Loading...
HomeMy WebLinkAboutAgenda - 05-29-2012 - C5ORANGE COUNTY BOARD OF COMMISSIONERS AND PLANNING BOARD QUARTERLY PUBLIC HEARING ACTION AGENDA ITEM ABSTRACT Meeting Date: May 29, 2012 Action Agenda Item No. C -5 SUBJECT: Eno Economic Development District (EDD) Area Land Use and Zoning Amendments DEPARTMENT: Planning and Inspections PUBLIC HEARING: (Y /N) Yes ATTACHMENT(S): See List of Attachments on Page 6 INFORMATION CONTACT: Craig Benedict, Director, 245 -2592 PURPOSE: This public hearing was continued from February 27, 2012. To hold a public hearing on a County initiated land use and zoning amendments. 1. Change Land Use 55.9 acres from Commercial Node to 10 -Year Transition 2. Change Land Use 130.8 acres from Commercial Node to Economic Development 3. Change Land Use 181.3 acres from Rural Residential to Economic Development (Plus 125.5± acres of right -of -way in the interstate and rail corridor) (Zoning amendments areas have been reduced from the previous 2/27/12 proposal) A. Change Zoning 159.25 acres from R -1 (Rural Residential) to EDE -1 (Economic Development Eno Lower Intensity) B. Change Zoning 86.57± acres (including right -of -way) from R -1 (Rural Residential) to EDE -2 (Economic Development Eno Higher Intensity) There are overlaps of the land use and zoning amendments, so these amendments do not exactly encompass the same lands. BACKGROUND: A second public outreach meeting was held on April 25, 2012. Additional public comment along with the original public hearing comments have prompted an amended planning staff recommendation to withdraw several properties (over 95 acres) south of the railroad tracks and another area west of Stoney Creek from the zoning amendments. The changes are shown on new maps on Attachment 2. Page 1 of 6 Comprehensive Plan Land Use Element Map and Zoning Atlas Amendments: In accordance with the provisions of Section 2.3 Comprehensive Plan Amendments and Section 2.8 Zoning Atlas and Unified Development Ordinance Amendments of the Orange County Unified Development Ordinance (UDO), the Planning Director has initiated amendments to the Comprehensive Plan Land Use Element Map and to the Zoning Atlas. The Land Use Element Map is proposed to be modified to change the land use classification of approximately 493.5 acres in the vicinity of the Eno Economic Development District (an area near the Interstate 85 /US Highway 70 interchange in eastern Orange County). An analysis of the land use transportation and environment are in Attachment 3. Land Use Element Map Changes (Area 1) Change 55.9 acres from Commercial Node to 10 -Year Transition (i.e. Urban Residential). This is the area that comprises Whispering Pines subdivision. If approved, this established residential area will have an underlying future residential land use which creates consistency with the existing use. The Parcel Identification Numbers (PIN) for these 55.9 acres are as follows: 9893910204 9893902442 9893700229 9893806742 9893806227 9893809927 9893804345 9893803290 9893902746 9893707211 9893803906 9893809399 9893802155 9893803793 9893805573 9893801992 9893705268 9893808198 9893700687 9893705584 9893709834 9893911241 9893700118 9893902655 9893800468 9893708847 9893912145 9893805077 9893804588 9893706488 9893902848 9893818273 9893808086 9893704588 9893808442 9893805724 9893902959 9893816073 9893803070 9893801473 9893705742 9893815030 9893806885 9892890994 9893707483 9893706647 9893900936 9893704736 9892797873 9893704315 9893809760 9893800876 9893703663 9892793874 9893700421 9893803661 9893808846 9893700525 9893809478 9893704381 9893809650 9893902340 9893902544 9893801306 9893708160 9893703339 9893807204 9893807766 9893805331 9893709160 9893806076 9893900119 9892793773 9893702648 9893708389 9893901121 9893800151 9893817195 9893802646 9893706244 9893703073 9893705048 9893804918 9893707652 9893703272 9892891986 9893703193 9893707829 9893708557 9893901232 9892798990 9892795738 9893807847 9893709563 9893801153 9893807291 9892797963 9893703811 9893807469 9893707016 9893707198 9892793983 9893809890 9893806572 9893804073 9893902164 9892795910 9893800735 9892799992 9893700007 9892699764 9892790923 9892892988 NOTE: 113 properties averaging less than Y2 acre each. Page 2 of 6 Land Use Element