Loading...
HomeMy WebLinkAboutAgenda - 11-08-2012 - 5f 1 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date:November 8, 2012 Action Agenda Item No.5-f SUBJECT:Comprehensive Plan and Unified Development Ordinance (UDO) Text Amendment Schedule for February 2013Joint Quarterly Public Hearing – Site Plan Submittal for Projects Requiring StormwaterReview DEPARTMENT:PUBLIC HEARING: (Y/N) Planning and InspectionsNo ATTACHMENT(S):INFORMATION CONTACT: 1.Comprehensive Plan and Unified Michael D. Harvey, Planner III,245-2597 Development Ordinance Amendment Ren Ivins, Erosion Control,245-2586 Outline Form (Zoning 2012-016)Craig Benedict, Director, 245-2575 PURPOSE: To consider and approve the process components and schedule for a Planning Director initiated Unified Development Ordinance (UDO) text amendment for the February 25, 2013 Quarterly Public Hearing concerning submission of formal site plans for projects requiring stormwater plan approval. BACKGROUND: On April 17, 2012 theBOCC approved a UDO amendment package incorporating recent stormwater management and nutrient reduction strategies implemented by the State.This included the establishment of land disturbance thresholds for both residential and non-residential projects requiring submittal of formal, engineered, stormwater plans. Please refer to Section B.1 of Attachment 1for additional information on these thresholds. Problems arisein those instances where a project’s proposed overall land disturbance requires the submission of a formal stormwater management plan. Staff does not want there to be conflicting information provided to the public as to when a formal siteplan is required nor is it efficient forthe staff of Current Planning and Erosion Control to potentially be looking at twodifferent sets of plans proposing the development of a given property. The intent of this amendment is to incorporate established thresholds into existing language within the UDO requiring formal site plan preparation and submittal by an applicant when said thresholds are exceeded. By modifying existing language staff intendsto eliminate unnecessary costfor the applicant, with respect to the completion of multiple site plans required for each division, and provide sufficient detailto local residents and developers on when formal site plan preparation is necessary. Staff is also proposing to include language requiring the development of formal stormwater plans, consistent with established land disturbance thresholds, for minor and major subdivisions. Both Current Planning and Erosion Control staff agree potential problems can be eliminated if there is a formal stormwater management plan approved duringthe subdivision(i.e. minor and major) review and approval process. 2 FINANCIAL IMPACT: Please refer to Section C.3 of Attachment 1. RECOMMENDATION(S): The Manager recommends the Board approve the Amendment Outline form contained within Attachment 1 and direct staff to proceed accordingly. Attachment 1 3 COMPREHENSIVE PLAN/FUTURE LAND USE MAP AND UNIFIED DEVELOPMENT ORDINANCE (UDO) AMENDMENTOUTLINE UDO / Zoning-2012-016 Amendment(s) requiring submittal of formal site plans and stormwatermanagement plans for residential and non-residential projects A.AMENDMENT TYPE Map Amendments Land Use Element Map: From: --- To: --- Zoning Map: From:- -- To:--- Other: Text Amendments Comprehensive Plan Text: Section(s): UDO Text: UDO GeneralText Changes UDO Development Standards UDO Development Approval Processes Section(s):1.Section 2.4.1 Zoning Compliance Permits –Applicability 2.Section 2.5.3 Plan Specifications 3.Section 7.6.3 Land Suitability Other: B.RATIONALE 1.Purpose/Mission In accordance with the provisions of Section 2.8 Zoning Atlas and Unified 1 4 Development Ordinance Amendmentsof the UDO, the Planning Director has initiated a text amendment to modify existing language requiring the submittal of formal stormwater plans as part of subdivision and development applications. The State recently implemented stormwater management and nutrient reduction strategies. As part of these strategies, the County recently modified existing regulations mandating the preparation and submittal of formal, engineered, stormwater management plans as part of any development project where proposed land disturbance reached the following thresholds: Watershed/River BasinStormwater –Non-Stormwater –Residential residential Cape Fear (includes the Projects proposing over Projects proposing over Back Creek, Haw River, 21,780 square feet of 43,560 square feet of Cane Creek, Jordan Lake, disturbance are required to disturbance are required to and University Lake submit a stormwater submit a stormwater protected and critical management planmanagement plan watershed overlaydistricts as well as those properties within the basin not located in a watershed overlay district) Neuse (includes Flat River, Projects proposing over Projects proposing over Little River, Upper