HomeMy WebLinkAboutAgenda - 05-29-2012 - C5ORANGE COUNTY
BOARD OF COMMISSIONERS AND
PLANNING BOARD
QUARTERLY PUBLIC HEARING ACTION AGENDA ITEM ABSTRACT
Meeting Date: May 29, 2012
Action Agenda
Item No. C -5
SUBJECT: Eno Economic Development District (EDD) Area Land Use and Zoning
Amendments
DEPARTMENT: Planning and Inspections PUBLIC HEARING: (Y /N) Yes
ATTACHMENT(S):
See List of Attachments on Page 6
INFORMATION CONTACT:
Craig Benedict, Director, 245 -2592
PURPOSE: This public hearing was continued from February 27, 2012.
To hold a public hearing on a County initiated land use and zoning amendments.
1. Change Land Use 55.9 acres from Commercial Node to 10 -Year Transition
2. Change Land Use 130.8 acres from Commercial Node to Economic Development
3. Change Land Use 181.3 acres from Rural Residential to Economic Development
(Plus 125.5± acres of right -of -way in the interstate and rail corridor)
(Zoning amendments areas have been reduced from the previous 2/27/12 proposal)
A. Change Zoning 159.25 acres from R -1 (Rural Residential) to EDE -1 (Economic
Development Eno Lower Intensity)
B. Change Zoning 86.57± acres (including right -of -way) from R -1 (Rural Residential) to
EDE -2 (Economic Development Eno Higher Intensity)
There are overlaps of the land use and zoning amendments, so these amendments do not
exactly encompass the same lands.
BACKGROUND:
A second public outreach meeting was held on April 25, 2012. Additional public
comment along with the original public hearing comments have prompted an amended
planning staff recommendation to withdraw several properties (over 95 acres) south of
the railroad tracks and another area west of Stoney Creek from the zoning amendments.
The changes are shown on new maps on Attachment 2.
Page 1 of 6
Comprehensive Plan Land Use Element Map and Zoning Atlas Amendments: In
accordance with the provisions of Section 2.3 Comprehensive Plan Amendments and Section
2.8 Zoning Atlas and Unified Development Ordinance Amendments of the Orange County
Unified Development Ordinance (UDO), the Planning Director has initiated amendments to the
Comprehensive Plan Land Use Element Map and to the Zoning Atlas. The Land Use Element
Map is proposed to be modified to change the land use classification of approximately 493.5
acres in the vicinity of the Eno Economic Development District (an area near the Interstate
85 /US Highway 70 interchange in eastern Orange County). An analysis of the land use
transportation and environment are in Attachment 3.
Land Use Element Map Changes
(Area 1)
Change 55.9 acres from Commercial Node to 10 -Year Transition (i.e. Urban
Residential). This is the area that comprises Whispering Pines subdivision.
If approved, this established residential area will have an underlying future residential
land use which creates consistency with the existing use.
The Parcel Identification Numbers (PIN) for these 55.9 acres are as follows:
9893910204
9893902442
9893700229
9893806742
9893806227
9893809927
9893804345
9893803290
9893902746
9893707211
9893803906
9893809399
9893802155
9893803793
9893805573
9893801992
9893705268
9893808198
9893700687
9893705584
9893709834
9893911241
9893700118
9893902655
9893800468
9893708847
9893912145
9893805077
9893804588
9893706488
9893902848
9893818273
9893808086
9893704588
9893808442
9893805724
9893902959
9893816073
9893803070
9893801473
9893705742
9893815030
9893806885
9892890994
9893707483
9893706647
9893900936
9893704736
9892797873
9893704315
9893809760
9893800876
9893703663
9892793874
9893700421
9893803661
9893808846
9893700525
9893809478
9893704381
9893809650
9893902340
9893902544
9893801306
9893708160
9893703339
9893807204
9893807766
9893805331
9893709160
9893806076
9893900119
9892793773
9893702648
9893708389
9893901121
9893800151
9893817195
9893802646
9893706244
9893703073
9893705048
9893804918
9893707652
9893703272
9892891986
9893703193
9893707829
9893708557
9893901232
9892798990
9892795738
9893807847
9893709563
9893801153
9893807291
9892797963
9893703811
9893807469
9893707016
9893707198
9892793983
9893809890
9893806572
9893804073
9893902164
9892795910
9893800735
9892799992
9893700007
9892699764
9892790923
9892892988
NOTE: 113 properties averaging less than Y2 acre each.
