HomeMy WebLinkAbout2012-351 AMS - JF Wilkerson for Contract material unit price adjustment for Buckhorn section unforeseen conditions contingency $92,670.50 Change Order No, 3 Date of Issuance: August 16,2012 Effective Date: August 16,2012 Project:Buckhorn Area North of I-85 and Owner:Orange County, Owner's Contract No.: SRF:CS370884-01 Efland Sewer System Improvements North Carolina STAG: XP95456411 Contract:Buckhorn Area North of 1-85 and Efland Sewer System Date of Contract: August 31,2011 Improvements Contractor:J.F. Wilkerson Contracting Company,Inc. Engineer's Project No.: 1.1.01111 The Contract Documents are modified as follows upon execution of this Change Order: Description: 1) Replace vented manhole ring and covers with solid ring and covers per the City of Mebane's request 2) Addition of sewer service installation through rock of$200.00/LF with an estimated total quantity of 70OLF 3) Delay due to and demolition of the discovered,unknown,Ruritan Club Septic Tank 4) Final adjustment of actual installed quantities in the Buckhom Section Attachments(list documents supporting change): J.F. Wilkerson letters dated February 8,2012,April 19,2012,May 15,2012,and June 22,2012 and McGill Associates letters dated March 23,2012 and June 20,2012. CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price: Original Contract Times: [❑ Working days ®Calendar days Substantial completion(days or(late): 450 Days $ 2,942,954.46 Ready for final payment(days or date): 450 Days [Increase] [Decrease] from previously approved [Increase] [Decrease] from previously approved Change Orders Change Orders No. to No.2: No. to No.2: Substantial completion(days): 90 Days $ 243,765.72 Ready for final payment(days): 90 Days Contract Price prior to this Change Order: Contract Times prior to this Change Order: Substantial completion(days or(late): 450 Days $ 3,186,720.18 Ready for final payment(days or date): 450 Days [Increase] [Dees ease]of this Change Order: [Increase] [tee]of this Change Order: Substantial completion(days or gate): 0 Days $ 92 670.50 Ready for final payment(days or date): 0 Days Contract Price incorporating this Change Contract Times with all approved Change Orders: ^ Substantial completion(days or date): 540 Days $ 3,279,390.68 Ready for fi atjlaiyment(days or date): 540 Days RECD -w-CCE ACCEPTED: By: By: Tui-4L By' Enginee A4tutho ed Signature) Owner�uthor zed Signature) o or(Authorized Signature) Date: ��-�t*xts-1�t'2.._ Date. ' % 1 '�-�-� Da:e: — Approved by Funding Agency(if applicable): Date: EJCDC C-941 Change Order Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications Institute. Page 1 of 1 This instrument has been pro-audited in the msnner,required by the Local Government QlazCnd F:cal Co 1 Act Clarence G.Grier,Assistant Co.Manager&CFO Change Order No. 3 Summary Orange County, North Carolina Buckhorn Area North of 1-85 and Efland Sewer System Improvements Project Item Description Cost Impact Time No. 1 7 1 IM pact 1 Costs associated with the replacement of the specified manhole ring and covers with solid covers per the request of Mebane. Eight manole covers were replaced. $8' 0.00 0 2 Adjustment and addition of sewer services installed in rock unit price item. Per the contract, the Contractor can request the negotiation of a new price for services that are installed in a condition other than soil. It is $140,000.00 0 anticiapted that a total of 70OLF of services will be installed in rock at the negotiated price of$200.00 per LF. 3 During the installation of the sewer line along Forest Avenue, the Contractor encounted the unknown, existing septic tank for the Ruritan club. The costs are associated $9,732.22 0 with the delay and demolition of the septic tank to continue the sewer line installation. 