Loading...
HomeMy WebLinkAboutAgenda - 02-27-2012 - C1 1 ORANGE COUNTY BOARD OF COMMISSIONERS AND PLANNING BOARD QUARTERLY PUBLIC HEARING ACTION AGENDA ITEM ABSTRACT Meeting Date: February 27, 2012 Action Agenda Item No. C-1 SUBJECT: Text Amendment to the Unified Development Ordinance: Rural Economic Development (UDO/Zoning -2012-06) DEPARTMENT: Planning and Inspections PUBLIC HEARING: (YIN) Yes ATTACHMENTS: INFORMATION CONTACT: 1. Comprehensive Plan/Land Use Element Glenn Bowles — Planner II, 245-2577 Map and Unified Development Ordinance Michael Harvey, Planner 111 245 2597 (UDO) Amendment Outline Form Craig Benedict— Planner Director, 245-2592 (UDO/Zoning-2011-06) 2. LIDO Text Amendments Educational Material 3. Alternatives to REDA Matrix PURPOSE: To hold a public hearing on Planning Director initiated text amendments to the Unified Development Ordinance (UDO) regarding the establishment of the NC Highway 57 Speedway Area Rural Economic Development Area Conditional Zoning (REDA-CZ-1) District. BACKGROUND: Please refer to Sections B and C2 of Attachment 1. FINANCIAL IMPACT: See Section C.3 in Attachment 1. RECOMMENDATION: The Planning Director recommends the Board: 1. Receive the proposed amendments to the Unified Development Ordinance as detailed in this abstract and attachments. 2. Conduct the public hearing and accept public, BOCC, and Planning Board comment on the proposed amendments. 3. Refer the matter to the Planning Board with a request that a recommendation be returned to the BOCC in time for the May 1, 2012 BOCC regular meeting. 4. Adjourn the public hearing until May 1, 2012 in order to receive and accept the Planning Board's recommendation and any submitted written comments. 2 � ' Attachment 1 3 COMPREHENSIVE PLAN/LAND USE ELEMENT MAP AND UNIFIED DEVELOPMENT ORDINANCE (UDO) AMENDMENT OUTLINE UDO/Zoning-2012-06 NC Highway 57 Rural Economic Development Area (REDA) Conditional Zoning District A. AMENDMENT.TYPE Map Amendments ❑ Land Use Element Map: From: To: ❑ Zoning Map: From: To: ❑ Other: Text Amendments ❑ Comprehensive Plan Text: ® U DO Text: ®UDO General Text Changes ®UDO Development Standards ❑UDO Development Approval Processes Sections: Section 3.8.3 — Districts Established— NC Highway 57 REDA. This amendment will create a new zoning district, specifically the NC Highway 57 Speedway Area Rural Economic Development Area Conditional Zoning (REDA-CZ-1), and a NC Highway 57 Speedway Area Rural Economic Development Area Condition Zoning (REDA- CZ-1) chart with a map. Article 5 — Uses. This amendment will create another column (REDA-CZ-1) in Section 5.2.3 Table of Permitted Uses. Section 5.7 Standards for Recreational Uses, this amendment will create a new Sub-section 5.7.5 Race Track (Motorized, etc.) and Go- t 4 Kart Track Facilities. F] Other: B. RATIONALE 1. Purpose/Mission In accordance with the provisions of Section 2.8 Zoning Atlas and Unified Development Ordinance Amendments of the UDO, the Planning Director has initiated an amendment to the UDO to establish a new conditional zoning district — NC Highway 57 Speedway Area Rural Economic Development Area (REDA-CZ-1). The REDA concept was first advocated in the NC Highway 57 Speedway Area Small Area Plan as an alternative to traditional zoning. The BOCC adopted the Small Area Plan Report on August 21, 2007. The Plan stated that: certain unique circumstances that arise when a general zoning district designation would not be appropriate for a certain property, but a specific use permitted under the district would be consistent with the policies of this ordinance. The conditional use process can accommodate these unique situations... Using the conditional district approach, the BOCC could allow some commercial ventures to occur in the rural parts of the county, based on the suitability of the use to the particular community.' The proposed text amendments would develop the necessary assurances for compatibility with the Comprehensive Plan and the requisite small area plan. While the initiative comes from the NC Highway 57 Small Area Plan, additional REDA conditional zoning districts could be adopted in the future for specific geographic areas within the rural portions of the county where a small area plan, enacted and adopted by the BOCC, are in effect. 