Project:Buckhorn Area North of I-85 and Owner:Orange County, Owner's Contract No.: SRF:CS370884-01
Efland Sewer System Improvements North Carolina STAG: XP95456411
Contract:Buckhorn Area North of 1-85 and Efland Sewer System Date of Contract: August 31,2011
Improvements
Contractor:J.F. Wilkerson Contracting Company,Inc. Engineer's Project No.: 1.1.01111
The Contract Documents are modified as follows upon execution of this Change Order:
Description:
1) Replace vented manhole ring and covers with solid ring and covers per the City of Mebane's request
2) Addition of sewer service installation through rock of$200.00/LF with an estimated total quantity of 70OLF
3) Delay due to and demolition of the discovered,unknown,Ruritan Club Septic Tank
4) Final adjustment of actual installed quantities in the Buckhom Section
Attachments(list documents supporting change):
J.F. Wilkerson letters dated February 8,2012,April 19,2012,May 15,2012,and June 22,2012 and McGill
Associates letters dated March 23,2012 and June 20,2012.
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original Contract Price: Original Contract Times: [❑ Working days ®Calendar days
Substantial completion(days or(late): 450 Days
$ 2,942,954.46 Ready for final payment(days or date): 450 Days
[Increase] [Decrease] from previously approved [Increase] [Decrease] from previously approved Change Orders
Change Orders No. to No.2: No. to No.2:
Substantial completion(days): 90 Days
$ 243,765.72 Ready for final payment(days): 90 Days
Contract Price prior to this Change Order: Contract Times prior to this Change Order:
Substantial completion(days or(late): 450 Days
$ 3,186,720.18 Ready for final payment(days or date): 450 Days
[Increase] [Dees ease]of this Change Order: [Increase] [tee]of this Change Order:
Substantial completion(days or gate): 0 Days
$ 92 670.50 Ready for final payment(days or date): 0 Days
Contract Price incorporating this Change Contract Times with all approved Change Orders:
^ Substantial completion(days or date): 540 Days
$ 3,279,390.68 Ready for fi atjlaiyment(days or date): 540 Days
RECD -w-CCE ACCEPTED:
By: By: Tui-4L By'
Enginee A4tutho ed Signature) Owner�uthor zed Signature) o or(Authorized Signature)
Date: ��-�t*xts-1�t'2.._ Date. ' % 1 '�-�-� Da:e: —
Approved by Funding Agency(if applicable):
Date:
EJCDC C-941 Change Order
Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications Institute.
Page 1 of 1
This instrument has been pro-audited in the
msnner,required by the Local Government
QlazCnd F:cal Co 1 Act
Clarence G.Grier,Assistant Co.Manager&CFO
Change Order No. 3 Summary
Orange County, North Carolina
Buckhorn Area North of 1-85 and Efland Sewer System
Improvements Project
Item Description Cost Impact Time
No. 1 7 1 IM pact
1 Costs associated with the replacement of the specified
manhole ring and covers with solid covers per the request
of Mebane. Eight manole covers were replaced. $8' 0.00 0
2 Adjustment and addition of sewer services installed in
rock unit price item. Per the contract, the Contractor can
request the negotiation of a new price for services that
are installed in a condition other than soil. It is $140,000.00 0
anticiapted that a total of 70OLF of services will be
installed in rock at the negotiated price of$200.00 per LF.
3 During the installation of the sewer line along Forest
Avenue, the Contractor encounted the unknown, existing
septic tank for the Ruritan club. The costs are associated $9,732.22 0
with the delay and demolition of the septic tank to
continue the sewer line installation.
4 Final adjustment of Quantities for the Buckhorn Area
($57,.861.72) 0
section.
TOTAL ESTIMATED CHANGE ORDER AMOUNTI ;92,670.50 0
-JFWILKERSON
CONTRACTING CO, INC.
April 19,2012
Mr. Wes Wightman
Mcgill Associates,P.A.
124o 191"St. Lane NW
Hickory,NC 28601
Re. Sanitary Sewer Improvements for grange County,NC Buckhorn Area—North of 1-85 and
Efland Community(Manhole Covers)
Dear Mr.Wightman:
We have been requested to change several MH Covers from the approved design that we had
already purchased and installed,to a different MH cover. We are requesting$100.04 each to
change the MH covers from the approved design to the new design,to cover the cost of Swapping,
them out and the freight associated with the swapping of the covers.
