SUBJECT: Orange County/Hillsborough's EDD Task Force Further Authorization Request
DEPARTMENT: Planning and Inspections PUBLIC HEARING: (Y/N) No
ATTACHMENT(S): INFORMATION CONTACT:
Craig N. Benedict, ext. 2592
Mission Statement Dianne Reid, ext. 2326
Draft Notes from 8/18/01 Work Group Meeting
Map with Explanation TELEPHONE NUMBERS:
Hillsborough 732-8181
Chapel Hill 968-4501
Durham 688-7331
Mebane (336)227-2031
PURPOSE: To provide an update on Economic Development Districts (EDD) Task Force and EDD
Joint Transportation Advisory Committee (JTAC) and suggest for consideration next steps in task
force work topics and products.
BACKGROUND: The original EDD Task Force was formed in February of 2000 by joint actions of
Orange County and Hillsborough to evaluate the EDD districts and recommend changes to the
process and land uses in the area to better address potential impacts. Those goals were achieved
in April of 2001 by the adoption of new regulations.
During that process, land use decisions was inextricably linked to the potential of transportation
network. Therefore, another broader multi-stakeholder group was formed by the Board of County
Commissioners (BOCC) to continue examining transportation challenges in the Hillsborough area
including the strong linkage to the EDD. Their mission statement is attached as well as the
unadopted minutes of their charrette held on August 18.
The original EDD Task Force of BOCC Chair Steven Halkiotis, BOCC Vice Chair Barry Jacobs,
Hillsborough Town Commissioner Mark Sheridan, Hillsborough Town Commissioner Evelyn Lloyd,
Economic Development Director Dianne Reid, Hillsborough Planning Director Margaret Hauth and
Orange County Planning Director Craig Benedict met on September 6, 2001 to discuss follow-up to
JTAC and next steps of Orange County/Hillsborough coordination and cooperation. The following
outline is attached for board discussion and consideration. Maps will be brought to the meeting for
general orientation of project issues.
AMENDED TO INCLUDE ATTACHMENTS 2
Orange County/Hillsborough Cooperative Projects
I. Transportation Network
A. Short Term
1. Joint Resolution of Orange County/Hillsborough to MPO regarding TIP
2. JTAC 8/18 Charrette roads discussion (see attachment)
3. Orange Grove Road capacity and improvements including development
impacts
4. NC86/NC57/US70Improvements
5. West Hillsborough (Nash Street and Dimmocks Mill Road)
B. Long Term
1. Orange County Thoroughfare/Functional Classification Plan
2. Hillsborough Thoroughfare Plan
3. Hillsborough Internal Collector Street Enhancements
4. Park and Ride Opportunities
II. Land Use
A. 2010 Hillsborough Plan .
B. Orange County Comprehensive Plan update
C. Integration of both plans incorporating aspects of Water and Sewer Management
Plan and Boundary Map
D. Watershed Preservation
E. Courtesy Review and Cooperative Agreements regarding land use, annexation and
buffers
III. Other Important Projects
A. Fairview Park Expansion
B. Justice Facility Expansion and River Park
Recommendations include:
Section I -A, 1 will be in the form of resolution to be brought to the Board in October.
Section I-A, 2, 3, 4, 5 would be addressed by the existing EDD Task Force over the next few
months.
Section II could be addressed by a small workgroup of staff, Planning Board and JTAC appointees
and elected body representatives, if suggested, to bring forth a work product and recommendation
to a joint meeting of the BOCC and the Hillsborough Board of Commissioners in January, 2002.
Section III topics could be separate workgroups, some of which are organized at this time.
FINANCIAL IMPACT: None at this time.
RECOMMENDATION(S): As the Board decides, specifically to address the work products noted in
Section 1, A, 2, 3, 4, 5 at this time.
3
Joint Transportation Advisory Committee .
Mission
The Joint Transportation Advisory Committee is formed to create a formal and lasting
communication conduit between the Town of Hillsborough and Orange County to jointly and
cooperatively study,request,and support transportation projects within each entity's jurisdiction.