Page 2 of 6
Land Use Element Map Changes
(Area 2)
• Change 130.8 acres from Commercial Node to Economic Development.
(Area north of the rail corridor and along Old NC 10)
Economic Development land use allows some residential and `soft' non - residential
such as office which exists in the area and removes the commercial element.
The Parcel Identification Numbers (PIN) for these 130.8 acres are as follows:
0803002614
9892998862
0803100109
9893604939
9893909606
9893608557
0803007438
0802092905
9893618051
9893608242
0803207282
0803004553
0803100055
9893603521
0803102261
0803107244
9892996872
0803001017
9893602164
0802394949
0803307352
9892699764
9892798476
9892790923
0803003547
0803006178
9892894495
9892990026
0803303393
0803109390
0802093923
0803300153
9892892121
0802094831
0803104242
0803202254
0802090955
9892991685
9892698891
9892895043
0803101210
Land Use Element Map Changes
(Area 3)
• Change 181.3 acres from Rural Residential to Economic Development.
(Area north of Old NC 10 and west of the railway underpass)
The Parcel Identification Numbers (PIN) for these 181.3 acres are as follows:
9892691494
9892693355
9893302785
9893333390
9893202889
0803307443
9892698435
9893501063
0803307352
9893403551
9892599833
9892696503
9892593907
9893214750
9893556457
9892594954
9893229506
9893524275
9893313471
9893556457
9892596828
19893420409
19892691711
19893313471
In addition, the following road right -of way (no PIN) is proposed to be changed (125.5±
acres):
• Approximately 11 acres from Commercial Node to 10 -Year Transition.
• Approximately 29.2 acres from Commercial Node to Economic Development.
• Approximately 85.3 acres from Rural Residential to Economic Development.
(Primarily 1 -85 and railroad right -of -way)
Page 3 of 6
4
Zoning p 9 Ma Changes
The Zoning district for a number of parcels in the same geographic area is also proposed
to be changed. The following Parcel Identification Numbers (PIN), comprising
approximately 205 acres, are proposed to be changed from R-1 (Rural Residential) to
EDE-1 (Economic Development Eno Lower Intensity):
(Area A)
R1 to EDE-1 0803101210 0.4 9892894495 6.42
Pin Acres 0803102261 0.67 9892895043 0.8
0802090955 1.33 0803104242 1.01 9892990026 1.82
0802092905 2.29 0803107244 1.37 9892991685 20.48
0802093923 1.37 0803109390 0.92 9892996872 2.38
0802094831 1.16 0803202254 7.18 9892998862 3.52
0802394949 6.48 0803207282 5.87 9893602164 5
0803001017 0.23 0803300153 2.13 9893603521 4.99
0803002614 2.44
0803307352 0.17 9893604939 4.67
0803003547 1.26 0803307443 0.22 9893608242 3.22
0803004553 1.13 9892698891 0.03 9893608557 3.16
0803006178 1.33 9892699764 2.13 9893618051 7.21
0803007438 4.29 9892790923 2.17 9893909606 2.73
0803100055 5.85 9892798476 9.9 ROW 28.74
0803100109 0.37 9892892121 0.41 159.25
(Area B)
R1 to EDE-2
PIN Acres
9893229506 61.55
9893420409 0.99
9893524275 3.05
ROW 20.98
86.57
These are recommended for removal from rezoning (included both EDE-1 and EDE-2):
(Area C-N/C)
To Remain 9892691711 2.09 9893403551 23.66
R1 9892693355 1.73 9893501063 1.48
PIN Acres 9892696503 2.45 9893556457 8.68
9892593907 1.68 9892698435 1.19 9893333390 0.16
9892594954 1.6 9893113171 1.44 ROW 23.34
9892596828 1.25 9893202899 22.25 105.48
9892599833 1.92 9893302785 4.55
9892691494 1.78 9893313471 4.23
Page 4 of 6
The purpose of the proposed amendments is to align Orange County land use and
zoning classifications with the City of Durham's Urban Growth Area located within
Orange County. In addition, implement recommendations of the Eno EDD Small Area
Plan (2005 -2008) and implement aspects of the Stoney Creek Basin Study (1994- 1996).
The City of Durham is concurrently amending land use designations within their
Comprehensive Plan [i.e. part of their Urban Growth Boundary (UGB)] to be consistent
with these amendments and will wait until Orange County completes their process.