2. Analysis Planning staff has been charged with bringing UDO amendments forward, which will implement adopted small area plans. These proposed UDO text amendments are derived from the recommendations of the NC Highway 57 Speedway Area Small Area Plan. Planning staff suggests that the amendment is appropriate to allow additional non-residential development and necessary to address existing zoning non-residential, non-conformiting uses within Rural Economic Development Area identified in the aforementioned plan. This is all being done within the context of the stated Planning Principles of the NC Highway 57 Speedway Area Small Area Plan to: 1. Preserve and protect the rural character and nature of the area, 2. Minimize negative impacts to natural systems/environmentally sensitive areas, 3. Restrict growth and development so that it complements the rural character and 2 5 lifestyles; and 4. Maintain present service levels for existing infrastructure. 3. Comprehensive Plan Linkage (i.e. Principles, Goals and Objectives) The Orange County 2030 Comprehensive Plan creates a mechanism through a small area planning process to update and re-evaluate the document. Several adopted small area plans have been adopted by the BOCC, including: 1. The 1991 Efland Area Study, 2. Stoney Creek Basin Small Area Plan, 3. Efland-Mebane Small Area Plan, and 4. NC Highway 57 Speedway Area Small Area Plan. Small area plans allow the goals and objectives of the Comprehensive Plan to be focused on a specific area or neighborhood. This process provides a foundation for improving the Comprehensive Plan to facilitate needed changes, such as with the NC Highway 57 Speedway Area Small Area Plan report putting forth the construct of Rural Economic Development Area conditional zoning. Land Use Overarching Goal: Coordination of the amount, location, pattern and designation of future land uses, with availability of County services and facilities sufficient to meet the needs of Orange County's population and economy consistent with other Comprehensive Plan element goals and objectives. Land Use Goal 1: Fiscally and environmentally responsible, sustainable growth, consistent with the provision of adequate services and facilities and a high quality of life. ObLective LU-1.1: Coordinate the location of higher intensity/ high density residential and non-residential development with existing or planned locations of public transportation, commercial and community services, and adequate supporting infrastructure (i.e., water and sewer, high-speed internet access, streets, and sidewalks), while avoiding areas with protected natural and cultural resources. This could be achieved by increasing allowable densities and creating new mixed-use zoning districts where adequate public services are available. Land Use Goal 2: Land uses that are appropriate to on-site environmental conditions and features, and that protect natural resources, cultural resources, and community character. Objective LU 2.4: Evaluate the development potential in rural crossroads communities to identify whether current regulations permit appropriate development that is in character with these communities, and whether potential development in these areas would require significant expansions or cause depletions of public services. 3 6 - Economic Development Goal 2: Infrastructure that supports desired development. Objective ED-25: Identify lands suitable to accommodate the expansion and growth of commercial and industrial uses in the County. Objective ED-2.7: Select industrial sites in Economic Development Areas based on present and planned supporting systems, such as public water and sewer, access to adequate highway, rail, or public transportation infrastructures, and minimize detrimental environmental or negative social outcomes. Transportation Goal 3: Integrated land use planning and transportation planning that serves existing development, supports future development, and is consistent with the County's land use plans which include provisions for preserving the natural environment and community character. NC Highway 57 Speedway Area Small Area Plan To evaluate the Small Area Plan with the context of the overall County Comprehensive Plan, Planning Principles were established within the report to include: 1. Preservation and protection of the rural character and nature of the area, 2. Minimization of negative impacts to natural systems/environmentally sensitive areas, 3. Restrict growth and development so that it complements the rural character