Please advise,of any additional information we may provide or of any questions you may have,
Sincerely„
JF Wilkerson Contracting Company,Inc.
de
Christopher J. tidce
Project Manager/Estimator
P.O.Box 183 Morrisville,NC 27560 (919)467-1829 Fax(919) 467-626'
-JFWILKERS l
CONMACTING CO., INC.
February 8,2011
Mr.Wes Wightman
Mcgill Associates,P.A.
1240 19"St.Lane NV4'
Hickory,NC 28601
Re.Sanitary Sewer Improvements for Orange County,NC Buckhorn Area—North of I-85 and
Efland Community(Sewer Service Rock Bore at MH 12)
Tear Mr.Cannella
As discussed in previous communications,we were not able to install the sewer service at MH 12
by traditional means due to their being rock. We have attempted over the last two days to free
bore the service using a rock head and have been unsuccessful at completing the bare on grade.
We are therefore,going to have to install the bore with 8"casing using a rock head to complete
the service. We are requesting a change order for$390.00 per foot to install the 8"casing
through rock with a 4"sewer service carrier pipe inside. We anticipate the bore to be
approximately 40 LF.
Please advise,of any additional information we may provide or of any questions you may have.
Sincerely,
JF Wilkerson Contracting Company, Inca
Christopher .Stike
Project Manager/Estimator
F.O.Box 183 Morrisvale,NC 27560 (gig)467-1829 I-'ax(919)467-6269
Mc s
A S S O C I A T E S
March 23, 2012
Mr. Christopher Stike
Project Manager
JF Wilkerson Contracting Co., Inc.
Post Office Box 183
Morrisville,North Carolina 27560
RE: Response to Unit Price Change Request
Buckhorn/Efland Sewers
Orange County,North Carolina
Dear Mr. Stike:
McGill Associates is in receipt of your letter dated February 8, 2011 (sic) requesting a
change in the unit price per foot to install a sewer service. The Contract Documents allow the
Contractor to request a change in the unit pricing if he encounters conditions other and soils for
the installing of sewer services. We agree that JF Wilkerson encountered rock while installing
the service as noted in your letter. However, we do not agree to the price recommended. Based
on our experience and pricing on other projects for similar work, we can recommend to the
Owner a change in unit price for this installation of$200.00 per foot for the length of the service,
approximately 40 linear feet.
We appreciate JF Wilkerson's continued efforts in the construction of the Buckhorn-Efland
Sewers project and look forward to the completion of a successful project. If you have any questions,
please do not hesitate to contact us.
Sincerely,
McGILL ASSOCIATES, P.A.
WESLEY D. WIGHTMAN, PE
Senior Construction Administrator
:ww
cc: Mr. Jeff Thompson, Orange County
Mr. Doug Chapman,PE, McGill Associates,PA
P:\2011 PROJECTS\11.01111 ORANGE COUNTY-Efland Buckhorn Sewer Proposal\04_Construction Phase\Correspondence\CS Unit Price
Change 03-23-12.docx
E n g i n e e r i n g * P l a n n i n g * F i n a n c e
McGill Associates,P.A. •P.O.Box 1136,Hickory,NC 28603•124019"St.Lane,NW,Hickory,NC 28601
Office:828-328-2024•Fax 828-328-3870
_J WILKERSON
CONTRAC rI TG CO., INC.
INlay 15.2012
Mr.Wes Wightman
Mcgill Associates, P.A.
1240 19'h St.Lane NW
Hickory,NC 28601
Re: unitary Sewer Improvements for Orange County,NC Buckhorn Area-North of I-85 and
E.1and Community(Ruritan Club Septic Tank)
Dear Mr.Wightman:
On Friday May 4,2012 we were installing the sanitary sewer line and found the septic tank for
the puritan club to he to direct conflict with the gravity sewer we were installing. We had to stag
installing pipe and wait for representatives from Grange County to come look at the problem. We
then had to wait--for the tank to be pumped out on Monday and Tuesday May 7 and May 8. On
Wednesday May 9,2012 we were able to crash the tank,so that we could start back installation
on Thursday May 9,2012. We are requesting a change order for 3 days for th a down time and
removal of the tank.at$3,500 per day for a total change order of$1 0,500.00,
Please advise,of any additional information we may provide or of any questions you may have.
Sincerely,
JF Wilkerson Contracting Company,Inc.
- -'
Christop er J. Stike
Project Manager/Estimator
P.U.Box 183 Morrisville,NC 7.7 1 560 (919) 467-1829 _ "tax(919)461-62+69
JF WILKERSON CONTRACTING CO., INC.