Map Changes (Area 2) • Change 130.8 acres from Commercial Node to Economic Development. (Area north of the rail corridor and along Old NC 10) Economic Development land use allows some residential and `soft' non - residential such as office which exists in the area and removes the commercial element. The Parcel Identification Numbers (PIN) for these 130.8 acres are as follows: 0803002614 9892998862 0803100109 9893604939 9893909606 9893608557 0803007438 0802092905 9893618051 9893608242 0803207282 0803004553 0803100055 9893603521 0803102261 0803107244 9892996872 0803001017 9893602164 0802394949 0803307352 9892699764 9892798476 9892790923 0803003547 0803006178 9892894495 9892990026 0803303393 0803109390 0802093923 0803300153 9892892121 0802094831 0803104242 0803202254 0802090955 9892991685 9892698891 9892895043 0803101210 Land Use Element Map Changes (Area 3) • Change 181.3 acres from Rural Residential to Economic Development. (Area north of Old NC 10 and west of the railway underpass) The Parcel Identification Numbers (PIN) for these 181.3 acres are as follows: 9892691494 9892693355 9893302785 9893333390 9893202889 0803307443 9892698435 9893501063 0803307352 9893403551 9892599833 9892696503 9892593907 9893214750 9893556457 9892594954 9893229506 9893524275 9893313471 9893556457 9892596828 19893420409 19892691711 19893313471 In addition, the following road right -of way (no PIN) is proposed to be changed (125.5± acres): • Approximately 11 acres from Commercial Node to 10 -Year Transition. • Approximately 29.2 acres from Commercial Node to Economic Development. • Approximately 85.3 acres from Rural Residential to Economic Development. (Primarily 1 -85 and railroad right -of -way) Page 3 of 6 4 Zoning p 9 Ma Changes The Zoning district for a number of parcels in the same geographic area is also proposed to be changed. The following Parcel Identification Numbers (PIN), comprising approximately 205 acres, are proposed to be changed from R-1 (Rural Residential) to EDE-1 (Economic Development Eno Lower Intensity): (Area A) R1 to EDE-1 0803101210 0.4 9892894495 6.42 Pin Acres 0803102261 0.67 9892895043 0.8 0802090955 1.33 0803104242 1.01 9892990026 1.82 0802092905 2.29 0803107244 1.37 9892991685 20.48 0802093923 1.37 0803109390 0.92 9892996872 2.38 0802094831 1.16 0803202254 7.18 9892998862 3.52 0802394949 6.48 0803207282 5.87 9893602164 5 0803001017 0.23 0803300153 2.13 9893603521 4.99 0803002614 2.44 0803307352 0.17 9893604939 4.67 0803003547 1.26 0803307443 0.22 9893608242 3.22 0803004553 1.13 9892698891 0.03 9893608557 3.16 0803006178 1.33 9892699764 2.13 9893618051 7.21 0803007438 4.29 9892790923 2.17 9893909606 2.73 0803100055 5.85 9892798476 9.9 ROW 28.74 0803100109 0.37 9892892121 0.41 159.25 (Area B) R1 to EDE-2 PIN Acres 9893229506 61.55 9893420409 0.99 9893524275 3.05 ROW 20.98 86.57 These are recommended for removal from rezoning (included both EDE-1 and EDE-2): (Area C-N/C) To Remain 9892691711 2.09 9893403551 23.66 R1 9892693355 1.73 9893501063 1.48 PIN Acres 9892696503 2.45 9893556457 8.68 9892593907 1.68 9892698435 1.19 9893333390 0.16 9892594954 1.6 9893113171 1.44 ROW 23.34 9892596828 1.25 9893202899 22.25 105.48 9892599833 1.92 9893302785 4.55 9892691494 1.78 9893313471 4.23 Page 4 of 6 The purpose of the proposed amendments is to align Orange County land use and zoning classifications with the City of Durham's Urban Growth Area located within Orange County. In addition, implement recommendations of the Eno EDD Small Area Plan (2005 -2008) and implement aspects of the Stoney Creek Basin Study (1994- 1996). The City of Durham is concurrently amending land use designations within their Comprehensive Plan [i.e. part of their Urban Growth Boundary (UGB)] to be consistent with these amendments and will wait until Orange County completes their process. Joint neighborhood information meetings with City of Durham staff were on February 22, 2012 and April 25, 2012 at The Murphey School (3717 Murphey School Rd., Durham, NC 27705). Interested persons were encouraged to attend these neighborhood information meetings to learn more about this proposal. Comments are part of Attachment 6. Purpose: To review the item and receive citizen comment on the proposed amendments. FINANCIAL IMPACT: There is no direct financial impact at this time beyond planning staff analysis, mailings and cost of a community meeting. However, these amendments prepare for appropriate land use and zoning categories that can bolster economic development opportunities in the county and its utility /urban growth partnership with the City of Durham. RECOMMENDATION: The Planning Director recommends the Board: 1. Receive the proposal to amend: a. Land Use b. Zoning 2. Conduct the Public Hearing and receive public, BOCC and Planning Board comments, 3. Refer the matter to Planning Board to be returned for BOCC action by September 6, 2012, 4. Adjourn the Public Hearing until September 6, 2012 to receive any written comments between May 29, 2012 and Planning Board recommendation. Page 5 of 6 LIST OF ATTACHMENTS 1. Map a. Land Use Changes (numbered) 2. Map a. Zoning Changes (lettered) b. Current and Proposed Zoning 3. Comprehensive Plan /Future Land Use Map and LIDO Amendment Outline (The Form) 4. Analysis of the Land Use Transportation and the Environment 5. Notice of Neighborhood Information Meeting & Public Hearing 6. Eno EDD Neighborhood Information Meeting Citizen Comments 7. Stoney Creek Basin Planning Area a. Overall Plan b. Subject Focus Area c. Text 8. Economic Development Eno Lower Intensity (EDE -1) & Economic Development Eno Higher Density (EDE -2) Permitted Use Comparison 9. Comparison Table of Land Use Element/Map between Orange County and the City of Durham 10. Landscape Comparison within Eno EDD District per Section 6.8.12 of the UDO — Light Industrial /Manufacturing Use Page 6 of 6 Eno EDD Area - Current and Proposed Future Land Use Classifications I m Z I J Eno EDD Area - Current and Proposed Zoning N�c c OB ....�.cs���A RESN �� ®r O � \� CURS S C 0 3sed Changes R" Durham Urban Growth Area AR PDHR4 R1 to EDE -1 City Limits EC5 PID R1 to EDE -2 ETJ EDE -1 R1 Return to R1 ` Watersheds EDE -2 R2 a_ Major Transportation Corridor i J� 1, 0 r._.. .7 17 �F It is recommended that these areas should be removed from the Feb. 22, 2012 recommendations and return to R1 zoning as part of the May 29, 2012 recommendations. KE D --I n CM) x 3 M Z --I I i t- n t z r n r i J� - N t mch = 1,300 feet 0 300 600 mPeet Orange County Planning and Inspections Department GIS Map Prepared by Brian Carson. 4/13/2012 It is recommended that these areas should be removed from the Feb. 22, 2012 recommendations and return to R1 zoning as part of the May 29, 2012 recommendations. KE D --I n CM) x 3 M Z --I I -no EDD Area - Current and Proposed Zoning 95.72 Proposed Changes AR PDHR4 ■R1 to EDE -1 EC5 PID ® R1 to EDE -2 i EDE -1 R1 DReturn to R1* EDE -2 R2 (F,O** ��� m ' iv�dfj- n i 1 inch = 1,300 feet 0 300 600 Feet Orange County Planning and Inspections Department GIS Map Prepared by Brian Carson. 4/13/20110 a y s 3 I * It is recommended that these areas should be removed from the Feb. 22, 2012 recommendations and return to R1 zoning as part of the May 29, 2012 recommendations. A7114 HM ,Wf -3 COMPREHENSIVE PLAN / FUTURE LAND USE MAP AND UNIFIED DEVELOPMENT ORDINANCE (UDO) AMENDMENT OUTLINE CP & Zoning - 2012 -10 A. AMENDMENT TYPE Map Amendments ® Land Use Element Map: From: Commercial Node To: 10 -year Transition — 55.9 acres (Area 1) From: Commercial Node To: Economic Development — 130.8 acres (Area 2) From: Rural Residential To: Economic Development — 181.3 acres (Area 3) ® Zoning Map: From: R -1 (Rural Residential) To. EDE -1 (Economic Development Eno Lower Intensity) — 159.25 acres (Area A) From: R -1 (Rural Residential) To: EDE -2 (Economic Development Eno Higher Density) — 86.57 acres (Area B) ❑ Other: 4.:;.lick h.cre : 4 , f- rite r• text. Text Amendments ❑ Comprehensive Plan Text: ❑ UDO Text: ❑UDO General Text Changes ❑UDO Development Standards ❑UDO Development Approval Processes Section(s): ❑ Other: 1 B. RATIONALE 1. Purpose /Mission To create consistency between the City of Durham's UGB and the Orange County Land Use Plan wherein both areas would suggest an urban growth pattern. Thereafter a zoning change would be made to a consistent implementing zoning district that would regulate with standards, permitted uses and processes the form of development. 