and lifestyles, and 4. Maintenance of present service levels for existing infrastructure. The following Goals were put forward to implement these Planning Principles: 1. The Study Area is located in a rural portion of the County where local residents have chosen to reside in an effort to escape the congestion and hectic pace of urban areas. Any additional development within the area shall augment or enhance, rather than detract from, the rural character and nature of the area. 2. The Study Area represents a 'gateway' into the County that establishes an entry corridor where travelers form opinions as to the quality of life within the area as a whole. To that end, steps should be taken to address design elements within the Study Area to aesthetically enhance this entranceway into Orange County. 3. The lack of reliable, consistent potable water supplies and poor soil conditions for septic drain fields limit development opportunities within the Study Area. Future development proposals should not adversely impact existing groundwater supplies and should be reviewed and approved with this factor in mind. 4. Stormwater runoff shall be maintained on site in conformity with existing standards and policies regardless of the age or approval date of the project. 5. Air quality issues shall be an intricate part of any future permit reviewed within the Study Area. 6. Existing non-residential, non-conforming land uses should be made into 4 7 conforming uses of property through amendments to the Zoning Ordinance and Comprehensive Plan and should then be brought into compliance with existing, or proposed, development criteria to address off-site impacts. 7. With respect to the quarry operation, the land use is already considered to be a conforming use of property, as per Section 11.6 of the Zoning Ordinance. The Task Force believes that the County should take appropriate action to address the off-site impacts of the quarry while limiting the potential for operational expansion beyond what is described in the existing end use plan. Further, the end use plan for the stone quarry calls for a 100-acre reservoir and outdoor recreational activities on both the Durham and Orange County portions of the property. The time horizon for the development of such a public asset is twenty to fifty years off, depending on aggregate rock market conditions. The creation of additional parkland within the Study Area shall be encouraged. 8. Each existing non-residential land use should be held to specific development/re-development criteria if they choose to take advantage of the sanctioned approval process for becoming conforming land uses. Any improvements to the existing raceway facilities or the stone quarry site should take the existing community character and form into consideration. 9. Infrastructure management is an important component to allowing for additional development within the Study Area. No new development should be allowed that negatively impacts existing infrastructure (i.e. groundwater, traffic generation, etc) unless an appropriate and viable solution has been approved by the County to mitigate these conditions. 4. New Statutes and Rules Not applicable. C. PROCESS 1. TIMEFRAME/MILESTONES/DEADLINES a. BOCC Authorization to Proceed November 1, 2011 b. Quarterly Public Hearing February 27, 2012 with referral to the Planning Board and others as applicable c. BOCC Updates/Checkpoints • February 7, 2012 — BOCC approval of Quarterly Public Hearing legal advertisement • May 1, 2012 —Receive Planning Board recommendation d. Other 5 8 , 2. PUBLIC INVOLVEMENT PROGRAM Mission/Scope: Public Hearing process consistent with North Carolina State Statutes and LIDO Sub-sections 2.8.6 and 2.8.7 requirements. a. Planning Board Review: December 7, 2011 Ordinance Review Committee discussed noise and enforcement of the noise ordinance, and petroleum tanks on the Raceway property, legal non-conformities. Board members requested some clarification on the definition of semi-opaque buffers and questioned the need for military installations. The Board members would like to build on the historic nature of the area and deal with unique commercial enterprises already in existence. Board members present did not express any reservations about moving forward with these amendments March 7, 2012 review and recommendation b. Advisory Boards: An informational meeting with the The group reviewed