4 Final adjustment of Quantities for the Buckhorn Area ($57,.861.72) 0 section. TOTAL ESTIMATED CHANGE ORDER AMOUNTI ;92,670.50 0 -JFWILKERSON CONTRACTING CO, INC. April 19,2012 Mr. Wes Wightman Mcgill Associates,P.A. 124o 191"St. Lane NW Hickory,NC 28601 Re. Sanitary Sewer Improvements for grange County,NC Buckhorn Area—North of 1-85 and Efland Community(Manhole Covers) Dear Mr.Wightman: We have been requested to change several MH Covers from the approved design that we had already purchased and installed,to a different MH cover. We are requesting$100.04 each to change the MH covers from the approved design to the new design,to cover the cost of Swapping, them out and the freight associated with the swapping of the covers. Please advise,of any additional information we may provide or of any questions you may have, Sincerely„ JF Wilkerson Contracting Company,Inc. de Christopher J. tidce Project Manager/Estimator P.O.Box 183 Morrisville,NC 27560 (919)467-1829 Fax(919) 467-626' -JFWILKERS l CONMACTING CO., INC. February 8,2011 Mr.Wes Wightman Mcgill Associates,P.A. 1240 19"St.Lane NV4' Hickory,NC 28601 Re.Sanitary Sewer Improvements for Orange County,NC Buckhorn Area—North of I-85 and Efland Community(Sewer Service Rock Bore at MH 12) Tear Mr.Cannella As discussed in previous communications,we were not able to install the sewer service at MH 12 by traditional means due to their being rock. We have attempted over the last two days to free bore the service using a rock head and have been unsuccessful at completing the bare on grade. We are therefore,going to have to install the bore with 8"casing using a rock head to complete the service. We are requesting a change order for$390.00 per foot to install the 8"casing through rock with a 4"sewer service carrier pipe inside. We anticipate the bore to be approximately 40 LF. Please advise,of any additional information we may provide or of any questions you may have. Sincerely, JF Wilkerson Contracting Company, Inca Christopher .Stike Project Manager/Estimator F.O.Box 183 Morrisvale,NC 27560 (gig)467-1829 I-'ax(919)467-6269 Mc s A S S O C I A T E S March 23, 2012 Mr. Christopher Stike Project Manager JF Wilkerson Contracting Co., Inc. Post Office Box 183 Morrisville,North Carolina 27560 RE: Response to Unit Price Change Request Buckhorn/Efland Sewers Orange County,North Carolina Dear Mr. Stike: McGill Associates is in receipt of your letter dated February 8, 2011 (sic) requesting a change in the unit price per foot to install a sewer service. The Contract Documents allow the Contractor to request a change in the unit pricing if he encounters conditions other and soils for the installing of sewer services. We agree that JF Wilkerson encountered rock while installing the service as noted in your letter. However, we do not agree to the price recommended. Based on our experience and pricing on other projects for similar work, we can recommend to the Owner a change in unit price for this installation of$200.00 per foot for the length of the service, approximately 40 linear feet. We appreciate JF Wilkerson's continued efforts in the construction of the Buckhorn-Efland Sewers project and look forward to the completion of a successful project. If you have any questions, please do not hesitate to contact us. Sincerely, McGILL ASSOCIATES, P.A. WESLEY D. WIGHTMAN, PE Senior Construction Administrator :ww cc: Mr. Jeff Thompson, Orange County Mr. Doug Chapman,PE, McGill Associates,PA P:\2011 PROJECTS\11.01111 ORANGE COUNTY-Efland Buckhorn Sewer Proposal\04_Construction Phase\Correspondence\CS Unit Price Change 03-23-12.docx E n g i n e e r i n g * P l a n n i n g * F i n a n c e McGill Associates,P.A. •P.O.Box 1136,Hickory,NC 28603•124019"St.Lane,NW,Hickory,NC 28601 Office:828-328-2024•Fax 828-328-3870 _J WILKERSON CONTRAC rI TG CO., INC. INlay 15.2012 Mr.Wes Wightman Mcgill Associates, P.A. 1240 19'h St.Lane NW Hickory,NC 28601 Re: unitary Sewer Improvements for Orange County,NC Buckhorn Area-North of I-85 and E.1and Community(Ruritan Club Septic Tank) Dear Mr.Wightman: On Friday May 4,2012 we were installing the sanitary sewer line and found the septic tank for the puritan club to he to direct conflict with the gravity sewer we were installing. We had to stag installing pipe and wait for representatives from Grange County to come look at the problem. We then had to wait--for the tank to be pumped out on Monday and Tuesday May 7 and May 8. On Wednesday May 9,2012 we were able to crash the tank,so that we could start back installation on Thursday May 9,2012. We are requesting a change order for 3 days for th a down time and removal of the tank.at$3,500 per day for a total change order of$1 0,500.00, Please advise,of any additional information we may provide or of any questions you may have. Sincerely, JF Wilkerson Contracting Company,Inc. - -' Christop er J. Stike Project Manager/Estimator P.U.Box 183 Morrisville,NC 7.7 1 560 (919) 467-1829 _ "tax(919)461-62+69 JF WILKERSON CONTRACTING CO., INC. PO BOX 183 MORRISVILLE, NC 27560 PROJECT: EFLAND SANITARY SEWER IMPROVEMENTS OWNER: ORANGE COUNTY, NC ENGINEER: MCGILL ASSOCIATES CHANGE ORDER - RURITAN CLUB SEPTIC TANK DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL On Friday May 4,2012 we were installing the sanitary sewer line and found the septic tank for the Ruritan club to be in direct conflict with the gravity sewer we were installing. We had to stop installing pipe and wait for representatives from Orange County to come look at the problem. We then had to wait for the tank to be pumped out on Monday and Tuesday May 7 and May 8. On Wednesday May 9, 2012 we were able to crush the tank,so that we could start back installation on Thursday May 9,2012. We are requesting a change order for 3 days for the down time and crushing of the tank. Labor(David Warren's Crew) _ _ 24.0 HRS $ 122.20 $ 2,932.80 Equipment 3.00 DAY $ 2190.00 $ _ 6,570.00 SUBTOTAL --- - _ $ 9,502.80 - - FEE @ 15% - -- -- $ 1,425.42 TOTAL ADDITIONAL COST $ 10,928.22 Page 1 JF WILKERSON CONTRACTING CO., INC. PO BOX 183 MORRISVILLE, NC 27560 PROJECT: EFLAND SANITARY SEWER IMPROVEMENTS OWNER: ORANGE COUNTY, NC ENGINEER: MCGGILL AND ASSOCIATES, NC HOURLY LABOR COST(DAVID WARREN'S CREW) FRINGE ADJUSTED EMPLOYEE BASE SALARY UNIT BENEFITS SALARY PER HOUR BRIAN WILKERSON(PROJECT MANAGER AT HALF TIME) xxx DAY xxx xxx xxx DAVID WARREN --__ xxx DAY_ xxx xxx xxx LUIS J MARTINEZ xxx ;HOUR xxx xxx xxx GERARDO CARRANZA xxx ffHOUR xxx xxx - xxx TOTAL CREW SALARY W/PROJECT MANAGER PER HOUR $ 122.20 JF WILKERSON CONTRACTING CO., INC. PO BOX 183 MORRISVILLE, NC 27560 PROJECT: EFLAND SANITARY SEWER IMPROVEMENTS LOCATION: ORANGE COUNTY, NC OWNER: ORANGE COUNTY, NC ENGINEER: MCGILL ASSOCIATES DAILY EQUIPMENT COST(DAIVD WARREN'S CREW) DAILY COST TOTAL COST (MONTHLY COST 1 (DAILY COST+ EQUIPMENT MONTHLY COST 120) FUEL COST FUEL) CAT 330 _ $ 9,000.00 1 $ 450.00 i $ 200.00 $ 65_0.00_ CAT 330 $ 9,000.00 is 450.00 $ 2_00.00 $ 650.00 CAT IT 28 1 $ 4,70-6.06 4 235.00 $ 100.00 $ 335.00 TOOL TRAILER - - --- _ _— - - +$ 105.00 RAMMAX $ 1,700.00 $ 85.00 $ 20.00 _ EQUIP.TOOL TRAILER $ 3,000.00 ' $ 150.00 I $ $ 1.50.00 TRENCH BOX - $ 1,000.00 j $ 50.00 $ - $ 50.00 TRENCH BOX is 1,000.00 $ _ 50.00 $ 5_0.00 FORD F150 _ $ 1,500.00 $ 75.00 $ 35.00 $ 110.00 TOYOTA MINI VAN $ 1,200.00 $ 60.00 $ 30.00 $ 90.00 TOTAL COST PER DAY $ 2,190.00 O o O c a n O p cm W m "im 40 co to V; 40 01-W 49 40 40 so 4*ow 49 w ow so 40* ,.-a C2 U, ami"t sag r. t a a CD a C3 4 k.111 GR":ul to In v!q#-- 03 m cm R at CA cc go ci sm a ci C'i .4 wSon 61 W.-- 01 Zz Z O pO 0000000 00o goacco 0 O0 w 0 a :6 ur 2E 2! WAR j! Co OR 'K CR q:C�0 0 1 a .0 .0 w to 4m 'n to co OD U)w nag Cq C",4 tmn M M w -w%n U�w w 40'o r�co —03 V) 12 --A ;!ta 0 g cd q; lip z. a 2a cv --u 1Y, 0 aw J2 a°0 E 9 r4 C, ;i i! W3 f� a OW 0 0-j c a a F- z'o(5 w o o i, IZ m it J-Z cm > 14 J. Co r= C., 0-ll w x cr cc CS uj ta d ul ui E C9 m 9 m w" w it UP z 0. rL 9 L rn g I Lam. =1'2 A 0 cmim C4 Cal X CL%6 C310, 00 -1 =0 PC 0 W) UO a E W C, -�-§R! 20 4A C%l co - . - = ", E 40 t:j U. 0 U,ttyy 40 40 to tu bmi -a— -Agg a -5-a-5 :4_j z Ms 0 C) U) r I cma w 0 U2 CD C3 0 CL, cit a ci(4 vq M CL t-t C4 a en to &n 4, V) co 40"ad .i 46 40 a; "i go j d 2c www LL. --———— LU 'y 0 At io MW a z -W w LU C4 id a to C3 z SAO 0 .0 47 qq 0! Cld —1 w w (4 C4 V4(4 C4 cm Cl NMNMr C4 V)4" -W Lu -j EL LU LL, z U? O Sir,-i 03 num a °isw � zus 0 4c 0. CL CL zw C3 x , Ike x=U3 cl; C, 03 U, Uj :3 CR Vi A qlq. .x to a r-ob a C4 15, 111111111 • 9 IWO aa M C-4 IT w co LL cm id d%a d 0 g 11 0(3 a V to m m C13 co cm -W C-D G-b Al a 40 w C20 91 IA 111 . § vi n q vi Iq Ct C= u" a = go 4.0� a c co a a%n a a a 'a a a a '52 a 4q Ict CR P't Ck C4 HN 40 a E IM a -0 a 4 C4 . . . . . .k Ale Oc 10 to I la 8 a 9 8 8 0 0.0 0 C, 0 MMm i " 81 14 5 2. r- 0 .9 a CD CL w Q to to W)to to R M F4 a X A R- r - CR i R 0 E 3: a a SOS uj W a ci rL rL 6: OO Lb oj 2 .8 J, x be w.a a -j it U, FA- . a — 9990 Z Wl "s . Qj Z:e CL 5- e IL is x 2 X- x 5i9,xo9xxAl E (9 z ig mod ulz a:cc k%v-a mim 11#L mm MONS '38 L D-W • MC 11 A S S O C I A T E S June 20,2012 Mr. Christopher Stike Project Manager JF Wilkerson Contracting Co.,Inc. Post Office Box 183 Morrisville,North Carolina 27560 RE: Response to Ruritan Club Septic Tank Delay Buckhorn/Efland Sewers Orange County,North Carolina Dear Mr. Stike: McGill Associates is in receipt of your letter dated May 15, 2012 requesting compensation due to the delay caused by the discovery of the Ruritan Club septic tank that was in direct conflict with the sewer line installation. Article 12 of the General Conditions of the Contract Documents allows the Contractor the right to make the claim as you have in your letter. We agree that JF Wilkerson encountered such a delay and is due a time extension and compensation. However, we do not agree with the dollar amount requested. This determination arises from the fact that for two (2) days JF Wilkerson's crew was not able to perform any work and one(1)day was required to demolish the septic tank. For those two(2) days where the crew and equipment was idle, no fuel would have been used by the equipment. We recognize that fuel would have been used to crush the tank on the third day end for the vehicles to transport the crew to the project all three(3)days. Therefore, after removing the fuel cost for the equipment for two (2) clays and recalculating the costs per the supporting documentation, we can recommend to the Owner a change in Contract Times of three(3)days and a change in Contract Amount of$9,732.22. We respectfully request that JF Wilkerson formally respond to this letter with your acceptance so that a Change Order can be processed. We appreciate JF Wilkerson's continued efforts in the construction of the Buckhorn-Efland Sewers project and look forward to the completion of a successful project. If you have any questions,please do not hesitate to contact us. Sincerely, McGILL ASSOCIATES,P.A. WESLEY D. WIGHTMAN, PE Senior Construction Administrator cc: Mr. Jeff Thompson, Orange County Mr.Doug Chapman, PE,McGill Associates,PA R\2011 PROJECTS\11.01111 ORANGE COUNTY-Efland Buckhorn Sewer Proposal\04_Construction Phase\Correspondence\CS Ruritan Club Tank 06-20-2012.docx E n g i n e e r i n g * P l a n n i n g e F i n a n c e McGill Associates,P.A. •P.O.Box 1136,Hickory,NC 28603•124019 St.Lane,NW,Hieko�y,NC 28601 Office:828-328-2024.Fax 828-328-3870 _JF 'I KERSON CONTRACTING CO., INC. June 22,2012 Mr.Wes Wightman Mcg it Associates,P.A. 1240 l V6 St. Lane NW` Hickory,NC 28601 Re.Sanitary Sewer improvements for Orange County,NC Buckhorn Area--North of 1-85 and fland Community Dear Mr.Wightman, We have received your letter dated February 8,2011 in regards to the rack sewer service bore and agree to your offer on the change order of$200.00 per If for 40 If. We have also received your letter dated June 20,2012 in regards to the Ruritan Club Septic Tank Delay and we will agree to your revised change order price of$9,732.22. Sincerely, J1:Wilkerson Contracting Company, Inc. Christopher J.Stike Project Manager I Estimator P.Q.Box X 83 Morrisville,NC 27560 (919)467-1829 Fax(919)467-6269, Buckhorn Area North of 1-85 and Efland Sewer System Improvements Project Orange County, North Carolina Buckhorn Final Adjustment of Quantities Item Actual Actual No. Item QTY Unit Bid Bid Total Installed Installedl Quantity Variance Total Variance Quantity Quantity Total 1 Mobilization 1 LS $18,200.00 $18,200.00 100% $ 18,200 00 0% $ 2 Meetins and Inspection 1 LS $500.00 $500.00 100% $ 50000 0% $ 3 8"PVC 0-6' 185 LF $28.75 $5,318.75 0.00 $ -185.00 $ (5,318.75) 4 8"PVC 6'-8' 1687 LF $32.34 $54,557.58 1360.39 $ 43,995 01 -326.61 $ (10,562.57) 5 8"PVC 8'-10' 1287 LF $37.24 $47,927.88 1444.13 $ 53,779 40 157.13 $ 5,851.52 6 8"PVC 10'-12' 703 LF $42.26 $29,708.78 749.42 $ 31,670 49 46.42 $ 1,961.71 7 8"DIP 0-6' 368 LF $37.18 $13,682.24 503.00 $ 18,701 54 135.00 $ 5,019.30 8 8"DIP 6'-8' 280 LF $40.77 $11,415.60 412.14 $ 16,802 95 132.14 $ 5,387.35 9 8"DIP 8'-10' 373 LF $45.67 $17,034.91 376.94 $ 17,214 85 3.94 $ 179.94 10 8"DIP 10'-12' 105 LF $50.69 $5,322.45 112.00 $ 5,67728 7.00 $ 354.83 11 8"CL 51 DIP 0-6' 272 LF $38.58 $10,493.76 271.17 $ 10,46174 -0.83 $ (32.02) 12 4'DIA.Manholes 25 EA $1,330.00 $33,250.00 25.00 $ 33,25000 0.00 $ 13 Installing extra depth manholes above 6' 70 LF $148.00 $10,360.00 62.17 $ 9,201 16 -7.83 $ (1,158.84) 14 Connect to Existing Sewer 1 LS $3,050.00 $3,050.00 100% $ 3,05000 0% $ - 16"Steel Encasement,0.25"Wall 15 Thickness/Boring and Jacking 120 