2. Analysis This area is within the Orange County WASMBPA primary utility service area. This area is within City of Durham's UGB. This area can be served by an existing utility service agreement with the City of Durham that can be extended to this area because of topographic sewer shed. The Eno Small Area Plan (SAP) anticipated urban /suburban densities in this area. Many existing Mobile Home Parks are in the area at higher densities than typical non - public sewered areas creating a fragile yet important housing segment. Some parks have marginal private septic systems that could be prone to failure at such densities and limited soils percolation. This area is within or adjacent to the Eno ED zone which primarily supports non - residential and could provide an adjacent residential component for the urban transition work force. (Update: Orange County and City of Durham have adopted a utility service agreement in January 2012) (See also further analysis attached) 3. Comprehensive Plan Linkage (i.e. Principles Goals and Objectives) 'ED -1.1 Focus public education efforts on sustainability issues, looking at the social, economic and environmental contributions of local businesses. ED -1.2 Form partnerships both within and outside the County to create a stronger business climate and market the changes to existing and potential employers. ED -2.1 Encourage compact and higher density development in areas served by water and sewer. ED -2.2, ED -2.5, ED -2.6, ED -2.7, ED -2.10, ED -3.5 Ensure that County workers and those preparing for the workforce have access to transportation, childcare, elder care, and affordable housing. H -1.5 Ensure that a variety of housing types can be developed throughout the County in a sustainable manner that locates housing near employment centers and commercial centers and that efficiently uses existing and planned public services. H -3.3 Expand assistance in the retrofitting, repair, and maintenance of existing homes owned by financially challenged households, particularly those that are senior citizens. H -3.6, H-4.1 2 Continue to permit HUD code - compliant manufactured housing as a form of affordable housing in the County. LU -1.1 Coordinate the location of higher intensity /high density residential and non - residential development with existing or planned locations of public transportation, commercial and community services, and adequate supporting infrastructure (i.e., water and sewer, high -speed internet access, streets, and sidewalks), while avoiding areas with protected natural and cultural resources. This could be achieved by increasing allowable densities and creating new mixed -use zoning districts where adequate public services are available. LU -2.2, 2.3, 2.7, 2.9, 3.2 LU -4.1 Support the use of individual manufactured housing units as a useful housing resource in the County by increasing the opportunities where these units can locate by- right. WW-2 Coordinate the provision of potable water and sanitary sewer services with the County's Land Use Plan and Orange County - Chapel Hill - Carrboro Joint Planning Agreement and Land Use Plan, targeting these services to urban, transitional, and economic development districts in a manner that does not endanger environmental resources. NACS -Goal 1 Energy conservation, sustainable use of non - polluting renewable energy resources, efficient use of non - renewable energy resources, and clean air. MACS -Goal 6 Sustainable quality and quantity of ground and surface water resources. MACS -Goal 7 A balanced and healthy diversity of native plant and animal populations. NACS -Goal 8 Networks of protected natural, cultural, and agricultural lands. These goals are promoted by creating urban areas that are more efficient in the use of human resources while taking pressure off natural resources in other areas. 4. New Statutes and Rules Not applicable. C. PROCESS 1. TIMEFRAME /MILESTONES /DEADLINES a. BOCC Authorization to Proceed November 1, 2011 b. Quarterly Public Hearing February 27, 2012 and May 29, 2012 c. BOCC Updates /Checkpoints 3 February 7, 2012 and May 3, 2012 — approval of legal ad d. Other Community Meeting February 22, 2012 and April 25, 2012 at the Shared Vision Retreat Center on Murphey School Road. 2. PUBLIC INVOLVEMENT PROGRAM Mission /Scope: The Quarterly Public Hearing public involvement process shall be consistent with North Carolina State Statutes and UDO requirements. a. Planning Board Review: February 1, 2012 (preview of item) March 7, 2012 (recommendation) May 2, 2012 b. Advisory Boards: Written Update to Economic Development Commission (when organized) c. Local Government Review: City of Durham (Ongoing) d. Notice Requirements In accordance with NCGS e. Outreach: ® General Public: February 22, 2012 and April 25, 2012 at Shared Vision Retreat Center ® Small Area Plan Workgroup: Send note to past SAP participants living or owning property in the affected area. ❑ Other: 'ilet, :4: here c tttc texi. 3. FISCAL IMPACT Orange County has committed utility investment in these areas to assist in economic development infrastructure. These amendments advance and support public investment. D. AMENDMENT IMPLICATIONS 4 Amend Orange County /City of Durham Utility Services Agreement to comport with new Land Use and Zoning Boundary. Continue to analyze Eno EDD SAP and amend as necessary to create a comprehensive program of development and environmental compatibility. E. SPECIFIC AMENDMENT LANGUAGE Primary Staff Contact: Craig N. Benedict Planning & Inspections 919- 245 -2585 cbenedict @co. orange.nc. us ENO EDD AREA LAND USE AND ZONING AMENDMENTS Land Use, Transportation and Environmental Analysis HISTORY ATTACHMENT 4 The majority of the area bounded by the NCRR Railway and 1-85 and west has been designated as an urban growth area since 1981 because of its proximity to transportation (Interstate, US Highway and Rail), adjacency to an urban area such as the City of Durham which can provide urban services such as water and sewer. This pattern of growth was reconfirmed in the 1988 land use plan and economic development land use and zoning amendments for the majority of the area in 1994. The majority of these areas were designated for non- residential commercial office and industrial uses although limited higher urban density housing is also permitted. In the late 90's (1994 -96) the Stoney Creek Basin Small Area Plan added certain additional lands to the west and southwest of the urban area for higher intensity and intermediate intensity. Only the higher intensity area is partially included in these amendment areas. JUSTIFICATION The analysis within the ENO SAP (which is on the County's Planning website) explains and supports the importance of this general area for higher intensity activity while preserving environmental and cultural resources of the Eno River to the north and Stoney Creek Basin to the west. The advent of public sewer will lessen the potential for septic systems to create nutrient runoff. In addition, Orange County has improved its floodplain regulations and stormwater techniques to further the protection of the Lower Eno Watershed which supports City of Durham's water supply. A7 -TAc- vt m,-;v r �' Eno Economic Development District (EDD) Neighborhood information Meeting February 25, 2012 Citizen Comments 1. Stoney Creek Basin EDE -1 vs. EDE -2 The EDE -2 is suggested by staff because of the frontage along 1 -85 and its relative isolation between the interstate, Mt. Herman Church Road, railroad tracks, and high voltage primary electric transmission lines. The opposite side (east) of the road is also presently EDE -2. Also to the east is Existing Commercial zoning (EC -5). 2. Resource Protection Areas (RPA) RPAs are a layer of the land use plan and are still operational in the Unified Development Ordinance (UDO) to protect environmental areas (i.e. stream buffers, steep slopes, etc.). 3. What is light industrial; compare Orange County and Durham County? The uses were discussed during the Eno EDD SAP meetings and comparability was achieved. Uses are not of the higher impact industrial. List of specific uses were added to webpage. 4. Why now public utilities? This area has been noted as an urban growth land use since 1981 and reconfirmed in 1994 and 2008. Recommendations in the Eno Small Area Plan suggested an agreement with the City of Durham which was accomplished in January 2012. Orange County is facilitating the proposed land use pattern since any one small or large business could not afford to build infrastructure. Job growth is more important than ever in designated areas. 