNING & INSPECTIONS DEPARTMENT
Craig N. Benedict, AICP, Director
Administration �'L Aat,+r6°$�
131 W. Margaret Lane
(919) 245-2575 MR Suite 201
(919) 644-3002 (FAX) '
P. O. Box 8181
www.co.orange.nc.us
Cate �= Hillsborough, NC 27278
6 "
MEMORANDUM
TO: Frank W. Clifton, Jr., Orange County Manager
Board of County Commissioners
FROM: Craig N. Benedict, AICP, Planning & Inspections Director
DATE: November 20, 2012
SUBJECT: Eno Economic Development District Engineering Progress Update
ATTACHMENT: Exhibit A— Draft Eno EDD Water& Sewer System Project
City of Durham— Scope of Work
This memo serves as an update of the utility engineering work in progress with the City
of Durham in the Eno EDD area. The interlocal utility service agreement was adopted
in January of this year. Monies funded from the '/ cent sales tax became available as
noted in the CIP and 2012-13 budget as of July 1, 2012.
A Request for Qualifications (RFQ) was distributed over the summer seeking qualified
engineers. Top prospective firms were chosen and presentations were made in early
fall.
The scope of work has been refined with the lead firm to include two phases; first, a
master planning element to determine, area, capacity needs, detailed hydraulic analysis
and best connections back to Durham infrastructure, and second, engineering design
and permitting with other engineering services as necessary. Orange County Planning
and Engineering Staff has been constantly involved in this process as outlined in the
agreement. Durham City is the lead and will be bringing contracts forward to their
council in December. After confirmation, we will further inform the Board of specifics
including timeline and cost.
If you have questions in the interim, please call my office.
Thank you.
EYMIT A
DRAFT
Eno EDD Water and Sewer System Project
City of Durham,North Carolina
(Project No. 1
Scope of Work
Introduction
The City of Durham is collaborating with Orange County to provide water and sewer service to
the Eno Economic Development District(EDD)to support economic viability and sustainable
growth in the area Figure 1 shows the Eno EDD boundary included in this Scope of Work.The
first phase will include development of a Master Plan.The second phase will include
development of a more detailed hydraulic model of the downstream basins in Durham's system
to assess the capacity improvements required in Durham's system considering other future flows
and UI as well. Design,permitting,construction,and closeout services will follow.
The overall project includes the following Phases:
1. Master Planning
a. Kickoff Meeting and Data Collection
b. Flow Projections
c. Proposed Water and Wastewater Infrastructure within Eno EDD
d. Force Main Discharge Alternatives
e. Permit Agency Coordination
f. Cost Estimates
g. Master Plan Report
2. Detailed Hydraulic Analysis
a. Data Collection
b. Hydrologic Model Development
c. Flow Projections
d. Hydraulic Model Development
e. Model Calibration
f Capacity Analysis
g. Improvement Alternatives Analysis
h. Draft and Final Reports
3. Design
4. Permitting
5. Construction Services/inspection
6. Start-up,Testing,Record Drawings and Closeout
This initial Scope authorization includes Phases 1 and 2. At their conclusion,the City intends to
amend this Agreement to authorize the Consultant to perform Phases 3,4,5,and 6.