proposed former NC Highway 57 Speedway Ordinance amendment package and SAP Workgroup was held on felt that it was adequate. November 3, 2011 Presentation at the Durham/Orange/ The map found in the Applicability Chapel Hill Transportation section of the REDA-CZ-1 form was Coordinating Workgroup — December presented with no ensuing 13, 2011. discussion. c. Local Government Review: Durham City County Planning and No comments have been received. Person County as partners in the Small Area Plan process. Ordinance was mailed out during the week of October 25, 2011. Coincidently with County Peer Review. d. Notice requirements Legal ad will be published on February 15 and 22, 2012. e. Outreach: ® General Public: Consistent with North Carolina State Statutes and Orange County ordinance requirements. ® Small Area Plan Workgroup: NC Highway 57 Speedway Area Small Area Plan workgroup on November 3, 2011. ® Other: Development Advisory Committee (DAC) presentation on Nov. 17, 6 - 9 2011 Peer Review, including the County Attorney and Economic Development from October 25 to November 15, 2011. 3. FISCAL IMPACT Consideration and approval will not create the need for additional funding for the provision of County services. Costs for the required legal advertisement will be paid from Fiscal Year 2011-12 Departmental funds budgeted for this purpose. Existing Planning staff included in the Departmental staffing budget will accomplish the work required to process this amendment. D. AMENDMENT INTENDED OUTCOMES The intended outcome is to implement recommendations of the NC Highway 57 Speedway Area Small Area Plan and to achieve the stated purposed and goals of the adopted Small Area Plan. E. SPECIFIC AMENDMENT LANGUAGE Please refer Attachment 2 for UDO text and development standards amendments. Primary Staff Contact: Glenn Bowles, Planner II Planning and Inspections Department 919 245 2577 gbowles @co.orange.nc.us 7 10 11 Attachment 2 lettering denotes additions/modifications to the existing text. Red StFikethr, ugh lettering denotes suggested deletions to the existing text. 3.8.3 Districts Established (A) Conditional Zoning Districts (1) Conditional Zoning (CZ) Districts are floating zoning districts, permitted within most land use designations allowing for the development of specific land uses, in accordance with established standards. (2) A CZ requires the approval of a rezoning by the Board of County Commissioners, approval of a site plan or Master Plan, and may include agreed-upon conditions of development. (3) The following CZ districts are hereby established: (a) Mobile Home Park(MHP-CZ) (b) Master Plan Development(MPD-CZ) (c) NC Highway 57 Speedway Area Rural Economic Development Area (REDA-CZ-1) • I • ��-� � , 1 Tract size, min. (acres) none ' ' ' Tract Front Setback No requirement[1] from ROW, min. (feet) Tract Side Setback, No requirement[1] min. (feet) The purpose of the NC Highway 57 Speedway Area Rural Economic Development Area Conditional Zoning (REDA-CZ-1) District is to encourage additional, compatible, and unique non-residential development opportunities in a predefined area of the County as identified within the adopted NC Highway 57 Small Area Plan. Further,this district is intended to provide existing non-conforming land uses an opportunity to become conforming through a development review process so that property owners can upgrade their existing business to address changing needs while recognizing, and being consistent with, local land use regulations. APPLICABILITY Tract Rear Setback, min. feet No requirement[1] This district shall be located consistent with the parcels designated as "Rural Economic Development Area"within the aforementioned Small Height, max. (feet) No requirement[1] Area Plan, a map of which is provided herein for illustrative purposes only: Tract Floor Area Ratio, No requirement[1] max 12 PeM."CEUrfy � 1 t 4 - I Ftat Rrv�r I Protected q0 c1.Y. ..3ACUr1R9t/'<'DG/J• 4 Qs �Yf 4 +�tii4 Yom' Y Dwnorn Coe ne.' 11 y� A Required Open Space No requirement[1] Ratio, min. Ri Protected i� 7 fB. .:..fit ! e uc. t i t e ••_ DIMENSIONAL STANDARDS NOTES: Required Livability [1] The REDA-CZ-1 district is intended to allow for flexibility in Space Ratio, min. No requirement[1] dimensional standards. The overall development will be evaluated to ensure compatibility with surrounding properties and with the adopted Required Recreation No requirement[1] goal statements, policies, and action statements of the Small Area Space Ratio, min. Plan and with the policies and objectives of this Ordinance. Specific Required Pedestrian/ site design standards shall be incorporated into the Planning Landscape Ratio, min. No requirement[1] Department-approved Site Plan. DA-CZ-1 DISTRICT SPECIFIC DEVELOPMENT STANDARDS 1. Applications for the REDA-CZ-1 district shall be accepted only for parcels delineated as being suitable for non-residential development within the NC Highway 57 Speedway Area Small Area Plan adopted by the BOCC on August 21,2007. 