Loading...
HomeMy WebLinkAboutRES-2001-057 Resolution to Approve the Sewer Service Extension Agreement for Ashwick Subdivision Preliminary PlanRESOLUTION EOU THE ORANGE COUNTY BOARD OF COMMISSIONERS TO APPROVE THE SEWER SERVICE EXTENSION AGREEMENT FOR ASHWICK SUBDIVISION WHEREAS, the Board of County Commissioners established an Overall Sewer Policy for the County of Orange to determine the extent of future public sewer service, and WHEREAS, the Board of County Commissioners adopted the Sewer Collection and Treatment Service Rules and Regulations on November 19, 1985, and WHEREAS, Provision IX of the Rules and Regulations, EXTENSIONS OF THE SYSTEM, outlines six criteria to determine to whether or not the County shall extend the system to serve undeveloped land, and WHEREAS, the proposed Ashwick subdivision meets all six of the following criteria: A. Extending service to Ashwick subdivision is consistent with the overall System plan adopted by Orange County. Extension is subject to the County Engineer's approval. B. All regulations of the Orange County Zoning Ordinance and Subdivision Regulations have been met by the preliminary plat for Ashwick subdivision. The property is located within the transition area along the Highway 70 West corridor. The extension of public services within the 10 -year transition area is consistent with the Land Use Element of the Comprehensive Plan and other long -term goals for county planning. The Orange County Engineer has reviewed and approved the engineering components of the preliminary plat with regards to water and sewer service. The County Engineer has approved preliminary plans for the sewer service extension. C. Extension of the System around the Elfand community is consistent with Goal 9.3 of the Orange County Land Use Plan, which prohibits the establishment of public water and sewer services in the areas designated as water quality critical areas except to address emergency situations. The proposed subdivision is outside of the Upper Eno Critical Area. D. The System extension shall be installed according to and in compliance with approved plans. E. The construction of the System extension will be inspected by Orange County at intervals determined by the County. Perry Construction Corporation agrees to permit access to the System and the System extension for inspection purposed. User connections to the System will only be permitted after the extension of the System is finally approved in writing by Orange County. F. Upon the completion of the System extension Perry Construction Corporation will convey to Orange County by deed or other appropriate instrument all portions of the System extension, including by not necessarily limited to right -of -way easements, collection lines, service lines, stub -outs, permits, pump stations and equipment. All System extensions will be at no cost to Orange County. NOW, THEREFORE, BE IT RESOLVED, That the Board of County Commissioners hereby approves the extension of the Orange County Sewer Collection and Treatment System serving the Efland areas of Orange County for Ashwick sudivision as shown on the preliminary plat dated April 4, 2000 (last revised October 26, 2000). The County agrees to extend public sewer service to Ashwick subdivision per the Orange County Water & Sewer Policy approved on April 3, 1989 (and last amended on September 3, 1991), and the Sewer Collection and Treatment Service Rules and Regulations adopted on November 19, 1985. This, the 15'h of May, 2001 Stephen H. Halkiotis, Chair County of Orange Board of Commissioners WITNESS: 4everlyy Clerk to th Board LAW OFFICES COLEMAN, GLEDHILL & HARGRAVE A PROFESSIONAL CORPORATION 129 E. TRYON STREET P. O. DRAWER 1529 HILLSBOROUGH, NORTH CAROLINA 27278 919.732 -2196 FAX 919- 732.7997 WEBSITE W W W.CGANDH.COM C O N F I D E N T I A L Attorney - Client Privilege May 14, 2001 Stephen H..Halkiotis, Chair Margaret W. Brown_ Moses Carey, Jr. Alice M. Gordon Barry Jacobs Orange County Board of Commissioners Post Office Box 8181 Hillsborough, North Carolina 27278 FROM THE DESK OF GEOFFREY E. GLEDHILL RE: Outline of Efland Sewer System Issues - Ashwick Subdivision - McGowan Creek Subdivision Dear Board Members: This letter is to provide you with a brief overview of the Board's consideration of the Ashwick Subdivision, the McGowan Creek Subdivision and the outline of Efland Sewer System issues related to extensions to undeveloped property. In the context of the Resolution Documenting the State of the Overall System Plan for the Efland Sewer System, which resolution was approved by the Board of Commissioners on May 1, 2001, the Board directed the staff to come back with a plan for a further course of action regarding principally extensions of the Efland Sewer System into undeveloped land. That outline and related documents are on.your agenda for tomorrow night's meeting as Item 9 -e. The objective of the outline is to allow you to focus on the policy, planning and utility issues implicit in the Efland Small Area Plan, the Buckhorn Road EDD, the Efland Sewer System, the public water systems in the Western Central portion of the County and other related matters. One of the possible outcomes of this analysis is that the Board will place a short -term moratorium on extensions to the Orange County Board of Commissioners Page 2 May 14, 2001 Efland Sewer System into undeveloped land. This may be deemed desirable by the Board as a way to move ahead with the bond