Loading...
HomeMy WebLinkAbout2001 NS Housing - Taylor Home Improvements Housing Rehabilitation Contract Award 4 ORANGE COUNTY HOUSING REHABILITATION PROGRAM SPECIFICATIONS FOR GLOSSON CIRCLE CHAPEL HILL,N.C. FOR NfABEL BURNETT PHONE: DATE: 9/18/2001 BY: JIM AXEIR OD REHAB SPECIALIST NOTE TO CONTRACTOR CONTRACTOR SHOULD REFER TO THE BASIC SPECIFICATIONS,PROPERTY REHABILITATION STANDARDS,GENERAL CONDITIONS,NORTH CAROLINA BUILDING CODES MANUAL,AND ORANGE COUNTY MINIMUM HOUSING CODE DOCUMENTS. IT IS NOT THE INTENT OF THE WRITER TO DIRECT ANY CONTRACTOR TO A SPECIFIC SUPPLIER OF MATERIALS CALLED FOR IN THIS WORK WRITE-UP ONLY TO SPECIFY A TYPE THAT WOULD BE ACCEPTABLE TO THE HOMEOWNER AND ORANGE COUNTY HOUSING REHABILITATION PROGRAM. Mable Burnett 5 114 Glosson Cir. Carrboro 967-4583 September 18,2001 EXTERIOR 1. Repair the front steps. Install a pressure treated handrail with pickets on the front steps and porch. 2. Remove the trash from the sides and rear of the house. 3. Paint the exterior trim, doors and shutters with semigloss, exterior latex paint. Paint to cover completely. 4. Install aluminum, continuous gutter and downspouts. Install splashblocks under each downspout. 5. Install a gravel driveway from the entrance driveway to the rear door with a turnaround in the rear.Driveway to be eight feet wide bordered with landscape timbers. Gravel to sit on black landscape siltation fabric. INTERIOR: WINDOWS: 1. Install vinyl replacement windows and trim. PAINT: 1. Prepare all surfaces for paint.Patch all holes.Paint the walls with flat latex paint, the ceiling with ceiling white latex paint,the trim,doors,kitchen and bath walls with semigloss latex paint. Paint to cover completely. FLOOR COVERINGS: , 1. Install carpet and pad and trim. Carpet to cost not less than$14/yd. 1 Mable Burnett 6 114 Glosson Cir. Carrboro 967-4583 . September 18, 2001 2. Install vinyl floor covering in the bath,kitchen and laundry room.Install shoemold and metal trim.Vinyl to cost not less than$14/yd. LIVING ROOM: 1. Install a six panel,metal insulated door unit with lockset and deadbolt to be keyed the same.Install a wide view peephole. 2. Install aluminum over wood core storm door with pneumatic closurer and vinyl sweep.Door to have a self-storing glass and screen,push button lock and key and a lifetime warranty. 3. Remove the masonry thimble on the gable wall. Install matching sheetrock. Tape and finish the sheetrock smooth. KITCHEN: 1. Remove the cabinets and floor covering to the joists. 2. Replace three floor joists with likesize lumber. 3. Replace approx. 1011 of sill plate. 4. Install matching plywood for finish and subfloor. Install Y4"luan plywood. Prepare the floor for vinyl. 5. Install factory finish cabinets with wood fronts.Install a formica counter top with a rolled backsplash. 6. Install 31/4 inch matching baseboard. Mable Burnett 7 114 Glosson Cir. Carrboro 967-4583 September 18, 2001 LAUNDRY ROOM: 1. Remove the floor covering to the joists 2. Replace two floor joists with likesize lumber. 3. Replace approx. eight IS of sill plate. 4. Install 3/4 inch CD plywood subfloor, 1/2inch AC plywood finish floor. Prepare the plywood.for vinyl. 5. Install 31/4 inch matching baseboard. 6. Install a six panel,metal insulated door unit with lockset and deadbolt to be keyed the same as the front door. Install a wide view peephole. 7. Install an aluminum storm door with pneumatic clousrer and vinyl sweep. Door to have a self-storing glass and screen,push button lock and key and lifetime warranty. RIGHT/FRONT BEDROOM: 1. Install a wood, door unit and privacy lockset BATH: 1. Remove the floor covering to the floor joists,the wall covering to the studs. Remove the closet framing. 2. Install%inch CD plywood subfloor and 1/2inch AC plywood finish floor. Prepare the plywood for vinyl. 3. Install 31/4 inch matching baseboard. 4. Insulate the exterior wall to R-15. S Mable Burnett. 114 Glosson Cir. Carrboro 967-4583 September 18, 2001 5. Install MR sheetrock on the walls and 3/8 inch sheetrock on the ceiling. Tape and finish the sheetrock smooth. 6. Install a five piece accessory kit to include two towel bars,tumble holder,paper holder, and soap dish. 7. Install a plastic tub enclosure with corner shelves. 8. Install the existing medicine cabinet. 9. Reframe the door opening for a 3-0 unit.Install a 3-0 door flush wood door unit, privacy lockset and doorstop. 10. Install two 36"stainless steel grab bars, one on the long wall of the tab and the other on the left wall outside tub. 11. . Provide a transfer seat. PLUMBING: 1. Install a 7-inch, stainless steel, double bowl sink with washerless faucets. Install strainers,p-trap, supply lines and cutoffs. 2. Install a washerless faucet on the tub. 3. Install a 24-inch vanity,washerless faucets,p-trap, supply lines and cutoffs. 4. Install a handicap commode, supply line and cutoff. 5. Install a washing machine box in the wall of the laundry room.Make all waste and supply connections. Mable Burnett g 114 Glosson Cir. Carrboro 967-4583 September 18,2001 ELECTRIC: 1. Install new fixtures in each room except the bath and right/rear bedroom and center/rear bedroom. Install a 36-inch ceiling fan with a light kit in those two MOMS. 2. Install GFI outlets in the kitchen and bath. 3. Install electric smoke detectors in the hall and bedrooms. 4. Install a 200 amp service,mast and weatherhead. 5. Install the floodlights on the front porch properly. 6. Install floodlights at the rear entrance. INSULATION: 1. Install R-30 insulation-in the attic. 2. Install a 6 mill vapor barrier in the crawlspace. Mable Burnett 10 114 Glosson Cir. Carrboro 967-4583 September 18,2001 MECHANICAL: 1. Install a gas pack heat and-air system with insulated ductwork.Make all necessary electric and mechanical connections. TERMITE TREATMENT: 1. Provide a termite inspection and treatment. JOB TOTAL t • 11 ' t a . 3