Joint neighborhood information meetings with City of Durham staff were on February
22, 2012 and April 25, 2012 at The Murphey School (3717 Murphey School Rd.,
Durham, NC 27705). Interested persons were encouraged to attend these neighborhood
information meetings to learn more about this proposal. Comments are part of
Attachment 6.
Purpose: To review the item and receive citizen comment on the proposed amendments.
FINANCIAL IMPACT: There is no direct financial impact at this time beyond planning staff
analysis, mailings and cost of a community meeting. However, these amendments prepare for
appropriate land use and zoning categories that can bolster economic development
opportunities in the county and its utility /urban growth partnership with the City of Durham.
RECOMMENDATION: The Planning Director recommends the Board:
1. Receive the proposal to amend:
a. Land Use
b. Zoning
2. Conduct the Public Hearing and receive public, BOCC and Planning Board comments,
3. Refer the matter to Planning Board to be returned for BOCC action by September 6,
2012,
4. Adjourn the Public Hearing until September 6, 2012 to receive any written comments
between May 29, 2012 and Planning Board recommendation.
Page 5 of 6
LIST OF ATTACHMENTS
1. Map
a. Land Use Changes (numbered)
2. Map
a. Zoning Changes (lettered)
b. Current and Proposed Zoning
3. Comprehensive Plan /Future Land Use Map and LIDO Amendment Outline (The Form)
4. Analysis of the Land Use Transportation and the Environment
5. Notice of Neighborhood Information Meeting & Public Hearing
6. Eno EDD Neighborhood Information Meeting Citizen Comments
7. Stoney Creek Basin Planning Area
a. Overall Plan
b. Subject Focus Area
c. Text
8. Economic Development Eno Lower Intensity (EDE -1) & Economic Development Eno
Higher Density (EDE -2) Permitted Use Comparison
9. Comparison Table of Land Use Element/Map between Orange County and the City of
Durham
10. Landscape Comparison within Eno EDD District per Section 6.8.12 of the UDO — Light
Industrial /Manufacturing Use
Page 6 of 6
Eno EDD Area - Current and Proposed Future Land Use Classifications
I
m
Z
I
J
Eno EDD Area - Current and Proposed Zoning
N�c
c
OB ....�.cs���A RESN �� ®r
O �
\� CURS S
C
0
3sed Changes
R" Durham Urban Growth Area
AR
PDHR4
R1 to EDE -1
City Limits
EC5
PID
R1 to EDE -2
ETJ
EDE -1
R1
Return to R1 `
Watersheds
EDE -2
R2
a_ Major Transportation Corridor
i
J�
1,
0
r._.. .7 17 �F
It is recommended that these areas should be removed from the Feb. 22, 2012 recommendations and return to R1 zoning as part of the May 29, 2012 recommendations.
KE
D
--I
n
CM)
x
3
M
Z
--I
I
i
t-
n t
z r
n
r
i
J�
-
N
t mch = 1,300 feet
0 300 600
mPeet
Orange County
Planning and Inspections Department
GIS Map Prepared by Brian Carson. 4/13/2012
It is recommended that these areas should be removed from the Feb. 22, 2012 recommendations and return to R1 zoning as part of the May 29, 2012 recommendations.
KE
D
--I
n
CM)
x
3
M
Z
--I
I
-no EDD Area - Current and Proposed Zoning
95.72
Proposed Changes AR PDHR4
■R1 to EDE -1 EC5 PID
® R1 to EDE -2 i EDE -1 R1
DReturn to R1* EDE -2 R2
(F,O**
���
m
' iv�dfj- n i
1 inch = 1,300 feet
0 300 600
Feet
Orange County Planning and Inspections Department
GIS Map Prepared by Brian Carson. 4/13/20110
a
y
s
3
I
* It is recommended that these areas should be removed from the Feb. 22, 2012 recommendations and return to R1 zoning as part of the May 29, 2012 recommendations.
A7114 HM ,Wf -3
COMPREHENSIVE PLAN / FUTURE LAND USE MAP
AND
UNIFIED DEVELOPMENT ORDINANCE (UDO)
AMENDMENT OUTLINE
CP & Zoning - 2012 -10
A. AMENDMENT TYPE
Map Amendments
® Land Use Element Map:
From: Commercial Node
To: 10 -year Transition — 55.9 acres (Area 1)
From: Commercial Node
To: Economic Development — 130.8 acres (Area 2)
From: Rural Residential
To: Economic Development — 181.3 acres (Area 3)
® Zoning Map:
From: R -1 (Rural Residential)
To. EDE -1 (Economic Development Eno Lower Intensity) — 159.25 acres (Area A)
From: R -1 (Rural Residential)
To: EDE -2 (Economic Development Eno Higher Density) — 86.57 acres (Area B)
❑ Other: 4.:;.lick h.cre : 4 , f- rite r• text.
Text Amendments
❑ Comprehensive Plan Text:
❑ UDO Text:
❑UDO General Text Changes
❑UDO Development Standards
❑UDO Development Approval Processes
Section(s):
❑ Other:
1
B. RATIONALE
1. Purpose /Mission
To create consistency between the City of Durham's UGB and the Orange County
Land Use Plan wherein both areas would suggest an urban growth pattern.
Thereafter a zoning change would be made to a consistent implementing zoning
district that would regulate with standards, permitted uses and processes the form of
development.
2. Analysis
This area is within the Orange County WASMBPA primary utility service area.
This area is within City of Durham's UGB.
This area can be served by an existing utility service agreement with the City of
Durham that can be extended to this area because of topographic sewer shed. The
Eno Small Area Plan (SAP) anticipated urban /suburban densities in this area. Many
existing Mobile Home Parks are in the area at higher densities than typical non - public
sewered areas creating a fragile yet important housing segment. Some parks have
marginal private septic systems that could be prone to failure at such densities and
limited soils percolation. This area is within or adjacent to the Eno ED zone which
primarily supports non - residential and could provide an adjacent residential
component for the urban transition work force. (Update: Orange County and City of
Durham have adopted a utility service agreement in January 2012)
(See also further analysis attached)
3. Comprehensive Plan Linkage (i.e. Principles Goals and Objectives)
'ED -1.1
Focus public education efforts on sustainability issues, looking at the social,
economic and environmental contributions of local businesses.
ED -1.2
Form partnerships both within and outside the County to create a stronger business
climate and market the changes to existing and potential employers.
ED -2.1
Encourage compact and higher density development in areas served by water and
sewer.
ED -2.2, ED -2.5, ED -2.6, ED -2.7, ED -2.10, ED -3.5
Ensure that County workers and those preparing for the workforce have access to
transportation, childcare, elder care, and affordable housing.
H -1.5
Ensure that a variety of housing types can be developed throughout the County in a
sustainable manner that locates housing near employment centers and commercial
centers and that efficiently uses existing and planned public services.
H -3.3
Expand assistance in the retrofitting, repair, and maintenance of existing homes
owned by financially challenged households, particularly those that are senior
citizens.
H -3.6, H-4.1
2
Continue to permit HUD code - compliant manufactured housing as a form of
affordable housing in the County.
LU -1.1
Coordinate the location of higher intensity /high density residential and non - residential
development with existing or planned locations of public transportation, commercial
and community services, and adequate supporting infrastructure (i.e., water and
sewer, high -speed internet access, streets, and sidewalks), while avoiding areas with
protected natural and cultural resources. This could be achieved by increasing
allowable densities and creating new mixed -use zoning districts where adequate
public services are available.
LU -2.2, 2.3, 2.7, 2.9, 3.2
LU -4.1
Support the use of individual manufactured housing units as a useful housing
resource in the County by increasing the opportunities where these units can locate
by- right.
WW-2
Coordinate the provision of potable water and sanitary sewer services with the
County's Land Use Plan and Orange County - Chapel Hill - Carrboro Joint Planning
Agreement and Land Use Plan, targeting these services to urban, transitional, and
economic development districts in a manner that does not endanger environmental
resources.
NACS -Goal 1
Energy conservation, sustainable use of non - polluting renewable energy resources,
efficient use of non - renewable energy resources, and clean air.
MACS -Goal 6
Sustainable quality and quantity of ground and surface water resources.
MACS -Goal 7
A balanced and healthy diversity of native plant and animal populations.
NACS -Goal 8
Networks of protected natural, cultural, and agricultural lands.
These goals are promoted by creating urban areas that are more efficient in the use
of human resources while taking pressure off natural resources in other areas.
4. New Statutes and Rules
Not applicable.
C. PROCESS
1. TIMEFRAME /MILESTONES /DEADLINES
a. BOCC Authorization to Proceed
November 1, 2011
b. Quarterly Public Hearing
February 27, 2012 and May 29, 2012
c. BOCC Updates /Checkpoints
3
February 7, 2012 and May 3, 2012 — approval of legal ad
d. Other
Community Meeting February 22, 2012 and April 25, 2012 at the Shared Vision
Retreat Center on Murphey School Road.