PO BOX 183
MORRISVILLE, NC 27560
PROJECT: EFLAND SANITARY SEWER IMPROVEMENTS
OWNER: ORANGE COUNTY, NC
ENGINEER: MCGILL ASSOCIATES
CHANGE ORDER - RURITAN CLUB SEPTIC TANK
DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
On Friday May 4,2012 we were installing the
sanitary sewer line and found the septic tank for the
Ruritan club to be in direct conflict with the gravity
sewer we were installing. We had to stop installing
pipe and wait for representatives from Orange
County to come look at the problem. We then had
to wait for the tank to be pumped out on Monday
and Tuesday May 7 and May 8. On Wednesday
May 9, 2012 we were able to crush the tank,so
that we could start back installation on Thursday
May 9,2012. We are requesting a change order
for 3 days for the down time and crushing of the
tank.
Labor(David Warren's Crew) _ _ 24.0 HRS $ 122.20 $ 2,932.80
Equipment 3.00 DAY $ 2190.00 $ _ 6,570.00
SUBTOTAL --- - _ $ 9,502.80
- - FEE @ 15% - -- -- $ 1,425.42
TOTAL ADDITIONAL COST $ 10,928.22
Page 1
JF WILKERSON CONTRACTING CO., INC.
PO BOX 183
MORRISVILLE, NC 27560
PROJECT: EFLAND SANITARY SEWER IMPROVEMENTS
OWNER: ORANGE COUNTY, NC
ENGINEER: MCGGILL AND ASSOCIATES, NC
HOURLY LABOR COST(DAVID WARREN'S CREW)
FRINGE ADJUSTED
EMPLOYEE BASE SALARY UNIT BENEFITS SALARY PER HOUR
BRIAN WILKERSON(PROJECT
MANAGER AT HALF TIME) xxx DAY xxx xxx xxx
DAVID WARREN --__ xxx DAY_ xxx xxx xxx
LUIS J MARTINEZ xxx ;HOUR xxx xxx xxx
GERARDO CARRANZA xxx ffHOUR xxx xxx - xxx
TOTAL CREW SALARY W/PROJECT MANAGER PER HOUR $ 122.20
JF WILKERSON CONTRACTING CO., INC.
PO BOX 183
MORRISVILLE, NC 27560
PROJECT: EFLAND SANITARY SEWER IMPROVEMENTS
LOCATION: ORANGE COUNTY, NC
OWNER: ORANGE COUNTY, NC
ENGINEER: MCGILL ASSOCIATES
DAILY EQUIPMENT COST(DAIVD WARREN'S CREW)
DAILY COST TOTAL COST
(MONTHLY COST 1 (DAILY COST+
EQUIPMENT MONTHLY COST 120) FUEL COST FUEL)
CAT 330 _ $ 9,000.00 1 $ 450.00 i $ 200.00 $ 65_0.00_
CAT 330 $ 9,000.00 is 450.00 $ 2_00.00 $ 650.00
CAT IT 28 1 $ 4,70-6.06 4 235.00 $ 100.00 $ 335.00
TOOL TRAILER - - --- _ _— - - +$ 105.00
RAMMAX $ 1,700.00 $ 85.00 $ 20.00 _
EQUIP.TOOL TRAILER $ 3,000.00 ' $ 150.00 I $ $ 1.50.00
TRENCH BOX - $ 1,000.00 j $ 50.00 $ - $ 50.00
TRENCH BOX is 1,000.00 $ _ 50.00 $ 5_0.00
FORD F150 _ $ 1,500.00 $ 75.00 $ 35.00 $ 110.00
TOYOTA MINI VAN $ 1,200.00 $ 60.00 $ 30.00 $ 90.00
TOTAL COST PER DAY $ 2,190.00
O o O c a n O p cm W m "im 40 co to V;
40 01-W 49 40 40 so 4*ow 49 w ow so 40*
,.-a
C2 U, ami"t
sag r. t
a a CD a
C3 4 k.111
GR":ul to In v!q#-- 03 m cm R at CA
cc go ci sm a ci C'i .4
wSon
61 W.-- 01
Zz Z O pO 0000000 00o goacco
0 O0 w 0 a
:6 ur 2E 2!
WAR j!
Co OR 'K CR q:C�0 0 1 a
.0 .0 w to 4m 'n to co OD U)w nag Cq C",4 tmn M M w -w%n U�w w 40'o r�co —03 V)
12 --A ;!ta 0 g cd q;
lip
z.
a 2a cv
--u
1Y,
0 aw
J2 a°0
E 9 r4
C, ;i i!