84% of the county is rural and only 16% including cities and along interstates is designated as Urban. 5. Annexation These land use and zoning amendments do not create annexation programs. If a new business or resident wants public water and sewer, they will sign a voluntary annexation form and if the City of Durham decides the petition meets state law and is fiscally feasible then it may be annexed. (See annexation monograph from City of Durham) 6. Why are there two plans Orange County and City of Durham? There are two land use plans (Orange County and City of Durham) and one zoning plan (only Orange County). The area is within Orange County which has a land use and zoning program. If a city also has an area of county within its future urban growth boundary (UGB) then they also have a future land use plan map. Land use comparability is key in these urban but non - extraterritorial jurisdictions (non -ETJ). 7. Mobile Home Parks The northern mobile home park is being rezoned to EDE -2 which has frontage on 1 -85. The southern mobile home park will remain Planned Development HR 4 zoning since its approval contains special `Planned Development' conditions until such time a different project is proposed. The future land use and existing zoning would allow residential to remain and /or be upgraded. 17 NOTICE OF NEIGHBORHOOD INFORMATION MEETING AND PUBLIC HEARING Comprehensive Plan Amendments and Zoning Atlas (Map) Amendments Orange County DURHAM City of Durham Planning and Inspections Department r City-County Planning Department 131 W. Margaret Lane I Suite 201 t 1 ;; 101 City Hall Plaza I Durham, NC 27701 P O Box 8181 1 Hillsborough, NC 27278 1 -° 919.560.4137 1 f 919.560.4641 (919) 245-2575 1 f(919)644-3002 ,o 1 8 6 9 www.durhamnc.gov ,,, ¢,to� www.co.orange.nc.us '111 Of Kclic NE April 13, 2012 `UPDATE m This letter reflects community and elected officials interest to reengage the public regarding land use and zoning changes in your area based on the prior meetings of February 22, 2012 and February 27, 2012. Dear Property Owner: This letter is to notify you of two NEW upcoming events pertaining to proposed changes to the Orange County Comprehensive Plan Land Use Element Map and Zoning Atlas (Map), and the Durham Future Land Use Map in the area near the Interstate 85/US Highway 70 interchange in eastern Orange County. Your property is within the area impacted by one of these proposed changes. The proposed changes, summarized below, are intended to support the goals and objectives of the Orange County Board of Commissioners and the Durham City Council with consideration of community input. Information and Neighborhood Information Meeting Map Sent The first new event is a neighborhood information meeting to readdress comments, learn about and provide input on proposed land use and zoning map changes for the area. The meeting will be jointly hosted by the Orange County Planning and Inspections Department and the Durham City-County Planning Department and i take place on Wednesday, April 25, 2012 at 6:00 pm at the Murphey School (3717 Murphey School Rd., Durham, NC 27705). Interested persons are encouraged to attend this neighborhood meeting to learn more about this proposal and/or amendments to the original proposal. A map of the area to be addressed is included. Community and public hearing comments will also be discussed and evaluated at this meeting. Orange County Joint Public Hearing The second new event is a Joint Public Hearing of the Orange County Board of Commissioners and Orange County Planning Board on the proposed changes on Tuesday, May 29, 2012 at 7:00 p.m. at the Department of Social Services, located at 113 Mayo Street (Hillsborough Commons Shopping Center) in Hillsborough, North Carolina. Interested persons are invited to address the boards with their comments regarding the proposed land use and zoning map changes at this Joint Public Hearing. Page 1 of 3 Summary of proposed Zoning Atlas (Map) Amendments Orange County is proposing Zoning Atlas Amendments that are compatible with the proposed Land Use Element Map Amendments. Reference the table below and the attached maps to see the proposed changes. Existing Pro used Acreage