2. PUBLIC INVOLVEMENT PROGRAM
Mission /Scope: The Quarterly Public Hearing public involvement process shall be
consistent with North Carolina State Statutes and UDO requirements.
a. Planning Board Review:
February 1, 2012 (preview of item)
March 7, 2012 (recommendation)
May 2, 2012
b. Advisory Boards:
Written Update to Economic
Development Commission
(when organized)
c. Local Government Review:
City of Durham
(Ongoing)
d. Notice Requirements
In accordance with NCGS
e. Outreach:
® General Public: February 22, 2012 and April 25, 2012 at Shared Vision
Retreat Center
® Small Area Plan Workgroup: Send note to past SAP participants living or
owning property in the affected area.
❑ Other: 'ilet, :4: here c tttc texi.
3. FISCAL IMPACT
Orange County has committed utility investment in these areas to assist in economic
development infrastructure. These amendments advance and support public
investment.
D. AMENDMENT IMPLICATIONS
4
Amend Orange County /City of Durham Utility Services Agreement to comport with new
Land Use and Zoning Boundary. Continue to analyze Eno EDD SAP and amend as
necessary to create a comprehensive program of development and environmental
compatibility.
E. SPECIFIC AMENDMENT LANGUAGE
Primary Staff Contact:
Craig N. Benedict
Planning & Inspections
919- 245 -2585
cbenedict @co. orange.nc. us
ENO EDD AREA
LAND USE AND ZONING AMENDMENTS
Land Use, Transportation and Environmental Analysis
HISTORY
ATTACHMENT 4
The majority of the area bounded by the NCRR Railway and 1-85 and west has been
designated as an urban growth area since 1981 because of its proximity to
transportation (Interstate, US Highway and Rail), adjacency to an urban area such as
the City of Durham which can provide urban services such as water and sewer.
This pattern of growth was reconfirmed in the 1988 land use plan and economic
development land use and zoning amendments for the majority of the area in 1994.
The majority of these areas were designated for non- residential commercial office and
industrial uses although limited higher urban density housing is also permitted.
In the late 90's (1994 -96) the Stoney Creek Basin Small Area Plan added certain
additional lands to the west and southwest of the urban area for higher intensity and
intermediate intensity. Only the higher intensity area is partially included in these
amendment areas.
JUSTIFICATION
The analysis within the ENO SAP (which is on the County's Planning website) explains
and supports the importance of this general area for higher intensity activity while
preserving environmental and cultural resources of the Eno River to the north and
Stoney Creek Basin to the west. The advent of public sewer will lessen the potential for
septic systems to create nutrient runoff. In addition, Orange County has improved its
floodplain regulations and stormwater techniques to further the protection of the Lower
Eno Watershed which supports City of Durham's water supply.
A7 -TAc- vt m,-;v r �'
Eno Economic Development District (EDD)
Neighborhood information Meeting
February 25, 2012
Citizen Comments
1. Stoney Creek Basin EDE -1 vs. EDE -2
The EDE -2 is suggested by staff because of the frontage along 1 -85 and its relative
isolation between the interstate, Mt. Herman Church Road, railroad tracks, and high
voltage primary electric transmission lines. The opposite side (east) of the road is
also presently EDE -2. Also to the east is Existing Commercial zoning (EC -5).
2. Resource Protection Areas (RPA)
RPAs are a layer of the land use plan and are still operational in the Unified
Development Ordinance (UDO) to protect environmental areas (i.e. stream buffers,
steep slopes, etc.).
3. What is light industrial; compare Orange County and Durham County?
The uses were discussed during the Eno EDD SAP meetings and comparability was
achieved. Uses are not of the higher impact industrial. List of specific uses were
added to webpage.
4. Why now public utilities?
This area has been noted as an urban growth land use since 1981 and reconfirmed in
1994 and 2008. Recommendations in the Eno Small Area Plan suggested an
agreement with the City of Durham which was accomplished in January 2012. Orange
County is facilitating the proposed land use pattern since any one small or large
business could not afford to build infrastructure. Job growth is more important than
ever in designated areas. 84% of the county is rural and only 16% including cities and
along interstates is designated as Urban.