Initially,the committee members will inventory the needs as described in the transportation plans
of the town and county,all necessary projects, and consider additional projects whose value may
not have been evaluated yet. The members will work:cooperatively to prepare a joint list of
priorities for referral back to the elected boards,NCAOT, and the Metropolitan Planning
Organization. The members shall consider envwonmental economic development,social justice,
and multi-modalism in creating their priorities.
4
Notes from Transportation Work Group retreat
DRAFT
Hillsborough House Inn
August 18, 2001
The group worked primarily with flip charts and maps. The notes from the flip charts
and the marked up maps provide the outputs from this meeting.
Objectives for retreat
Ideal:
Identify and prioritize alternative roads and modes, and identify the relevant resources
and actors
Decide what to tell the DOT.about the Elizabeth Brady extension
Decide upon transportation improvements needed to serve the Old 86 EDD
At a minimum:
Establish areas of agreement among work group members
Identify issues for future consideration
Identify further information needed
Meeting ground rules
Stay on task
➢ End on time (or early)
➢ Be explicit but brief
➢ Use all expertise in the room
➢ Rely on facts and shared beliefs
One talk at a time(no side conversations)
➢ Classify statements—e.g., fact,belief
➢ Test assumptions with others
➢ Keep moving
Profile of.group assembled for retreat
(Dianne or Margaret: please code work group members with an asterisk...I went from
my list)
Name Care about... Have ea erience or expertise in...
Hazel residents in Hampton area planning board
Lunsford*
Crai ..good"xrowth Transportation and land use lmka es
Scott I Agreement with town
Scott Full discussion of issues,and a Planning/transportation/economic development
Radwa " supportable decision
Mark Serious traffic problems and quality of Law;town council
Sheridan* life in Hillsborough;economic
0 ortuni •land use along b
1
DRAFT 5
Jim Traffic problems,managing Public relations,economic development
dcvelo went
Scott Lawrence Rd.corridor Golf course
Ken EDD and traffic issues Town council
Margaret Future of Hillsborough Planning -
Hauth
George County and town worldng together; Builder/developer
Horton* quaffty of life lanned growth
John Lawrence Rd.residents
Dianne Economic development that supports Economic development
Reid opportunity for all residents,including
through transportation
Bryant Future of Hillsborough Longtime resident
Warren*
Bill Preservation of the Eno River and Carpenter,former member of town planning and
Crowther* historic sites county commission
Wendy Skepticism toward DOT solutions; Landscape architecture and transportation
Olsen* supporting the southern EDD
Hervey Wise growth,planned;addressing Conservation
tr-Ansportation problems
Barry Context of planning in Hillsborough County planning board,commission
Jacobs* (cultural,political and environmental);
strengthening town/county relations;
quality of life in Hillsborough
Holden Special sense of place Historic commission
Richards*
Holly Walking to school,alternatives to cars to Ecology,air quality,Eno River
Reid* reduce congestion
Karen Multimodal transportation,good Land use and transportation planning
solutions
Derek DOT,road maintenance
Jim Historic preservation and economic Engineer,surveyor,contractor,site planner
Parker* development
•work group member
Facts
➢ No decision to DOT means Hillsborough loses its priority in the Transportation
Improvement Program
➢ DOT needs new priorities list by September '01
➢ DOT will narrow down its options for Elizabeth Brady road or substitute by February
'03,hold public hearings, and submit its final report in '04.
The EDD is about 1000 acres and once developed will generate and draw traffic from
surrounding region
➢ It takes 8 to 10 years to plan major roads
➢ The Town has already endorsed 1)the Elizabeth Brady road extension; and 2)the
widening of Churton between south of the RR bridge to I-40.