and 12,000 square feet of 21,780 square feet of Lower Eno protected and disturbance are required to disturbance are required to critical watershed overlay submit a stormwater submit a stormwater districtsas well as those management planmanagement plan properties within the basin not located in a watershed overlay district) Roanoke (includes SouthProjects proposing over Projects proposing over Hyco Creek protected 20,000square feet of 43,560 square feet of watershed overlay district)disturbance are required to disturbance are required to submit a stormwater submit a stormwater management planmanagement plan These changes were incorporated into the UDO on April 17, 2012. This proposed amendment is designed to: 1.Require formally prepared site plans for those projects exceeding established stormwater disturbance thresholdsfor residential projects. Submittal of formal site plans isalready required for all non-residential projects regardless of the proposed land disturbance activity. 2. Incorporate references within various locations of the UDO identifying which land development projects need to comply with these standards in an effort to 2 5 eliminate confusion and provide definitive application submittal standards. 3.Analysis As required under Section 2.8.5 of the Orange County Unified Development Ordinance, the Planning Director is required to: ‘cause an analysis to be made of the application and, based upon that analysis, prepare a recommendation for consideration by the Planning Board and the Board of County Commissioners’. The required analysis will be completed before the public hearing and will be part of the quarterly public hearing materials. 4.Comprehensive Plan Linkage (i.e. Principles, Goals and Objectives) This amendment is designed to provide additional references to existing development standards already contained within the UDO. 5.New Statutes and Rules This amendment is designed to reference compliance with recently adopted modifications to the UDO related to stormwatermanagement and nutrient reduction standards consistent with the following State regulations: 15A NCAC 2B. 0277Falls Lake Stormwater New Development Rule 15A NCAC 2B. 0265 and Session Law 2009-484 Jordan Lake Stormwater New Development Rules C. PROCESS 1.TIMEFRAME/MILESTONES/DEADLINES a.BOCC Authorization to Proceed November 8, 2012 b.Quarterly Public Hearing February 25, 2013 c. BOCC Updates/Checkpoints December 5, 2012 -BOCC members receive materials to be reviewed by the Planning Board’s Ordinance Advisory Committee(ORC) as part of the Planning Board packets sent to all BOCC members each month February 5, 2013 – Approval of legal ad May 7, 2013 -Receive Planning Board recommendation 3 6 d.Other 2.PUBLIC INVOLVEMENT PROGRAM Mission/Scope: Public Hearing process consistent with NC State Statutes and Orange County ordinance requirements a.Planning Board Review: December5, 2012 –Ordinance Review Committee(ORC). March 6, 2013–April 3,2013 (recommendation) b.Advisory Boards: c. Local Government Review: Courtesy Review –Town(s) of Chapel Hill, Carrboro, Hillsborough, City of Mebane d.Notice Requirements Legal advertisement will be published on February 13 and 20, 2013. e.Outreach: General Public: Small Area Plan Workgroup: Other: 3.FISCAL IMPACT While these proposed amendments are merely designed to incorporate necessary references with respect to complying with established thresholds, and requiring the submission of formal site plans in the event a stormwater management plan is required, staff had previously identified compliance with these new State required standards will impose additional costs for development projects and require additional staff resources. Workloadfor Current Planning and Erosion Control staff to review and approve stormwater management plans required by the rules is expected to increase. Workload for staff with respect to the inspection of stormwater management features is also expected to increase. This may necessitate an increase in fees charged to developers. 4 7 As reported at the February 27, 2012 Quarterly Public Hearing, it is expected that enforcement of the new regulations will require, at a minimum,one up to one additional full time employee for Erosion Control with an approximate cost of $65,000. Staff is continuing to evaluate workload and needs as the process moves forward. D.AMENDMENT IMPLICATIONS The amendments are in response to recent modifications to the UDO relating to compliance with stormwaterand nutrient management requirements and staff’s desire to ensure proper reference forcompliance with these aforementioned new standards. As previously indicated by staff, compliance with these required standards is expected to increase the cost of development and increase staff workload. E. SPECIFIC AMENDMENT LANGUAGE Available as part of public hearing materials. Primary Staff Contact: Michael D. Harvey Planning (919) 245-2597 mharvey@orangecountync.gov 5