5. Annexation
These land use and zoning amendments do not create annexation programs. If a
new business or resident wants public water and sewer, they will sign a voluntary
annexation form and if the City of Durham decides the petition meets state law and is
fiscally feasible then it may be annexed. (See annexation monograph from City of
Durham)
6. Why are there two plans Orange County and City of Durham?
There are two land use plans (Orange County and City of Durham) and one zoning
plan (only Orange County). The area is within Orange County which has a land use
and zoning program. If a city also has an area of county within its future urban growth
boundary (UGB) then they also have a future land use plan map. Land use
comparability is key in these urban but non - extraterritorial jurisdictions (non -ETJ).
7. Mobile Home Parks
The northern mobile home park is being rezoned to EDE -2 which has frontage on 1 -85.
The southern mobile home park will remain Planned Development HR 4 zoning since
its approval contains special `Planned Development' conditions until such time a
different project is proposed. The future land use and existing zoning would allow
residential to remain and /or be upgraded.
17
NOTICE OF NEIGHBORHOOD INFORMATION MEETING AND PUBLIC HEARING
Comprehensive Plan Amendments and
Zoning Atlas (Map) Amendments
Orange County DURHAM City of Durham
Planning and Inspections Department r City-County Planning Department
131 W. Margaret Lane I Suite 201 t 1 ;; 101 City Hall Plaza I Durham, NC 27701
P O Box 8181 1 Hillsborough, NC 27278 1 -° 919.560.4137 1 f 919.560.4641
(919) 245-2575 1 f(919)644-3002 ,o 1 8 6 9 www.durhamnc.gov
,,, ¢,to�
www.co.orange.nc.us '111 Of Kclic NE
April 13, 2012
`UPDATE m This letter reflects community and elected officials interest to
reengage the public regarding land use and zoning changes in your area based
on the prior meetings of February 22, 2012 and February 27, 2012.
Dear Property Owner:
This letter is to notify you of two NEW upcoming events pertaining to proposed changes
to the Orange County Comprehensive Plan Land Use Element Map and Zoning Atlas
(Map), and the Durham Future Land Use Map in the area near the Interstate 85/US
Highway 70 interchange in eastern Orange County. Your property is within the area
impacted by one of these proposed changes. The proposed changes, summarized
below, are intended to support the goals and objectives of the Orange County Board of
Commissioners and the Durham City Council with consideration of community input.
Information and
Neighborhood Information Meeting Map Sent
The first new event is a neighborhood information meeting to readdress comments,
learn about and provide input on proposed land use and zoning map changes for the
area. The meeting will be jointly hosted by the Orange County Planning and
Inspections Department and the Durham City-County Planning Department and i take
place on Wednesday, April 25, 2012 at 6:00 pm at the Murphey School (3717
Murphey School Rd., Durham, NC 27705). Interested persons are encouraged to attend
this neighborhood meeting to learn more about this proposal and/or amendments to the
original proposal. A map of the area to be addressed is included.
Community and public hearing comments will also be discussed and evaluated at this
meeting.
Orange County Joint Public Hearing
The second new event is a Joint Public Hearing of the Orange County Board of
Commissioners and Orange County Planning Board on the proposed changes on
Tuesday, May 29, 2012 at 7:00 p.m. at the Department of Social Services, located at
113 Mayo Street (Hillsborough Commons Shopping Center) in Hillsborough, North
Carolina. Interested persons are invited to address the boards with their comments
regarding the proposed land use and zoning map changes at this Joint Public Hearing.
Page 1 of 3
Summary of proposed Zoning Atlas (Map) Amendments
Orange County is proposing Zoning Atlas Amendments that are compatible with the
proposed Land Use Element Map Amendments. Reference the table below and the
attached maps to see the proposed changes.
Existing
Pro used
Acreage
R -1 Rural Residential)'
EDE -1 Economic Development Eno Lower Intensity)
205 ac.
R -1 Rural Residential
EDE -1 Economic Development Eno Lower -Intensity)
50 ac. (ROW)
R -1 Rural Residential
EDE -2 Economic Development Eno Higher Intensity)
74.3 ac.
R -1 Rural Residential
EDE -2 (Economic Development Eno Higher Intensity)
17 ac. (ROW)
EC-5 (Existing m
Comercial
EDE -2 Economic Development Eno Higher Intensity)
4.2 ac. (ROM
Public Interest District
EDE -2 Economic Development Eno Higher Intensity)
0.6 ac. (ROW)
One parcel located in Stoney Creek Basin Overlay
2 Three parcels located in Stoney Creek Basin Overlay
Total: 35.11
acres
The City of Durham does not have zoning jurisdiction in this area. Therefore, there are
no zoning changes to be made for the City of Durham.
