HomeMy WebLinkAboutAgenda - 09-06-2012 - 5i ORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: September 6, 2012
Action Agenda
Item No. 5-i
SUBJECT: Amendment to Hobbs, Upchurch & Associates Contract: Buckhorn-Mebane
EDD Water and Sewer Extension Project— Phase 2
DEPARTMENT: Planning PUBLIC HEARING: (Y/N) N
ATTACHMENT(S): INFORMATION CONTACT:
1. Original Hobbs, Upchurch & Associates Craig Benedict, Planning Director, 245-
Contract 2592
2. Contract Amendment Kevin Lindley, PE, Staff Engineer, 245-
a. Buckhorn-Mebane 2583
b. Efland Redirection
3. Maps of Project Area
a. Water
b. Sewer
PURPOSE: To approve two amendments to the Hobbs, Upchurch & Associates (HUA)
contract for design of water and sewer utilities in the extended Efland-Buckhorn-Mebane
Economic Development District (EDD) area.
BACKGROUND: The amendments will add:
1. Easement negotiation and coordination of the bid ($30,500 and $16,000) for the original
Buckhorn-Mebane EDD Phase 2
2. Design and bid services for the Buckhorn-Mebane EDD Phase 2 - Extension (Efland sewer
redirection to Mebane) ($151,600).
Orange County contracted with HUA in November 2010 to provide design and permitting for
water and sewer infrastructure in the Buckhorn EDD area (Attachment 1). To maximize design
efficiency (e.g. choosing a gravity sewer option along Bowman Road, see below), the timeline
as originally set forward would need to be adjusted. The amendment adding time to the
contract as shown in Attachment 2 will simply be an official acknowledgement of this.
Included in the first amendment language is an acknowledgement of the option chosen by the
BOCC to pursue a gravity sewer outfall along Bowman Road. This option was outlined in the
original contract, and as such, is not an amendment. However, the information regarding the
decision to pursue the gravity sewer option along Bowman Road and the cost associated with
this option are included in the Amendment document for clarification purposes.
In addition, staff has received a proposal from HUA to coordinate acquisition of the necessary
easements in the project area. This scope of work is outlined in the amendment, but will
generally include surveying and mapping the easements, contacting and negotiating with
2
individual property owners on behalf of the County, and conducting easement value
assessments, if necessary. Both the County Attorney's office and Planning will still organize the
legal aspects of easement dedication. Orange County staff has held community outreach
meetings describing the project and the necessity of easements. However, because HUA has
experience performing this type of work on previous projects, and staff experience with
acquiring easements is limited, staff believes the process would go more smoothly if HUA were
contracted to coordinate the easement acquisition process. This easement process will be
concurrent with the permitting for the project and will take place over the next two months.
Buckhorn-Mebane EDD Phase 2 - Extension (Efland sewer redirection to Mebane)
The second amendment to the HUA contract entails the design phase of the Efland sewer flow
to Mebane redirection. This project went through `feasibility engineering' as part of HUA
Buckhorn-Mebane Phase 2 project since this new flow from Efland will flow through the new
sewer master planned area completed by HUA with the original contract. Agreements are now
in place with the City of Mebane to permit these new Efland flows.
This project was anticipated in the adopted Fiscal Year 2012-13 Capital Investment Plan (CIP)
and after completion will eliminate the approximately $100,000 annual subsidy to support the
Efland sewer system users. Orange County has aligned its sewer rates in Efland to compare
with the City of Mebane `outside city rate' which has been a dramatic moderation in rate
increases originally expected in the Efland area.
Also, as a side engineering note, minor field piping changes were made in the ongoing Efland
sewer project (also known as Efland Sewer Expansion Phase 1 East and Phase 2) to create
cost and operational efficiencies when the sewer flow redirection projects begins.
FINANCIAL IMPACT: This first amendment will add:
1.1 Easement Negotiations HUA $30,500
The cost of any easement appraisals will be negotiated on a case-by-case basis due to the
wide variation in potential cost and would be considered a reimbursable item in addition the
amount above. Staff recommends an additional easement appraisal allocation of
1.2 Easement, Appraisal and Dedication Fund (Budget)
$29,000 should be set aside as a budget amount for this reimbursable item. Money has
been set aside in the recommended capital budget for this project which will cover the cost
of purchasing the easements and any permitting fees for the project.
1.3 Buckhorn Mebane EDD Phase 2 Bid Management Services
2. Buckhorn-Mebane EDD Phase 2 - Extension (Efland sewer redirection to Mebane) Design
Services
The second amendment (i.e. Buckhorn Mebane Phase 2 Extension or Efland Sewer Flow
Redirection Engineering Design) is funded in Fiscal Year 2012-13 in the amount of
$160,000. This proposal is $151,600 and within budget.
RECOMMENDATION(S): The Manager recommends the Board:
1. Approve the contract amendments;
2. Authorize the Chair to sign on behalf of Orange County; and
3. Authorize the Manager to sign permit applications or other documents related to the
permitting with bid results for Buckhorn Mebane EDD Water and Sewer Project-
Phase 2 to be brought to the BOCC for approval in the Fall 2012.
Attachment 1 3
[Departmental Use Only
TITLE zalckhorn4ii ebane EDD W.ter and Sewer Extension Project—Phase 9a
FY 2010
NORTH CAROUNA
SEMVMES AGREEMENT I'VER$90,000.00
�y COUNTY
FP o NO RGBMBURSA'-LE EXPENSES
ORANGE COUN G Y
•
This Services Agreement (hereinafter "Agreement"), made and entered into this 4th day of
November, 2010, ("Effective Date") by and between Orange County, North Carolina a body
politic and corporate of the State of North Carolina(hereinafter,the "County") and
Hobbs,Upchurch&Associates,P.A, (hereinafter,the "Provider").
WITNESSETH:
That the County and Provider, for the consideration herein named, do hereby agree as
follows:
1. Services
a. Scope of Work.
i) This Services Agreement ("Agreement") is for professional services to be
rendered by Provider to County with respect to. (insert type of project):
Professional Engineering Service
ii) By executing this Agreement, the Provider represents and agrees that Provider is
qualified to perform and fully capable of performing and providing the services
required or necessary under this Agreement in a fully competent,professional and
timely manner.
iii) Time is of the essence with respect to this Agreement.
iv) The services to be performed under this Agreement consist of Basic Services, as
described and designated in Section 3 hereof. Compensation to the Provider for
Basic Services under this Agreement shall be as set forth herein.