issue sewer system project while discussions about the Orange Alamance Water System and any other potential public water provider in the area are underway. These issues are complex and will take some time to resolve. In that regard, I cannot tell you how long it is reasonable to maintain a moratorium on extensions to the Efland Sewer System into undeveloped land, particularly those within the overall system plan. I can tell you that however long it takes will be too long to hold off consideration of the two projects that are in the planning "pipeline" which are proposed to be served by the Efland Area Sewer System, one with Orange Alamance water and the other with a community well system. Because these projects have been in the pipeline for some time, it is, in my opinion, necessary to move them through the planning process and to consider them in the context of existing rules and regulations. That is why the Ashwick Subdivision and the McGowan Creek Subdivision precede consideration of the Outline on your agenda for tomorrow night. As you can see from the agenda materials, the administration recommendation is for approval of the Ashwick Subdivision. It will be a public water and public sewer project served with water by Orange Alamance and by Orange County's sewer system. Its location within the Efland Area Sewer System and within the Orange Alamance water system make many of the policy issues in front of you secondary for this project. In that respect it is a better project than the Richmond Hills Subdivision. The Ashwick project is completely within the overall system plan and located such that the Orange Alamance water system that serves it will provide fire protection. By comparison, the Richmond Hills Subdivision required an overall system plan boundary change, a sewer system design change and is probably too far away from the larger pipes of the Orange Alamance system for it to receive reliable fire protection from that system. The administration is recommending denial of the McGowan Creek Subdivision because it can only be accomplished as designed with public sewer and it is located wholly outside of the present overall system plan. Further, approximately one half of the project is outside of the 20 -year transition area on the land use map for this area. The Manager, the Planning Director Orange County Board of Commissioners Page 3 May 14, 2001 and myself think that the Ashwick project captures all that the County's regulations now require with respect to an open space project. That is why we are recommending approval. We think otherwise about the McGowan Creek Subdivision, even though one Of its most important features is that it includes almost two thirds of the property left in open space. However, given the fact that it is outside of the overall system plan for the Efland Sewer System it is not possible for the administration to recommend approval on this project. As you probably have noticed, lawyers representing these two developers have attended many if not of all your meetings in which the Efland Sewer System had been discussed. The administration recommendations on these two projects are made independent of their presence. However, I would advise you as I always do, to be circumspect in the comments you make during your consideration of these projects. For example, I think it unnecessary to debate with the developers whether or not the land use plan prohibits the extension of utilities outside of a transition area (it does not) or whether or not the County's Water and Sewer Policy also prohibits these extensions (that Policy has never been made a land use plan document). Resolution of this preliminary plan does not require resolution of that issue since the project cannot proceed without public sewer. Likewise, questions raised by the developers regarding procedural matters (the order of subdivision approval vs. sewer system approval and whether the developer had the right to rely on correspondence from the County Engineer and what the context was of that correspondence) will not be fruitfully debated at the Board meeting. What matters for the McGowan Creek Subdivision is that the County is not now willing to allow the extension of its sewer system to this property, is not now willing to commit when it will and that this development cannot be approved without public sewer because of the lot sizes proposed. In the instance of Ashwick, the public water and public sewer door has been opened by the approval of Richmond Hills. Debate about the future course of public utilities in the West Central part of the County should proceed as though Ashwick were a "done deal." My guess is that the owners of McGowan Creek will take a denial in stride. I make no promises about that, however. What I Orange County Board of Commissioners Page 4 May 14, 2001 can promise is that if they do take a denial in stride you will see this same property brought back to you with a development plan that does not include public sewer and which is not nearly as desirable from a design or open space point of view. On the other hand, it will have to be designed with less density. What is certain is that whatever land the developers have to use to satisfy minimum lot sizes required for septic systems will come from the open space proposed in the present plan. GEG /lsg xc: Craig Benedict John M. Link, Jr. Very truly yours, COLEMAN, GLEDHILL & HARGRAVE, P.C. lsg: letters \bdofcomeflandsewer #3.ltr sill