Loading...
HomeMy WebLinkAbout2001 NS Purchasing - Reece, Noland, McElrath Award of Bid, Contract Approval for Whitted HVAC Consulting Engineer 6 i� a MECE,1`1 AM 81111"1 RAT#� CONSULTING ENGINEERS P.O.oOX 546/WAYNESVU E,NORTH C/1ROUMA 267MrM6 WATMW*ILLt pas. &OW A7NLNLLE P" PAX(ap A5641a 94"1: nn�AA wean Ms. Pamela K. Jones,Director August 21, 2001 Purchasing and Central Services County of Orange 132 E. King Street Hillsborough,N.C. 27278 Re: RFP#5076 for Mechanical Engineering HVAC Design Services for the Richard E.Whiffed Human Services Center and Central Recreation Building Deal'Pam: I certainly enjoyed meeting with you, Wilbert,and Wayne,and we are pleased to provide you our proposal on this project to furnish you design engineering services for new Heating, Air Conditioning and Ventilating Systems for these facilities. We will provide professional services as outlined in your July 20, 2001 RF'P to design mechanical systems, prepare working drawings, specifications, and front end documents necessary for above buildings in sufficient detail to allow formal bidding of the project, after receiving approvals.. We will also work with you and the occupants of the facilities to develop a phasing schedule.to allow the County to plan staff locations in advance of the work, We have included providing Construction Phase Services including conducting a preconstruation conference,twice monthly construction conferences on site,three constriction site visits per week while work is taking place on site, office review of Contractor's shop drawings, and assistance with construction coordination or problem resolution by phone as necessary. We will provide Contractors and Owner support needed during the Contractor's one- year warranty for coordinating and resolving any problems with equipment manufaatarerslsuppliers,systems functions,balancing, etc. We will provide record drawings prepared from the Contractor's as-built drawings in both paper and electronic(Autocad)fife fomw. Our lump sum professional fee for the above work is One Hundred Seventy-Five Thousand and Forty Dollars(5175,040)payable monthly as project progresses per Standard ATA milestones. We will invoice montlily, with fee to be payable monthly as project progresses on a net 30 day basis. Financing service charges would be 1-Urle per month(18% APR)on balance carried past 30 days. if we should have to seek legal action to effect collection and prevail in C.JM REECQ,JR„P.E./Wy,64eEL11AI",JR.,P.E./S'rMMX G KAUF}R X P.R r C"QLFA W-GARPETT/KV4M W.iRGOtt.P.L.1 i6prmY Q.PLgMmO"&/IWR YODOWELL.►.E. DAM R.MOUND,P.[.1014.1 , \ 7 litigation,then all of our costs associated with collection are recoverable_ Tf payments are withhold or disputed,we retain the right to stop work until account is current. If there is a project sign and building plaque,Reece,Noland&McElrath Engineers will be appropriately listed. Document preparation and distribution for bidding,as welt as expedited shipping requested by Owner,will be treated as reimbursables. The basic HVAIC system proposed is variable air volume(VAV)with terminal reheat,air cooled water chiller, and natural gas boilers, as recommended by the Robson& Woese, Inc. Study. Enhancemcnt/modifications to this basic system will be considered as budget supports, for improved environmental sustainrbility,comfort, and indoor air quality. Possibilities include heat recovery,water cooled chiller with hydronic economizer.variable speed pumping,demand control ventilation, and increased efficiency boilers. Electrical connections to new HVAC equipment will be designed based on being supplied from existing building service. New building lighting,systems wilt be specified if ce diogs are removed, which is expected. New tight fixtures will typically be T.g fluorescent fixtures with electronic ballasts,with some HID fixtures in the Library. Tliis should improve the enirrgy efficiency of the facility significantly,in addition to reducing the cooling load. New lay-in ceilings and new suspension systems will most likely be specified,as expectations are that mechanical work in the above ceiling cavities wilt require almost complete removal of existing ceilings. We have included no services related to identification or removal of hazardous wastes (asbestos,lead based paint, etc.)from the facility, as our understanding is that the buildings have been inspected and no such materials have been identified. If such materials are encountered during construction,it will be the responsibility of the Owner to have such materials removed. If you have any questions or your needs differ from the woo of work I have assumed and quoted above,please let me know. Yours very truly, REECE,NOLAND&McBLRATH,INC. Stephan C. Kaufman,P.B. Accepted By: ----. Date: