Loading...
HomeMy WebLinkAboutRES-2002-086 Resolution Regarding DCHC 2025 Long-range Transportation PlanDRAFT 2 ~~'S'_~~d2-~d$~~ /~-z-o z. ORANGE COUNTY BOARD OF COUNTY COMMISSIONERS f~ A RESOLUTION TO PROVIDE THE DURHAM-CHAPEL HILL-CARRBORO TRANSPORTATION ADVISORY COMMITTEE WITH COMMENTS REGARDING THE DRAFT RECOMMENDED FINANCIALLY CONSTRAINED 2025 LONG-RANGE TRANSPORTATION PLAN (LRTP) FOR THE DURHAM-CHAPEL HILL-CARRBORO METROPOLITAN PLANNING ORGANIZATION WHEREAS, Orange County has participated in regional transportation planning as a member of the Durham-Chapel Hill-Carrboro Metropolitan Planning Organization; and WHEREAS, the Durham-Chapel Hill-Carrboro Transportation Advisory Committee is preparing a Long-Range Transportation Plan, and has released the Draft Recommended Financially Constrained 2025 Lonq-Ranae Transportation Plan, dated November 6, 2002, for public comment; and WHEREAS, Orange County is committed to a transportation plan that protects the natural environment and culturaf sites, and provides alternatives to highways and reliance on single occupancy vehicles; and WHEREAS, Orange County seeks ample opportunities to review and comment on regional transportation plans and policies, and may offer additional comments on this plan at a later date; NOW, THEREFORE, BE IT RESOLVED by the Orange County Board of Commissioners that the Board of Commissioners makes the following recommendations and comments to the Transportation Advisory Committee concerning the 2025 Durham-Chapel Hill-Carrboro Metropolitan Planning Organization Long-Range Transportation Plan. Revised Northern Durham ParkwaY The Orange County Board of Commissioners recommends that the alignment of the Revised Northern Durham Parkway terminate at Roxboro Road, and that the Durham City Council and Durham County Board of Commissioners ensure by resolution that there will be no westward extension of the corridor; and (NOTE: This wording may be revised to reflect exactly the agreement reached by the TAC representatives for.Orange County.) II. Elizabeth Brady Road Extension The Orange County Board of Commissioners is pleased that bicycle and pedestrian facilities have been included in the Elizabeth Brady Road Extension project connecting US 70 Business and US 70 Bypass. The Board requests that the 2025 Long Range Transportation Plan reflect the following alignment and cross section for the project: (NOTE: the Board should decide which option, a or b, to include for issue.) ~-:', i ransportation`~2q25 ~CH~ 1~4ani~~HC2q25i~4an Pe~ i 2- OZ-D2.do~; DRAFT 3 A. 1. An alignment that has the least impact on the Eno River, the natural environment and cultural sites; 2. No statement; B. 1.a. An alignment that does not cross the Eno River, but is aligned along the ridge south of the river (if that alignment has the least impact on the river) in accordance with the Orange CountylHillsborough Economic Development District Transportation Work priority order by preference of options to be studied for environmental analysis. 1.b. The Board requests that this alignment be modeled for the 2025 Long Range Transportation Plan by December 11, 2002; 2. No statement; C. 1. A road configuration of two lanes with right-of-way reserved for four lanes (four lanes if necessary). 2. A road configuration of four lanes (two lanes if adequate). III. Other Hiahwav Proiects in Oranqe Countv The Orange County Board of Commissioners is pleased that the plan includes improvements to US 70 Bypass in Orange County, from NC 86-North to I-85 exit 170 and improvements to NC 86-North from US 70 Bypass to NC 57; and IV. Alternative Modes of Transportation Includina Transit The Orange County Board of Commissioners is pleased that the p{an includes alternative transportation modes including intensive transit improvements to provide an integrated transit system throughout the urban area; and V. Non Traditional Revenue Sources A. Although highway projects have, historically, been given higher funding priority than transit projects, the Orange County Board of Commissioners believes that should not be the case in the future. The Board therefore recommends that the sentence in the first paragraph of Section 1.3 - Non Traditional Revenue Sources, indicating that the plan's funding shortfall occurs in the bus transit and fixed guideway projects be deleted. B. Although the Board acknowledges the need for additional revenue sources, the Board recommends that the recommended non-traditional revenue sources be further analyzed and discussed by local government before they are adopted. Upon motion of Commissioner , seconded by Commissioner , the foregoing resolution was adopted this the day of , 2002. I, Donna Baker, Clerk to the Board of Commissioners for the County of Orange, North Carolina, DO HEREBY CERTIFY that the foregoing is a true copy of so much of the proceedings of said Board at a meeting held on October 30, 2002 as relates in any way to the C:iTr;~nspirrt~tiof'~12i725 13CNC ~'Van1DGHC2D2~Plan ~es'l2~02-f~2.d€~c DRAFT 4 adoption of the foregoing and that said proceedings are recorded in the minutes of said Board. WITNESS my hand and the seal of said County, this day of , 2002. Clerk to the Board of Commissioners ~:17rara~{:~csrt~ti~ni2025 C}CHC PianilJG~iC2~}2fiPl~n f~~s 12~02-~2.doc