THIS CONSTRUCTION AGREEMENT (hereinafter called "Agreement"), made as of the 30th day of
March, 2012, by and between ALT Services Group, (hereinafter called the "Contractor"), and Orange County, a
body corporate and politic and a political subdivision of the State of North Carolina, (hereinafter called the
"Owner").
WITNESSETH:
That the Contractor and the Owner, for the consideration herein named, agree as follows:
1. SCOPE OF WORK
The Contractor shall furnish and deliver all of the materials, and perform all of the work required by this
Agreement within the time period stipulated in a written Notice-to-Proceed to be executed by the Contractor and
Owner and in accordance with the following enumerated documents, which are attached hereto and made a part
hereof as if fully contained herein:
a. Construction Drawings prepared by N/A (Sheet dated
b. Written specifications prepared by the project engineer.
c. Bid 367-1649 instructions and proposal dated March 7, 2012 which fully describes the work to be
performed, such work hereinafter called the "Work".
d. Other documents as follows: Addendum # 1 dated March 13, 2012; and Addendum #2 dated March
14, 2012, and Scope Clarification letter dated 3/27/12.
2. TERM AND SCHEDULING
a. The Contractor agrees to commence work on the date of the executed original of this Agreement
and agrees to complete fully all Work included by 4/25, 2012, except for West Campus Office
Building charging stations that will be fully installed no later than 5/31/12.
b. Time is of the essence with respect to all dates specified in the Contract Documents as Completion
Dates.
c. The Contractar shall perform the Work in the time, manner and form required by the Contract
Documents and as stipulated in a written Notice-to-Proceed to be executed by the Contractor and
Owner.
d. It is expressly understood that the Owner will employ other contractors to perform work as a part
of the Project whose work will be performed simultaneously and sequentially with the performance
of the Work by the Contractor. It shall be necessary for the Contractor to coordinate its activities
with such other contractors, particularly with respect to access to work areas, storage of materials
and other common facilities.
e. Should the Owner determine that the Contractor is behind schedule, it may require the Contractor
to expedite and accelerate its efforts, including providing additional resources and working
overtime, as necessary, to perform the Work in accordance with the approved project schedule at
no additional cost to the Owner.
Revised October 2011
3. STANDARD OF CARE
a. The Contractor shall exercise reasonable care and diligence in performing the Work in accordance
with the highest generally accepted standards of this type of Contractor practice throughout the
United States and in accordance with applicable federal, state and local laws and regulations
applicable to the performance of these services. Contractor is solely responsible for the
professional quality, accuracy and timely completion and/or submission of all work.
b. The Contractor shall not load or permit any part of the Work to be loaded with a weight that will
endanger its safety, intended performance or configuration.
c. Contractor shall be responsible for all errors or omissions, in the performance of the Agreement.
Contractor shall correct any and all errors, omissions, discrepancies, ambiguities, mistakes or
conflicts at no additional cost to the Owner.
d. Contractor is an independent contractor of Owner. Any and all employees of the Contractor
engaged by the Contractor in the performance of any work or services required of the Contractor
under this Agreement, shall be considered employees or agents of the Contractor only and not of
the Owner, and any and all claims that may or might arise under any workers compensation or
other law or contract on behalf of said employees while so engaged shall be the sole obligation and
responsibility of the Contractar.
e. Contractar agrees that Contractor, its employees, agents and its subcontractors, if any, shall be
required to comply with all federal, state and local anti-discrimination laws, regulations and
policies that relate to the performance of Contractor's services under this Agreement.
f. If activities related to the performance of this Agreement require specific licenses, certifications, ar
related credentials Contractor represents that it and/or its employees, agents and subcontractors
engaged in such activities possess such licenses, certifications, or credentials and that such licenses
certifications, ar credentials are current, active, and not in a state of suspension or revocation.
4. PAYMENT & TAXES
a. The Owner hereby agrees to pay to the Contractor for the faithful performance of this Agreement,
and the Contractor hereby agrees to perform all of the Work for a sum not-to-exceed Eighty Four
Thousand Five Hundred and Thirty Dollars ($84,530.00). Not later than the fifth (Sth) day of each
calendar month the Contractor shall submit to the Owner a Request for Payment for work done
during the previous calendar month. The Request for Payment shall be in the form of a
standardized invoice or AIA Document G702 and shall show substantially the value of the wark
done during the previous calendar month. This amount may be paid by the Owner on or before the
last business day of the month. Final payment shall not be due to the Contractor until thirty (30)
days after all work, including punch list work, has been satisfactorily completed.
b. Should Owner reasonably determine that Contractor has failed to perform the Work related to a
Request for Payment, Owner, at its discretion may provide the Contractor seven (7) days to cure
the breach. Owner may withhold the accompanying payment without penalty until such time as
Contractor cures the breach. Should Contractor or its representatives fail to cure the breach within
seven (7) days, or fail to reasonably agree to such modified schedule, Owner may immediately
terminate this Agreement in writing, without penalty ar incurring further obligation to Contractor.
This section shall not be interpreted to limit the definition of breach to the failure to perform the
Work related to a Request for Payment.
c. The Contractor has included in the Contract Price and shall pay all taxes assessed by any authority
on the Work or the labor and materials used therein. It shall be the Contractor's responsibility to
Revised October 2011 ~,
furnish the Owner documentary evidence showing the materials used and sales and use tax paid by
the Contractor and each of its subcontractors.
5. INSURANCE
a. Minimum requirements - The Contractor shall obtain, at its sole expense, all insurance required
under this Agreement and the Contractor shall not commence work until such insurance is in force
nor shall the Contractor allow any Subcontractor to commence work on its subcontract until all
insurance required to be procured by Subcontractors hereunder has been so obtained by or for the
Subcontractor. All required insurance shall be procured from insurance companies licensed to do
business in North Carolina with a Best's Insurance Guide Rating of A- or better. Coverage for the
following types of insurance shall be maintained continuously during the life of the Project until
Final Completion of the Work. Coverages shall be maintained continuously during the life of the
Project until Final Completion of the Work for the following types of insurance in the amounts
listed:
i. Worker's Compensation Insurance with limits for Coverage A Statutory - State of North
Carolina and Coverage B Employers Liability $500,000 each accident and policy limit and
disease each employee.
ii. Comprehensive General Liability and Property Damage Insurance ($500,000 Each
Occurrence; $1,000,000 Aggregate).
iii. Contractual Liability (Bodily Injury and Property Damage $500,000 Each Occurrence;
Property Damage $1,000,000 Aggregate).
iv. Personal Injury, with Employment Exclusion deleted ($1,000,000 Aggregate).
v. Comprehensive Automobile Liability Insurance (Bodily Injury $100,000 Each
Person/Each Accident, $300,000 Each Occurrence; Property Damage $100,000 Each
Occurrence).
b. Additional Insured - The Owner shall be named as additional insured on all forms of insurance
except Worker's Compensation. Each certificate of insurance and policy required hereunder,
except the worker's compensation policy, shall bear the provision that "The policy cannot be
canceled or reduced in amount and that coverage cannot be eliminated in less than thirty (30) days
after mailing written notice to the Owner of such alteration, cancellation, or elimination, the written
notice to be sent by Certified Mail.
Performance Bonds - Contractor shall furnish bonds covering the faithful performance of the
Contract and payment of all obligations arising under any of the Contract Documents or related in
any way to the Work. Contractor shall immediately furnish a copy of such bonds to any requesting
person who appears to be a potential beneficiary of bonds covering payment obligations arising
under any of the Contract Documents. This subsection 6(c) applies only to Contracts of fifty
thousand dollars ($50,000.00) or more where the total cost for the project is three hundred thousand
dollars ($300,000.00) or more.
6. INDEMNITY
a. The Contractar shall indemnify and hold harmless to the extent permitted by law the Owner and its
agents and employees from and against any and all claims, damages, losses and expenses,
including attorney's fees, arising out of or resulting from the performance or nonperformance of the
Work, provided that any such claim, damages, loss or expense (A) is attributable to bodily injury,
sickness, disease or death or injury to, or destruction of, property, including the loss of use
resulting therefrom; and (B) is caused in whole or in part by any breach of any provision of the
Agreement or by any negligent or wrongful act or omission of the Contractor, any Subcontractor,
Revised October 2011
or supplier of the Contractor, anyone directly or indirectly employed by any of them or anyone for
whose acts any of them may be liable. The indemnification obligation under this paragraph shall
not be limited in any way by any limitation of the amount or type of damages, compensation or
benefits payable by or for the Contractor or any subcontractor under workers' compensation acts,
disability benefits acts or other employee benefit acts.
b. The Contractor shall indemnify and hold harmless Owner from any lien of whatever type
through the purchase of appropriate bonds and insurance as designated in Section 5 above. In
the event any such lien is filed against Owner's property Contractor shall, through such bonds
and insurance or at Contractors expense, defend Owner against all such claims of lien.