There is DOT money available for small improvements like turn lanes
2
6
DRAFT
Shared beliefs
➢ The EDD should be supported with transportation and other infrastructure
➢ Any road(or none)will affect traffic issues in and around the EDDs
➢ Greater Hillsborough needs more roads and improvements to existing roads,
including signals
➢ Greater Hillsborough needs an integrated transportation network to include
pedestrian,bike, rail and transit infrastructure
➢ Any new road should minimize negative impacts on the environment,historical or
cultural assets,existing neighborhoods, and the overall rural character of the area
A Town and county must continue to coordinate their planning
➢ Transportation needs will increase over time
➢ Land use and transportation plans must be linked, and growth channeled to specified
areas
➢ Development should not outpace the transportation system and other infrastructure
➢ Elizabeth Brady road extension(alone)will not significantly reduce traffic congestion
on Churton St.
➢ Those who benefit from road improvements should help bear the cost of them
Objectives for any new transportation project
➢ Improve traffic flow (reduce travel time,improve safety)
Minimize negative impacts
➢ Be completed within reasonable time and cost
Criteria for evaluating any road
Effectiveness:
Provides access to the EDDs
Diverts through traffic from Churton.St., from I-40:to 70 bypass
Improves traffic safety(including ped,bike) and flow
Channels development where it is planned and wanted
Feasibility:
Reasonable cost, time, engineering, legality
Town and county working together and agreeing
Equity and Integzity:
Minimizes negative impacts to:
Existing houses,neighborhoods, or businesses
Environmentally sensitive areas, including air and water,wildlife habitat
Sites of historic or cultural value
Town character as a whole
Neighboring areas/towns
3
a DRAFT 7
Alternative roads
From DOT's list
In priority order by what is preferred by the work group:
1. Elizabeth Brady alignment 3,which does not cross the river, goes across ridge(IF
this is the least impact to the river)
2. Elizabeth Brady alignment 2 (averts racetrack, crosses river)
3. (original)Elizabeth Brady alignment 1
4. Lawrence Road(with 86 connector)—but different function from above
5. Western bypass
6. No build
7. Widen Churton St. from 70 business to 70 bypass
Other Proposed road projects
Please review these carefully because I don't know these roads, and code to map
➢ Amended northwest bypass using existing wads
Connector from Lawrence Rd. to 86
➢ New interchange on 1-85 and road connecting 70 and New Hope Church Rd.
➢ Straighten(and widen?)Efland Cedar Grove Rd., and improve near 1-85
70A cross-connector to Orange Grove Road, over RR tracks
➢ Northeastern loop connector
➢ Entire perimeter of DOT study area, as a road
➢ East-west connector adjacent to Duke Forest
➢ East-west connector between 86 and Old 86
Widening of 70 bypass (in town plan but not in state TIP)
Recommendations from group
Expand the DOT study area to the entire 50-year water and sewer boundary from the
town plan
➢ Have DOT continue with its existing list of options
➢ Consider DOT's current study area boundary as a road alignment, adjusted as needed
and using existing roads where possible
➢ Design and build the Elizabeth Brady road extension to minimize the impact on the
Eno River,even if it reduces mobility
➢ Treat Elizabeth Brady Rd. as a local road,not a bypass
➢ Treat Lawrence Rd. option as having a different function from Elizabeth Brady,to
move through traffic around,not through, downtown
➢ Develop a new interchange of I-85 east of Lawrence Rd.
➢ Do other non-road fixes too
Issues for another day
Non-road improvements needed
4
UMM
_ "" � ,aye
p+ Vii_
�"ta'
ma '� �` ► , �`�� Ar'�' e'„sin
np
� � ,r ��Sri. .:'��`•� /�� � � �x �� ��t �� �'� f
��g � is � �� �:■ ? � '��wi�� ��J.+ f �-
i nyls s f tuay t v $
����i i ��
it
9
EXPLANATION OF MAP
The area shown in white is the Courtesy Review Area, which also
matches the Hillsborough 50-year Water/Sewer Service boundary.
Projects outside the town's ETJ (solid gray line) but within the area
above would be within the county's jurisdiction and the county would
send certain threshold proposals to Hillsborough for courtesy review.