2. Potential uses shall be restricted to those listed as permitted for the REDA-CZ-1 District in Section 5.2.3. 3. Specific uses shall be limited to those approved by the Board of County Commissioners. Additionally, non-residential uses are restricted based on the Watershed Protection Overlay District in which the property is located. Refer to Section 4.2.3 for land use restrictions. 4. Allowable impervious surface area is based on the Watershed Protection Overlay District in which the property is located. Refer to Section 4.2.6 for a breakdown of the allowable impervious surface area. 5. Development within the conditional zoning district shall be subject to all applicable use standards detailed in Articles 5 and 6 of this Ordinance or provide creative alternatives that meet the intent and spirit of the regulations. 6. Applicants shall complete a comprehensive groundwater study to anticipate future usage to determine the appropriateness of a proposed land use. Such a study shall detail how much water is anticipated to be consumed,what amount of groundwater withdrawal is safe and sustainable in the immediate vicinity of the use, and if other wells will be affected by such withdrawals. 7. All new development shall limit groundwater withdrawals to not more than 240 gallons per day per acre. 8. No new development having a significant negative impact on existing roadways, traffic patterns or surface drainage patterns shall be permitted, unless an appropriate and viable solution has been approved to mitigate these conditions. 13 CONDITIONAL EXCERPT FROM TABLE OF PERMITTED USES— DISTRICTS CONDITIONAL PERMITTED USE DISTRICTS USE TYPE . • NOTE:Applications for Conditional Zoning Districts must list specific uses for consideration/approval AGRICULTURAL USES Agricultural Services Uses Commercial Feeder Operation Farm Equipment&Sales Feed, Seed, Storage&Processing Stockyards CHILD CARE&EDUCATIONAL FACILITIES Center in a Residence for 3 to 12 Children Child Care Facilities Libraries Non-Profit Educational Cooperative Schools: Dance,Art&Music Schools: Elementary, Middle&Secondary Schools: Vocational Universities, Colleges& Institutes COMMERCIAL USES Banks&Financial Institutions Beauty&Barber Shops Bed &Breakfast Bed& Breakfast Inn Construction (Sector 23) Contractors, Building&Trade Country Inn Finance& Insurance(Sector 52) Funeral Homes Garden Center(On Premises Sales) Greenhouses(No On Premises Sales) Greenhouses(On Premises Sales) Hotels&Motels Insurance Carriers&Agents Junkyards Kennels, Class I Kennels, Class 11/Riding Stables Laundry&Dry Cleaning Services 14 EkERPT FROMITABLE OF • ® o • D PERMITTED USE CONDITIONAL ZONING DISTRICTS USE TYPE ■ • NOTE:Applications for Conditional Zoning Districts must list specific uses for consideration/approval Management of Companies&Enterprises(Sector 53) Massage, Business of Nightclubs, Bars, Pubs Offices&Personal Services, Class 1 Offices&Personal Services, Class 2 Offices&Personal Services,Class 3 Professional,Scientific&Technical Services(Sector 54) Real Estate Agents&Brokers Repair Service Electronic&Appliance Restaurants: Carry Out Restaurants: Drive In Restaurants: General Retail,Class 1 Retail,Class 2 Retail,Class 3 Storage of Goods, Outdoor Storage or Warehousing: Inside Building Studio(Art) Theater, Indoor or Outdoor(including Drive-ins) Tourist Home Wholesale Trade EXTRACTIVE USES Extraction of Earth Products GOVERNMENTAL USES Governmental Facilities&Office Buildings Governmental Protective Services(Police&Fire Stations)Rescue Squads,Volunteer Fire Departments Military Installations(National Guard&Reserve Armory) Public Administration (Sector 92) MANUFACTURING,PROCESSING&ASSEMBLY Assembly and Packaging Operations Including Mail Order Houses, But Excluding On-Premises Retail Outlets Industrial, Heavy