Upon completion of the Work the Contractor shall execute an affidavit stating there are no unpaid
debts for any wark that has been done or materials that have been furnished to the Project prior to
and as of the date of substantial completion and further stating that Contractor shall indemnify,
save and protect Owner and Owner's lender, if any, harmless from and against any and all claims,
liabilities, losses, damages, causes of action, and expenses (including court costs and reasonable
attorney's fees related thereto) arising out of, in connection with, or resulting from any such debts
and liens in a form and substance mutually acceptable to Owner and Contractor.
d. By executing this Agreement Contractor agrees to abide by and be bound by the indemnification
provisions herein and of Section 6(c) specifically.
7. GOVERNING LAW
The laws of the State of North Carolina shall apply to the interpretation and enforcement of this
Agreement. Any and all suits or actions to enforce, interpret or seek damages with respect to any provision of, or
the performance or nonperformance of, this Agreement shall be brought in the General Court of Justice of North
Carolina sitting in Orange County, North Carolina and it is agreed by the parties that no other court shall have
jurisdiction or venue with respect to such suits or actions.
8. NON-ASSIGNMENT
The Contractor shall not assign any portion of this Agreement nor subcontract ~the Work in its entirety
without the prior written consent of the Owner.
9. NON-APPROPRIATION
Contractor acknowledges that Owner is a governmental entity, and the validity of this Agreement is based
upon the availability of public funding under the authority of its statutory mandate.
In the event that public funds are unavailable and not appropriated for the per.formance of Owner's
obligations under this Agreement, then this Agreement shall automatically expire without penalty to Owner
immediately upon written notice to Contractor of the unavailability and non-appropriation of public funds. It is
expressly agreed that Owner shall not activate this non-appropriation provision for its convenience or to circumvent
the requirements of this Agreement, but only as an emergency fiscal measure during a substantial fiscal crisis.
In the event of a change in the Owner's statutory authority, mandate and/or mandated functions, by state
and/or federal legislative or regulatory action, which adversely affects Owner's authority to continue its obligations
under this Agreement, then this Agreement shall automatically terminate without penalty to Owner upon written
notice to Contractor of such limitation or change in Owner's legal authority.
10. NOTICES
Any notice required by this Agreement shall be in writing and delivered by certified ar registered mail,
return receipt requested to the following:
Owner: Contractor:
Orange County ALT Services Group
Revised October 2011 4
Attn: Pam Jones
P.O. Box 8181
Hillsbarough, NC 27278
118 Peter Gill Road
Henderson, NC 27537
252-430-0326
11. TERMINATION
The Owner may, without cause, order the Contractor to terminate, suspend, delay or interrupt the Work in
whole or in part far such period of time as the Owner may determine. In the event of termination by the Owner
under this Agreement, the Contractor shall be entitled to receive its reasonable and documented direct costs prior to
termination, including the cost of materials purchased for the Work which purchases cannot be canceled or which
material cannot reasonably be used by the Contractor on other work, and the cost of closing down the work in a
safe and efficient manner.
12. ENTIRE AGREEMENT
All of the documents listed, referenced or described in this Agreement, the written Notice-to-Proceed,
together with Modifications made or issued in accardance herewith are the Contract Documents, and the work,
labor, materials and completed construction required by the Contract Documents and all parts thereof is the Wark.
The Contract Documents constitute the entire agreement between Owner and Contractor. This Agreement may be
amended only by written instrument signed by both parties. Modifications may be evidenced by facsimile
signatures. If any provision of the Agreement shall be declared invalid or unenforceable, the remainder of the
Agreement shall continue in full force and effect.
IN WITNESS WHEREOF, the Parties hereto have executed this Agreement as of the day and date first
above written in a number of counterparts, each of which shall, without proof or accounting for other counterparts,
be deemed an original contract.
ORANGE COUNTY CONTRACTOR
Signature
Frank W. Clifton,
Signature
~~~~~.,~ j~ _~~ -.~
c~~ ~ _ l~t'Cc,c, /~iY1.~'
Printed Name and Title
Thi 'nstrument has been approved as to technical content.
l~~c~, l;L
Pamela Jones, artment Director
This instrument has been pre-audited in the manner required by the Local Government Budget and Fiscal Control
Act.
C~ //- ./ ` "v
Office the Finance Director
This inst~rument has been approved as to legal form and sufficiency.
,
~~ ? ~
~:
Office of the o ty Attorney
Revised October 2011
5
~~R° CERTIFICATE OF LIABILITY INSURANCE OPID pD DATE~MM/DDlYYYY)
03/29/12
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATNE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMP RT T: I the certi icate older is an D TIO AL RED, the policy(ies) must be en orsed. S R GA I N IS A D, subject to
the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the
certi£cate holder in lieu of such endorsement(s).
Moore & Johnson Agency
PO Box 17867
Raleigh NC 27619
Phone:919-781-0200 Fax:919-582-1999
INSURED
Advanced Lighting
Technologies LLC
DBA ALT Services group
P.O. Box 1758
Oxford NC 27565-1758
COVERAGES
CERTIFICATE NUMBER:
CERTIFICATE HOLDER CANCELLATION
CUSTOMER ID #: ADVAN-I.
INSURER(S) AFFORDING COVERAGE NAIC #
INSURERA: EXC21S10= Insurance CO.
INSURER B: Peerleas Indemnity ins. Co.
iNSUReac: Peerless Insurance Co an 24198
INSURER D :
INSURER E :
INSURER F :
oe~mm~s~ ~inAenro.
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTVJITHSTANDING ANY RE~UIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS
,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. L~MITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
LTR TYPE OF INSURANCE INSR NND POLICY NUMBER
(MM/DD/YYYY)
{MM/DD/YYYY)
LIMITS
GENERAL LIABILITY
EACHOCCURRENCE $ ZOOOOOO
B X COMMERCIALGENERALLIABILITY CBP8497918 oe/zi/i1 oe/21/i2 pREMISES(Eaoccunence) $ ZOOOOO
CLAIMS-MADE ^X OCCUR MED EXP (My one person) $ 1 rj ~ 0 ~
X PERSONALBADVINJURY $ ZOOOOOO
GENERALAGGREGATE $ ZOOOOOO
GEN'LAGGREGATELIMITAPPLIESPER: PRODUCTS-COMPlOPAGG $2000000
POLICY ~E ~ $ LOC
$
AUT OMOBILE LIABILITY COMBINED SINGLE LIMIT
B
X
ANYAUTO
BA8496218
oe/21
l
(Eaaccident) $ lOOOOOO
/i oe/21/12 BODILY INJURY (Per person) $
ALL OWNED AUTOS
BODILY INJURY (Per accident) $
SCHEDULED AUTOS }[
PROPERTY DAMAGE $
HIRED AUTOS (Per accideM)
NON-OWNED AUTOS g
$
C UMBRELLALIAB g OCCUR CU8499418 oe/2i/ii oe/2i/12 EACHOCCURRENCE $ 4QQQQQQ
EXCESSLIAB CLAIMS-MADE X AGGREGATE $ QOOOOOO
DEDUCTIBLE
$
X RETENTION $ O $
j~ WORKERS COMPENSATION
' WC8 7 o7/ie/11 07/19/12 '
. AND EMPLOYERS
LIABILITY Y~ N TORY LIMITS ER
ANYPROPRIETOR/PARTNER/EXECUTN
OFFICER/MEMBER EXCLUDED? ~
~ A E.L.EACHACCIDENT ~ $ SOOOOOO
(MandatoryinNH)
If yes
describe under E.LDISEASE-EAEMPLOYEE $ ~.OOOOOO
,
DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT $ Z O OOOOO
B Contractors Equip CBP8497918 oaiz~i~~ oeiz~i~2 Leased or 100,000
Rented
DESCRIPTION OF OPERATIONS / LOCATIONS ! VEHICLES (Attaeh ACORD 101, Addifional Remarks Schedule, if more spaee is required)
Certificte Holder is named as an Additional Insured with respect to General
Liability and Auto. Cancellation no~ice applies per form 17-490 attached.
jethompson@co.orange.nc.us
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELNERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
County o£ Orange
Financial Services
P.O. Box 8181
iEiillsborouah NC 27278
AUTHORIZED ~.
~`~- ~~-
O 1988-2009 ACORD CORPORATION. All rights reserved.