R -1 Rural Residential)' EDE -1 Economic Development Eno Lower Intensity) 205 ac. R -1 Rural Residential EDE -1 Economic Development Eno Lower -Intensity) 50 ac. (ROW) R -1 Rural Residential EDE -2 Economic Development Eno Higher Intensity) 74.3 ac. R -1 Rural Residential EDE -2 (Economic Development Eno Higher Intensity) 17 ac. (ROW) EC-5 (Existing m Comercial EDE -2 Economic Development Eno Higher Intensity) 4.2 ac. (ROM Public Interest District EDE -2 Economic Development Eno Higher Intensity) 0.6 ac. (ROW) One parcel located in Stoney Creek Basin Overlay 2 Three parcels located in Stoney Creek Basin Overlay Total: 35.11 acres The City of Durham does not have zoning jurisdiction in this area. Therefore, there are no zoning changes to be made for the City of Durham. Changes from original proposals are anticipated Community input to date has prompted reanalysis of the amendments to add clarity and increase the specificity of future uses. The new proposals will be discussed. More Information Maps and other information regarding the proposed Land Use Element map and zoning changes can be viewed at the following website after Tuesday, May 17, 2012: http: / /www.co.orange.ne.us /planning /SpecialProject.asp If you cannot attend the Joint Public Hearing and the website does not answer your questions about the proposed land use and zoning map changes, you may call the Orange County Planning and Inspections Department at (919) 245 -2575 during regular business hours and you will be directed to a staff person who can assist you. Sincerely, Craig N. Benedict, AICP Hannah Jacobson Orange County Planning Director Durham City - County Planning Department Page 3 of 3 19 Eno EDD Area ® Current and Proposed Zoning MYRr«,� 70 f a z NO y U� q - ,o o CURT/s ��RD C�6 _ O eA TREE 70 us 1��GK,Q :z oto a y' 1TRL R o�D SB• .UGM � N�10 m Z � W G Lower-- rotected D J 9 N1t 0 Proposed Changes ®Durham Urban Growth Area ! AR PDHR4 pPSCHA�L� ®R1 to EDE-1 (- City Limits EC5 PID N h=1,300 feet I ®R1 to EDE-2 ETJ EDE-1 R1 300 60 Watersheds EDE-2 R2 Major Transportation Corridor Orange County Planning and Inspections Department „„__. � p GIS Map Prepared by Man Carson.4/13/2012 20 A l�nllc;-lrvi&v a 1711 Stoney Creek Basin Planning Area T . JI& LIT ��. S Old NC ,�• � � ; /�' �Y;:y :tip � `=- '_ \\... (,I 1`r < r ! �if1 C`I�VI fN% '/� 21 Stoney Creek Basin Plannin g Area ( enlarged Eastern Area ) !� 1 t yy j+ j • r1 -k • r .. r 1 }.. 8. !t +e x111 • rt � 1� r I'a ii ti •LII•_•1 eYs e}t � .IS :<<iA4 ".; '� �, t,• At J1 F o *a t'1 tp r s � a e f' x ,1 t m 4.j a � 4TTr1,rk1M' -1V i Ie„ Land Use Intensity Categories A. Higher Intensity Areas These areas are generally synonymous with the ten and twenty year transition areas. in the existing Land Use Plan (adopted 1981, amended 1988) or they are adjacent to areas proposed for future development on an urban scale. At some future date, they will most likely be incorporated into the municipalities of Hillsborough and Durham through the annexation process. A mix of land uses is possible in these areas and they will be served by water and sewer. They could be viewed as "receiving areas" for lower density areas to the south. B. Goals 1. Preserve landowners' rights to get fair value for the property; and 2. Protects the area's "rural character ". Economic Development Eno Lower Intensity (EDE -1) EDE -1 Allows: Finance Government Residential (Urban) Services * (Office) Transportation Miscellaneous EDE -1 Doesn't Allow: Agricultural Commercial /Retail Construction Manufacturing, Assembly & Processing Recreation Wholesale Trade Economic Development Eno Higher Intensity (EDE -2) (Existing and proposed primarily along 1 -85 and US 70) EDE -2 Allows: Agricultural Construction Finance Government Manufacturing, Assembly & Processing Commercial/Retail Services Transportation Wholesale Trade EDE -2 Doesn't Allow: Recreation (New /Outdoor) Residential (New - except by conditional use rezoning) A Special Class A B Special Class B C# Conditions Source: Orange County Planning - February 2012 Comparison Table of Land Use Element /Map Orange County vs. Durham City - County Orange County Durham City -County 10- year Transition: Zoning Districts: Density: Residential: Zoning Districts: Density: Lands located in areas that are in the * R1 * 1 DU /acre Land designated for buildings * RS-20 e 2 DU /acre process of changing from rural to * R2 e 2 DU /acre consisting only of dwelling units. * RS -10 e 3 DU /acre urban densities and /or intensities, * R3 * 2.9 DU /acre a Very Low Density (2 DU /acre) * RS -8 * 5 DU /acre that are suitable for higher * R4 * 4.3 DU /acre a Low Density (4 DU /acre) * RS -5 a 8 -10 DU /acre densities /intensities and could be * R5 * 5.8 DU /acre provided with public utilities and * Rg * 8.7 DU /acre services within the first 10 -year phase of the Plan update or where * R13 * 14.5 DU /acre such utilities are services are already present or planned. Non - residential uses implemented in accordance with small area plans and /or overlay *Information from * Information from Durham districts may be appropriate. *Information from 2030 *Information from *Information from Durham Comprehensive Durham Unified Development tined Development Ordinance, Article 6.3 *Information from 2030 Comprehensive Plan, Comprehensive Plan, Appendix F: Land Use Orange County LIDO, Article 3 Plan, Chapter 2, Land Use Element, Ordinance, Article 4.2.2, Residential Suburban Chapter 5: Land Use Element, Section 5.3, pg and Zoning Matrix, pg. F- Development 2 -18 & 19; Chapter P pg 18 Residential Suburban Development 5-15, 3 Appendices, pg. 8-12 Density Economic Development: Zoning Districts: Density: Industrial: Zoning Districts: Density: Land in transition areas of the * EDC -1 * No requirement. The manufacture, production, and a Industrial * 30,000/ sq. ft. County which has been specifically * EDE -2 Density based processing of consumer goods. a Industrial Light * 25,000/ sq. ft. targeted for economic development compliance with Industrial is often divided into activity consisting of light industrial, site ratio "heavy industrial' uses, such as distribution, office, service /retail requirements. construction yards, quarrying, and uses and flex space (typically one * Open space, factories; and "light industrial' story building designed, constructed, floor area, uses, such as research and and marketed as suitable for use as ped /landscaping development and less intensive offices but able to accommodate warehousing and manufacturing. other uses such as a warehouse, showroom, manufacturing, assembly, or similar operations). Such areas are located adjacent to interstate and major arterial highways, and subject to special *Information from 2030 *Information from *Information from Durham design criteria and performance Comprehensive Plan, Durham Unified Unified Development standards. Appendix F: Land Use *Information from Durham Comprehensive Development P Ordinance, Article 6.10, *Information from 2030 Comprehensive Plan, and Zoning Matrix, pg. F- 3 * Information from Orange County LIDO, Plan, Chapter 2, Land Use Element, P Development Teir, pg 2 -18 & 19; Chapter 18 Ordinance, Article 4.3.6 Nonresidential District Development Intensity Chapter 5: Land Use Element, Section 5.3, pg Article 3 Appendices, pg. 8 -18 and 4.33, Nonresidential District 5 -16. S N, Z v1 C 7 25 Laridscape Comparison within ENO E ® ditty- Per-Section 6.6.12 of the UDO Light Industrial/M f t 6. ri Use-----j f GROUCH0.99 ft ,. # Af Government 's. Land Use, Building Parking t/► p r� Light Industrial ef or t Manufacturing 1 space for every 40,ft employee on Residential shift of maximum Land Use employment } (Section 6.9.7) , r Protected Watershed EDE-� 20 ft'(minimum�required,for�undeve lope drparcel) p f y %sue 11 10 + Undeveloped Parcel . i y - -� Data shown on this map is obtained from Orange County GIS and is for reference only. Exact locations and boundaries should be verified. Map prepared by Orange County Planning&Inspections. USGS Water Feature M Parcels Zoning D 100 YR Floodplain(Effective 02/02/07) z' N Soils Survey Water Feature d..J Township 0 City Limits W. . Floodway(Effective 02/02/07) M OC Updated Water Feature School System Boundary 0 ETJ 500 YR Floodplain(Effective 02/02/07) Water Body Contours Conservation Easements O Buildings Held b Others 1 inch=so feet [ _1 y River Basins L=�County Boundary In Water and Sewer Boundary ®Watershed >:°„Soils Orange County 0 30 so 120eet Conservation Easements