Changes from original proposals are anticipated
Community input to date has prompted reanalysis of the amendments to add clarity and
increase the specificity of future uses. The new proposals will be discussed.
More Information
Maps and other information regarding the proposed Land Use Element map and zoning
changes can be viewed at the following website after Tuesday, May 17, 2012:
http: / /www.co.orange.ne.us /planning /SpecialProject.asp
If you cannot attend the Joint Public Hearing and the website does not answer your
questions about the proposed land use and zoning map changes, you may call the
Orange County Planning and Inspections Department at (919) 245 -2575 during regular
business hours and you will be directed to a staff person who can assist you.
Sincerely,
Craig N. Benedict, AICP Hannah Jacobson
Orange County Planning Director Durham City - County Planning Department
Page 3 of 3
19
Eno EDD Area ® Current and Proposed Zoning
MYRr«,� 70 f a z
NO
y
U� q -
,o o
CURT/s ��RD C�6 _ O
eA TREE 70 us
1��GK,Q :z
oto a y' 1TRL R o�D SB• .UGM �
N�10 m
Z �
W G
Lower-- rotected D
J 9
N1t 0
Proposed Changes ®Durham Urban Growth Area ! AR PDHR4 pPSCHA�L�
®R1 to EDE-1 (- City Limits EC5 PID N h=1,300 feet
I
®R1 to EDE-2 ETJ EDE-1 R1 300 60
Watersheds
EDE-2 R2
Major Transportation Corridor Orange County Planning and Inspections Department
„„__. � p GIS Map Prepared by Man Carson.4/13/2012
20 A l�nllc;-lrvi&v a 1711
Stoney Creek Basin
Planning Area
T .
JI&
LIT
��.
S
Old NC
,�• � � ; /�' �Y;:y :tip � `=- '_ \\...
(,I
1`r < r !
�if1 C`I�VI fN% '/� 21
Stoney Creek Basin
Plannin g Area
( enlarged Eastern Area )
!� 1 t yy j+ j •
r1 -k
• r
.. r
1 }.. 8. !t +e x111 • rt � 1�
r I'a ii ti •LII•_•1 eYs e}t � .IS :<<iA4 ".; '� �, t,•
At
J1
F o *a t'1 tp r s
� a
e f'
x
,1
t m 4.j a �
4TTr1,rk1M' -1V i Ie„
Land Use Intensity Categories
A. Higher Intensity Areas
These areas are generally synonymous with the
ten and twenty year transition areas. in the
existing Land Use Plan (adopted 1981, amended
1988) or they are adjacent to areas proposed for
future development on an urban scale. At some
future date, they will most likely be incorporated
into the municipalities of Hillsborough and
Durham through the annexation process. A mix
of land uses is possible in these areas and they
will be served by water and sewer. They could
be viewed as "receiving areas" for lower density
areas to the south.
B. Goals
1. Preserve landowners' rights to get fair value
for the property; and
2. Protects the area's "rural character ".
Economic Development Eno Lower Intensity (EDE -1)
EDE -1 Allows:
Finance
Government
Residential (Urban)
Services * (Office)
Transportation
Miscellaneous
EDE -1 Doesn't Allow:
Agricultural
Commercial /Retail
Construction
Manufacturing, Assembly & Processing
Recreation
Wholesale Trade
Economic Development Eno Higher Intensity (EDE -2)
(Existing and proposed primarily along 1 -85 and US 70)
EDE -2 Allows:
Agricultural
Construction
Finance
Government
Manufacturing, Assembly & Processing
Commercial/Retail
Services
Transportation
Wholesale Trade
EDE -2 Doesn't Allow:
Recreation (New /Outdoor)
Residential (New - except by conditional use rezoning)
A Special Class A
B Special Class B
C# Conditions
Source: Orange County Planning - February 2012
Comparison Table of Land Use Element /Map
Orange County vs. Durham City - County
Orange County
Durham City -County
10- year Transition:
Zoning Districts:
Density:
Residential:
Zoning Districts:
Density:
Lands located in areas that are in the
* R1
* 1 DU /acre
Land designated for buildings
* RS-20
e 2 DU /acre
process of changing from rural to
* R2
e 2 DU /acre
consisting only of dwelling units.