2. esponsibilities of the Provider
a. Services to be provided. The Provider shall provide the County with all services
required in Section 3 to satisfactorily complete the Project within the time limitations set
forth herein and in accordance with the highest professional standards.
b. Standard of Care.
i) The Provider shall exercise reasonable care and diligence in performing services
under this Agreement in accordance with the highest generally accepted standards
of this type of Provider practice throughout the United States and in accordance
Revised July 2010 1
4
•
with applicable federal, state and local laws and regulations applicable to the
performance of these services. Provider is solely responsible for the professional
quality, accuracy and timely completion and/or,submission of all work related to
• the Basic Services.
ii) Provider shall be responsible for all errors or omissions, in the performance of the
Agreement. Provider shall correct any and all errors, omissions, 'discrepancies,
ambiguities,mistakes or conflicts at no additional cost to the County.
iii) The Provider shall not, except as otherwise provided for in this Agreement,
subcontract the performance of any work under this Agreement without prior
written permission of the County. No permission for subcontracting shall create,
between the County and the subcontractor, any contract or any other relationship.
iv) Provider is an independent contractor of County. Any and all employees of the
Provider engaged by the Provider in the performance of any work or services
required of the Provider under this Agreement, shall be considered employees or
agents of the Provider only and not of the County, and any and all claims that may
or might arise under any workers compensation or other law or contract on behalf
of said employees while so engaged shall be the sole obligation and responsibility
of the Provider.
v) Provider agrees that Provider, its employees, agents and its subcontractors, if any,
shall be required to comply, with all federal, state and local antidiscrimination
laws,regulations and policies that relate to the performance of Provider's services
under this Agreement. .
vi) If activities related to the performance of this Agreement require specific licenses,
certifications, or related credentials Provider represents that it and/or its
employees, agents and subcontractors engaged in such activities possess such
licenses, certifications, or credentials and that such licenses certifications, or
• credentials are current, active, and not in a state of suspension or revocation.
3. Basic Services
a. Basic Services.
i) The Provider shall perform as Basic Services the work and services described
herein and as specified in the County's Request for Proposals (the "RFP") "RFP
Number 5164 for "Buckhorn-Mebane Economic Development District (EDD)
Water and Sewer Extension Project — Phase II" issued June 14, 2010, and the
Provider's proposal, which are fully incorporated and integrated herein by
reference together with Attachments Hobbs Upchurch cost proposal dated
September 14, 2010 (designate all attachments). In the event a term or condition
in any document or attachment conflicts with a term or condition of this
Agreement the term or condition in this Agreement shall control. Should such
conflict arise the priority of documents shall be as follows: This Agreement, the
County's RFP together with attachments, Provider's Proposal. together with
attachments.
Revised July 2010 . 2
.. ...........
5
ii) The Basic Services will be performed by the Provider in accordance with the
following schedule: (Insert task list and milestone dates)
Task Milestone Date
1. Conduct Initial Meeting with Project Team 12/9/2010 5%
2. Compile Background Information/Preliminary Analysis 1/21/2011 10%
3. Finalize Water and Sewer System Analysis Phase* 2/28/2011 16% 3)
4. Complete Field Survey/Preliminary Utility Layout 2/28/2011 14% ' S.
5. 50%Design Review Meeting with Project Team 3/31/2011 .14% 5
6. 90%Design Review Meeting with Project Team 4/30/2011 15%
7. Submit Permits for County Review/Approval. 5/31/2011 10% ?4-
8. Submit Final Design for Permitting Agency Approval 6/21/2011 10% 1-y-
9. Finalize Project—Receive Permitting Approvals from State_ 11/30/2011 6% t 0 0
10. Coordinate Funding Opportunities On-going Discussions As required
At this point, the decision will be made to pursue design of either a gravity
outfall running north and roughly parallel to Bowman Road or to continue the
force main along the Bowman Road right-of-way.
iii) Should County reasonably determine that Provider has not met the Milestone
Dates established in Section 3(a)(ii), County shall notify Provider of the failure to
meet the Milestone Date. The County, at its.discretion may provide the Provider
seven (7) days to cure the breach. County' may withhold the accompanying
• payment without penalty until such time as Provider cures the breach. In the
alternative, upon.Provider's failure to meet any Milestone Date the County may
modify the Milestone Date schedule. Should Provider or its representatives fail to
cure the breach within seven(7) days, or fail to reasonably agree to such modified
schedule, County may immediately terminate this Agreement in writing, without
penalty or incurring further obligation to Provider. This section shall not be
interpreted to limit the definition of breach to the failure to meet Milestone Dates.
4. Duration of Services
a. Term. The term of this Agreement shall be from November 2010 to June 2011.
b. Scheduling of Services
i) The Provider shall schedule and perform his activities in a timely manner so as to
meet the Milestone Dates listed in Section 3.
ii) Should the County determine that the Provider is behind schedule, it may require
the,Provider to expedite and accelerate his efforts, including providing additional
resources and working overtime, as necessary, to perform his services in
accordance with the approved project schedule at no additional cost to the
County.
iii) The Commencement Date for the Provider's Basic Services shall be second week
of November 2010.
Revised July 2010 3
6
•
S. Compensation
a. Compensation for Basic Services. Compensation for Basic Services shall include all
• oompensatkon due-the PrOvider from the County for all services under this Agreement.
The maximum amount payable for Basic Services is one hundred and ninety two
thousand Dollars ($192,000.00). In the event the amount stated on an invoice is disputed
by the County,the County may withhold payment of all or a portion of the amount stated
on an invoice until the parties resolve the dispute. Payment for Basic Services shall
become due and payable in direct proportion to satisfactory services performed and work
accomplished. Payments will be made as percentages of the whole as Project milestones
as set out in Section 3(a)(ii) are achieved.
b. Additional Services. Should the County choose to pursue design of a gravity sewer
outfall from the intersection of West Ten Road and Bowman Road (as described in the
footnote to Milestone 3 of Section 3(a)(ii) of this contract) to the City of Mebane's
Southeast Regional Pump Station in lieu of the force main design included in Basic
Services, the Provider shall be entitled to additional compensation, if necessary, for the
difference in design costs between the force main option and the gravity sewer outfall
option. Once the County notifies Provider of the decision to pursue the gravity sewer
outfall option, the Provider will submit a revised cost estimate for the sewer design
portion of the project that includes design costs for this section of gravity sewer outfall
and removes the design costs for the section of force main to be replaced In no case will
the compensation for these additional services cause the total compensation for this
contract to exceed two hundred thousand Dollars ($200,000). • County shall not be
responsible for costs related to any services in addition to the Basic Services performed
by Provider unless County requests such additional services in writing and' such
additional services are evidenced by a written amendment to this Agreement.
6. Responsibilities of the County
a. Cooperation and Coordination. The County has designated the (Planning Director,
Craig Benecict)to act as the County's representative with respect to the Project and shall
have the authority to render decisions within guidelines established by the County
Manager and/or the County. Board of Commissioners and shall be available during
working hours as often as may be reasonably required to render decisions and to furnish
information:
7. Insurance
a. General Requirements. The Provider shall purchase and maintain and shall cause each of
his subcontractors'to purchase and maintain, during the period of performance of this
Agreement:
i) Worker's Compensation Insurance for protection from claims under workers' or
workmen's compensation acts;
• ii) Comprehensive General Liability Insurance covering claims arising out of or
relating to bodily injury, including-bodily injury, sickness, disease or death of any
Revised July 2010 4
7
of the Provider's employees or any other person and to real and personal property
including loss of use resulting thereof;
iii) Comprehensive Automobile Liability Insurance, including hired and non-owned
vehicles, if any, covering personal injury or death, and property damage; and
iv) Professional Liability Insurance, covering personal injury, bodily injury and
property damage and claims arising out of or related to the performance under this
Agreement by the Provider or his agents, Providers and employees.
b. Insurance Rating. The minimum insurance rating for any company insuring the Provider
shall be Best's A. If the Provider does not meet the insurance requirements the County's
Risk Manager must be consulted prior to finalizing this Agreement.
c. Limits of Coverage. Minimum limits of insurance coverage shall be as follows:
INSURANCE DESCRIPTION MINIMUM REQUIRED COVERAGE
o Worker's Compensation Limits for Coverage A- Statutory State of N.C.