Projects within Hillsborough's ETJ and town (solid black line), south
of the Eno River, are accordingly within Hillsborough's jurisdiction and
the town would send to Orange County for courtesy review.
A color map will be available at the meeting.
1
ORANGE COUNTY
BOARD OF COMMISSIONERS
AGENDA ITEM ABSTRACT
Meeting Date: September 18, 2001
Action Agenda
Item No.
SUBJECT: Orange County/Hillsborough's EDD Task Force Further Authorization Request
DEPARTMENT: Planning and Inspections PUBLIC HEARING: (Y/N) No
ATTACHMENT(S): INFORMATION CONTACT:
Craig N. Benedict, ext. 2592
Dianne Reid, ext. 2326
TELEPHONE NUMBERS:
Hillsborough 732-8181
Chapel Hill 968-4501
Durham 688-7331
Mebane (336)227-2031
PURPOSE: To provide an update on Economic Development Districts (EDD) Task Force and EDD
Joint Transportation Advisory.Committee (JTAC) and suggest for consideration next steps in task
force work topics and products.
BACKGROUND: The original EDD Task Force was formed in February of 2000 by joint actions of
Orange County and Hillsborough to evaluate the EDD districts and recommend changes to the
process and land uses in the area to better address potential impacts. Those goals were achieved
in April of 2001 by the adoption of new regulations.
During that process, land use decisions was inextricably linked to the potential of transportation
network. Therefore, another broader multi-stakeholder group was formed by the Board of County
Commissioners (BOCC)to continue examining transportation challenges in the Hillsborough area
including the strong linkage to the EDD. Their mission statement is attached as well as the
unadopted minutes of their charrette held on August 18.
The original EDD Task Force of BOCC Chair Steven Halkiotis, BOCC Vice Chair Barry Jacobs,
Hillsborough Town Commissioner Mark Sheridan, Hillsborough Town Commissioner Evelyn Lloyd,
Economic Development Director Dianne Reid, Hillsborough Planning Director Margaret Hauth and
Orange County Planning Director Craig Benedict met on September 6, 2001 to discuss follow-up to
JTAC and next steps of Orange County/Hillsborough coordination and cooperation. The following
outline is attached for board discussion and consideration. Maps will be brought to the meeting for
general orientation of project issues.
2
Orange County/Hillsborough Cooperative Projects
1. Transportation Network
A. Short Term
1. Joint Resolution of Orange County/Hillsborough to MPO regarding TIP
2. JTAC 8/18 Charrette roads discussion (see attachment)
3. Orange Grove Road capacity and improvements including development
impacts
4. NC86/NC57/US70 Improvements
5. West Hillsborough (Nash Street and Dimmocks Mill Road)
B. Long Term
1. Orange County Thoroughfare/Functional Classification Plan
2. Hillsborough Thoroughfare Plan
3. Hillsborough Internal Collector Street Enhancements
4. Park and Ride Opportunities
11. Land Use
A. 2010 Hillsbor6ugh Plan
B. Orange County Comprehensive Plan update
C. Integration of both plans incorporating aspects of Water and Sewer Management
Plan and Boundary Map
D. Watershed Preservation
E. Courtesy Review and Cooperative Agreements regarding land use, annexation and
buffers
Ill. Other Important Projects
A. Fairview Park Expansion
B. Justice Facility Expansion and River Park
Recommendations include:
Section I A 1 will be in the form of resolution to be brought to the Board in October.
Section I-A, 2, 3, 4, 5 would be addressed by the existing EDD Task Force over the next few
months. -
Section 11 could be addressed by a small workgroup of staff, Planning Board and JTAC appointees
and elected body representatives, if suggested, to bring forth a work product and recommendation
to a joint meeting of the BOCC and the Hillsborough Board of Commissioners in January, 2002.
Section Ill topics could be separate workgroups, some of which are organized at this time.
FINANCIAL IMPACT: None at this time.
RECOMMENDATION(S): As the Board decides, specifically to address the work products noted in
Section 1, A, 2, 3, 4, 5 at this time.