* RS -10
e 3 DU /acre
urban densities and /or intensities,
* R3
* 2.9 DU /acre
a Very Low Density (2 DU /acre)
* RS -8
* 5 DU /acre
that are suitable for higher
* R4
* 4.3 DU /acre
a Low Density (4 DU /acre)
* RS -5
a 8 -10 DU /acre
densities /intensities and could be
* R5
* 5.8 DU /acre
provided with public utilities and
* Rg
* 8.7 DU /acre
services within the first 10 -year
phase of the Plan update or where
* R13
* 14.5 DU /acre
such utilities are services are already
present or planned. Non - residential
uses implemented in accordance
with small area plans and /or overlay
*Information from
* Information from Durham
districts may be appropriate.
*Information from 2030
*Information from
*Information from Durham Comprehensive
Durham Unified
Development
tined Development
Ordinance, Article 6.3
*Information from 2030 Comprehensive Plan,
Comprehensive Plan,
Appendix F: Land Use
Orange County LIDO,
Article 3
Plan, Chapter 2, Land Use Element,
Ordinance, Article 4.2.2,
Residential Suburban
Chapter 5: Land Use Element, Section 5.3, pg
and Zoning Matrix, pg. F-
Development 2 -18 & 19; Chapter
P pg 18
Residential Suburban
Development
5-15,
3
Appendices, pg. 8-12
Density
Economic Development:
Zoning Districts:
Density:
Industrial:
Zoning Districts:
Density:
Land in transition areas of the
* EDC -1
* No requirement.
The manufacture, production, and
a Industrial
* 30,000/ sq. ft.
County which has been specifically
* EDE -2
Density based
processing of consumer goods.
a Industrial Light
* 25,000/ sq. ft.
targeted for economic development
compliance with
Industrial is often divided into
activity consisting of light industrial,
site ratio
"heavy industrial' uses, such as
distribution, office, service /retail
requirements.
construction yards, quarrying, and
uses and flex space (typically one
* Open space,
factories; and "light industrial'
story building designed, constructed,
floor area,
uses, such as research and
and marketed as suitable for use as
ped /landscaping
development and less intensive
offices but able to accommodate
warehousing and manufacturing.
other uses such as a warehouse,
showroom, manufacturing,
assembly, or similar operations).
Such areas are located adjacent to
interstate and major arterial
highways, and subject to special
*Information from 2030
*Information from
*Information from Durham
design criteria and performance
Comprehensive Plan,
Durham Unified
Unified Development
standards.
Appendix F: Land Use
*Information from Durham Comprehensive
Development
P
Ordinance, Article 6.10,
*Information from 2030 Comprehensive Plan,
and Zoning Matrix, pg. F-
3
* Information from
Orange County LIDO,
Plan, Chapter 2, Land Use Element,
P
Development Teir, pg 2 -18 & 19; Chapter 18
Ordinance, Article 4.3.6
Nonresidential District
Development Intensity
Chapter 5: Land Use Element, Section 5.3, pg
Article 3
Appendices, pg. 8 -18
and 4.33,
Nonresidential District
5 -16.
S
N,
Z
v1
C
7
25
Laridscape Comparison within ENO E ® ditty-
Per-Section 6.6.12 of the UDO
Light Industrial/M f t 6. ri Use-----j f
GROUCH0.99
ft
,.
#
Af
Government 's.
Land Use,
Building Parking t/►
p r�
Light Industrial
ef
or t
Manufacturing 1 space for every
40,ft employee on Residential
shift of maximum Land Use
employment }
(Section 6.9.7)
, r
Protected Watershed
EDE-�
20 ft'(minimum�required,for�undeve lope drparcel) p
f y %sue 11 10
+
Undeveloped Parcel .
i
y -
-�
Data shown on this map is obtained from Orange County
GIS and is for reference only.
Exact locations and boundaries should be verified.
Map prepared by Orange County Planning&Inspections.
USGS Water Feature M Parcels Zoning D 100 YR Floodplain(Effective 02/02/07) z' N
Soils Survey Water Feature d..J Township 0 City Limits W. . Floodway(Effective 02/02/07)
M OC Updated Water Feature School System Boundary 0 ETJ 500 YR Floodplain(Effective 02/02/07)
Water Body Contours Conservation Easements O Buildings
Held b Others 1 inch=so feet
[ _1 y River Basins L=�County Boundary In Water and Sewer Boundary
®Watershed >:°„Soils Orange County 0 30 so 120eet
Conservation Easements