Coverage B -Employers Liability
$500,000 each accident and policy limit and disease each
employee
• Commercial General Liability $1,000,000 Each Occurrence; $2,000,000 Aggregate.
• Automobile Liability Combined Single Limit$500,000
• Professional Liability NOTE: Insert coverage limits required by Risk Manager if
applicable.
$1,000,000 •
d. Additional Insured. All insurance policies (with the exception of Worker's
Compensation and Professional Liability) required under this Agreement shall name the
County as an additional insured party. Evidence of such insurance shall be furnished to
the County, together with evidence that each policy provides the County with not less
than thirty (30) days prior written notice of any cancellation, non-renewal or reduction
• of coverage.
8. Indemnity
a. Indemnity. The Provider agrees to defend, indemnify and hold harmless the County
from all loss, liability, claims or expense, including attorney's fees, arising out of or
related to the Project and arising from bodily injury including death or property damage
to any person.-or persons caused in whole or in part by the negligence or misconduct of
the Provider except to the extent same are caused by the negligence or willful
misconduct of the County. It is the intent of this provision to require the Provider to
indemnify the County to the fullest extent permitted under North Carolina law.
9.. Amendme i is to the Agree II ent
Revised July 2010 5
8
a. Changes in Basic Services. Changes in the Basic Services and entitlement to additional
compensation or a change in duration of this Agreement shall be made by a written
Amendment to this Agreement executed by the County and the Provider. The Provider
shall proceed to perform the Services required by the Amendment only after receiving a
fully executed Amendment from the County.
10. Ter,I I ination
a. Termination for Convenience of the County. This Agreement may be terminated without
cause by the County and for its convenience upon seven (7) days prior written notice to
the Provider.
b. Other Termination. The Provider may terminate this Agreement based upon the County's
material breach of this Agreement; provided, the County has not taken all reasonable
actions to remedy the breach. The Provider shall give the County seven (7) days' prior
written notice of its intent to terminate this Agreement for cause.
c. Compensation After Termination.
i) In the event of termination, the Provider shall be paid that portion of the fees and
expenses that it has earned to the date of termination, less any costs or expenses
incurred or anticipated to be incurred by the County due to errors or omissions of
the Provider.
ii) Should this Agreement be terminated, the Provider shall deliver to the County
within seven (7) days, at no additional cost, all deliverables including any
electronic data or files relating to the Project.
d. Waiver. The payment of any sums by the County under this Agreement or the failure of
the County to require compliance by the Provider with any provisions of this.Agreement
or the.:.waiver.,by the County of any breach of this Agreement shall not constitute a
waiver of any-claim for damages by the County for any breach of this Agreement or a
waiver of any other required compliance with this Agreement.
11. Additional Provisions
a. Limitation and Assignment. The County and the Provider each bind themselves, their
successors, assigns and legal representatives to the terms of this Agreement. Neither the
County nor the Provider shall assign or transfer its interest in this Agreement without the
written consent of the other.
b. Governing Law. This Agreement and the duties, responsibilities, obligations and rights
of respective parties hereunder shall be governed by the laws of the State of North
Carolina.
•
c. Dispute Resolution. Any and all suits or actions to enforce, interpret or seek damages
with respect to any provision of, or the performance or non-performance of, this
Agreement shall be brought in the General Court of Justice of North Carolina sitting in
Orange County,North Carolina. It is agreed by the parties that no other court shall have
Revised July 2010 6
9
jurisdiction or venue with respect to such suits or actions. The Parties may agree to
nonbinding mediation of any dispute prior to the bringing of such suit or action.
d. Entire Agreement. This Agreement, together with the RFP and its attachments and the
Proposal and its attachments,represents the entire and integrated agreement between the
County and the Provider and supersedes all prior negotiations, representations or
agreements, either written or oral. This Agreement may be amended only by written
instrument signed by both parties. Modifications may be evidenced by facsimile
signatures.
e. Severability. If any provision of this Agreement is held as a matter of law to be
unenforceable, the remainder of this Agreement shall.be valid and binding upon the
Parties.
•
f. Ownership of Work Product. Should Provider's performance of this Agreement generate
documents, items or things that are specific to this Project such documents, items or •
things shall become the property of the County and may be used on any other project
without additional compensation to the Provider. The use of the documents, items or
things by the County or by any person or entity for any purpose other than the Project as
set forth m this Agreement shall be at the full risk of the County.
g. Non-Appropriation, Provider acknowledges that County is a governmental entity, and
the validity of.this Agreement is based upon the availability of public funding under the
authority of its statutory mandate.
In the event that public funds are unavailable and not appropriated for the performance of
County's obligations under this Agreement, then this Agreement shall automatically
expire without penalty to County immediately upon written notice to Provider of the
unavailability and non-appropriation of public funds. It is expressly agreed that County
shall not activate this non-appropriation provision for its convenience or to circumvent
the requirements of this Agreement, but only as an emergency fiscal measure during a
substantial fiscal crisis.
In the event of a change in the County's statutory authority, mandate and/or mandated
functions, by state and/or federal legislative or regulatory action, which adversely affects
County's authority to continue its obligations under this Agreement,then this Agreement
shall automatically terminate without penalty to County upon written notice to Provider
of such limitation or change in County's legal authority.
h. Notices. Any notice required by this Agreement shall be in writing and delivered by •
certified or registered mail,return receipt requested to the following:
•
Orange County Provider's Name &Address
Attention: David Cannell Hobbs Upchurch Assoc. PA
P.O. Box 8181 PO Box 1737
Hillsborough,NC 27278 Southern Pines,NC 28388
Revised July 2010 7
10 •
IN WITNESS WHEREOF, the Parties, by and through their authorized agents, have
hereunder set their hands and seal, all as of the day and year first above written.
ORANGE COUNTY: PROVIDER:
C-°--A--1-----20) pj.„.7.9.,..,,.._-- , , .
Chair _ - _
Orange County Board of Commissioners TrintecName afvid T''le.
Bill Lester, Jr., PE
Cove •1 ent. Division Manager
Attest: ,.�
t r'/-
4,_.` -, Donna Baker, Clerk t• the Board Fre H. Hobbs, P.E., President
„ �,�',1'1........'SS's
# o
5
r Q.a err,a �k
y A
a
fl' r 0 I.
Is 0 This r-F -'r-07. ° .een approved as to technical content:
\0, •° y�.c•''°
0,,evl�iri91°1°`°A`
Planning 1d Inspections,Department Director
This instrument has been pre-audited in the manner required by the Local Government Budget
and Fiscal Control Act. c
a L, 4,---
Office of the Finance Director -
ti
This instrument has been approved as to form and legal sufficiency.
