Loading...
HomeMy WebLinkAboutAgenda - 10-11-2012 - 1 1 ORANGE COUNTYBOARD OF COMMISSIONERS CARRBORO BOARD OF ALDERMEN JOINT MEETING AGENDA ITEM ABSTRACT Meeting Date:October 11, 2012 Action Agenda Item No.1 SUBJECT: Access Road –Twin Creeks Park / Ballentine Subdivision (MI Homes) DEPARTMENT:PUBLIC HEARING: (Y/N)No Environment, Agriculture, Parks and Recreation; Planning and Inspections ATTACHMENT(S):INFORMATION CONTACTS: Adopted Master Plan –Twin Creeks Park David Stancil, 245-2510 (With Final Greenway Location)Craig Benedict, 245-2575 Letters from Corps of Engineers(Three)Marabeth Carr, 245-2510 PURPOSE: To review the proposed access road (also known as “Road A” of Ballentine subdivision) that would serve the Twin Creeks (Moniese Nomp) District Park and Ballentine subdivision. n 2001, Orange County purchased 193 acres from two families for the future BACKGROUND: I Twin Creeks District Park and Educational Campus. This park and campus was acquired to meet the previously-identified need for a Chapel Hill Township District Park and offer the opportunity to co-locate a park with a school campus. A master plan for the parkand educational campus, adopted in 2003 (revised and re-adopted in 2005) proposed using an existing shared driveway along a boundary with then undeveloped land to the south as the entranceway into the park. In the last decade, MI Homes purchased the property south of the County’s Twin Creeks site, gained subdivision approval, and in 2010-11developed a portion of the Ballentine subdivision. The concept of the shared road continued to be envisioned as part of this process, although initial phase(s) of this development did not require the completion of the shared road, identified as “Road A” on Ballentine plans. However, the original conditional use permit (CUP) adopted for the Ballentine property did envision a shared entrance road for both Ballentine and Twin Creeks. “Road A” as designed to date straddles the County/Ballentine property line. Over the past several years, County and MI Homes staffs and attorneys have discussed working together onthe road construction, at the appropriate time. However, the economic downturn of the last decade served to delay the construction of Twin Creeks Park, and portions of Ballentine that would use the shared Road A.Over the past several months, MI Homes has been in informal dialogue with Town staff regarding the submittal of a CUP Modification and a possible Town Land Use Ordinance textamendment to allow an alternative to parallel sidewalks on both sides of Road Ahas also been raised. In the meantime, aredefined Phase I of the park, the Jones Creek Greenway through the County’s property, was constructed in 2010 and opened in 2011. 2 With the potential for a CUP modificationfor the remainder of Ballentine,the issue of constructing “Road A” has come again to the forefront. While there are a number of issues related to the discussions to date (including sidewalks versus trails along the road), aprimary stumbling block for the parties that would construct the road is the concept of requiring a bond or a bridge connection across Jones Creek, located atthe eastern edge of the Ballentine and Twin Creeks properties. MI Homes has argued, and the County has supported, a position that this is not an appropriate place for a stream crossing at this time, the construction of which benefits neither the park nor the subdivision. A letter from the U.S. Corps of Engineers from January 2006 (reissued in January 2012)has been offered in support of this position. The letter asserts that the Corps is unlikely to permit multiple crossings of Jones Creek in the short stretch through Ballentine and Twin Creeks due to environmental concerns. Town of Carrboro staff hashad their own conversations with the Corps of Engineers in recent months (see attached memofrom June 2012) that may offer a different view if the crossing were applied for by a municipality. A related issue to the potential road extension/bridge is a significant grade separation that would be created where the road and the Jones Creek Greenway intersect, which would likely require a pedestrian underpass. Orange County has appropriated$600,000 through its Capital Investment Plan (CIP) in FY 2012-13 toward a share of the planned Road Aconstruction. However, construction of the remainder of the park (estimated to be between $9-12 million as designed) is still beyond the five-year horizon of the current CIP, and no funding source has been identified for that purpose. The purpose of tonight’s discussion is to discuss the options for addressing the shared road issue.While potentially many years away, it should be noted that options for the eventual development process for the future park were considered by the County and Town Attorneys in 2007,with the concept of a “Development Agreement” model identified as a mechanism for addressing future park construction, when funds become available. However, there is no funding for additional phases of the parkat this time,and no immediate development issues to be considered for the park at this time beyond the disposition of the “Road A” question. FINANCIAL IMPACT: Orange County has appropriated $600,000 toward the cost of constructing “Road A,” which as proposed wouldstraddle the Twin Creeks/Ballentine property line andprovide access to the future Twin Creeks Park. Phase Iof the park,the Jones Creek Greenway from Morris Grove Elementary School onthe northern edge of the Twin Creeks complex to the southern boundaryof the site,was completed and opened in 2011at a cost of $927,000.The remainder of Twin Creeks Park construction is beyond the current County CIP (beyond 2017). General cost estimates for the 96-acre park, which as designed would be the County’s largest and most-comprehensive, are between $9 million and $12 million (not including any future roads). The cost for the construction of Road A is estimated to be between $1.1 and $1.4 million by staff and MI Homes engineers – not including a crossing of Jones Creek. A potential bridge across Jones Creek for Road A may cost an additional $1 million. RECOMMENDATION(S): The County Manager recommendsthat the two governing Boards discuss the issues related to the construction of “Road A” and consider alternativeoptions or solutionsto the current status. 3 4 J�C.13`2006 09:00 93.9 B76 58?.3 usAC� R��?, RE� #}5888 P.OQ2/003 �,."'`� ���`� � l:�ec�z�lbcx 6,zoOG � :t�e�.tatory Uxv�siota .Aotios�.�17 T�Ia, S.�W-2046���G03�26$ ZvSr, M�ta.la C�uff' � - �I/I T�oiz�es �S00 �uzzd���3rive,Suitc T 3 3 �Zaieig'�,�FC 27647 Dc:�r�z•.��u��: d �" x�o���'i�o�.r�zrza�.ia�w��h yaur co:cl4ul��xt,Iv.�. :Ke�>in Yates o;�7'ixc J'ohn�, �c.�.cYa�ns Cazz��az�y,�n�,,wc�Zave�e�x'��ed 9�a�otc�zti�:�xet�t��;e�cz�.t 1���he°�`o�0� � Car,�boro to coz�Sfi�a�et a xoad erasszz�g tivithir�at��;,eA C�t�txex�t�y�lanncci fos•d��clop����t of �h��3alle�t��ae Subr�i�7ts�or��:a C�zr�axo��r�u3g�Co��y,�foz�.h Carolina, `t'�e cxossi.n� �vov�c�be�ae third czc�sGts���'a����s dGVelapm�:zac tiv�t�uz fi00 fect a�zd wo���ct st���ot,tt��ex cro;�szn�Jazazs Gzeek,a lurisdiclxo�.a�t�zbtztaxy to Bvli�Cxeel:.xn fi�.re C��e�evc;t2���r � 13ass�z. �ased upc�ri the��ozxra#�ar!�rovided;t�e azaiy pl�oce�'ox t�.xs erossin�is iQ zz�ee� t�ze�oc�orcii�aY�ce 5.�,suppozZ vf fut�ar�de�Je�o�7�.czlt�nd zs n,ot 52��'ety xcla�cd. Tz�o�des ta�i�ili�e zxat:ton���e.�Z���.ts,�.hc a�p.lzc�zzt zs xyqu�red to p.rove�t��a���.lxes� . ; k�a�re avo,`tdect z���acts to jtzr��dic�so�al waters ofthe U�.i,tect St�.t_cs sub�ec#to ota.x` rc•,gulafdx�au�1�,�xtty�uz•suar�t to Sec�io�,4��of the C�e����a�e��l.c:. C7zzce a.�applaaazzt • . �zas ad�q��te�y dc�x�oz�stxat�d tl�at�.��y have avc,zd�c�jurisctzational ace�s,t���y z�aust cloc�cnt st�p�tkae�r�xave tak.�r�ic��°iu�h�r;iliz�3mizc 3.�:�zpar.ts to wv�rLrs o�'thE U.S. �'i,aat�y, �a��]°scaLS�n�zy t��z�eqc��xecl ta�Sxovide coxaa�sez�sa�:ox�n�iti��tt,ior�f�z r�r�a�wvzc�ablE j�.lr.�sdict�o��a��z�pacts. .�.acoxdr�.�ly,°�as�d upo�a t1�ze�rovzdcd info.r:n.�txo�z,a z���ues�t�ar i,rzap�ats�o�`�e s��c�tx�or�dja�ez�t wetla�;ds fox Guc��a crasszzz��vo�,z.Id zao�z�zeet the ria�tzonwide p�xr.xzat cozad�tiot�s. Thexefore,s�YCh�p.rvpasaZ would z-c��,�i.ru�ae subz�zi�tal of aDc�a.rt�ez��o� � fi�ae l:.r���(.�7�h)x��.ctividu�?pezx��t a�,���ication. ��7��z1e w�have�o�xuc�.i�ved a p����ii x•c��test far tY�is�rQposed pxo�ec�a�d�vouic� . not L�c abtc ta��t�avac�e c�znnaents re�a.t'dit;��citt�Gx�he 3sstl�ce ar�i��u2�1 o.f z,-��t�z1t - rcgu�.