ACORD 25 (2009/09) The ACORD name and logo are registered marks of ACORD
Fnrminn a nart of
~ ~
• --•...--~ - ~-- -
Policy Number.
Caverage Is Provided In
Named Insured: Agen~
Moore & Johnson Agency
ALT Services Group
Agent Gode: Agent Phone:
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
AMENDMENT OF CANCELLATIQN PRQVISIQNS
Any term or provision of the Cancellation Conditions of the policy or any endorsement amending or repiacing such
Conditians is amended by the following:
A. If we cancel this policy for any reason other than nonpayment of premium, we will notify the person or
organization shown in the Schedule below. In no event will the notice to the person or organization scheduled
below exceed the notice to the first named insured.
B. Our obligation to send notice to the person ar organization listed in the Schedule below will terminate at the
earlier of the current palicy period expiration or when you no longer have a legal ar contractual abligatian to
such person or arganization ta maintain insurance co~erage under a policy which requires that such person or
organization be notified in the event af cancellation.
SCHEDULE
1. Name or Person ar Organization: COUflty Of OI'8tlge, Financial Services
2. Mailing Address: P.O. Box 8181, Hillsborough, NC 27278
3. Numbe~ Days Advance Notice: 30 DayS
All ather terms and conditians of this policy remain unchanged.
C42016 Liberty Mutual Insurance Company. All rights reserved.
Includes copyrighted mate~ial of Insurance Services Office, Inc. with its permission.
17-490 (10t10)
March 27, 2012
Orange County Financial Services
PO Box 8181
Hillsborough, NC 27278
Attn: Jeff Thompson
Job Name: Orange County Bid #367-1649
Deduct Pricinq Breakdown for deletion of (21 EVSE Pedestal Units at Sevmour Center~
(2) Pedestai Mount EVSE $2,896.00/each $5,792.00
(1) 200 amp Sub Panel perAddendum 2 $2,775.00
(2) Bollards $150/each $ 300.00
(2) Pedestal Electrical Wiring $1,800.00
(2) Concrete Pad $175/each 350.00
TOTAL DEDUCT $11,017,00
..............................................................................~
ADD ALTERNATES
Alternate #1
(1) Increase Amperage for Electrical Panel at Durham Tech $ 900.00
(Necessary for the additional units from 2-4 units)
(2) Landscaping Blocks
(1-Seymour Center & 1-Durham Tech) $ 850.00
Increase Cost for adding (2) EVSE Pedestal at Durham Tech: 9 267.00
ADDITIONAL COST $11,017.00
..............................................................................~
Oriqinal Contract Amount $84,530.00
Deduct - $11,017.00
$73,513.00
Alternate #1 $ 11,017.00
Original Contracted Amount $84,530.00
We will install the (2) delete EVSE Pedestal units from Seymour Senior Center at the Durham Tech
site for the original contracted amount listed above.
Thanks,
Dan Thomas
ALT Services Group
118 Peter Gill Rd.
Henderson, NC 27536
252-430-0326 office
252-430-0322 Fax
COUNTY OF ORANGE
FINANCkAL SERVICES - PURGHASING
PO BQX 8181
HILLSBC?ROUGH, NORTH CAROLINA 27278
ORANG~ COUNTY B1~ NO. 367-1849
Marcts 7, 2012
THE AMER/CAN REGOVERY & RE/NVESTMENT ACT IS A SOURGE OF FUNDS FOR THiS PROJECT
ATTENTIQN:
INTERESTED VENDORS~~~
Orange County requests your competifive quotation to furnish th~ item(s} iisted beiow for the Orange County AMS
Department, Hiilsborough, NC.
Please transmit this quotation via facsimile or deliver by hand or U.S, Mail, ta the Orange County
Purchasing Agent- fax #{919} 644-3324 {NEW!!) , 200 South ~ameron Street, Hilisborough, NC 27278
by MARCH 16, ~012 af at 10:00 AM
~T~"" CQMMODITIES/GOODS C1R SERVICES ~.UMP SUM
#
cosT
,~ Site #1: Skilts Development Center - 503 W Franklin Street, Ghapel Hill ~
~
~
~
Furnish and insta[I four (4) Electric Vehicie Supply Equipment - Wa11 Mount - ~
-~~
30a,18' cord, - each o# the fourstations shail come equipped with a credit
card reader , er attached s ecifications
Site #Z: Seymour Senior Center- 2504 Homestead Road, Ghapel Hi11 Furnish a~d ~~~
~
install four (4) Electric Vehicle Supply Equipment - Pedesta! Mount (two $~
'~
pedestals) 30a,18' cord, - each of the four stations shall come equipped with a
credit card reader , per attached specifications
Site #3: West Campus Office Building - 131 W Margaret Lane Hilisborough
Furnish and instalt four (4) Electric Vehicte Suppiy Equipment-Pedestat Maunt c,r.,
~~ ~J~
(#wo pedestals) 30a, 18' cord, - each of the four stations shall come equipped
with a credit card reader , per attached specifications
Site #4: Durham Tech-525 College Park Dr Hiflsbo~ough Furnish and install four
(4) Electric Vehicle Supply Equipment - Pedestal Moun# (two pedestals) 3Qa, $o~~~
18" cord, - ea~ch of the four stations shalE come equipped with a credit card
reade~ , per attached specifications
Will ar~y people working an this job make less than $10.33 per hour YES '
NU if es, the lawest haurl wa e to be aid an em (o ee shall be: $ / HOUR
ALL INSTALLATIQNS MUST BE COMPLETEQ AND INVOICED BY APRlL 25, 2012 CAN
'
~
~
3~r
YES MEET THIS DEADLINE? YES,~ NO !F NO WHEN? ~~ °'""~'~ `~~"
`
UCENSE # , ,~ ~~ ~ ~'~ ~ i,,,~
ADDRESS ~ ~~s T~ ~~ t~ ~~~ } ~ ~„` ~.
,~r~r-~t ~ (~~'~~ , ~~` ~7~'37
d
EMA4L: ~~ t~ ~ 7` t`x ~ ~~~~
F1RM NAME I7 ~..~ ~t~. E; t3 t~~~ ~rc;~,~
BY ~ r1.. ! ~'~it;=:~
~
(Proposal must be signed in wrifing)
FAX: ~ ~ ~ - ~1:~ ~`~ ~' ~ ~ ~
TELEPHONE: ~~~." ~ ~a ~ - ~ ~ ~.~'
~ur~s# ~'J~~ ~}~5 1'7
z~~ ~.
3I7i2~12 3:25 PM tt~1T) Fro~; €~ COi~iTY PURGHR5IE~ 919-644-3324 To: 1252430Ff322 Page 3 oF 29
COUNTY OF t3RANGE
~INANCIAL SEf~ViCES - PURGHASING
Pt3 BOX 8'i81 ~ 200 South Churton Stree#
HILLSBOROUGH, NCiRTH CARO~INA 27278
1. All bicts and propasals shatt be fior fumishing apparatus, supplies, materials, equipment and/or work a.nd
services in accardance with the applicable ptans and specifications prescribed by Orange Gounty. Pians
andl4r speci#ications may be obtained at the Orange County Finance Department Purchasing Divisio~
Departmen#, 2Q0 S Camaron Stree#, Millsborough, Narth Carolina 27278.
2. Orange County reserves the right to av~+ard #he bid that is in the best interest af Orange County or to reject
any or all bids, and to wraive minor irregularities.
3. The successful bidder shall comply fully with the requirements flf Genera) Statutes, Section 143-129 and
143-131, as amended. This is an informal bid, therefo re there will not be a formal opening. Results will be
made available aftQr award.
4. In the event of default by any contractor or vsndor Orange County may pracure from other sources
whatever service ar item is being bid and hold the contractor responsible for any excess cost occasioned
thereby.
5. Payment bycheck is due thirtyctays afker completion and inspectian unless otherwise specificallypravided;
subject to any discaurrts allowed.
6. North Carolina sales and use tax sha11 NQ7 be included in the bid amount.
7. Bids submitted via facsimile sha~l be accepted.
8. Propasals received afEer apening date and time shall not bs cflnsidered.
9. Bids musf be signed and submitted an the attached form.
10. Contract: Attached is a copy of the Caunty's standardized contract. All insurance requirements are
contained therein. Please read the agreement carefiully as that document and this bid sha11 constitute the
agreement he cast of aEl irssurance shail be included in the price(s) bid,
The Contrac#or shall not corr~rtence work until he has dbtained al[ the insurance required herein, tnsurance
shal( be maintained in ful! force and effsct unti{ the Cantract has been fully and completely performed, as
evidenced by final acceptance paymenk. Contractor shail provide Certifiicats of Insurance reflecting
aforementioned coverages as proof of coverage. Certificate of tnsurance shalt provide for a thirty (3tl) day
uuritten notice to the Owner in the event af any modifications, canr..E(lation, or expiration of said po(icies.