1____&<"_-.2.-
-_,
. „ Offic f the County Attorney -
•
Revised July 2010 8
11
Buckhorn Mebane Phase 2
Water& Sewer Improvements
Permitting Schedule
(Revised 6-8-12)
City of Mebane Review MOM
Easement Surveys&Platting
Easement Preparation by County Attorney
i
Easement Negotiation and Acquisition i
J
Sewer Permit
Water Permit
Erosion Control
Controlled Access Encroachment 1
Secondary Road Encroachment
Stream Crossing (May Not Need)
1
Advertisement, Bids&Contract Award 1
6-> G -> -> di cP 9� 9� ,I0 10 11 11
oj, I </ , 1ST 30 1ci 36� 9�� �a'i ��i /�1 /� /IcP
01� �01c 01, �01� �01� �01� �01� 01� �01� �01� /�01� �01� /�0<,
•Target Duration C,Potential Delays
Attachment 2A 12
Hobbs Upchurc h Associates
1 a.
engineering I planning I surveying
August 3, 2012
Mr. Craig Benedict
Orange County Planning& Inspection
131 W. Margaret Lane
Hillsborough,NC 27278
RE: Buckhorn-Mebane EDD
Water& Sewer Improvements Project
Construction Management/Inspection/Bid Management Services
Dear Mr. Benedict:
Per your request, please find attached detailed cost estimate and layout maps for the planned water
and sewer improvements to serve Buckhorn-Mebane EDD. We also offer Resident Project
Inspection and Construction Management Services in accordance with the attached scope for the
noted amounts as summarized below:
Water hnprovements (Lines W-1, W-2 and W-3) $82,000.00
Sewer Segment#1 (Lines S-1 and S-2) $82,000.00
Sewer Segment#2 (Line S-3) $87,000.00
Sewer Segment#3 (Pump Station/Force Main) $52,000.00
As previously discussed we recognize that the project may move forward in its entirely, or in
segments. As such, if the project should be constructed in its entirely concurrently, the above totals
may be discounted to a total of $268,000.00 to account for savings associated with required
manpower and total length of oversight. Likewise, there may be negotiated savings with other
chosen combinations, however the actual improvements to be completed may not be known until
after the bid opening. Also, note that this assumes we will provide daily inspection and oversight.
Deviations from this concept will also impact costs.
HUA offers to coordinate all technical services related to preparing construction documents,
advertising the project, managing the bid process, issuing addenda, conducting the bid opening,
reviewing all bids for completeness and accuracy, and making a recommendation of award to the
County for the following amount:
Bid Management Services $16,000.00
If you should have any questions regarding this information, or if you should require additional
detail, please do not hesitate to contact this office. As always, I sincerely appreciate the opportunity
to assist Orange County and look forward to the implementation of this project.
Sincerely, . °t ° ° . ..„<",�0 D
BS, UP HU' &ASS No;• s, Is.OI .. 4, � CEIVE
,e • - . - 40.. SEAL r Nu
g 2012
or �. 9'7651
0.C ill Lester,Jr., '
T:910.692.8816 1 F:910.692.7342 1 300:SW �t �°fib 1 SOUTHERN PINES,NC 28387 1 WWW.HoBBSUPGHURCH.COM
SUPEI1IOR PERFORMANCE"THROUGH INNOVATIVE DESIGN
13
CONSTRUCTION MANAGEMENT AND PROJECT INSPECTION
DUTIES AND RESPONSIBILITIES OF THE ENGINEER
AND THE RESIDENT PROJECT REPRESENTATIVES)
The ENGINEER shall perform all required services to adequately inspect the project and insure compliance with the
detailed drawings and contract documents. Services shall also include all work to maintain project schedule and budget,
review all requisitions, and make recommendations for payment. The ENGINEER shall coordinate all construction
management activities for the OWNER,including the following tasks;
Construction Management Responsibilities of the ENGINEER
1. Prepare formal contract documents, including any and all documents required for execution of the
construction contract by OWNER.
2. Provide construction inspection and construction management services as necessary to expedite
construction in a timely fashion,insuring that total compliance with general and technical specifications are
met by the successful bidder, and that construction is in strict accordance with the plans such that the
OWNER receive FIRST-CLASS workmanship and materials,and maintain accurate inspection files.
3. Prepare and issue change orders,and review any and all request for change order from the successful bidder.
4. Investigate any and all request for partial and final payments prior to approval to insure payment to bidder in
accordance with the contract documents as executed and amended.
5. Conduct final inspection of construction upon completion of work by the successful bidder,and accompany
OWNER on courtesy inspection prior to approval of final payment to successful bidder.
6. Prepare "AS-BUILT" record drawings and provide two (2) sets to OWNER along with certification of
completion and satisfaction of project requirements and recommendation of final acceptance by the
OWNER.Record Drawings shall also be provided in digital format based on OWNER's preference.
In order to assist in providing the highest quality project,the ENGINEER shall furnish a Resident Project Representative
(RPR), assistance and other field staff to assist ENGINEER in observing performance of the Work of the Contractor.
The duties and responsibilities of the RPR(s) are limited to those of ENGINEER in ENGINEER's agreement with the
OWNER and in the construction Contract Documents,and are further limited and described as follows;
RPR is ENGINEER's agent at the site,will act as directed by and under the supervision of ENGINEER,and will confer
with ENGINEER regarding RPR's actions. RPR's dealings in matters pertaining to the on-site work shall in general be
with ENGINEER and CONTRACTOR keeping OWNER advised as necessary. RPR's dealings with sub-contractors
shall only be through or with the full knowledge and approval of CONTRACTOR. RPR shall generally communicate
with OWNER with the knowledge of and under the direction of ENGINEER.
Duties and Responsibilities of RPR.
1. Schedules: Review the progress schedule, schedule of Shop Drawing submittals and schedule of values
prepared by CONTRACTOR and consult with ENGINEER concerning acceptability.
2. Conferences and Meetings; Attend meetings with CONTRACTOR,such as preconstruction conferences,
progress meetings,job conferences, and other project-related meetings,and prepare and circulate copies of
minutes thereof.
3. Liaison:
a. Serve as ENGINEER'S liaison with CONTRACTOR, working principally through
CONTRACTOR'S superintendent and assist in understanding the intent of the Contract Documents;
14
and assist the ENGINEER in serving as OWNER'S liaison with CONTRACTOR when
CONTRACTOR'S operations affect OWNER'S onsite operations.
b. Assist in obtaining from OWNER additional details or information, when required for proper
execution of the Work.
4. Shop Drawings and Samples:
a. Record date of receipt of Shop Drawings and samples.
b. Receive samples which are furnished at the site by CONTRACTOR, and notify ENGINEER of
availability of samples for examination.
c. Advise ENGINEER and CONTRACTOR of the commencement of any Work requiring a Shop
Drawing or sample of the submittal of the submittal has not been approved by ENGINEER.
