HomeMy WebLinkAbout2012-388 Planning - J F Wilkerson Contracting Co Future connection stub out N Oak Street $22,496.60 Change Order
No. 4
Date of Issuance: October 16, 2012 Effective Date: October 16, 2012
Project:Buckhorn Area North of I-85 and Owner: Orange County, Owner's Contract No.: SRF: CS370884-01
Efland Sewer System Improvements North Carolina STAG: XP95456411
Contract:Buckhorn Area North of I-85 and Efland Sewer System Date of Contract: August 31,2011
Improvements
Contractor:J.F. Wilkerson Contracting Company,Inc. Engineer's Project No.: 11.01111
The Contract Documents are modified as follows upon execution of this Change Order:
Description:
Provide a future connection stub-out on the force main at North Oak Street and Highway 70 as shown on the
revised drawing E-3.1 including additional pipe,wye,valve, and bore-and-jack.
Attachments(list documents supporting change):
Revised Drawing E-3.1 (sealed 9-12-12)and JF Wilkerson letter dated September 20,2012.
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original Contract Price: Original Contract Times: ❑ Working days ® Calendar days
Substantial completion(days or date): 450 Days
$ 2,942,954.46 Ready for final payment(days or date): 450 Days
[Increase] [Decrease] from previously approved [Increase] [ ] from previously approved Change Orders
Change Orders No. to No. 3: No. to No. 3:
Substantial completion(days): 90 Days
$ 336,436.22 Ready for final payment(days): 90 Days
Contract Price prior to this Change Order: Contract Times prior to this Change Order:
Substantial completion(days or date): 540 Days
$ 3,279,390.68 Ready for final payment(days or date): 540 Days
[Increase] [ ] of this Change Order: [Increase] [Deer-ease] of this Change Order:
Substantial completion(days or date): 0 Days
$ 22,496.60 Ready for final payment(days or date): 0 Days
Contract Price incorporating this Change Order: Contract Times with all approved Change Orders:
Substantial completion(days or date): 540 Days
$ 3,301,887.28 Ready for final payment(days or date): 540 Days
REC VYWID: ACCEPTED: ACCEPTED:
By: By: By. c
Engin er(Au orized Signature) Owner(Authorized 'gature) ntra or(Authorized Signature)
Date: 1(Q-OGT- 2a 12 Date: z/ Date: Octa6c r 16'. ZVi Z
Approved by Funding Agency(if applicable):
Date:
EJCDC C-941 Change Order
Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications Institute.
Page 1 of 2
U)
uj 00
111 z
0 z
Lu
SoR des
LU N 0) 0 EL
AINO SMOISIm
310M G" EIDMVNIA ONINNV'Id • ON11193NION3
IlillilIII 4 S 9 1 v 1 3 0 S S v
all ....... ---
ti
------ 74
I . i It a
Val
RIE
Ear- far
14 -
!L
IN
Ing'.
ampl, .1 -
Asa d is
at
HIM IT
Mair.
JT it
ZVI
aR
NMI a
Irv,
17
P.9 1i
Ile 'ig Li
ILL
a
Lo T- i
u
r-)
11
LO
+w LO
C14 +co
is CD
CD
41
LL
CO
$hp.-- Cl)
64
,To
No
-3 CL
-JFWILKERSON
CONTRACTING CO., INC.
September 20,2012
Mr. Wes Wightman
Mcgill Associates,P.A.
1240 19"'St. Lane NW
Hickory,NC 28601
Re: Sanitary Sewer Improvements for Orange County,NC Buckhorn Area—North of I-85 and
Efland Community(8"FM Bore)
Dear Mr.Wightman:
Please find attached our change order request for additional work designed on sheet E-3.1 and
sealed 9-12-2012.
Please advise,of any additional information we may provide or of any questions you may have.
Sincerely,
JF Wilkerson Contracting Company,Inc.
64r-�/'
Christopher J. Stike
Project Manager/Estimator
P.O. Box 183 -Morrisville,NC 27560 (919) 467-1829 Fax (919) 467-6269
JF WILKERSON CONTRACTING CO., INC.
PO BOX 183
MORRISVILLE, NC 27560
PROJECT: EFLAND SANITARY SEWER IMPROVEMENTS
OWNER: ORANGE COUNTY, NC
ENGINEER: MCGILL ASSOCIATES
CHANGE ORDER - 8" FM Bore
DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
16" Bore Under HWY 70 w/Carrier Pipe 60 LF $ 235.00 $ 14,100.00
8" DIP FM 40 LF $ 30.29 $ 1,211.60
8" MJ Gate Valve 1 EA $ 1,550.00 $ 1,550.00
8"x F MJ Wye 1 EA $ 775.00 $ 775.00
8" MJ Cap 1 EA $ 360.00 $ 360.00
Rod Cap to Casing —1 --Ls— $ 500.00 $ 500.00
Remobilization of Boring Crew 1 LS $ 4,000.00 $ 4,000.00
TOTAL ADDITIONAL COST $ 22,496.60
Page 1