Work shall not comrnence until the contractor has obtained a11 required insurance and the owner has
approved verifying certificates of insurance in writing.
11. ~range Gounty suppurts a(iving vvage of $1 Q.33 per hour. Please indicate on the bid form whether any
workers on this job will make less than $10.33 per hour
12. All contractors are hereby nQtified that they must trave proper licsnse under khe State laws gaveming their
respective trades. Rlease display license number on yaur submittal.
MAR-~7-2012 10:~5 From:
I~;1111
Page:0~3 R=93~
S/f/"Lkll'L "S:"15 }'!7 tbi'11) ti'0~: tAUi1~t I~RVIY N[ktL7~iSIT'Ri 819-699-;f314 f0: IZ:3Y9:i(~3'C1 N~ 4 OF Zy
13. Please suppf}~ a Iist of 3 commercial references with phcne numbers and contact peaple Qf simi{ar
instatlation,
15, The succassfut contractor shall be responsible for obtaining ali permits and inspections frarr- Hillsborough
and Chape( Hi[)
16. Piease direct questions concerning this bid to David Canneit, Purchasing Agent, Orange County Financial
Services Services, {919} 245-2651 ar via email at dcannel[~caaranqe.nc.us Pf~EFERRED
17. THE AM'ERICAN RECOVERY & REINVESTNtENT ACT !S ASOURCE aF FUNDS F4R THIS PR~JEC7
18. Bidder must list their DU ~1S number an ihe bid form dacument ta be considered
99. The successful bidder must abide bythe Energy Efficiency and Canservation [~IockGrant GranteeslSpacia)
Term~ and Canditions. The ~'erms and C~nditians' can be abtained in any of the foll~w[ng 3 ways:
o http:/l~u~t~w.co.arafige,nc.us/t~urchasitt~/documentslSpecialTezm.sCanditions BECBG Grantees.pdf
a By emailing dcanneiltc~co.ocanqe.nc,us and request[ng a copy
~0. HISTORIGALL4` UNDERUTILiZED BU5INESSES: Pursuant to Genecal Statute 143-48 and Executive
Order #154, ths State invites and encaur~ges participation in this procurement process by businQSSes
owned by minorifies, wamsn, disabled, disabEed business enterprises and non-profit work centers for #he
biind and severely disabled. !t is the policy of this State to encourage and promo#e the use af small
contractors, rrsinarity vendors, physicaliy handicapped vendors, and women vsndars in State purchasing ofi
~UO{IS ~31EI SQfVIC~S. Titie VI of the Civil Rights Act of 1954 mandates that "na person in the United States
shall, on the graund of race, co[or, or national origin, ~re exc(uded from participation in, be denied the
ben~fits of, or be subjected to discrimination under any pragram ar ~ctiviiy receiving Federal assistance: `
Title Vlt of the Civil Righks Act of 1964 prohibits discrimination on the basis of the race, colar, religion, sex,
or national origin. All vendors should compiy with these federal lav+rs.
t3range County hereby noti~ies a!( Bidders that it will affirmatively insur~ that in any contract entered in#o
pursuant to this advertisement, minarity business enterprises ravvilt be afforded fiu{1 opportuniiyto submit Bids
in respnnse to this Requsst for Praposal, and v~rill no~E be discriminated against on the g~ounds af race,
religion, gender, color, national origin, or ancestry in consideration af an award. Bidder hereby agrees that
should Bidder be awarded this contract, the Bidder will not discriminate against any persan who perForms
work there under because ofi race, religion, gender, color, nationa[ origin, ar ancestry. Furthermore, the
Bidder should be an organizatic~n that also practices #he beliefs of equal opportunity in the morals oftheir
corr~pany.
i~1flR-07-201z 10:26 ~'rom: ID:1111 f'aae:~04 R=93~
3t7/2012 3:25 Ft°! tGMT} ~fo~: ~ COt~1TY PURqiRSli~ 9i9-&94-3324 To: 1~5243flB3?2 Page 5 oP 29
SCOPE QF ~JiT4RK
PURPOSE: The purpose and intent of this Bid is t~ saEicit proposals from qualified Contractor(s} to
establish a contract to furnish and provide instaliatian services for Electric Vehicle Supply Equipment
(EVSE) stations at mulfiple County facilities.
Ple~se nat~ that Qrange Coun#y Bid number 367-'t647 will net be awarded. Orange Count
reaeived add'stianal grant funding at'ter bid 367-1647 was bpened, The Caunty has added ~wa
(2~ additional units to ea~h ofithe feur sites ea~h of the new lacations is a maxitttum of 2fi'
#ram the sites that were identified at prebid. Alsa note that an adsliticnal manufacturer's
praduct has b~en identified in the specs.
Pleasa check yes or no fior each item, faiiure to do so could render the bid non-respansive, The
specifications are intended to detai( ~ran e County's minimum requirements. Any mention of brand
name ts mtended to denote fsatures and ~unctionality requirements. Piease includ~ a com lete Iist ofi
deliverables with make/model etc, af any item(s) bid. County assumes issues relating ta A~A
com pliance
PROQUGT SPECIFICATIOMS
Electric Vehicle Supply Equipment
hem
Descripfion: YES ND VARIANCE
1. Electric Vehicle Supply Equipment - Wall ~Aount - Eaton Level 2 Pow-R-Station - 30a,
i8' cord, - SAR38XOQ0000 EACH UNIT EQUlPPED WITH TDaEVQQ006E.
FCEDIT GARD REAQER, ar GE Energy EV~RiN3 with credit card ~
f~~dLf(s) ar Equ'tvalent, four each at srte #1, mounted on two pedestals
ate makelmodel of unit bid ~t~'~~"~'t °'Y(~~- ~_;~~~~'t~4~,c1
2_ Electric Vehicle Supply Equipment-Pedestal Moun# - Eaton Levef 2 Paw,R- Station -
Oa, 18' cord, - SBR3BX400000 EACH UNIT EQUIRPED WITH TDQEV0~006E.
REDIT GARa READER, or GE En~rgy EVSN3 or EVDN3 (double ,
,/
p~d~stal) with credit cards or Equiva~ent, Four each at sites #2, #3  ~/
ate make/model of unit bid ~t~-~ -' ~t" ~ ~ ~+^~ ~r~
3. Aveilable in wall and pedestal mount versions. 18 foot long cord minimum. Suppart
or 208 Valt, 3Q -32 Amp power. Available vrithout 110 Volt outletfor Lsvel 1
harging. ~
~
4. Fieid upgradeabie Wireless LAN support .
5. Na user authentication / pre-registration requirement for use of the unit. ~~+
6. Un€ts must come equipped with Credit Card payment capability using standard (~o ° ;
RFID) credit cards. With cellular capabiiities. h
'
7. Ability to opera#e vrithout subscription tc~ vendor's network serviaes offering.
8. Must have Ability to store usage data locally on S~ memory card.
MRR-07'-2H1~ 10:26 From: Id.11S1 Pa~e'~~5 R=93f
~irrrni~ s;-r,, ~n t~n~~ rro~: GF~IIit G[RMIY k~lt~i yi9-ti99-33L4 io: ~z5z~;~'zt Na~ s oe 2s
9. EV station must be capable of interacting with the communications driver, written by
ActiveLogix f4r use ~rith the Pgriscope product, rur~ning on a Vycon JAGE engine and
interfacing to the charging station through t~odbus RTU and Modbus TGP. EV
station manufactu~er shai! exgose aIl registers/paints frorrt the EV station to the
communications driver.
10. Products must complywith #he Sectian 1605 of the American Recovary and
Reinvestment Act of 2009. Bid~er must provide certification of compEiance. See ~
attached specifications.
91. Warranryshal! be a s#andard c~nrttmerciai warranty. Please statewarranty /
~
- r~..~-w,~ S
f
EVSE REQUIREMEIVTS
S.~gp[emental Snecifiaations - Electri~ Vehicle Supp[y ~quipment
Orange Caunty is seeking quality EVSEs far its countywide infirastructure. The selected EVSE
Pravider must be able to deliuer and service high quality products beyond the installation period.