5. Review of Work,Rejection of Defective Work,Inspections and Tests
a, Conduct on-site observations of the Work in progress to assist ENGINEER in determining if the
Work is in general proceeding in accordance with the Contract Documents.
b. Report to ENGINEER whenever RPR believes that any Work is unsatisfactory,faulty or defective or
does not conform to the Contract Documents, or has been damaged, or does not meet the
requirements of any inspection, test or approval required to be made; and advise ENGINEER of
Work that RPR believes should be corrected or rejected or should be uncovered for observation, or
requires special testing,inspection or approval.
c. Verify that tests, equipment and systems startups and operating and maintenance training are
conducted in the presence of appropriate personnel, and the CONTRACTOR maintains adequate
records thereof;and observe,record and report to ENGINEER appropriate details relative to the test
procedures and startups.
d. Accompany visiting inspectors representing public or other agencies having jurisdiction over the
Project,record the results of these inspections and report to the ENGINEER.
6. Interpretation of Contract Documents: Report to ENGINEER when clarifications and interpretations of
the Contract Documents are needed and transmit to CONTRACTOR clarifications and interpretations as
issued by ENGINEER,
7. Modifications: Consider and evaluate CONTRACTOR'S suggestions for modifications in Drawings or
Specifications and report with RPR's recommendations to ENGINEER. Transmit to CONTRACTOR
decisions as issued by ENGINEER.
8. Records:
a. Maintain at the job site orderly files for correspondence,reports of job conferences, Shop Drawings
and samples, reproductions of original Contract Documents including all Work Directive Changes,
Addenda, Change Orders,Field Orders, additional Drawings issued subsequent to the execution of
the Contract, ENGINEER'S clarification and interpretations of the Contract Documents, progress
reports,and other Project related documents.
b. Keep a diary or log book,recording CONTRACTOR hours on the job site,weather conditions, data
relative to questions of Work Directive Changes, Change Orders or changed conditions, list of job
site visitors, daily activities, decisions, observations in general, and specific observations in more
detail as in the case of observing test procedures;and send copies to ENGINEER.
c. Record names, addresses and telephone numbers of all CONTRACTORS,subcontractors and major
suppliers of materials and equipment.
9. Reports:
a. Furnish ENGINEER periodic reports as required of progress of the Work and of CONTRACTOR'S
compliance with the progress schedule and schedule of Shop Drawing and sample submittals.
15
II
b. Consult with ENGINEER in advance of scheduled major tests, inspections or start of important
phases of the Work,
c. Draft proposed Change Orders and Work Directive Changes, obtaining backup material from
CONTRACTOR and recommend to ENGINEER Change Orders, Work Directive Changes, and
Field Orders.
d. Report immediately to ENGINEER and OWNER upon the occurrence of any accident.
10. Payment Requests: Review applications for payment with CONTRACTOR for compliance with the
established procedure for their submission and forward with recommendations to ENGINEER, noting
particularly the relationship of the payment requested to the schedule of values, Work completed and
materials and equipment delivered at the site but not incorporated in the Work.
11. Certificates, Maintenance and Operation Manuals: During the course of the Work, verify that
certificates,maintenance and operation manuals and other data required to be assembled and furnished by
CONTRACTOR are applicable to the items actually installed and in accordance with the Contract
Documents,and have this material delivered to ENGINEER for review and forwarding to OWNER prior to
final payment for the Work.
12. Completion:
a. Before ENGINEER issues a Certificate of Substantial Completion, submit to CONTRACTOR a list
of observed items requiring completion or correction.
b. Conduct final inspection in the company of ENGINEER,OWNER and CONTRACTOR and prepare
a final list of items to be completed or corrected,
c. Observe that all items on final list have been completed or corrected and make recommendations to
ENGINEER concerning acceptance.
Limitations of Authority
Resident Project Representative:
1. Shall not authorize any deviation from the Contract Documents or substitution of materials or equipment,
unless authorized by ENGINEER.
2. Shall not exceed limitations of ENGINEER'S authority as set forth in the Contract Documents,
3. Shall not undertake any of the responsibilities of CONTRACTOR, subcontractors or CONTRACTOR'S
superintendent.
4. Shall not advise on, issue directions relative to or assume control over any aspect of the means,methods,
techniques, sequences or procedures of construction unless such advice or directions are specifically
required by the Contract Documents.
5. Shall not advise on, issue directions regarding or assume control over safety precautions and programs in
connection with the Work.
6. Shall not accept Shop Drawing or sample submittals from anyone other than CONTRACTOR,
7. Shall not authorize OWNER to occupy the Project in whole or in part,
8. Shall not participate in specialized field or laboratory tests or inspection conducted by others except as
specifically authorized by ENGINEER.
The ENGINEER and RPR shall insure that the OWNER's project is completed in accordance with the contract
documents and all permits.After final acceptance the ENGINEER and RPR shall maintain contact with the OWNER to
address any issues that may arise during the warranty period of the project, including conduction a one year warranty
inspection.Any outstanding items will be addressed and coordinated with the CONTRACTOR as required.
16
Buckhorn- Mebane EDD Water Improvements Phase 2
Orange County, NC
Preliminary Cost Estimates (Revised 8-2-12)
Water Improvements:Lines W-1, W-2, and W-3
Item Description Quantity Unit Unit Price Extended Price
16" D.I.P. Water Main 12,568 LF $60.00 $754,080.00
16" Restrained Joint D.I.P 571 LF $100.00 $57,100.00
18" HDPE Directional Bore 882 LF $120.00 $105,840.00
12" D.I.P. Water Main 2,267 LF $45.00 $102,015.00
16"x12" Reducer 4 EA $500.00 $2,000.00
16" 90 Degree Bend 5 EA $600.00 $3,000.00
16" 45 Degree Bend 12 EA $550.00 $6,600.00
16" 22.5 Degree Bend 7 EA $550.00 $3,850.00
12" 90 Degree Bend 2 EA $550.00 $1,100.00
12" 45 Degree Bend 2 EA $535.00 $1,070.00
16"x12" Tee 1 EA $650.00 $650.00
16"x6" Tee 10 EA $650.00 $6,500.00
12"x12" Tee 1 EA $625.00 $625.00
12"x6" Tee 2 EA $600.00 $1,200.00
16" Gate Valve 18 EA $2,000.00 $36,000.00
12" Gate Valve 8 EA $1,750.00 $14,000.00
6" Gate Valve 12 EA $1,000.00 $1 2,000.00
Fire Hydrant Assembly 12 EA $2,000.00 $24,000.00
Combination Air Release Valve Assembly 2 EA $2,500.00 $5,000.00