W3 f�
a
OW 0 0-j c a
a F- z'o(5 w o o i,
IZ m it
J-Z cm
>
14 J. Co r= C., 0-ll w
x cr cc CS uj ta d ul ui E
C9 m 9 m
w" w it UP z
0.
rL 9 L rn g I Lam. =1'2
A 0
cmim C4 Cal X CL%6
C310, 00 -1 =0
PC 0
W) UO a E
W C,
-�-§R!
20 4A C%l co
- . - = ", E
40 t:j U. 0 U,ttyy 40
40 to
tu
bmi -a— -Agg a -5-a-5 :4_j z Ms 0
C) U)
r I cma w 0 U2 CD C3 0 CL,
cit a ci(4 vq M CL
t-t C4 a en to &n
4, V) co 40"ad .i
46 40 a; "i go j d
2c www
LL.
--———— LU
'y 0
At io MW a z
-W w LU
C4 id a to C3 z
SAO 0 .0 47 qq 0! Cld —1 w w
(4 C4 V4(4 C4 cm Cl NMNMr C4 V)4" -W Lu -j
EL LU
LL, z U?
O
Sir,-i
03 num a °isw � zus 0
4c
0. CL CL zw
C3 x ,
Ike x=U3 cl;
C, 03 U, Uj :3
CR Vi A qlq. .x to a
r-ob a C4 15,
111111111 • 9 IWO aa M C-4 IT w
co LL
cm id d%a d
0 g 11 0(3 a V to m
m
C13 co cm -W
C-D G-b Al a 40 w
C20 91 IA
111
. §
vi n q vi Iq
Ct C=
u" a =
go 4.0�
a c co
a a%n a a a 'a a a a '52 a
4q Ict CR P't Ck C4 HN 40
a E IM
a -0 a
4 C4 . . . . . .k
Ale Oc
10 to I la
8 a 9 8 8 0 0.0 0 C, 0 MMm i " 81 14 5 2. r- 0 .9 a
CD CL
w Q
to to W)to to R M F4 a X A
R- r -
CR i R
0 E 3:
a a SOS uj
W
a
ci
rL rL 6:
OO Lb oj 2 .8 J,
x be w.a a -j it
U, FA- . a —
9990 Z Wl "s . Qj
Z:e CL 5-
e
IL is
x 2 X- x 5i9,xo9xxAl E
(9 z ig
mod ulz a:cc k%v-a
mim 11#L
mm MONS '38 L
D-W
•
MC 11
A S S O C I A T E S
June 20,2012
Mr. Christopher Stike
Project Manager
JF Wilkerson Contracting Co.,Inc.
Post Office Box 183
Morrisville,North Carolina 27560
RE: Response to Ruritan Club Septic Tank Delay
Buckhorn/Efland Sewers
Orange County,North Carolina
Dear Mr. Stike:
McGill Associates is in receipt of your letter dated May 15, 2012 requesting compensation
due to the delay caused by the discovery of the Ruritan Club septic tank that was in direct conflict
with the sewer line installation. Article 12 of the General Conditions of the Contract Documents
allows the Contractor the right to make the claim as you have in your letter. We agree that JF
Wilkerson encountered such a delay and is due a time extension and compensation. However, we do
not agree with the dollar amount requested.
This determination arises from the fact that for two (2) days JF Wilkerson's crew was not
able to perform any work and one(1)day was required to demolish the septic tank. For those two(2)
days where the crew and equipment was idle, no fuel would have been used by the equipment. We
recognize that fuel would have been used to crush the tank on the third day end for the vehicles to
transport the crew to the project all three(3)days.
Therefore, after removing the fuel cost for the equipment for two (2) clays and recalculating
the costs per the supporting documentation, we can recommend to the Owner a change in Contract
Times of three(3)days and a change in Contract Amount of$9,732.22. We respectfully request that
JF Wilkerson formally respond to this letter with your acceptance so that a Change Order can be
processed.
We appreciate JF Wilkerson's continued efforts in the construction of the Buckhorn-Efland
Sewers project and look forward to the completion of a successful project. If you have any
questions,please do not hesitate to contact us.
Sincerely,
McGILL ASSOCIATES,P.A.