LF $235.00 $28,200.00 140.00 $ 32,900 00 20.00 $ 4,700.00 16 Fine grading,seeding and mulching 1 LS $5,400.00 $5,400.00 100% $ 5,40000 0% $ - 17 Trench Rock Excavation 150 CY $50.00 $7,500.00 3.70 $ 18500 -146.30 $ (7,315.00) 18 Installing#57 Washed Stone 300 TON $17.00 $5,100.00 4.46 $ 7582 -295.54 $ (5,024.18) 19 Installing#67 Washed Stone 200 TON $17.00 $3,400.00 0.00 $ -200.00 $ (3,400.00) 20 Installing Crusher Run,CABC 150 TON $25.00 $3,750.00 150.00 $ 3,75000 0.00 $ 21 Asphalt Drives Cut and Patch Heavy Duty 25 SY $28.05 $701.25 0.00 $ -25.00 $ (701.25) 22 Asphalt Roads Cut and Patch Heavy Duty 30 SY $55.00 $1,650.00 0.00 $ -30.00 $ (1,650.00) 23 Asphalt Roads Cut and Patch Heavy Duty 200 SY $68.75 $13,750.00 42.70 $ 2,935,63 -157.30 $ (10,814.38) 24 Installing 1"1-2 Overlay 200 SY $10.38 $2,076.00 0.00 $ -200.00 $ (2,076.00) Replacing Concrete Drives,Sidewalk and 25 other Concrete 40 SY $53.00 $2,120.00 0.00 $ -40.00 $ (2,120.00) 26 Silt Fence 2000 LF $1.72 $3,440.00 1696.00 $ 2,917.12 -304.00 $ (522.88) 27 Outlet Protection 4 EA $150.00 $600.00 4.00 $ 600.00 0.00 $ 28 Gravel Arch Filters 1 EA $300.00 $300.00 1.00 $ 300.00 0.00 $ 29 Temporary Ditch Liner 100 LF $4.00 $400.00 0.00 $ -100.00 $ (400.00) 30 Erosion Control Blankets(6.67 feet wide) 4500 LF $1.40 $6,300.00 1230.00 $ 1,722.00 -3270.00 $ (4,578.00) 31 Rock Check Dams 15 EA $150.00 $2,250.00 13.00 $ 1,950.00 -2.00 $ (300.00) 32 Class B Rip Rap 40 TON $45.00 $1,800.00 0.00 $ -40.00 $ (1,800.00) 33 Class I Rip Rap 25 TON $45.00 $1,125.00 0.00 $ - -25.00 $ (1,125.00) 34 Select Backfill 200 CY $3.00 $600.00 60.00 $ 180.00 -140.00 $ (420.00) 35 12"RCP 8 LF $35.00 $280.00 0.00 $ -8.00 $ (280.00) 36 15"RCP 120 LF $34.00 $4,080.00 0.00 $ -120.00 $ (4,080.00) 37 18"RCP 16 LF $36.00 $576.00 0.00 $ -16.00 $ (576.00) 38 24"RCP 12 LF $46.00 $552.00 0.00 $ -12.00 $ (552.00) 39 36"RCP 12 LF $70.00 $840.00 0.00 $ -12.00 $ (840.00) 40 Class C Concrete 10 CY $145.00 $1,450.00 0.00 $ -10.001$ (1,450.00) 41 Flowable Fill 75 CY $85.00 $6,375.00 0.00 $ - -75.001$ (6,375.00) Site Clean up of Temporary Erosion Control 42 Measures 1 LS $1,000.00 $1,000.00 100% $ 1,000.00 0% $ 43 Testing of 8"Sanitary Sewers 1 LS $500.00 $500.00 100% $ 500.00 0% $14"PVC Service Connections(No Road 44 Crossings) 200 LF 1 $49.00 $9,800.00 221.00 $ 10,829.00 21.00 $ 1,029.00 Buckhorn Area North of 1-85 and Efland Sewer System Improvements Project Orange County, North Carolina Buckhorn Final Adjustment of Quantities Item Actual Actual No. Item QTY Unit Bid Bid Total Installed Installed Quantity Total Variance Quantity Quantity Tonal Variance 4"PVC Service Connections(Cross State 45 Roads) 125 LF $26.50 $3,312.50 120.00 $ 3,180.00 -5.00 $ (132.50) 6"PVC Service Connections(No Road 46 Crossings) 110 LF $58.00 $6,380.00 100.00 $ 5,80000 -10.00 $ (580.00) 16"PVC Service Connections(Cross State 47 Roads) 140 LF $64.00 $8,960.00 122.00 $ 7,80800 -18.00 $ (1,152.00) 14"DIP Service Connections(No Road 48 Crossings) 100 LF $70.00 $7,000.00 77.00 $ 5,39000 -23.00 $ (1,610.00) 16"DIP Service Connections(No Road 49 Crossings) 25 LF $76.00 $1,900.00 22.00 $ 1,67200 -3.00 $ (228.00) 50 3/4"Service Taps 7 EA $363.00 $2,541.00 0.00 $ -7.00 $ (2,541.00) 51 Installing 3/4"Copper Water Services 7 EA $680.00 $4,760.00 6.00 $ 4,08000 -1.00 $ (680.00) Installing 3/4"Coppers tubing from 52 relocated water meter 100 LF $19.50 $1,950.00 0.00 $ - 100.00 $ (1,950.00) Totals $413,540.70 $ 355,678.98 $ (57,861.72)