32" Steel Casing(Bored &Jacked) 330 LF $400.00 $132,000.00
24" Steel Casing(Bored&Jacked) 100 LF $375.00 $37,500.00
Gravel for Driveways 296 TN $25.00 $7,400.00
Asphalt Open Cut and Patch 75 SY $50.00 $3,750.00
Concrete Open Cut and Patch 50 SY $60.00 $3,000.00
Tie to Existing Water Main 2 EA $3,000.00 $6,000.00
Stream Crossing(Type 1) 1 LS $3,500.00 $3,500.00
Clearing and Grubbing 3.2 AC $4,000.00 $12,800.00
Seed, Mulch, &Erosion Control 6.0 AC $3,500.00 $21,000.00
Subtotal Construction Cost $1,363,580.00
Construction Contingency $137,000.00
Construction Administration/Inspection $82,000.00
Total Project Cost $1,582,580.00
17
Buckhorn- Mebane EDD Sewer Improvements Phase 2
Orange County, NC
Preliminary Cost Estimates (Revised 8-02-12)
Sewer Improvements Segment 1:Lines S-1 &S-2
Description of Item Quantity Unit Unit Price Extended Price
12" PVC SDR 35 Gravity Sewer(6'-8') 340 LF $60.00 $20,400.00
12" PVC SDR 35 Gravity Sewer(8'-10') 1,048 LF $65.00 $68,120.00 l
12" PVC SDR 35 Gravity Sewer(10'-12') 518 LF $75.00 $38,850.00
12" PVC SDR 35 Gravity Sewer(12'-14') 25 LF $85.00 $2,125.00
12" D.I.P. Class 52 Gravity Sewer(8'-10') 822 LF $75.00 $61,650.00
12" D.I.P. Class 52 Gravity Sewer(10'-12') 762 LF $85.00 $64,770.00
12" D.I.P. Class 52 Gravity Sewer(12'-14') 875 LF $95.00 $83,125.00
12" D.I.P. Class 52 Gravity Sewer(14'-16') 1,145 LF $105.00 $120,225.00
12" D.I.P. Class 52 Gravity Sewer(16'-18') 327 LF $115.00 $37,605.00
12" D.I.P. Class 52 Gravity Sewer(18'-20') 25 LF $120.00 $3,000.00
12" D.I.P. Installed in Casing 400 LF $75.00 $30,000.00
8" PVC SDR 35 Gravity Sewer(8'-10') 1600 LF $50.00 $80,000.00
8" PVC SDR 35 Gravity Sewer(10'-12') 550 LF $60.00 $33,000.00
4' 0" Diameter Manhole (10'-12') 17 EA $2,500.00 $42,500.00
4' 0" Diameter Manhole(12'-14') 7 EA $3,000.00 $21,000.00
4' 0" Diameter Manhole(14'-16') 2 EA $3,500.00 $7,000.00
4'0"Diameter Manhole(14'-16')with Outside Drop 1 EA $4,500.00 $4,500.00
4' 0" Diameter Manhole(16'-18') 2 EA $4,250.00 $8,500.00
4' 0" Diameter Manhole (18'-20') 3 EA $5,000.00 $15,000.00
4' 0" Diameter Manhole (20'-22') 1 EA $5,750.00 $5,750.00
24" Steel Casing(Bored&Jacked) 140 LF $425.00 $59,500.00
24" Steel Casing(Bored &Jacked) for I-85 1 LS $485,000.00 $485,000.00
Stream Crossings (Type 1) 2 EA $3,500.00 $7,000.00
Stream Crossing(Type 2) 1 LS $12,000.00 $12,000.00
Gravel for Driveways 85 TN $25.00 $2,125.00
Tie to Existing Manhole 1 LS $3,500.00 $3,500.00
Clearing and Grubbing 4.10 AC $4,000.00 $16,400.00
Seed &Mulch&Erosion Control 7.52 AC $3,500.00 $26,320.00
Subtotal Construction Cost $1,358,965.00
Construction Contingency $136,000.00
Construction Administration/Inspection $82,000.00
Total Project Cost $1,576,965.00
it
18
Buckhorn -Mebane EDD Sewer Improvements Phase 2
Orange County,NC
Preliminary Cost Estimates (Revised 8-2-12)
Sewer Improvements Segment 2:Line S-3
Description of Item Quantity Unit Unit Price Extended Price
18" PVC SDR 35 Gravity Sewer(6'-8') 492 LF $90.00 $44,280.00
18" PVC SDR 35 Gravity Sewer(8'-10') 2,907 LF $97.50 $283,432.50
18" PVC SDR 35 Gravity Sewer(10'-12') 550 LF $112.50 $61,875.00
18" PVC SDR 35 Gravity Sewer(12'-14') 61 LF $127.50 $7,777.50
18" D.I.P. Class 52 Gravity Sewer(0'-6') 325 LF $95.00 $30,875.00
18" D.I.P. Class 52 Gravity Sewer(6'-8') 418 LF $105.00 $43,890.00
18" D.I.P. Class 52 Gravity Sewer(8'-10') 414 LF $112.50 $46,575.00
18" D.I.P. Class 52 Gravity Sewer(10'-12') 533 LF $127.50 $67,957.50
18" D.I.P. Class 52 Gravity Sewer(12'-14') 760 LF $142.50 $108,300.00
18" D.I.P. Class 52 Gravity Sewer(14'-16') 650 LF $157.50 $102,375.00
18" D.I.P. Class 52 Gravity Sewer(16'-18') 315 LF $172.50 $54,337.50
18" D.I.P. Class 52 Gravity Sewer(18'-20') 525 LF $180.00 $94,500.00
18" D.I.P. Class 52 Gravity Sewer(20'-22') 475 LF $187.50 $89,062.50
18" D.I.P. Class 52 Gravity Sewer(22'-24') 200 LF $200.00 $40,000.00
18" D.I.P. Class 52 Gravity Sewer(24'-26') 275 LF $212.50 $58,437.50
18" D.I.P. Installed in Casing 90 LF $110.00 $9,900.00
4' 0" Diameter Manhole(6'-8') 5 EA $2,000.00 $10,000.00
4' 0" Diameter Manhole(8'-10') 3 EA $2,250.00 $6,750.00
4' 0" Diameter Manhole (10'-12') 19 EA $2,500.00 $47,500.00
4' 0" Diameter Manhole(12'-14') 5 EA $3,000.00 $15,000.00
4' 0" Diameter Manhole(14'-16') 4 EA $3,500.00 $14,000.00
4' 0" Diameter Manhole(16'-18') 4 EA $4,250.00 $17,000.00
4' 0" Diameter Manhole(18'-20') 1 EA $5,000.00 $5,000.00
4' 0" Diameter Manhole(20'-22') 4 EA $5,750.00 $23,000.00
4' 0" Diameter Manhole(22'-24') 3 EA $6,250.00 $18,750.00
4' 0" Diameter Manhole(24'-26') 1 EA $7,000.00 $7,000.00
4' 0" Diameter Manhole(26'-28') 2 EA $7,750.00 $15,500.00
36" Steel Casing(Bored&Jacked) 90 LF $525.00 $47,250.00
Gravel for Driveways 15 TN $25.00 $375.00
Clearing and Grubbing 5 AC $4,000.00 $20,000.00
Seed&Mulch&Erosion Control 12.25 AC $3,500.00 $42,875.00
Subtotal Construction Cost $1,433,575.00
Construction Contingency $144,000.00
Construction Administration/Inspection $87,000.00
Total Project Cost $1,664,575.00
19
Buckhorn - Mebane EDD Sewer Improvements Phase 2
Orange County,NC
Preliminary Cost Estimates (Revised 8-2-12)
Sewer Improvements Segment 3:Pump Station and Line FM-1
Description of Item Quantity Unit Unit Price Extended Price
10" PVC SDR 21 Force Main 12,258 LF $25.00 $306,450.00
10" D.I.P. Force main 390 LF $50.00 $19,500.00
10" Restrained Joint D.I.P. 100 LF $75.00 $7,500.00
12" HDPE Directional Bore 180 LF $90.00 $16,200.00
10" 90 Degree Bend 4 EA $500.00 $2,000.00
10" 45 Degree Bend 3 EA $425.00 $1,275.00
10" 22.5 Degree Bend 1 EA $425.00 $425.00
10" Gate Valve 6 EA $1,500.00 $9,000.00
Combination Air Release Valve Assembly in Manhole 4 EA $2,500.00 $10,000.00
Pump Station/Site Work 1 LS $235,000.00 $235,000.00
Permanently Mounted Generator 1 LS $60,000.00 $60,000.00
Emergency Pump Connection 1 LS $3,000.00 $3,000,00
20" Steel Casing(Bored&Jacked) 390 LF $400.00 $156,000.00
Gravel for Driveways 371 TN $22.00 $8,162.00
Asphalt Open Cut and Patch 40 SY $39.00 $1,560.00
Tie to Existing Manhole 1 EA $1,300.00 $1,300.00
Seed&Mulch&Erosion Control 7.3 AC $3,500.00 $25,550.00
Subtotal Construction Cost $862,922.00
Construction Contingency $87,000.00
Construction Administration/Inspection $52,000.00
Total Project Cost $1,001,922.00
Attachment 2B 20
I-1(6os Upchurch Associates
°lig noni'ingl i p 8nrung surveying
August 3, 2012
Mr. Craig Benedict
Orange County Planning & Inspection
131 W. Margaret Lane
Hillsborough,NC 27278
RE: Efland Sewer System
Re-Routing Sewer Discharge to Gravelly Hill
Engineering Design Services Proposal
Dear Mr. Benedict:
Per our previous discussions, and in accordance with our preliminary engineering report for the
Buckhom-Mebane EDD project, HUA offers to provide engineering design services for the
above referenced project. Our design services shall adhere to the conditions, expectations, and
level of service as noted in our original contract with Orange County dated November 4, 2010.