Tha following tables contain a list c~f specific requirernents for the EVSE consideration that
should be addressed as part ~# the Bid response:
Description: YES NO VftRIANCE
tt~
~2~ E ui ment must be durable ta withstand area's extreme weather ,,~'"
13~ EVSEs that witl accomm~date the needs of the full range:of ~
vehicles requiring access ta
~4_ EVSEs tFrat universalty accommodate vshicle~ from all
rnanufacturers, and that comply with all applicable bui{ding codes,
SAE standards, UL safety codes, ADA requirements and ~
industr standards.
~5~ EVSEs that meet customers' EV charging needs in any or a[I
key lo~ations including commercial garages and parking lots, ~
transit hubs, warkplace locations, and on-streef
parking in residential neigh~orhoads.
~~~ Use o# "smart charging~ concepts to minimize charging during
art-peak hours ~nd to maximize custflmer convenience, and ~
which are compatible with the utili#y industry's
Advanced Me#~ring Infrastructure systems ("smart meters"}
~~~ Pr~vision ~f at#ractiue EW charging with conventional billing
rates far customers, and convenient billing systems, ~
~$~ Consideration of ineans to accommodate the extended-range needs ~
of E1/ drivers, such as fast charging.
19. Provisions for maintenance requirements and other an~illary
services rovided b v~ndor or distributer.
20. Warrant eriad far e ui ment and insta(lation of e ui ment. / ~.
MAR-07-z012 10:26 Fram:
SD:1111
Pa9e:006 R=93~
J/ t/~L17.1 L 3: L3 Y!9 ivn ~~ r r~ :~ ~wn ~ r r~»ss,r~ i ra~ ~ i a-avy-saz~ I 0: I Y5'L9",Sk1t~IL'L r~e r or ra
TECHNt7LOGY ENVIRC?NMENT FtaR EVSE REQUIREMENTS
Specify Applicabie Techni~al EVSE specitications, listing and testing such as:
SAE Standards me#:
~ SAEJ551 Electromagneticcompatilailitystandards
~ SAE J177'~TM Conductive 54pin coupling far EVSE
o SAE J1850 Communication network beriveen EVSEand fhe EV
~a 5AE J2178 Message formatfor the communication network
;~ 5AE J2293 Energy transfer system, umbrella documentfor EV standards
o SAE J2294 Onboa rd power charger quality
~a SAE J2836 Digitalcommunications use case between EVSE and vehicle
0 5AEJ2847 Digitalcommunicationsspec~cabons
UL Listed / T~ste~
o UL 2202 Safety of EVSE
,~~ UL 2231 Shock prevention measures for EVSE
r, UL 2251 Safet t~f COrd Set
Circuit re-closure - remote or automatic re-energized after a fault has cleared
Cold load pickup (random restart after power outage)
Load management connectian (far future utility cantrol)
Input vQitage and amperage rang~
Seff testing - diagnostics, safety, ground monitor, etc.
Diagnostic 5tatus indicator
t~perating temperature range
Mounting -wa1l, pedestal, other
EquipmenE must me~t the emerging open standard of the industry and avaids
pra rietar subscriber n~tworks
~quipment that can communicate the EVS~s availabilify is preferr~d yef not
Equipment that can accept payment is not necessary for this project but having the
ability to da so in the future is preferred
Charge status display
EVSE dimensions
EVSE footprint dimensions (for installafion) "
MAR-~7-2~12 10:26 Fram:
ID:~111
Paae:007 R=93:
S!f![l7IY S:'L~ YI7 tl~l'II) tf0~t tk{h1N~t 4~AA'IIY ~11~i ytJ-b4q-3SL4 10: ]'Lb`L4:3Nfx~'Cl t'~ t3 OF `L9
INSTALL.ATIfJN SPEG1FiGAT{ONS
Eteatric V~hicle Suppfy Equipment
4 sites
~t~ Qescription:
YES
NO
VAftIANCE
1. eneral Notes
2. a ime work onl . ~°
3. ontractars res onsible for removin ovvn trash. ~''
4. erm its to be secured b Co~tractar, y~
5. o smokin , no fioad and drink, no music. ~
6, ite verification needsd; re-bid mandatory ~
7. nits must be installed to manufacturer's s ecifications ~
S. e uired ermits -e. . electrical, ri ht af wa ~
9. ocatian of under round utilities v~
'ID. nstailatian of conduit roundwork ~
1 i. nstallation of s are conduit for future EVSE where s ecified u`~
12. ntinuafion of data eonduits u ta and wi#hin the EVSE unit ,~
13. roper scheduled inspections ~./
14. nstailation and functinnal verification of EVSE e ui ment ~
15. EFT PURPOSELY B~ANK
16. e-striping of access lanes (except Caurthouse Parking Garage) (shouid alternate
e accepted)
~ ~-
17. rotection of EVSE unii from potential physicaf damage (i.e. whee! stops or b~lards,
s specified} with 2 bollards at each ~destal (fiour bollards at each site ~
18. ignage and boIlards are rec~uired at each site_ Twc~ eaeh ~l" concrete filIed steel
ollards (painted). !~nci t~~o each 12"' ?:18" signs ~z~iti~ p~sts. The ~hoto belot
~llush-ates the ro osed lavout.
t,°'~
MAR-~7-2012 10:"'c6 Fram:
ID:1111
Pa9e:0F~8 R=93%
~r ~~tu~L J:LJ n~ 1~~~J ~ ~ vm~ ixupw~ uxn~i i runi.i~~aw a~a-v`r7-.r.~tt i~: ~~J[^taw~tt ra~ ~ tlf ~~
,~ c:
s`:_:
~ I
~
~ ~
-
j y ;
i
~..~ , ;
'bY
~ISJkS3 I 5~. w V !
~ tF 4V ,~y.. 1 . i ~• .
; :~r ~z~' ~;.
~
t
;,
;
°,~ ,~ ~:~_.:;~
r fi
~
.
l~" # } 7„~'.
:. ~; ,,,d~.,~
~ J t ~:x
}~r~3 y~. Y~E~'. ~i. ~
f .
S ~
Please include ~ per unit for bath Uallards and signs for possibl
additiQns or deductions.
Ballards $ J.~ ~~``~~ es~ch Signs v-lposts $ '~~,°k""" eacli
~,~~U s~a'Y, s-f` `I' 1~t'°~t'"f ~a~d
i ~
19. e air af sidewalks, landsca in u on com letion of the EVSE installation
~
20. kilis transfer to Coun em lo ees
merican Reeovery and Reinvestment Act {ARRR} requirements conformance ~
21. nd dacumentafian
~
22. Ioseout Documents typical of a construction project
23. O&M Manuals, Warranties, ContractortSubcontractor Affidavits, Record Drawings)
24. ite 1: Skilis Develo ment Center - 503 W Franklin Street, Gha ei Hill
2~. un four each 4a?, 240V circuits unch-in breakers) out of existin sub anel /
u!i approximately 125 feet of #8 wire per circuit inside 12~" conduit instalEed by
26. ontractor, electrical wiring must be in cnnduit entire run ~
27. rill pathwaythrough existing masonryvvall t~
URNISH, WSTALL RND 7ERMINATE FOUR WALL MOUNTED ELECTRIC ~
28. HARGING STATIONS
rovide 112" low ~oltage conduit stubbed out above exposed rafters near wall ~;r''
29. enetration
30. ife 2: Se our Senior Center - 25t}4 Hamestead ~.oad, Cha ei Hil!
~
31, un four each 40A 240V circuits (bolt-in breakers) out of existin subpanel
ull approximately 125 fieet of #8 wire per circuit inside 1.25" conduit installed by ~
32. ontractor
~
33. rill pathwa through existing foundation wall and additional retainin wal(
'~
34. ut and install buried cnnduit to pedestai location
URNISH, INBTAL~ AN~ TERMINATE FOUR PEDESTAL MOUNTED ELECTRIC ~
35. HARGlNG STATIONS OR TWO DOUBLE PEDES
rovide !ow voltage conduit from telephone room to same location. SIZED TO ~~/'
36. EET CODE
MAf~-~7-~012 10:c7 ~rom: ID:1111 Fa9e;dt~9 R=93~
v ~i..v~.. v.w ..~ aw~~i ~~vw~. wu..v~ vv.n.3F ~y~awa~v~iw viv v-r-i .w~~ tv: ~t.li-tWOJGG fG7yG 10 Uf YJ
37. nstatl TWO _3' x 3' x 4° concre#e pad with anchor bolts per manufactur~r's
ecifications ~
7A onduitsJwiring to penetrate re#aining wall at gro~nd level and be aitached to
estern retaining wall.