Industrial, Light Industrial, Medium Manufacturing(Sector 31-33) Pharmaceutical Products 15 NOTE:Applications for Conditional Zoning Districts must list specific uses for consideration/approval Printing&Lithography Sawmills MEDICAL USES Animal Hospitals;Veterinarians Health Services: Over 10,000 Sq. Ft. Health Services: Under 10,000 Sq. Ft Hospitals RECREATIONAL USES Arts, Entertainment&Recreation(Sector 71) Botanical Gardens&Arboretums Camp/Retreat Center Golf Driving and Practice Ranges Parks, Public&Non-Profit Recreational Facilities(Non-Profit) Recreational Facilities(Profit) Golf Course Race Track(Motorized, etc.)and Go-Kart Track Facilities) RESIDENTIAL USES Dwelling; Mobile Home Dwelling; Multiple Family Dwelling; Single-Family Dwelling;Two-Family Family Care Home Group Care Facility Rehabilitative Care Facility Residential Hotel(Fraternities,Sororities,and Dormitories) Rooming House TELECOMMUNICATIONS Telecommunication Tower—Stealth(75 feet or shorter) Telecommunication Towers(150 feet in height or shorter) Telecommunication Towers(greater than 150 in height) TEMPORARY USES Buildings, Portable Temporary Mobile Home(Custodial Care) Temporary Mobile Home(Use during construction/installation of permanent residential unit and for 30 days following issuance of Certificate of Occupancy i 16 '• OF�PERMITTEU�'USES-CONDITIONAL ONIN 9 PERMITTED USE CONDITIONAL ZONING USE TYPE NOTE:Applications for Conditional Zoning Districts must list specific uses for consideration/approval AUTOMOTIVEITRANSPORTATION Bus Passenger Shelter Bus Terminals&Garages Motor Freight Terminals Motor Vehicle Maintenance&Repair (Body Shop) Motor Vehicle Repair Garage Motor Vehicle Sales Rental New&Used Motor Vehicle Services Stations Parking As Principle Use, Surface or Structure Petroleum Products: Storage&Distribution Postal&Parcel Delivery Services Utilities Elevated Water Storage Tanks Public Utility Stations&Sub-Stations, Switching Stations, Telephone Exchanges,Water&Sewage Treatment Plants Transmission Lines Water&Sanitary Sewer Pumping WASTE MANAGEMENT Landfills(2 Acres or More) Landfills(Less Than 2 Acres) Waste Management Facility; Hazardous&Toxic MISCELLANEOUS Accessory Uses Airports, General Aviation, Heliports, S.T.O.L. Assembly Facility Greater Than 300 Occupants Assembly Facility Less Than 300 Occupants Cemetery Church Clubs or Lodges; Social; Fraternal or Union Clubhouses Community Center Crematoria(4) Historic Sites Non-Residential/Mixed Use Information (Sector 51) Research Facility Research Lands&Installations, Non-profit 17 5.7.5. Race Track(Motorized, etc.) and Go-Kart Track Facilities (A) A formal site plan shall be submitted showing the current and proposed conditions of the property, including: (1) Existing impervious surface calculations, (2) Location of stormwater retention sites, (3) The location of all structures and their distance from all property lines, (4) The location of the septic field and repair areas, (5)The location of petroleum storage containers and re-fueling areas, (6) The location of all existing vegetation and buffer areas, (7)All parking areas including internal traffic circulation patterns for the property, and (8)All other required information outlined within Section 2.5 of this Ordinance. (B) Prior to any land disturbing activity on the property, including the expansion of any existing uses, the property shall be brought into compliance with Section 6.15 of this Ordinance. (C) A 30-foot wide landscaped buffer shall be installed along the public road frontage according to the provisions of Section 6.8 of this Ordinance to form a semi-opaque intermittent visual buffer. (D) A 200-foot landscape and conservation buffer/easement shall be established along the all other property perimeters. No vegetation within this area shall be disturbed. (E) Existing and proposed signage shall comply with Section 6.12 of this Ordinance. (F) The facility owner shall demonstrate compliance with Section 6.9 of this Ordinance and, specifically, complete the following: (1) Properly define and delineate the parking and travel lanes on the property, and (2). Define and delineate emergency vehicle access points and fire lanes on the property. (G) The facility owner shall work with NCDOT to complete a traffic intersection analysis for access points along any state-maintained road or highway to determine need for access improvements such as left turn lanes or deceleration lanes. (H) The facility owner shall work with NCDOT, the State Highway Patrol, and County officials to address traffic management issues to coordinate acceleration and deceleration lanes at approved entrance and exit points on the property during major events. (I) The facility owner shall work with NCDOT and County officials to post proper signage on the property directing traffic through a one-way ingress and egress location. 