Following is a summary of the proposed costs:
Surveying $18,000.00
Engineering Design $133,600.00
Please find attached a copy of the detailed estimate and layout map for the proposed project.
Upon execution of an amendment to our contract to complete this work, we will schedule a
meeting to review the previously completed report, all the latest Efland design information, and
develop a detailed work schedule.
If you should require additional information, or wish to discuss the project further, please do not
hesitate to contact this office.
Sincerely,
HOBBS,UPCHURCH&ASSOC,: e;c t
�/
E •
•. os 9
a SEAL
17651
=
Bill Lester, Jr.,
'
"iii ESTE'\'
1:910,692.5618 1 F;910.692.7342 ( 300 SW BROAD STREET 1 SOUTHERN PINES,NC 28387 1 WWW.HOBBSUPCHURCH.COM
SUPERIOR PERFORMANCE THROUGH INNOVATIVE DESIGN
21
' Hobbs Upchurch Associates
i., ,,,,„10 1 s.
Buckhorn-Mebane EDD Phase 2
Sewer Improvements to serve the Efland Community
Orange County, NC
Preliminary Cost Estimate
Item Quantity Unit Price Extended Cost
10-inch SDR 35 Sanitary Sewer 2,300 If $60,00 $138,000.00
10-inch DI Sanitary Sewer 300 If $75.00 $22,500.00
4-foot Diameter Manhole 10 ea $2,750,00 $27,500.00
8" PVC SDR 21 Forcemain 1,400 If $18.00 $25,200.00
8" CL 250 DI Forcemain 360 If $35.00 $12,600.00
10" PVC SDR 21 Forcemain 6,950 If $22.00 $152,900.00
10"CL 250 DI Forcemain 500 ea $50.00 $25,000.00
10" ID HDPE Installed by Directional Bore 1,750 If $450.00 $787,500.00
16"Steel Casing Installed by Bore&Jack 280 If $200.00 $56,000.00
20"Steel Casing Installed by Bore &Jack 380 If $250.00 $95,000.00
20"Steel Casing Installed on Grade by Bore&
60 If $350.00 $21,000.00
Jack
Tie to Existing Forcemain 1 Is $3,000.00 $3,000.00
Existing Pump Station Modifications 1 Is $75,000.00 $75,000.00
Duplex Submersible Pump Station 1 Is $195,000,00 $195,000.00
Standby Emergency Generator 1 Is $60,000.00 $60,000.00
Clearing 2.25 ac $4,000.00 $9,000.00
Select Fill 1,500 cy $20.00 $30,000.00
Asphalt open cut&Patch 240 sy $50,00 $12,000.00
Concrete Drive Removal&Replacement 25 sy $350.00 $8,750.00
Seed Mulch &Erosion Control , 8.50 ac $3,000.00 $25,500.00
Total Estimated Construction Cost: $1,781,450.00
Construction Contingency: $178,145.00
Survey: $18,000.00
Engineering Design: $133,600.00
Construction Administration& Inspection: $115,800.00
R/R Encroachment $25,000.00
Easement Acquisition $10,000.00
Permits $2,000.00
Total Estimated Project Cost: $2,263,995.00
T:910,692.5618 I F:910.892.7342 I 300 SW BROAD STREET I SOUTHERN PINES,NC 28387 I WWW.HOBBSUPCHURCH.COM
SUPERIOR PERFORMANCE THROUGH INNOVATIVE DESIGN
_! I ® Buckhorn -Mebane EDD Phase 2-Sewer
I 1 Improvements for the Efland Community e
4.
r mirk: 1111111 Orange County, NC
40 ■I it"
7 ) 11A ..........r---- .....„--___-, 71017,
_ Grua , ^ �,r� 1 j
IF � I "" f { ��0�� III � ,
IIIUP'
tea. ��
�,."� �� " I F!!���' o—r-- 10 : I cj um. ;Connect to `I '
f t 1 1 ; , I i i o f i I 0 Existing Main I I Q I
C ,,�. 1I'�_Qr+ J j _ I I i'_.. l.I 1 L. i
I
�r I Y. :1�%I FoRRESr f - $ i'B li L i
- SOUTHERN �\ iF
>♦ _____-- I4/IIH/I!11 Win " �L�� 1 , I
�111�® �m 1 . , 1
S _�
po j I ! j
I J � o
Pum Station ' o� <
i Proposed
S$S/401y �� '
la
�...�.. �. _ _-__ EXYT16
1 splommel
-e_,,..w,„,,,,.,, �7y� p i.. I - N x,10 E E%�i /85N/40 E EX/T 16Y- '''''''-'7•'-'-'
1 __ a.