~..~
38. Site 3; West Gam US OffICE BUII{II~3 - 131 W Ma aret Lane Hilisborou h
39. un four each ~10A 24DV circuifs bolt-in breakers out of existin ane! ~
4Q. ull approximately 40 feef of #a wire per circuit inside 1.2~" conduit installed by
ontractor. no exposed uriringJconduit on e~ernal brick wall
~
41. rili athwaythrou h existin foundafian ~!vaU ~
42. ut and instal! buried co~duit to edestal location ~
43. URNISH, fhlSTALL AND TERMINATE FOUR REDESTAL MOUNTED ELECTRIC
HARGING STATIDNB OR TWO DOUBLE PEQESTALS
A4. rovide low voftage conduit from telephane room to same location. SiZED TO
EET CODE
~
45. nstall TWO _3' x 3' x 4" conerete pad with anchor bolts per man~acturer's
ecifications
~ j
5A ontractor responsible fior drywal[ repair
45B anduits on internai wafl can' be exposed .~`
46. ite 4: Durham Tech-525 Catle e Fa~k Qr Hillsborau h
47. nstali an exterior 6~A an:e3 from a sub-meter rovided b Quke Pawer ~
48. un four each 40A 24~V circuits bolt-in breakers out of ne~vl instailed sub anel ~
49. ull approximately 50 feet of #8 wire per circui# inside 1.25" conduit inatalled by
ontrac#or ~
5(~. ut and instail buried conduit fo pedestal location ~
51. URNISH, Ih1STALL ANp TERMINATE FOUR PEDESTA~ MOUNTED ELECTRIC
HAFZGING STATIONS OR TWO D~UBLE PEDESTALS
~
52. nstall TWO _3' x 3° x 4" concrete pad with anchor bolts per manufacturer's
pecifications
53A rovide cabie ramp ouer sidewalk
~3B elete conduit for low v~ltage d
MRR-0?-2~'J12 10:27 From:
ID:1111
Pa~e:010 R=93~
I. Below is the drawing depicting tlie staiid alonz senice reqaired at T.)urh~am Tecti_
Rsssi;fe;rr.'at5yrtiros; ~err,aarrentL'rro'ergrounti
A 7l•picaf Penma~tert Undergra~und ~-H~--
ft43ouf.~trirted katiz 8e~iri~B
~ Custoc5er 1:ma4~es & Im~its
I~ bu~ce ~~smis;es & i~stz~ts
2"~a: o. 3:V A1YfP 6rea~f 3nx a EArrs!~ut
Mc(crF:m:lcw~e'~\Pa _~_~-..
1;2" fx~ria
?yrroad a
i' x 6^ Trea'wd
B'x 'rts
6Erv~ce
Ca^d~t "wc tYOle
-Gr~rui
Suucb+~e
Wim
~ .
4 6.tiia.ad FCx! ----
IU~a~ cac a C7c ~
GUUxI R~A sheCl~e nt
Auh tw4r~xlx~~f.MY .
Ssao uNeti !In ItrJ ;
~nl;azi ysalnd j
rc avr/ A:uaynmt)
wt GM1'~.k.:~ dg31IP2
P~'~`+"~. BT.ITI~QG~ ~ , ~~
~ R
".
-0.. ~
~...,_ ~
z
,
r~~~ rf~ir~
Rodea ni Tim6crs.
P1AR-~7-291z 1Q:~~ From: ID:1111 Pa~e:L11 R=S3~
,. ... w... ....«.. .........~ ....~~... .....w~,....... ..w .... w... .v. e..~...~vw..« ~u,v ~a vt cv
DELI`~ER.48LES
PLE:iSE ItiOTE THE TABLE BELOW ~1IliST BE CO~IFLETEU BY Yt3I:TR COi~~IP~NY ~ND
II~CLUDED WITH Z'OtiR SL,BIvIITTAL FOFt ~4UR BTD T(j BE ~ONSIDERED!!
BIDS Vv~LL BE E~"~iLUTED BaSED U'~T THE LIT11~iF S[JI~~ PRICES Ul~? PAGE UNE.
DESCRIPTION MAKE MODEL BID QUANTITY
PROVIQED !N
BIQ UNIT CQST
Z~'.~,LL 1~IOUNT E~rSE '~"~,,~;-...
~ !~ f~ 3 ~ ~ C.t_ ~ r~t.~c.~
z'~ ~ ~~
~j ~ ~, ..~
PEDESTAL lUIflUNT
EVSE ~~.
~~.t~t~G
~,
~ r~ u ~l ~, ~a
CREDIT C!~RD
RE<~D~R `
~~~c.~~ i n
~ ~ i"1$~
B~LLARDS
~~} ~ l .~~Cf'j~~ c~,
!
SIG~S
~ ~
~~ ~~~~
MAR-07-2H12 10:28 From: ID:1111 Pa9e:012 R=93~
SUPPLEMENTAL CQNTRAGT PROVISIONS FOR DVIISR~/ARRA FUNDiNG
By submission of a prapasal, Contractor agrees to comptywith the following pravisians. Fai{ure to complywith any
and al[ provisians herein may ba cause for the contraciing a~ency to issue a cancellation notice to a contracior.
Reporting Requirements
The Contractor is notified that #Mis project wilf be fin~nced with American Reco~rery and Re~nvestmenfAct of
20(?9 (hereinafter, "ARRA"') Funds. The Contractar shall ensure that aii subconfracts and other cantracts for
gotsds and services far an ARRA funded project haue the mandated provisions af this directive in their
contracts, Pursuant to Title XV, Section 1512 of the ARRA, the State shall require that the Con#ractor provide
reports and other emp(oyment information as evidence ta document the number of jobs created ar jobs retained
by this confiract from the Contractor's own warkforce and any sub-contractors. Na direct payment wiQ be made
for providing said repo~ts, as the cost far same shatl be includecl in the various items in the contract.
Pasting with the Laea! Errtployment Security Cammissian
In addifion to any other jab pastings the Contractor norma!!y utilizes, the Qffice of Ecanamic Recovery &
Investment {hereinafiter, "dERI") requires that the Contractor shafl post with #he lacal Employment Seau~ty
Cammission t7fifice a11 pasitions for whieh he intends to hire vsrorkers as a result of being awarded this contract.
Labor and semiskilfed pasifions must be past~d for at least 48 hours before the hiring decision. AI! other
pasitions must be posted a minimum posting of five days befare the hiring decisian. The Contractar and any
Suk~contractor shall report #he new hires in the manner prescribed by the Employment Security Carnmissi~n
and the OER1.
Required Cantract Pravision ta imp[ement ARRA Section 902
Sectian 902 of the ,4RRA requires that each c~ntract awarded using ARRA funds rr-ust include a provision that
pravid~s the IJ.S. Comptroller Genera) and his representatives wsth the authority to:
(1} examine any recards of the contractac or any of its subcantrac#ars, ar any State or bca) agency
administering such contract, that directly perta[r~ to, and involve transactians relating to, the contract or
subcontract; a~d
(2) inferview any officer ar employee af #he cantractor or any of its subcontractors, ar of any 5tats ar la~ca)
government agency administering the contract, regarding such transactions.
accordingiy, the ~omptroller General and his tepresentatives shall have fhe autharity and rights prescribed under
Section 902 ofi the AR}ZAwith respectta cantracts funded wi#h recovery fiunds made availabte under the ARRA.
Section 9~2 furtherstaf~s that nothing in 902 shaq be interpreted to timit vr rastrict in ar~yway anyexisting authority
of #he Comptroller General.
Authcrrity of the tnsp~ctor General pravision
5ectian 1515(a) of the ARRA provides authority for any represen#atives of the United States Inspector Generat #o
examine any recards or interviewany employee ar offtcers working o n this cantract. The contractar is advised that
representatives of the Inspector General have the autharity to examine any record and interview any emplayee or
officer A#the contractor, its subcontractors ar o#herfirms working on this conteact. Sec#ion 1515(b) further provides
that nothing in this section shaEl b~ interpreted to iimit t~r restrict in any way any existing authority of an (nspector
General.
Buy American provisian
5ection 1605 ofithe ARRArequires that iron, steel and manufactt~red goods ~~sed in public buildings or publicworks
projec~.s be manufactured in the United States. Contractor agrees to abide by this provisian and shall maintain
records of such purchases for irtspections by authorized agents of the State of North Carolina and federal
ageneies. The Contracto~ must obt~in written exception from this provision from the agency issuing the contract.
