HomeMy WebLinkAbout2012-350 AMS - J F Wilkerson Contracting Co for Change Order @2 for Brookhollow Creek Pump Station #219,257.78 Change Order
No. 2
Date of Issuance: August 13,2012 Effective Date: August 13,2012
Project:Buckhorn Area North of 1-85 and owner:Orange County, Owner's Contract No.: SRF:CS370884-01
Efland Sewer System Improvements North Carolina STAG: XP95456411
Contract:Buckhorn Area North of 1-85 and Efland Sewer System Date of Contract: August 31,2011
Improvements
Contractor:J.F.Wilkerson Contracting Company,Inc. Engineer's Project No.: 11,01111
The Contract Documents are modified as follows upon execution of this Change Order:
Description:
Increase the capacity of the pump station from a 250 gpm pump station to a 550 gpm pump station. This change
includes the deepening of the wet well,increase in size of the pumps,increase in generator size and change in
associated piping sizes and depths.
Attachments(list documents supporting change):
Pump Station Change Summary,Revised drawings E-2.0,E-3.0,E-3.1,E-7.0,E-7.1,and E-7.2,McGill Associates
letter dated July 5,2012,and J.F.Wilkerson letters dated July 27,2012 and July 30,2012(with attached cost)
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original Contract Price: Original Contract Times: ❑ Working days Z Calendar days
Substantial completion(days or date): 450 Days
$ 2,942,954.46 Ready for final payment(days or date): 450 Days
[Increase] [Decrease] from previously approved [Increase] [Decrease] from previously approved Change Orders
Change Orders No. to No. 1: No. to No. 1:
Substantial completion(days): 0 Days
$ 24,507.94 Ready for final payment(days): 0 Days
Contract Price prior to this Change Order: Contract Times prior to this Change Order:
Substantial completion(days or date): 450 Days
$ 2,967,462.40 Ready for final payment(days or date): 450 Days
[Increase] [Deer-ease] of this Change Order: [Increase] [Deer-ease] of this Change Order:
Substantial completion(days or date): 90 Days
$ 219,257.78 Ready for final payment(days or date): 90 Days
Contract Price incorporating this Change Contract Times with all approved Change Orders:
Substantial completion(days or date): 540 Days
$ 3,186,720.18 Ready for final payment(days or date): 540 Days
A
RECO ACCE ACC
By:L�W(Aut4h , By: MWZV By:��_1111 t, ) 10
--;;F
Enginee (Auiho;Zd Signature) 0 r(Authorized Agnature) ontrWor(Authorized Signature)
� t, t � i
Date: Date: ► " Date: C-)
Approved by Funding Agency(if applicable):
Date:
EJCDC C-941 Change Order
Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications Institute.
Page 1 of 2
This Instrument has been pro-audited In the
manner required by the Local Government
Budget and Fiscal Contr Act
J01
Clarence G.Grier,Assistant Co.Manager w CFO
Buckhorn Area North of 1-85 and Efland Sewer System Improvements
Project
Orange County, North Carolina
Summary of Brookhollow Pump Station Redesign Pricing
PUMP STATION BID PRICING
77 Constructing 250 GPM Pump Station 1 LS $195,000.00 $195,000.00
9 8"DIP 6'-8' 86 LF $40.77 $3,506.22
26 Installing extra depth manholes above 6' 0 LF $123.00 $0.00
$198,506.22
PUMP STATION REDESIGN PRICING
77 Constructing 550 GPM Pump Station 1 LS $399,719.00 $399,719.00
9 12" DIP 24'-26' 90 LF $180.00 $16,200.00
26 Installing extra depth manholes above 6' 15 LF $123.00 $1,845.00
$417,764.00
ANTICIPATED COST IMPACT OF PUMP STATION REDESIGN $219,257.78
* NOTE: Unit price items may change due to site conditions and actual quantity installed.
4
McGM
A S S O C I A T E S
July 5,2012
Mr. Christopher Stike
Project Manager
JF Wilkerson Contracting Co.,Inc.
Post Office Box 183
Morrisville,North Carolina 27560
RE: Brookhollow Pump Station Changes
BuckhorwEfland Sewers
Orange County,North Carolina
Dear Mr. Stike:
We believe that we are at the point of having final plans for the proposed changes to
modify the Brookhollow pump station and associated force main for the subject project.
Please find attached revised plan sheets E7.0,E7.1, E7.2, E3.0, E3.1, and E2.0. Changes
to those plan sheets have been clouded or printed in red. Further, the technical specifications for
the pump and electrical shall be modified as follows: I
• Proposed pumps shall be 550 gpm at 110' TDH, 50 horsepower.