18 (J) A litter collection system shall be developed throughout the grounds and at all points of egress. During events facility employees shall remove trash from the receptacles in a timely manner. (K) All vehicles used for racing shall have approved, functional noise mufflers attached at all times; or, in the alternative, a system of noise baffles on the perimeter of the racetrack shall be incorporated into the design and placement of any lighting system and viewing stands. The baffles shall be so constructed as to reduce sustained noise levels at the property lines to a level permitted within the County Noise Ordinance for residential properties. (L) Limits on racing activities shall be such that no race shall extend beyond 11:00 p.m. on Friday and Saturday nights, or beyond 9:00 p.m. on other evenings. Practice activities shall not commence before 10:00 a.m. on any day and shall cease by 9:00 p.m. (M) All external lighting fixtures shall comply with Orange County lighting standards (Section 6.11). (N) No storage of hazardous materials shall be permitted, except for racing fuel and lubricants. Such material storage areas shall be enclosed and posted and the Orange County Fire Marshal shall approve a pollution incident prevention plan for the storage facility prior to final occupancy permits. (0) If additional or accessory land uses are desired, the facility owner shall cause a new site plan to be created outlining the location and nature of the proposed new land use, demonstrating compliance with this Ordinance. (P) The County shall approve a construction schedule to complete the items listed above. Attachment 3 • 19 Ln A 6o N vYi da d a) N Ln L6 C > 7 C > 7 v+'i b E v tw Z U 0 "a 0 c c C C yr + 41 LP >O — Q O > Q E > m a) Ln N m CL N CO Q 0 c N a) 0 c CL 0 CL o CL CL W a o Q Q ° Q M 0 � � 4-- � vi > 4- p w O N w- v o4 o 0 o a, c c c v c ,, v .� = N Lu a) -Q C O N 6o O N Lao L c l6 c L 4110 a � � oQ � _ oQ ° aN a) 0 ° a O N U ° O U L@ u Y T �-' T N (� Q 3 c) O p Q m Ln a U U , � U U 1 ° +3• o c U 4-3 N (3) O ° Q m Q m u , 6 ro m — � O Q m .j z `!- LL Q `!' LL Q — oa) u n. Q � io u Id L L 4� 4� N N p Q n 41 -a 6a 6.a N U m E m m m m -a a) a O a o a o a 3 a C Ln > > > >> > m > Q a CD (D u aa)i u a) cu m 4- c > v � � - � - � � � min c � E a Q Q L L CL Ll Q i1 -'° c v N f6 -� f9 L) N a, Q a a a a v ° a s g w to Q a ®. m n E v v E m E ° a fO E@ m v 'ro E +� o s v o t ° p m a O *' -a N 4- c O O (U c � U 41 +- U 4� +� U a, L U wZ) a, o ° •3 m '3 c a 3 c L — •CL > a m '3 c V � N `� O w `� O a) N 0 LL a) V;.f)o •p A a p U N 60 O ° a) n ° v a s a 0 c6 c ° a c M n +� a a Y Q, Q. 41 � a +� +� a) O _ ' Q +- Ln a LA H Ca a O J Ln aL Q- L CL 4J o v NO w m E o E u o f o E o o v 0 E E 0 L j O *' 4'a i L c Qu u c u u .s 0 n V v O U C a) O a) L O a) ai t6 u Uo = a) Ln .2° '+ s ± • = -0 U ' + } ` � U 41 r v c 'A . A c Z, 'c ai N C i a) p a) o L ° m O 7 p - N Y H V) O U Y h O U z U > N p V) d m f9 L 0 0 N 0 c N t7 Lz CL CL o E O o Q Q o Q a ° c V Y a) u o O o a O c a u O 0. o ai u E o N a) N O N ,A a) +-' "p c C 'a C c Q 4- 'O Q CL 0 '++ Q CL a ° 'a O ° ° Q O ° ° Q -a fu O Q c'^o .a p Q c L6 " C v o — aui Q E 4N c U Q 41 c W +� O v v v oc v o v w c Q a) AC v c E Q. o v E Q. o v LZ ar a o .5 — E — a) w e E v i E O. U L E m L2 U L a U L a) E f6 L= 'L E E m o Q ° o > a +� > E m t o > E m 0 ® ® _a a) U _+ C 6 U 0 41 C 6 N O c aa-+ -° a) +1 V O : 0 a) U ® ®' aci u CC o E `° w o a E m w E a v E `° v ° w o a °) cr o 41 QE V a) m 60 U 4 aJ rfa °° Q N m -0 N � U 41 1 Q ° - � u � N L6 Q a LL .c m a p ° LL C p N a LL 3 a m Q o N m Q Q CO m N ° m m N O Q C a-• N O >, — m f6 d m LO C jy 6No = C u.. dA = - 4Nia N C 'u. r—c6 p) C LL O c � EU c v •EU � .� c v � � c •� Ern u- Z, cat 'cU U E L6 c U v n c U c a) -0 m c c G, m a) c U c c v m c U O a m O ry n m m N CL 41 M U m N m Uam u_ d a u V d U V in d u in U a e o • • • O • o • • o O • o O • • o • o o o o • • • • • ® W I 'A C U c N O L sr a� v C L •v E 'v E r -a . ® a C7 Z N V ( U ® U N U 20