MAR-07-201~ 10:28 From: ID:1111 Paee:~13 R=93~
Avaifability and Use of Funds
Con~ac2ors undetstand and acknowledge that any and a1[ payment of funds 4r #he continuation thereof is
contingent upon funds provided salely byARRA or required s#ate matching funds. Pursuant to Section 1604 of the
ARRA; cantract~rs agree notto undertake armake progresstaward anyactivity using recoveryfundsthatwill Eead
Eo the development of such activiiy as casinos or other gambling establishments, aquariums, zoas, gotf courses,
swimming pools or any other activiry specifically prQhibited by the Recovery Act.
Whistleblawer Provisions
Contractars understand and acknowtedge tha# Article 14 of Chapter 124, NCGS 126-84 through 126-88
(applies to the State and state employees), A~tie(e 21 of Chapter 95, NCGS 85-24o through 85-2A~5 (applies to
anyone, including state employe~s), and Sectian 1553 ofthe RecoveryAct (applies tfl an~one receiving federa{
fiunds), provide protectiar~ ta State, Federal and contract emplayess.
Outsaurcing outside the USA without Specific Prior Appr~vaE Provision
Contractaragrees nat to use any rgcovery funds from a cantrac# or any other performance agreerr~ent awarded
bythe State af North Caralina, its agencies, or po#i#ical subdivisians far outsaurcing outside of the United
States, vrithout specific prior written appraval from the agency issuing the corrtracE.
Federal, State and Locai Tax Ctbligatians
By submissi~n of a proposaE> cuntractors and 5ubcantractors assert and s~1f-ceriify that atl Federal, State and
local tax abligations have been ar will be satis~ed priorto receiving recovery funds.
Anti-Discrimin~ttion and Equal Upportunity ~
Pursuant #o Section 1.7 af the guidance memarandum issued by the United States Office of Managemsn# and
Budget an Apri13, 20Q9, recovery funds must be dist~ibuted in accordan~ with a(I an#i-discriminativn and equal
appartunity statutes, regulations, and Executive Orders pertaining to the exp~nditure of funds.
Office of State Budgef and Management Access to Records
OERI requires that the contra~tor and subcontractor agree ta allow the Uffice ofi S#ate Budget and Management
interna) auditars and state agency internal auditors ar.cess #a records and emplayees periaining ta the
perfiormance of any contract awarded by a public agency.
MRR-07-z~12 10:~8 From: ID:1111 Pa9e:014 R=93~
J4BS REPaRTING
Jobs Reporting - Appticants must inctude in their bid documents a requirement that cantractars submit
infarrnatian abaut how many jobs were cteated or retained with each invoice, The format should be how many
person-hours of work are included within the invoice for al! work that can be counted ar measured. This can be
reported to the Appiicant on the frequency they desire, but nQ later than time of invoice submittal. Applicants in
turn will provic{e the information on job creation to the state with each reimbursement request,
Successful bids must include a statemen~ regarding the requirernent that each contractor invoice shall include a
statement about the person-hours of wark reflected in the invoice. Contractors shoutd require of
subcantractors simitar estimates ta be ineluded in the repc~rting vvith the invoice such that ths invoice inctudes a
fair and reasonable es#ima#e af the jobs created or retained by the services represented in the invoice.
~rom the
EXECUTIVE OFFIGE O~ TFtE PRESIDEN7
COUNCIL OF ECONC)MIC ADVISER5
ES7IMATE5 OF JOB CREATIOhI FR4M THE
AMERIGAN RECUVERY AND RElNVESTMENT ACT QF 2009
IUlay 2049
111. REPORTING ACTUAL DIRECT JOB CREATIt7N
Ail recipients of recovery funds far government inves#me nt a re required to report the jobs reta ined or created bythe
funds. These reports vvill provide infortnation an the direct jab creation and retention nf this crucial p`rece of the
ARRA. This information wiil be useful in the avsrail evaluafion of the empbyment effects of the act.
General Re~ortina Guidelines
C3M6 guidelines for reparting jobs created or retained are unde~r review and wilf be reCeased shor~ly. This report
describes the genera! approach that witt be in fhe guidelines.
• Primary recipients are required ta report an estimate of jabs directly creafi~d or retained by project and
activity or contrac#. Grant recipients should report on the employment impact of sub-recipients.
Recipients shauld not ai#empt to report on the employrr~nt impact an maferials suppliers {so called
"indirect" jobs) or on tha local community {"induced" joas}.
• A jab created is a new position crea#ed and filled; a job retainsd is an existing position that w~utd not
have been continued were i# not far ARRA funding. ~niy compensated employment should be reported.
• The number af jobs shoutd be expressed as full-time equivalents {FTEs}, which is catcutat$d as totat
hours worked in jobs created or retained divided by the number of fiours in a futf-time schedule, as
definsd by the recipient.
• The number reported shouid represent a reasonabte average of FTEs created and retained for the
quarter. Such an estimate would ideally be done by taking FTEs for ~ach pay period in the quarter and
averaging them, Jt could also be dt~ne at a single paint in time, as long as care is taken that the single
point is repres~ntat~ve of the qwarter,
• A 6rief description of fypes af jabs created Qr retained should be pravided.
MAR-07-2@12 1~:2~ From: IC1:1111 Pa9e:015 R=93~
Appendix B: Certi~caticn of Primary Partiaipants Regarding Qebarment, Suspension, and Other
Responsibiiity IUlatters
CERTiFICATiON REGARDING DEBARMENT, SU5PENSION,
tNELIGI~(LITYand V~LUNTARY EXCLUSION
LOWER T1ER GOVERED TRAN5ACTlON
(To be submitted with all bids)
{1 } The prospective tawer tier participant (BidderlContractor} certifies, by submission of this bid vr prapasal;
that nei#her it nar its principa#s is presently debarred, suspended, prapased far debarment, declared
ineligible, ar voluntarily excluded from participa#ion in this transaction by any FederaE department ar agency.
{2} The prospective Bi~lder/Contractor also certifies by submissian of this bid ar praposal that all subcontractors
and suppliers {fhis requirement flows down to all subcantracts at all (evels) are not presently debarred,
suspended, proposed for debarment, declaeed ineligible, or voluntarily ~xcluded from participation in fl~is
transaction by any Federal deparfinent ar agency.
(3) Where the prospective lower tier participant (Bidder/Contractor) is unable to certify to any of the statements
in this certificatian, such prospective par~icipan# shall attach an explanation to this bid ar pronosai.
The lower ti~r participant (BidderlContrac#or}, ~~,.,~ ,`~~ ~,~~~~, ~,~;~, ~~{~~~s or af~rms the truthfulness
and accuracy of this statemerit of its cerfification and disclosure, i# any. ~
~l; /~
Stafe of _ 1 ~1CkI~~-, d C~ ~t ~~ i'~
Gauntypf ~~i~,t~~~
~ATE ~~....~`'~1~ ~l~ ;2.
----, ---
SIGNATU ~
COMPANY ~~. 4 ti.~ ~~ 1~C-''~ Clt`" t i~.i t~
r~aM~ 1~.~~'~1-~ k`~ . ~i~~ ~C.
rir~.E ~U~ q`~ ~;v~ ~ ~Y~'~~ ~ ~n~"
Subscrbed and sworn to before me this ~ day of _~~~'c~.~~ , 20~,
~~
.~~~\~`~~~~ ~fi~,Jf l,'~~
~ ~~~ ~C~~~ ~
=' N~?TARY ~ ~
' ~ PUB~.l~ =
:~ ..y~ ~U,~~
,~
'l~~~~~ c ~ C O U N ~ ; ~ .' ' ~~ ~
MAR-07-2012 1ac~9 From:
Notary Pubiic f ~: ~~-~'"~. ,~d ~,/L-'-~--^-----
My Appaintment~~xpir~s f~-- ~~;,-- ~ '~
IQ:1111
Pase:016 R=93%
ORAN6E CflUN'i'Y BED PRQTEST PRCtCEQURE
PURPOSE
To put in place a pracedure #ar bidders, offerors or contractors to pratest bids.
RR~CEDURE
Any party which is a prospective bidder, offeror, or contractorthat may be aggrieved by the solicitation must submit a~~rritten
protest within five (5) Calendar days prior ta the opening of the Request for Bid, Requ.est for Prapa52l.
Any party which is an actual bidder, offeror, or contractor that may be aggrieved by the award of a contract, must submit a
~vritten protest within five (S} days of County transmitting via fax or email the announcement af intent to award.