• Engine-generator set shall be rated for :150 kW at 0.8 power factor, with a
minimum starting KVA at 15%voltage dip of 600 KVA
• The two (2) circuit breakers specified to be 3 pole, 3 phase, 90-amp shall be 250
amp,from the generator and utility service. The generator mounted circuit breaker
shall also be 250 amp.
• The specification requiring the engine to.be 4 cycle,276 cubic inch displacement, 1�
1800 rpm shall be deleted.
• The sub-base fuel tank for the generator shall be 500 gallon capacity in lieu of
227 gallon.
• The automatic transfer switch shall be 200 amp in lieu of 150 amp.
There have been some additional plan changes since you last provided pricing, so please
review and provide updated pricing. j
I
I
i
Engineering • Planning • Finance
McGill Associates,P.A.•P.O.Box 1136,Hickory,NC 28603•124019`"St.Lane,NW,Hickory,NC 28601
Office:828-328-2024•Fax 828-328-3870
Mr. Christopher Stike
March 30,2012
Page 2
We appreciate JF Will{erson's continued efforts in the construction of the Buckhorn-Efland
Sewers project and look forward to the completion of a successful project. If you have any questions,
please do not hesitate to contact us.
Sincerely,
Mc LL ASSOCIATES, P.A.
DOUG CHAP ,PE
Senior Pr ' ct Manager
:dc
cc: Mr. Jeff Thompson, Orange County
Mr.Kevin Lindley,PE, Orange County,w/attachments
Mr. Wes Wightman,PE,McGill Associates,PA
FA2011 PROJECTS\11.01111 ORANGE COUNTY-Efland Buckhom Sewer Proposal\04_Construction Phase\Correspondence\CS pump station
plans 07-5-12.docx
I
I
I
i
I
i
I
I
i
Engineering • Planning • Finance
I ,
McGill Associates,P.A.•P.O.Box 1136,Hickory,NC 28603•124019"St.Lane,NW,Hickory,NC 28601 •
828-328-2024•FAX 828-328-3870
July 27,2012
Mr. Douglas Chapman
McGill&Associates
124019th St Lane NW
Hickory, NC 28601
Re: Efland Sanitary Sewer Improvements
Dear Mr. Chapman
This letter is to request the addition of a bid item not included in the original bid. The pipe
from Manhole#1 to Manhole#2 had been changed from 8" DIP to 12" DIP. The depth has
been changed from 6 to 8 feet deep to 24 to 26 feet deep. This depth will require Class 50 DIP
with special bedding.
90 If 12" DIP 24'to 26' @ $180.00 If
Manhole#2 will be moved away from Brookhollow Road approximately 15 feet. The revised
plans will make this manhole deeper,from 5 feet to 20.8 feet. The sewer was approximately
6 feet from the cement asbestos waterline. The new alignment will decrease the change of
damage to the waterline.
The increase depth of the wet well will require moving the wet well approximately 15 feet away
from the property line to allow for sloping of the excavation to the new depth of 35 feet.
Both the relocation of manhole#2 and the wet well will remain in the property lines.
Sincerely
J F WILKERSON CONTRACTING COMPANY, INC
J se P h Wilkerson
-JFIL RSO
CONTRACTING;CO., INC.
July 30, 2012
Mr. Douglas Chapman
McGill&Associates
124019t'St Lane NW
Hickory, NC 28601
Re: Efiand Sanitary Sewer Improvements
Dear Mr. Chapman
I have enclosed the revised change order for the Efiand Pump Station. Bitting Electric has given
$20,533.00 reduction for the 150 KW,generator. All the controls and switches did not change.
Pete Duty and Associates will give a deduction of$1,200.00. The pumps and controls have not
changed. The only change is the decreased motor horsepower. 1 have added one item for
Manhole#1 for additional depth. At the time we priced the original change order,we did not
have the new depths for the manhole.
