Loading...
HomeMy WebLinkAboutAgenda - 02-27-2012-C10ORANGE COUNTY BOARD OF COMMISSIONERS AND PLANNING BOARD QUARTERLY PUBLIC HEARING ACTION AGENDA ITEM ABSTRACT Meeting Date: February 27, 2012 SUBJECT: Master Telecommunication Plan Map Modification DEPARTMENT: Planning and Inspections ATTACHMENT: 1. UDO Outline Form (UDO /Zoning 2012- 09) — Master Telecommunications Plan Map 2. Proposed Master Telecommunication Plan Map Action Agenda Item No. C -10 PUBLIC HEARING: (YIN) Yes INFORMATION CONTACT: Glenn Bowles, Planner II 245 -2577 Craig Benedict, Director 2462592 PURPOSE: To hold a public hearing to receive comment on the proposed modifications to the Master Telecommunication Plan Map (hereafter the "Plan "). BACKGROUND: The BOCC approved the initial Plan on May 17, 2011 along with a resolution establishing application procedures for the location of cell towers on County properties. This proposal seeks to modify the Plan by adding four new sites (P -9, P -10, P -12 and P -15 as shown in yellow on Attachment 2). The owners of the Scott property had petitioned the BOCC at the February 2011 Quarterly Public Hearing to be included on the map. On February 1, 2011, the OWASA Executive Director, Ed Kerwin, sent a signed letter of interest to be included in the Plan. A Cane Creek Reservoir site was first included, and now the OWASA American Stone Quarry site is submitted for inclusion. Please refer to Attachment 1 for additional background detail on this item. FINANCIAL IMPACT: Please refer to Section C.3 of Attachment 1. RECOMMENDATIONS: The Planning Director recommends that the Board: 1. Receive this abstract. 2. Conduct a Public Hearing and accept all public and BOCC comments on the subject. 3. Adjourn the public hearing until March 22, 2012 where final action on the proposal shall be taken by the BOCC. 2 Attachment 1 COMPREHENSIVE PLAN / FUTURE LAND USE MAP AND UNIFIED DEVELOPMENT ORDINANCE (UDO) AMENDMENT OUTLINE UDO / Zoning- 2012 -09 Master Telecommunications Plan Map A. AMENDMENT TYPE Map Amendments ❑ Land Use Element Map: From: To: ❑ Zoning Map: From: To: ® Other: Addition of 4 new telecommunication tower sites to the adopted Master Telecommunications Plan Map per Section 5.10.2 of the UDO Text Amendments ❑ Comprehensive Plan Text: Section(s): ❑ UDO Text: ❑UDO General Text Changes ❑UDO Development Standards ❑UDO Development Approval Processes Section(s): ❑ Other: 1. Purpose /Mission As has been stated previously to the BOCC, portions of the County are either not served, or are underserved, by telecommunication services. This has become an impediment to essential County communications for several departments (i.e. Emergency Management, Sheriff, Information Technologies, Building Inspections, Health Department, etc.), is a detriment to economic development, and has 1 3 4 negatively impacted local residents. Section 5.10.2 of the UDO enables Orange County to develop and adopt a Master Telecommunications Plan Map (hereafter 'Plan') in an effort to address these deficiencies. The purpose of the Plan is to display properties where owners have expressed, interest in allowing wireless telecommunication facilities to be constructed. The BOCC first reviewed the Plan at its February 29, 2011 Joint Quarterly Public Hearing and adopted it subsequently. According to Sub - section 5.10.2(D)(2) of the UDO, additions or modifications to the Plan are reviewed annually, as warranted, by the BOCC at the February Quarterly Public Hearing. Applications to add to withdraw from or otherwise modify the Plan are required to be filed with the Planning Director prior to December 1St of each year. The need for public safety, wireless broadband, and information technology connectivity continues to be in high demand. Adoption, or subsequent modification, of the Plan does not include approval of a specific cell tower development project. Rather, the Plan in conjunction with the guidelines found in Section 5.10.6 of the UDO provides an administrative mechanism to encourage cell tower providers to work as partners to improve broadband and emergency service in the rural portions of the County. Telecommunication support structures are still required to adhere to the various development standards detailed within Section 5.10.8 of the UDO. This includes adherence to the following requirements: a. Development of a site plan denoting the location of the proposed tower, setback distances, fall zone requirements, etc, b. A landscape plan denoting the planting of require foliage for the tower, c. Draft bond agreements for the project, d. Data concerning possible environmental impact, and e. All other required documentation detailed within the UDO. Further, all telecommunication support structures located on County property are required to adhere to initial notification and testing requirements, including the holding of a properly advertised balloon test, the completion of an Environmental Assessment, and the holding of a neighborhood information meeting to inform local residents of the pending application. 2. Analysis The Plan essentially serves as a marketing tool to allow the County to provide some direction on where available properties, suitable for the development of wireless support structures, are located. Available properties include those where existing property owners have expressed formal, written, interest in allowing for the development of a wireless support structure. 