Loading...
HomeMy WebLinkAbout2012-388 Planning - J F Wilkerson Contracting Co Future connection stub out N Oak Street $22,496.60 Change Order No. 4 Date of Issuance: October 16, 2012 Effective Date: October 16, 2012 Project:Buckhorn Area North of I-85 and Owner: Orange County, Owner's Contract No.: SRF: CS370884-01 Efland Sewer System Improvements North Carolina STAG: XP95456411 Contract:Buckhorn Area North of I-85 and Efland Sewer System Date of Contract: August 31,2011 Improvements Contractor:J.F. Wilkerson Contracting Company,Inc. Engineer's Project No.: 11.01111 The Contract Documents are modified as follows upon execution of this Change Order: Description: Provide a future connection stub-out on the force main at North Oak Street and Highway 70 as shown on the revised drawing E-3.1 including additional pipe,wye,valve, and bore-and-jack. Attachments(list documents supporting change): Revised Drawing E-3.1 (sealed 9-12-12)and JF Wilkerson letter dated September 20,2012. CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price: Original Contract Times: ❑ Working days ® Calendar days Substantial completion(days or date): 450 Days $ 2,942,954.46 Ready for final payment(days or date): 450 Days [Increase] [Decrease] from previously approved [Increase] [ ] from previously approved Change Orders Change Orders No. to No. 3: No. to No. 3: Substantial completion(days): 90 Days $ 336,436.22 Ready for final payment(days): 90 Days Contract Price prior to this Change Order: Contract Times prior to this Change Order: Substantial completion(days or date): 540 Days $ 3,279,390.68 Ready for final payment(days or date): 540 Days [Increase] [ ] of this Change Order: [Increase] [Deer-ease] of this Change Order: Substantial completion(days or date): 0 Days $ 22,496.60 Ready for final payment(days or date): 0 Days Contract Price incorporating this Change Order: Contract Times with all approved Change Orders: Substantial completion(days or date): 540 Days $ 3,301,887.28 Ready for final payment(days or date): 540 Days REC VYWID: ACCEPTED: ACCEPTED: By: By: By. c Engin er(Au orized Signature) Owner(Authorized 'gature) ntra or(Authorized Signature) Date: 1(Q-OGT- 2a 12 Date: z/ Date: Octa6c r 16'. ZVi Z Approved by Funding Agency(if applicable): Date: EJCDC C-941 Change Order Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications Institute. Page 1 of 2 U) uj 00 111 z 0 z Lu SoR des LU N 0) 0 EL AINO SMOISIm 310M G" EIDMVNIA ONINNV'Id • ON11193NION3 IlillilIII 4 S 9 1 v 1 3 0 S S v all ....... --- ti ------ 74 I . i It a Val RIE Ear- far 14 - !L IN Ing'. ampl, .1 - Asa d is at HIM IT Mair. JT it ZVI aR NMI a Irv, 17 P.9 1i Ile 'ig Li ILL a Lo T- i u r-) 11 LO +w LO C14 +co is CD CD 41 LL CO $hp.-- Cl) 64 ,To No -3 CL -JFWILKERSON CONTRACTING CO., INC. September 20,2012 Mr. Wes Wightman Mcgill Associates,P.A. 1240 19"'St. Lane NW Hickory,NC 28601 Re: Sanitary Sewer Improvements for Orange County,NC Buckhorn Area—North of I-85 and Efland Community(8"FM Bore) Dear Mr.Wightman: Please find attached our change order request for additional work designed on sheet E-3.1 and sealed 9-12-2012. Please advise,of any additional information we may provide or of any questions you may have. Sincerely, JF Wilkerson Contracting Company,Inc. 64r-�/' Christopher J. Stike Project Manager/Estimator P.O. Box 183 -Morrisville,NC 27560 (919) 467-1829 Fax (919) 467-6269 JF WILKERSON CONTRACTING CO., INC. PO BOX 183 MORRISVILLE, NC 27560 PROJECT: EFLAND SANITARY SEWER IMPROVEMENTS OWNER: ORANGE COUNTY, NC ENGINEER: MCGILL ASSOCIATES CHANGE ORDER - 8" FM Bore DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL 16" Bore Under HWY 70 w/Carrier Pipe 60 LF $ 235.00 $ 14,100.00 8" DIP FM 40 LF $ 30.29 $ 1,211.60 8" MJ Gate Valve 1 EA $ 1,550.00 $ 1,550.00 8"x F MJ Wye 1 EA $ 775.00 $ 775.00 8" MJ Cap 1 EA $ 360.00 $ 360.00 Rod Cap to Casing —1 --Ls— $ 500.00 $ 500.00 Remobilization of Boring Crew 1 LS $ 4,000.00 $ 4,000.00 TOTAL ADDITIONAL COST $ 22,496.60 Page 1