HomeMy WebLinkAbout2012-349 AMS - JF Wilkerson Contracting Co for FAorce Main Adj Sper State Approval of Outfall Design $24,507.94 Change Order No. I Date of Issuance: August 10,2012 Effective Date: August 10,2012 Project:Buckhorn Area North of 1-85 and owner:Orange County, Owner's Contract No.: SRF:CS370884-01 Efland Sewer System Improvements North Carolina --STAG: XP954:56411 Contract: Buckhorn Area North of 1-85 and Efland Sewer System Date of Contract: August 31,2011 Improvements Contractor: J.F. Wilkerson Contracting Company,Inc. Engineer's Project No.: 11.01111 The Contract Documents are modified as follows upon execution of this Change Order: Description: Install an 8-inch DIP force main in lieu of a 6-inch DIP force main and connect to the existing 10-inch force main on US Highway 70 at the intersection with North Oak Street. Attachments(list documents supporting change): Force Main Change Summary,Revised drawings E-3.0 and E-3.1,J.F.Wilkerson Email dated April 30,2012 CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price: Original Contract Times: ❑ Working days 0 Calendar days Substantial completion(days or sate): 450 Days $ 2,942,954.46 Ready for final payment(days or date): 450 Days [Increase] [Decrease] from previously approved [Increase] [Decrease]-] from previously approved Change Orders Change Orders No. to No. No. to No. Substantial completion(days): 0 Days $ 0.00 Ready for final payment(days): 0 Days Contract Price prior to this Change Order: Contract Times prior to this Change Order: Substantial completion(days or date): 450 Days 2,942,954*46 Ready for final payment(days or date): 450 Days [Increase] [Deefeaw] of this Change Order: [Increase] [Decrease]of this Change Order: Substantial completion(days or date): 0 Days $ 24,507.94 Ready for final payment(days or date): 0 Days Contract Price incorporating this Change Contract Times with all approved Change Orders: Substantial completion(days or date): 450 Days $ 2,967,462.40 Ready for final payment(days or date): 450 Days REC ACCE ACCEPTED: By:A — By:_ By: Eng*inr qAut rized Signature) Owner orized Signature) n aaor(Authorized Signature) Date: V-4s&bt-1-c>t�L D___ �L f �2 61.9 Approved by Funding Agency(if applicable): Date: EJCDC C-941 Change Order Prepared by the Engineers Joint Contract Documents committee and endorsed by the Construction specifications Institute. Page 1 of I , x � This instrument has been pro-audited in the manner required by the Local Government LA Z-1arence G.Grier,Assistant Co.Mana"r a CFO Buckhorn Area North of 1-85 and Efland Sewer System Improvements Project Orange County, North Carolina Summary of Brookhollow Force Main Redesign Pricing FORCE MAIN BID PRICING 34 6" DIP Force Main 2460 1 LF $23.17 $56,998.20 36 Installing 6" 22.5 Degree Bends on 6" FM 1 EA $400.00 $400.00 37 Installing 6"45 Degree Bends on 6" FM 2 EA $400.00 $800.00 $58,198.20 FORCE MAIN REDESIGN PRICING 34A 8" DIP Force Main 2100 1 LF $30.29 $63,609.00 36A Installing 8" 22.5 Degree Bends on 8" FM 1 EA $540.00 $540.00 37A Installing 8"45 Degree Bends on 8" FM 2 EA $540.00 $1,080.00 Complete Tie-in to Existing FM 1 EA $17,477.14 $17,477.14 $82,706.14 ANTICIPATED COST IMPACT OF FORCE MAIN REDESIGN $24,507.941 * NOTE: Unit price items may change due to site conditions and actual quantity installed. From: christopher @ifwilkerson.com To: wes.wightman mcgillengineers. com; Subject: Pump Station revised Pricing Date: Monday, April 30, 2012 3:10:50 PM Wes, We have revised the pricing for the pump station and force main as requested. The revised price for bid item number 77, Lump Sum Price for constructing and developing a 250 G.P.M. Pump station and site, complete as specified, is $4q 9,462.819 lump Sum. Revised July 30, 2012 A A J The price for doing the proposed tie to existing force main using W/es and gate valves by cutting them in is $17,477.14 lump sum. The price for installing an 8" force main instead of the 6" force main listed in item 34 is $30.29 per If. Revised July 27, 2012 The price for installing the 8" MJ 45 Degree Bend instead of the 6" MJ 45 Degree bend listed in item 37 is $540.00. The price for installing the 8" MJ 22 1/2 Degree Bend instead of the 6" MJ 22 1/2 Degree bend listed in item 36 is $540.00. Please advise as when the change order is approved, so that we can start having the shop drawings prepared. Christopher J. Stike Project Manager/ Estimator JF Wilkerson Contracting Co., Inc. PO Box 183 Morrisville, NC 27560 Phone: 919-467-1829 Fax: 919-467-6269 E-mail: Christopher @jfwilkerson.com .. . ' . � - . ^ � dgfm g uj .945 a. Ph 6 I is It Its ' qP 4w go Is CD CD 14 C5 cc .. . ' . � ~ LL Us so let all 0 lid Met All JIod hie All Saw d All Hi lot sit fill No