2 It should be remembered that the proposed modification of the Plan does not create an automatic exemption for the various denoted properties from the review and approval processes as prescribed by the UDO with respect to the development of wireless support structures. Based on reports, certain areas show coverage weaknesses and other areas with coverage often have capacity issues. 3. Comprehensive Plan Linkage (i.e. Principles, Goals and Objectives) Economic Development Goal 2: Infrastructure that supports desired development Objective ED -2.11: Establish adequate information networks throughout the towns and County. Services and Community Facilities Goal 7: Efficient and effective public safety including, police, fire, telecommunications, emergency services, and animal services. Objective PS -T -6: Develop a mechanism for cooperation with telecommunication facilities stakeholders regarding the siting and design of towers. Objective PS -T -7: Manage the number of future wireless telecommunication facilities by identifying preferred locations capable of accommodating service Countywide. Objective PS -T -6: Encourage the expansion of affordable, high -speed internet access, fiber - optic lines, and other high -speed communication networks to rural and underserved areas. Objective PS -9: Maintain a radio communication system that ensures reliable notification and oversight of emergency assets, such as personnel vehicles, and response equipment throughout Orange County and inter - operability of communication among jurisdictions. 4. New Statutes and Rules Not applicable. C. PROCESS 1. TIMEFRAME /MILESTONES /DEADLINES a. BOCC Authorization to Proceed November 15, 2012 b. Quarterly Public Hearing February 27, 2011 c. BOCC Updates /Checkpoints February Quarterly Public Hearing legal ad approved on February 7, 2012. d. Other Requests for modifications by staff received on or before December 1, 2011 2. PUBLIC INVOLVEMENT PROGRAM 3 5 Iq Mission /Scope: Public Hearing process consistent with NC State Statutes and Orange County ordinance requirements.. a. Planning Board Review: The Planning Board is not directed to review the MTP. b. Advisory Boards: Not applicable c. Local Government Review: Not applicable d. Notice Requirements None related to the review and modification to the MTP. e. Outreach: ❑ General Public: ❑ Small Area Plan Workgroup: ❑ Other: 3. FISCAL IMPACT Expenditures for this project will be paid using Departmental funds budgeted for the specific activity. Expenditures include the legal advertisement of the public hearing. Existing Planning staff included in the Departmental staffing budget will accomplish the work required to process this amendment. It should be noted that Orange County may receive co- location rents from private broadband access providers if facilities are located on County owned properties. Building tower facilities, with public communication technologies, on County or other similar quasi - public properties (i.e. OWASA sites, fire stations, etc.) will forego the need for providers to purchase additional private property to accomplish the same task. D. AMENDMENT IMPLICATIONS The MTP will be updated with a listing of additional properties that are available for the potential location of wireless telecommunication facilities to address under- and un- served portions of Orange County. n E. SPECIFIC AMENDMENT LANGUAGE There is no specific amendment language required. Please refer to the Attachment 2 denoting the proposed amendments to the Plan. Primary Staff Contact: Glenn R. Bowles, Planner II Planning and Inspections Department 919 245 2577 gbowles @co.orange.nc.us 5 7 8 _ Telecommunication Plan Map sites Attachment 2 9 ------------------------------------- I (E-1) ------------------ I Piedmont Electric Tower 4 I (P-2)Cedar j (P-1)Cedar 49 Grove Park j Grove Fire Department 157 (P-3)Caldwell Fire Department j j I j (P-4) Future Northeast (P-15)Scott Property Park I 57 I I (P-7)Buck horn Road ss (P-5)Walnut ; Grove SW Site I j �j (P-6)Eno Fire and (E-2) Emergency Services - 70 Occoneechee Tower � 1 1 ®®° (E-3) 1 j EMS Tower I 1 j (P-8)Countyj— Soccer Fields (E-4) j j Piedmont Electric j Tower (P-9)County Park Site (P-11) I ID X Y OWASA Property j 'y -2 79°7'19.17"W 36°3'42.86" N E 3 79°4'22.80"W 36°3'36.50"N (P-10)County Park Site E-4 79°4'42.51"W 36°2'43.20"N 't P-1 79°12'29.57"W 36°10'58.27"N Ij 501 —— j 86 15 j P-2 79°8'25.44"W 36°10'45.37"N P-3 79°0'53.63"W 36°11'14.82"N I j j (P-12) P-4 79°3'4.87"W 36'8'53.54"N on American St on 54 Amerie j j ' P-5 79°T 6.63"W 36°8'36.48"N I Quarry(OWASA) j P-6 79°0'14.49"W 36°6'53.57"N _ I '� 54 P-7 79°13'32.98"W 36°4'54.21"N 1 P-8 7, 1 4$,9j," t j P 9 79°4'54.48"W 36°1'4.18"N.. 501 j P 10 79°4'53.82"W 35°58'41.90"N — — j ----- 15 j P, (P-13)White -- _ P-12 79°9'l.82"W 35°55'56.00"N .-____ _ Cross Fire — ----------- Department (P-14)Mellot Property P-14 79°1'20.97"W 35'52'2L47"N P-15 79°10'56.31"W 36'7'41.49"N Existing Tower Locations 4..r,, N °•• 1 inch=3.2 miles O Proposed Tower Locations ° y 0 1 2 3 Approved Tower Locations c Miles 2 Mile Buffer Orange County Planning and Inspections Department GIS Map Prepared by Brian Carson.2/10/2012 i i r t I {