��,p.leasE�e hdvased t��a�sirriila.r pc.r.r.�it.rec��sests�ox z�o:a-�vace,�c]�pcndez�z�ara;e;crts ��,7t,_;�,.�>act ju�-isd�ct.ibza�l�uaCcrs a£tk�e United SFates�a��;nof bcL:�z�eviev���c��`avor��iy . atad h.isto��ically hzv�:citYsex bccs���itlidrtttivr�by�pp.lxc��t�,�szoc�z�'z�'c�fio cl�mia�a�e t`he juristlicti�ana:t i,�z;t.pacts,�tt�tl�xa sonze c�ses�ave b���cte�kxed. ....._.............................................................................................................................................................................._......................_......................................................................................................................................................................................._........................ 5 ;��c,13'2006 09;00 9ifl 876 5823 Us7�CF �kL R�« ;�9n8a P,403/003 . . <<:• . �<� • � Sllou�d you.i���ve�t��>�ua.�;l�e�c�ucst�oi�s rc�ardaz�g�izs�ro3�ct ox�1��z�suw o��hc ,�m.�osGd ooz�stz��ciia�o��oads that da xlot serv�safe�y co�cez�zs ar�d a�e c�nly just�fi�d�y koeal ordiixances,;�lease contac���r.Monte I✓'xaft�e�s at(91�} 876-8�4x?ex�c.n.siai�3Q, �ii�cer�.ly,�'Z���'.����B1�T1:f.�NT�'�;ROA.��XTEI���O�vY�,S.�'4V_ZOQ�i-41603.1��7C CESr�.'W•�t���\J��c�zac CESAW�RG��I�'5�.� Iv�AIL . , :�can B. ��x�:ue�� C;h�ef,�.at�z��x Re�ulatory Field(��zce 4 " . 0 • ..................................................................._................................................................................................................................................................................................................................................................................................................_........................................................ 6 � � ;;� r���y Zs, 2012 Regulatory Division/1145 Action ID: SAW 2008-00754 � Mr. Jeremy Medlin � M/I Homes 1500 Sunday Drive,Suite 113 Raleigh,North Carolina 27607 Dear Mr.Medlin: � The following is an updated letter to our original letter dated December 6, 2006, regarding avaidance and minuuization of jtu�isdictional stream impacts related to potential road crassings for the Ballentine Subdivision in Carrboro, Orange County,North Carolina. Through coardinafion with your consultanf,Mr. Kevin Yates of The John R.McAdam.s Company, Inc.,we are aware of a pofiential requiremenf by the Town of Carrboro to construct a road crossing wifihu�.an area currently planned for development of the Ballentine S�bdivision in Carrboxo, Orange County,North Carolina. The crossing would . be the third crossing for this development wi�h.in 800 feet and would sfub out after crossing Jonis Creelc, a jurisdictional tributary to Bolin Creek in the Cape Fear River Basin. Based ' upon the infoimation provided,the only purpose for this crossing i�s to meet the local ordinance zn support of fizture development and is not safety related. 7n order to utzlize nationwide pernufs,the applicant is required to avoid and minimize impacts to jurisdictional waters of the United States subject to o�x regulatoiy authority ' ptusuant to Secfion 404 of the Clean Water Act. Once an applicant has adequately ' demonstrated that they have avoided jur.isdictional areas,they must document steps they have talcen to fiu-ther min;mize impacts to waters of the U.S. Finally, an applicant may be ' _ required to provide compensatory mi�iga�ion for unavoidable jurisdictional impacts. Accordingly, based upon the provided infaixnation,a request for impacfis to-�he st�eam oY adjacent wetlands for such a crossing may not meet the nationwzde permit conditions. ' Therefoze, such a proposal may requzre the submittal of a Depa�.