WESLEY D. WIGHTMAN, PE
Senior Construction Administrator
cc: Mr. Jeff Thompson, Orange County
Mr.Doug Chapman, PE,McGill Associates,PA
R\2011 PROJECTS\11.01111 ORANGE COUNTY-Efland Buckhorn Sewer Proposal\04_Construction Phase\Correspondence\CS Ruritan Club
Tank 06-20-2012.docx
E n g i n e e r i n g * P l a n n i n g e F i n a n c e
McGill Associates,P.A. •P.O.Box 1136,Hickory,NC 28603•124019 St.Lane,NW,Hieko�y,NC 28601
Office:828-328-2024.Fax 828-328-3870
_JF 'I KERSON
CONTRACTING CO., INC.
June 22,2012
Mr.Wes Wightman
Mcg it Associates,P.A.
1240 l V6 St. Lane NW`
Hickory,NC 28601
Re.Sanitary Sewer improvements for Orange County,NC Buckhorn Area--North of 1-85 and
fland Community
Dear Mr.Wightman,
We have received your letter dated February 8,2011 in regards to the rack sewer service bore and
agree to your offer on the change order of$200.00 per If for 40 If.
We have also received your letter dated June 20,2012 in regards to the Ruritan Club Septic Tank
Delay and we will agree to your revised change order price of$9,732.22.
Sincerely,
J1:Wilkerson Contracting Company, Inc.
Christopher J.Stike
Project Manager I Estimator
P.Q.Box X 83 Morrisville,NC 27560 (919)467-1829 Fax(919)467-6269,
Buckhorn Area North of 1-85 and Efland Sewer System Improvements Project
Orange County, North Carolina
Buckhorn Final Adjustment of Quantities
Item Actual Actual
No.
Item QTY Unit Bid Bid Total Installed Installedl Quantity Variance Total Variance
Quantity Quantity Total
1 Mobilization 1 LS $18,200.00 $18,200.00 100% $ 18,200 00 0% $
2 Meetins and Inspection 1 LS $500.00 $500.00 100% $ 50000 0% $
3 8"PVC 0-6' 185 LF $28.75 $5,318.75 0.00 $ -185.00 $ (5,318.75)
4 8"PVC 6'-8' 1687 LF $32.34 $54,557.58 1360.39 $ 43,995 01 -326.61 $ (10,562.57)
5 8"PVC 8'-10' 1287 LF $37.24 $47,927.88 1444.13 $ 53,779 40 157.13 $ 5,851.52
6 8"PVC 10'-12' 703 LF $42.26 $29,708.78 749.42 $ 31,670 49 46.42 $ 1,961.71
7 8"DIP 0-6' 368 LF $37.18 $13,682.24 503.00 $ 18,701 54 135.00 $ 5,019.30
8 8"DIP 6'-8' 280 LF $40.77 $11,415.60 412.14 $ 16,802 95 132.14 $ 5,387.35
9 8"DIP 8'-10' 373 LF $45.67 $17,034.91 376.94 $ 17,214 85 3.94 $ 179.94
10 8"DIP 10'-12' 105 LF $50.69 $5,322.45 112.00 $ 5,67728 7.00 $ 354.83
11 8"CL 51 DIP 0-6' 272 LF $38.58 $10,493.76 271.17 $ 10,46174 -0.83 $ (32.02)
12 4'DIA.Manholes 25 EA $1,330.00 $33,250.00 25.00 $ 33,25000 0.00 $
13 Installing extra depth manholes above 6' 70 LF $148.00 $10,360.00 62.17 $ 9,201 16 -7.83 $ (1,158.84)
14 Connect to Existing Sewer 1 LS $3,050.00 $3,050.00 100% $ 3,05000 0% $ -
16"Steel Encasement,0.25"Wall
15 Thickness/Boring and Jacking 120 LF $235.00 $28,200.00 140.00 $ 32,900 00 20.00 $ 4,700.00
16 Fine grading,seeding and mulching 1 LS $5,400.00 $5,400.00 100% $ 5,40000 0% $ -
17 Trench Rock Excavation 150 CY $50.00 $7,500.00 3.70 $ 18500 -146.30 $ (7,315.00)
18 Installing#57 Washed Stone 300 TON $17.00 $5,100.00 4.46 $ 7582 -295.54 $ (5,024.18)
19 Installing#67 Washed Stone 200 TON $17.00 $3,400.00 0.00 $ -200.00 $ (3,400.00)