I Gravelly Hill - °�
\ �Pump Stationer z '—,.._
1 //' .,/,°�-� , j jr%.e \1 Legend
�.j, , -1-�''' ' \ I ga Ex.Pump Station
_._. »..». Proposed m I { + ( i I j j Pu p S tab'
oo
i ■ j Proposed ravi' J I
e 1 I I i t /\--/12
o I I ) ` �/' Proposed Forcemain -
Q
A V/ Imo— Existing Sewer
t
/� "/Gravity
Hobbs 'J C ! i r 2 ( l / /'�' Forcemain
y i 1 i _ Parcels
r
/ ,se , ll ,� 111�iG�''l �/ wz '!1'�� 23
t_ 'J�_= au,►� � Attachment 3a ������ Buckhorn - Mebane EDD Phase 2 =
tt -11;74:7191•6041 �i�t'S"Q\ Water & Sewer Improvements -
<<-tu'# r, ..1 , �,14lf.� �.`!s Layout
ti Natew '" & • `t`" ilit ill�+►� iii.,. Water System y
r�. l t(t���.; i ��� ;�, :_�III1,�t� ��1 ' ` Orange County, NC _ 14
s, _ ,! Aim it :a Mai`/ _g • 11„ lir GOWAN CR . 1 0 :its'#''I; 1■ d"l 41 • ' ..•A��'■''`/I „��� ism i
�le� ,��r , Proposed 16-inch Water Main ,`I ' .N
t i7 ` �� / t,t`� '��;• /'' / « 'a i== ay '-. -� •.•• C :,' � � ,�:_% ,ji, ,
Existing 300,000 a! , re���iII1111'I'II'��t,.�� /��II ,/ .�..uI.,i ■■■■ /� r• f
Elevated Stora a Tank ■1�!.. l G`' � T- �� ■
x � a ._■. �' ��'���illikk .. #1 . ■i rr.,,al��l;y�>.%ma ��� m-: �ro Oril
1"116�� t !ruin 11�IS1iril �1 'et lY*1',�..... 4111. i� c11 a / 1 Proposed i2 inch �hllf un��� � ■ 1 �'��� ��1��u■o■..� ,. i "�111��� Jy�� ■sii, s v Water Main G. „fin ■ 111■ p� . a, , 7 11111■L ___1111.94 ,Ir
His ,.. dill -,
a il 12 1141°)
AC;.. j 1 'l;taro Q
ri: 1 IE ; llLi - Proposed 16-inch Water Main "."I � __-�i`ni�� =i'riVm �L-� ,'` r,%Ira
,�I
itcra
■ :.1�. _, l• 1• i`t •Ili
��1.aimm.n � I ■ _ -
Y _t� , 1WES I,p 'f
Ta _ tiM alb.t- 4.4 lit�.�'�!1111 i,/ ��.'� '.�i,\ ^���,1 v \ilver,,2,Avilill __Iiii . og Itt
ISA Future 12-inch 11
Water Main ���� �� Legend
01P.7.14_11Hileril
' ,40,..fr..--
,11411111IL ,� .I�� �.\ ��' 673 City Limits . Existing Tank• Wir M�-• ,•. ,- /�0 k Li County Boundary Existing Water
/f ,�`� � �� '� ""^"-Streams � �.'2-mch '
Itj F4kw. Land Use Area Name 3-inch t I �/ tots � :�� 10-Y ear Transition �, '4-inch '' � RADH 17 Fp.� '� '6-Inch
� � � I � � ��� ��� � Comm/Ind .E �: ���� ��� �� EDD .'s..'8-Inch
y u:[n' G�OacN l� 'i / / �� , Future EDD i% ,'10-Inch
VA, ,. ■■ �IIR` , Mixed Use General , 12-Inch
m 1111111. ��� ��
is Hobbs Upchurch Associates Artitaihiman
���/� _.ice I � �' Proposed water .,„' 1s-Inch
engineering planning I surveying
g ���` F /\/12-inch 24-inch
IN , i\i 1 .T /N 1 I�-1 1 a .4 011 ,' /�/16 Inch Project Area
Feet ' a ��� �'.0 2,000 0 2,000 4,000 ._ !� , ` l
a 1#w 1U\ A I 1 l It \ __ ��
:'NI ;1 =� IM, r_ ,�tiiV ZIRMltu��' Attachment 3b --- 4
�1 �, e� iRL.�tr" >- ,ice�o ._.r (�`�wr'.^���/ie all Buckhorn-Mebane EDD Phase 2 2
7 '114 i IAA. n M'r���•
e�.� Al����%'-°��! �w�'�'►.���� -��'��:���►:��..• �.�•-���� . Water and Sewer Improvements-
r 1_ 17 4 i`111' -i:n■..1■i`5146:` �� „ p
'�/ �,' 1 F,� y Sewer Layout Map
IA \ Q � � 4 ,.yew. .12: WWI a�� ; lit. Orange County, NC t. ■ ir „ i =.610,1,106, swami..
1 ■ �4Q;1■ 1fil�������1:1�C71rt' .. 1 ` -=�e„ 1 r
�ill�
�.y� �L� 1t„ 1�.��[��1��jiut�i,'� h,�� �,� !� ������ �—� � � �r�� v � t . ..
■ ■■► ►: i ► ►\ �Je■� X11 a ., 111.1 IP
N.,_._. w`,��s l as*_t. �,( " : / 3cl X1111111 1 i i�=�Cii x1111 `�::_? mill�o '4F-Ilhooli%
lI 1 Was* -4,-," D3 11�/ 91UI 'Ju=M K as.�„ `'l• _ I _ ym ,_
1 pal -Vim / *air'T , IIIrIf�� ,11Yni:. �y1."Ft'ail, ...r �J�II
s � ,
i � ,�� . STRIAE 1 .e� 1' j i�uu Nev.1 a �i_\_ L ' --�.�� "+ 1h �_ t
1.1m? � roe
0 .0 �' \ le Segment i 12"&8 ei !�
fa ieftl WI k..°�� ` \ � . Wilk: e � /` \ 1�14.: i Ali'�/'� ° ' �� �® D1 > Gravity Sewer -
a� ? �� �. I ��w`�' !s\ ' irk' t"��--- r 81,,,....,...,
4 unnm'
vir
,,, r�r�� 111111.11.11161111.11MailiiiWaiiiiiii—riir t,iii
;, �, Gravel) Hil l
\ Pump Station i , SBgGrenvt:sewer,a Ailiaialtlik_.111111
ment 3:Pump Station /� 1'/ ■ and 10"Forcemain �a�` /
`.� ■„„.. k
I4 Southeast Regional ,�f ii,.�.� 0' ��1 Pump Station ` �� �
II _kith
� �f ' RADH - ,�111111161WI°
�' ,� '� w; Legend
cN I �w ,„ , Proposed Sewer Land Use Area Name
ctoP � 4111011/ , /�8'Grawty 10-Year Transition
j k vHIE Il14:7/iliM1V
N IIIIIIII ■� 12”Gravity E__ ; Comm/Ind
.2 ill
ilk'��•1 ilia,1111A h /\/18'Gravity EDD
m
t 10"Forcemain Future EDD
a` ♦ �I ' ; I ® Ex.Pump Station Mixed Use General
n 4Ili `, �-�` ` ,` �• Existing Sewer _ Efland Service Area
/ - -- ,'S„'Gravity City Limits
Hobbs Upchurch Associates �� 2 00 4,000 6,000 .
��I�i'�; 0 i,000 ,o
J engineering i planning i surveying ''®�'' !'�! Forcemain Parcels I
D `'_� _ ��_ VI ., �.� ■ I �∎Feet
�i A It