-finent of the Army(DA) individual permit applicatian. ' � While we have not recezved a pernut request fox a third road crossing related to this project and would nof be able to provide comments regarding either�e issuance or de.nial of a permii request,please be advised that similar permit requests for non-water dependent . , 7 -2- projects that impact jurisdictional waters of the United States have not been reviewed favorably and historically have either been wzthtlrawn by applicants,modified to eliminate the jtuisdictional impacts, and in some cases have been denied. Should you have any farther questions regarding this proj ect or t�.e issue of cons�ructing roads to meet local interconnectiviiy requirements,please do not hesitate to confactme at(919) 554-4884 ext.26. � Sincerely,Filename:Ballentine Subdiviszon- Stream Crossing- Carrbaro-25 Jan 12(2).docx CESAW RG-RIAW/dh CESAW-RG-R/FILE MAIL ( ������ Andrew illi�s Regulatory Project Manager, Raleigh Field Office � I ; , 8 ' DEPARTMENT OF THE ARMY � � � ' . ��� • ������ WILMINGTON DISTRICT,CORPS OF ENGINEERS „ �; ���� : �� � 69 QARL1NG70N AVENUE ___��_ _-.- -� WILMINGTON,NORTH CAR�LINA 28403-1343 w �� REPLYTO . . ATTENTION OF: JUIZP+2��2�12 Regulatory Division Action ID: SAW-2008-00754 Patricia J. McGuire,AICP, CZO, CFM Planning Directar Tovvx�.of Carrboro 301 W. Main Street . Cai7boro,North Carolina 27510 Dear Ms. McGuire: Reference is made to the meeting on March 7, 2012,with qou and other representatives with the Town of Cai�boro and Mr. Craig Brown and me to discuss our regulatory program pursuant to Section 404 of the Clean Water Acf with regard to road construction and residentiaUcornmerciai development. Mr.Mike Braugh,At�oY�ney for the Town of Carrboro; Ms. Trish McGuire,Planning Director;Mr. Jeff Brubaker, Transp�rtation Planner; and Mr. Heury Wells,Town Engineer,were also present, Reference is also made to the attached letter dated January 25,2012,to Mr. Jeremy Medlin,representing M/I Homes and Ballentine Subdivision, addressing the proposed road crossing of Jonis Creek, a�iibutaxy to Bolin Cxeek, in the Cape Fear River Basin. Specifically,the purpose of the meeting was to discuss Depai�tment of the Army(DA) permitting and how it pertains to road infrastructure planuing and development. In the meeting, we advised you that in ordex to utilize nationwide permits,the applicant is required to avoid and uLnimize impacts to jurisdictional waters of the United States subject to our regulatoiy authority. Once an applicant has adequately demonsi�ated that they have avoided jurisdictional areas,fhey must document steps they have taken to fiu�ther minimize impacts to waters of the U.S. Finally, an applicant maq be required to provide compensatozy mitigation for unavoidable jurisdictional impacts. Please realize that an applicant can still pursue DA individual permitting;however, they would lilcely experience similar permitting issues in documenting avoidance and mimmizati0n. i During the meeting,we also cliscussed road infrastrucizzre develapment by munzcipalities. We mentioned that municipal'zties can often justify the road's construction based upon firaffic data and purpose and need of the proj ect;whereas, developers contribute only to a portion of the tra.ffic volume and have difficulfy justifying road construction based upon the purpose and need. Accordingly,you were advised that the Town of Cairboro is eligible to apply for DA peimitting , to extend Lake Hogan Road north.to access a pzoposed municipal park. Eligihilify for DA permitting will be based upon the extent of jurisdictional impacts. If project impacts do not exceed 3001inear feet of Jurisdictional stream channel and/or 0.5 acre of jtu-isdictional wetlands, ; then the project may be eligible for auf.hozization through nationwide permits. Should the + impacts exceed those mentioned above,the project would require DA individual permit authorization, In addition,please be reminded that sisnilar to Ballentine subdivision,a road which services only a subdivision,parlc, and/or residentiaUcommercial development,will likely ' � 9 - � , be evaluated with the impacts associated with the project. Finally, should it be determined that a . � road can be bnilt and have independent utility, such as a thoroughfare road,the road may qualify � for authorization separately. Should you have any fiu-�her questions regaiding this praject or the issue of constructing roads to meet local interconnectivity requirements,please do not hesitate to contact me af(919) 554-4884 ext.26. Sincerely, ���.s'� `�'3��-v �' � Jean B. Gibby Chief,Raleigh Regulafory Field Office Attachment � Copies FLUxiished(with attachment): Mx. Jeff Kleaveland Town of Carrboro Planning Department 301 West Main Street : Car�boro, North Carolina 27510 � 2 ;