20 Installing Crusher Run,CABC 150 TON $25.00 $3,750.00 150.00 $ 3,75000 0.00 $
21 Asphalt Drives Cut and Patch Heavy Duty 25 SY $28.05 $701.25 0.00 $ -25.00 $ (701.25)
22 Asphalt Roads Cut and Patch Heavy Duty 30 SY $55.00 $1,650.00 0.00 $ -30.00 $ (1,650.00)
23 Asphalt Roads Cut and Patch Heavy Duty 200 SY $68.75 $13,750.00 42.70 $ 2,935,63 -157.30 $ (10,814.38)
24 Installing 1"1-2 Overlay 200 SY $10.38 $2,076.00 0.00 $ -200.00 $ (2,076.00)
Replacing Concrete Drives,Sidewalk and
25 other Concrete 40 SY $53.00 $2,120.00 0.00 $ -40.00 $ (2,120.00)
26 Silt Fence 2000 LF $1.72 $3,440.00 1696.00 $ 2,917.12 -304.00 $ (522.88)
27 Outlet Protection 4 EA $150.00 $600.00 4.00 $ 600.00 0.00 $
28 Gravel Arch Filters 1 EA $300.00 $300.00 1.00 $ 300.00 0.00 $
29 Temporary Ditch Liner 100 LF $4.00 $400.00 0.00 $ -100.00 $ (400.00)
30 Erosion Control Blankets(6.67 feet wide) 4500 LF $1.40 $6,300.00 1230.00 $ 1,722.00 -3270.00 $ (4,578.00)
31 Rock Check Dams 15 EA $150.00 $2,250.00 13.00 $ 1,950.00 -2.00 $ (300.00)
32 Class B Rip Rap 40 TON $45.00 $1,800.00 0.00 $ -40.00 $ (1,800.00)
33 Class I Rip Rap 25 TON $45.00 $1,125.00 0.00 $ - -25.00 $ (1,125.00)
34 Select Backfill 200 CY $3.00 $600.00 60.00 $ 180.00 -140.00 $ (420.00)
35 12"RCP 8 LF $35.00 $280.00 0.00 $ -8.00 $ (280.00)
36 15"RCP 120 LF $34.00 $4,080.00 0.00 $ -120.00 $ (4,080.00)
37 18"RCP 16 LF $36.00 $576.00 0.00 $ -16.00 $ (576.00)
38 24"RCP 12 LF $46.00 $552.00 0.00 $ -12.00 $ (552.00)
39 36"RCP 12 LF $70.00 $840.00 0.00 $ -12.00 $ (840.00)
40 Class C Concrete 10 CY $145.00 $1,450.00 0.00 $ -10.001$ (1,450.00)
41 Flowable Fill 75 CY $85.00 $6,375.00 0.00 $ - -75.001$ (6,375.00)
Site Clean up of Temporary Erosion Control
42 Measures 1 LS $1,000.00 $1,000.00 100% $ 1,000.00 0% $
43 Testing of 8"Sanitary Sewers 1 LS $500.00 $500.00 100% $ 500.00 0% $14"PVC Service Connections(No Road
44 Crossings) 200 LF 1 $49.00 $9,800.00 221.00 $ 10,829.00 21.00 $ 1,029.00
Buckhorn Area North of 1-85 and Efland Sewer System Improvements Project
Orange County, North Carolina
Buckhorn Final Adjustment of Quantities
Item Actual Actual
No.
Item QTY Unit Bid Bid Total Installed Installed Quantity Total Variance
Quantity Quantity Tonal Variance
4"PVC Service Connections(Cross State
45 Roads) 125 LF $26.50 $3,312.50 120.00 $ 3,180.00 -5.00 $ (132.50)
6"PVC Service Connections(No Road
46 Crossings) 110 LF $58.00 $6,380.00 100.00 $ 5,80000 -10.00 $ (580.00)
16"PVC Service Connections(Cross State
47 Roads) 140 LF $64.00 $8,960.00 122.00 $ 7,80800 -18.00 $ (1,152.00)
14"DIP Service Connections(No Road
48 Crossings) 100 LF $70.00 $7,000.00 77.00 $ 5,39000 -23.00 $ (1,610.00)
16"DIP Service Connections(No Road
49 Crossings) 25 LF $76.00 $1,900.00 22.00 $ 1,67200 -3.00 $ (228.00)
50 3/4"Service Taps 7 EA $363.00 $2,541.00 0.00 $ -7.00 $ (2,541.00)
51 Installing 3/4"Copper Water Services 7 EA $680.00 $4,760.00 6.00 $ 4,08000 -1.00 $ (680.00)
Installing 3/4"Coppers tubing from
52 relocated water meter 100 LF $19.50 $1,950.00 0.00 $ - 100.00 $ (1,950.00)
Totals $413,540.70 $ 355,678.98 $ (57,861.72)