Sincerely
J E WILKERSON CONTRACTING COMPANY,INC,
oseph Wilkerson
P.O.Box 183 Morrisville,NC 27560 (919) 467-1$29 Fax(919)467-6269
EFLAND SANITARY SEWER IMPROVEMENTS
PUMP STATION BREAK DOWN WITH ORGINAL VERSUS CHANGE ORDER COSTS
DATE: JULY 31,2012
ORGINAL PS CHANGE ORDER PS
DESCRIPTON UNIT PRICE UNIT PRICE
Excavation,Installation_and Backfill Wet Well $ 17,500.00 $ 59,700.00
Hauling of Excavated Material from Wet Well and
Returning $ - $ 14,500.00
Installation of Piping,Pumps and Valve Vault $ 26,428.00 $ 44,500.00
Wet Well(Material OMy) $ 4,362.00 $ 16,995.00
Wet Well Coating(Subcontractor) $ 5,426.00 $ 7,806.00
Valve Vault(Material Only) $ 2,200.00 $ 2,200.00
Piping(Material Only) $ 12,100.00 $ 19,134.00
Electrical(Subcontractor includng Generator with
150 kw priced in CO) _ - $ 65,538.00 $ 100,064.00
Additional cost to Install Concrete Ballast beyond
Unit Price $ - $ 4,250.00
Crane Rental _ $ - $ 6,600.00
Pumps(Material Cost) $ 29,546.00 $ 78,220.00
Fence(Subcontractor) $ 8,800.00 $ 8,800.00
Clearing(PS Site) $ 10,000.00 $ 12,000.00
Telephone Conduit $ 800.00 $ 800.00
3W Water Service(Installation and Materials) $ 2,700.00 $ 2,700.00
Site Grading $ 7,500.00 $ 12,000.00
Bollards --- $ - 700.00 $ 700.00
PS Wall Mounts $ - $ 3,500.00
Fuel for Generator $ 1,400.00 $ 3,280.00
Manhole#1 (Additional Depth) $ - $ 1,970.00
TOTAL $ 195,000.00 $ 399,719.00
w
9 0
! P W-
w z z I
z
till
LU
0
F-1 1 5 i R I
CL
U.
Lo it
(L CID
V
GUM A
9i v
tillsa
fit
ucz
rn
MON
VN. i fWi
Z .
4-
t lit
Oil
Sit
ji
f"P-
10-
Ik
,7
+
4 AD
1A
IS C=) CD
CD CD
CD
SPIN z
bi Ill
LL
0
as
>
IV I NrF-'�
I CL All
1111116111@ holi'migil z a.
{�
-Mill.�' _
_ >— ISO0��n��9o���3�0���� �
1 _
unuuu ,W�� n,�unun
Ml-
ZMAI
n►n�� �►��u�n��nu� u=
- :I - ICI '��Nli►�_ _ _ _
:: � � w
11;w Gq�Jl
LU
MMO SNOMIA38
ZION ■ HOMVNIA • ONINNVId DMIU33MION3
S sa " V ' 30�" —v
Jig, lip
BE
I fit
Jig
are I
0
bg ha
tl
WIN
is
fill
Isol
M7-1 —
-17
r
I d
lip
11h QQ
11)77
4—
LO
ills
Eno ail
Mal
Ll
N
NAM v"
-441
v4 Ny"�
0
sssss�----sum.mm-1 simmon a m MEEk'm 0 WN!'.
eL
39P3 7i i
CL
r W Q
W� �W F Q ESS yN O
® a ev�•t4D �
1 - \
I
\
tle 3 m
� p •� N
y €
i
r
i
» tl f a
X
115 \ » �..' \ ,, g - - \ ;s o
�.. rs ae � € o
5 LU
1 zw
�+q�pp33b��td�. 1 k,\ �� \ k i � iil tl9¢� �+�•3 1ucF�a,WRt n�
6
UO�
\ \\\ _,,,.ern_��,- ♦♦
6a R¢gy�..2S ���,J�E' 8x✓�s♦♦ fie € i 1' °,..,.•
d 5!tl y 8 Cam, � �♦ v°m
Ln
/� \Ytl �C � bYJ ♦♦ / 1--1� i II �
\`\ M1 ♦♦ / �U z d R m �
ddb 8�� ♦•♦ / �� �O¢ � N O
\ i!tl ♦ 8 , ASE Q'z ® J
\E d s ♦� ��tl W ] p
m ` Ijl ai �'i &Zp
lu
LU
i=
g
R
tl tl q i R c<ai: a1 Ll1LlSU a
i I
B� � � � L1I oil
sW: @g
Ila
9 a
� Y
• w - - .J� �i�u�s�a w
1
Q�
{! E E c aep{ a pp q
:gig
fill
f9 E 6 E �!^3'c �E�� � ••I ��
Ly L
i 1 a 4.
a { R
its
1 Me
ell
1 IN
Egli
If
y ne
sf9 ' I tl Rdg�
a ��tl
i
I
L'. 7N0 CYOISIA3M w�,snuan,mR ,O[9,temv 1,Nt JR aaOR]u ru
p
"Jill r: 3io" 3JISYNId flNINAIY1d flNIlIHHNIfl NH
1 a S a 1 v I O O S S v
¢ DOW
R 1 is 11-11; �i }.
. .~
LU
o
fit
�
ow
gut
KI
iL
k!i, 'p;q L------ w
Jll