The protest must be addresssd #a the Director afAsset Management and Purchasing Services, Orange County, FQ 8ox 8i81,
131 W Margaret Lane, Suite 3f11., HiIlsBorough, NC 27278 and must include al1 the following information:
1. Name, address, telephone number, facsimile number and e-mail of the protester.
2. Signature af the protester or authorized agent.
3. The bid name and nurnber.
4. A detailed statement of the legal and fiactual grounds of protest including copies of reievant documents.
S. Any supporting exhibits, evidence, ar documents to substantiate any c)aims.
6. A[I infarmation establishing that the protester is an interested party for the purpose of ffling a protest.
7. The form of relief requested
After careful consideratian of al1 relevant information, and consultation with the County Attorney, the Dir~ctor of Asset
CVlanagement and Purchasing Services shall make a written decision.
A decision of the Directar of Asset Management and Purchasing Services may be appealed to ihe County Manager or Board of
Corrrmissioners, depending on the type of bid. An appeal must be in writing and be delivered to the County Manager, PO Box
8181, 20~ 5 Cameron Street, Hillsborough, NC Z7Z78, within seven (7) calendar days of the date af the ~irector of Asset
Management and Purchasing Serviees faxed or ernaifed their decision.
Any and all costs in~urred by a protesting party in connection with a protest shall 6e the sole responsibility of the protesting
pa rty.
MAP.-B7-2012 1~t29 Frorn: ID.1111 Pase:0li R=53:
ATTACHIvIE:dT ~i
APPENDIX A
MB~ GC~NTRACT' PROVISIGN (CGNSTRUCTIC~Ni
APPI.ICATION :
The requirements of the Guidzlines For Recruitment And Selecfion 4f 2viinorit;r Business ara llere}rr made a part of ~ese contract
cioeuments. These reqi~irem.ent, shatl apply fo a1I c~ntractors regardle~s ef ownership.
MBE SLTBCONTItA.CT G~ALS:
The goais for participation byMinority firms as subcontractors on this project have been set at ten (10%).
The Bi@der Fvill provicle documentzd proof in tliz form of Appendix B,1~IBE UTILIZATION COM?4~TM~NT, that these goals
have been met or exceaded;
OR
Provida Appendix B, n~BE UTILIZ11TI0~; C(II~~IlviiTM~NT, identifyi~g the amount of MBE parcicipation; and, priar to a~azd,
upon raquest, show evid~nce of good faith effort made prior to fihe bid opening ta meet these goals;
OR
Provide Appendix D, CERTIFICAT'IONRE~'r~RDIt*IG SUBGONTR~CTING PR~ICTICES, and vpon request, information
s~.tfficient for the Gwner to datermine that the Bidder dozs not customaril}r su6aontract w~k on this type projecL
It is desued that the above informatian be 3ubmitted ~vith the Md fVthough bids may be read without the form atxached, no
ccmmsideration wZil be givem to any bid relative to award of coniract ~ttil the required forms and supporting data are in the hanct~
o£the Otsner.
~311v~IM`IJ~1 COMPLIANCE REOUIRE~~IENT3:
If the ~E subcaniract goals are not achieved, Che Bidder shall provide the following dacumentation to the C)wner.
1. MBE ITtilization Cozamiimern (.Appendix B)_
'. Doaumantation af the Bidder's ~ood faith efforts to meet the goals set fortl~ in #hese prorisions
(upon request prior to award).
This documentation shall include an affidavit thar certifies that the Bidder Iias taken at least five
(~) of the folloe~i~g ten ~i 0) gaod faith steps to procure MBEs, and it should also list ~vhich steps
were taken;
1• ContacCad minority businesses tlaat reasazablp could have 6een expected to submit a
quote and fhat ~vere known ta the contrac~r or a~aiIabie on these SYata or local govemment-
maintained lists at least ten (10 j days befare the Md or praposal date and notifying #hzra of the
nature and scope of the work to be pesformed.
2. Made t~e constructic~n ~lans, sp~i~cations, ancl raquirements available for re~riew by
prospective minority busirtesses, or proviciing these documents to them at least ten (10) da}5 before the bid
Froposals are due.
Broke down or canbined elements of work into ecanomically feasible umts to facilitate
MRR-07-2012 1H:Z9 From: TD:1111 Paae:818 R=93~
minority participatial.
4. Worked ~~ith ~rinority h~ade, communitp, or contractor orgazuzatiozZS iclentifierl by
the C~ffice of Historical LTnderutilized Businesses and 'nlcluded in Tliz bid documents that provided
assistance inrecruihnetrt ofminoritybusinasses.
~, Attended any prebid nteetings scheduled by tke public otivner.
6. Provided assistance in getting requirecl bonding or a~surance or pror~dusg
alten~atives to honding or insiaance for subcontractors.
7. N~,gotiated ui good faithvaith ~terested minoritybusin~sses and didnotreject
them as unqualified without sound reasoils based on their capabiliiies. Any rejection of a
minority business based on lack af qualifications shauld ha~ e the rt~sons documentied in writing.
8. Prouided assistance to an otherwise qualified minority business in neecl o£
equipment, loa.n capital, lines of credi~, or joinE pay a~reements to secure loans, supplies, or Ietters
of credit, uicluding waiving credit that is ~di.narily requii-ed. Assisted minority Uusinesses in
obtaining the same unit pricin~ with the bidder's supplier in order to help the minority businesses in
establishing credit.
9. Negotiated joint centure azid partnership arrangements withminoritybusin~sses
in order to increas~ apportunifies for mi.nait.y business parEieipation on a public constructian ar
rapair pr~jeot when possible.
1 Q. Provide quick pay agreements azad pelicies to anable minority: contractors and.
suppliers to meet cash flow deman~s.
This decurneniation shall include the follo~ving e~~id~nce:
A. Copies of solicitations for quotes to at least three (3) MBE fi~ms from the ~ource list
gro~rided try the StaYe for each subcontract to be let under this con#ract (if 3 or more firms
aze shor~ on the source list}. Each solicitation shall cccitaui a specific descrigti~. of the
work to be subcontraeted, laeaticm where ~id documents ean be reviewed, repressntatave
of the Prune Bidder Co eontact, and location, date and time when quotes inust be receivecl.
B. Capies of quotes orresponses received frona each fumresPonding to thesoiicitation.
G. A telephone log of follaw-up call~ to each firm sent a salicitaticm.
D. For subco~acis evhere an ?~iBE fum is not consiciared to be the lrnvest respaisible sub-
bidder, copiss of qnotes received from all firms sub~nitting quotes Eor that particular
subcontract.
E. Documentation of an}~ centraots, correspondence or conversation v«~ith'v1BE firms made
in an attempt to meet fhe goals.
NQTE: If the Bidder provides sufficient evidence (listed m#A} that the goals stated 'u~ the contract
documenLs have been met, or awards all subcantracts to ivIBE's, the docuznentation listad
in B will not ba required.
Ispon being named apparent law bidder, the Bidder shall provide a Letter of Inteni (Appendix Cl, com~lete with a
descripti~ of tha scape of services and dollar i=alue from each ivIDE firm proposed for use in dus contract Failure
to providz the documentatian as listed in these pr~visions may result ui rejection of the hid and awau•d The next
]o~vest respcrosible and responsive bidder. The O«ner resen~es the riglit to waive an}~ irrzgularities in MBE
documeniation if they can be resolved grior to award of flze contract, and the Owner finds it to be in its t~st interast
f'1RR-07-2~12 1~:2~ From: ID:1111 Faae:l~19 R=93~
to dn sd and a~~ard the con(ract.
PROGRAh4 GONtI'LIAATCE RE~UIR~MENTS:
All ~vritten statements,, certifications a- intentions made by the $idder shall became a part of the agreement between
the Crnitractor and flie Go~u~ty of Orange for performance ofthis cantract. Pailure to comgly ~sth any of thsse
statements, cerfifications or intentions, or w~th the MBE Gtiudvl.ines shall constitute a breach ofthe contract. r~
fnding by dle Qtivtivr f.hat any information submitted either grior to ar~~ard of tl~e ~ntract or ~3urin~ the per£onnance
of the contract is inaccurate, false or incomplaEe, shall also constitute a brzach of the coutract. r'~ay such breach map
result in termination of the contract in accordance w-ith the term~ation provisions contained in the oantract. It shall
be solely at the uption of f1~e Qwner whether ta terminate the contract for breach.
MAR-07-2012 1F~:29 From: ID:1111 Paae:0Z0 P.=93~
APPE~DIX B OFL D MC~ST BE SUBh~LITTED WTTH BTD
APPENDIX B
I~~IBE L'TILIZATiON ~Oh1ivIITME'~~I'
W e,
(Bidder)
ELECTRIC STEHIGLE SL;PPL~' EQLiIPALE~T {EVSE)
{Dollar Amoturt of Bid}
do certify that on the
wi11 expend a minimum af °,'o of the total doll.ar amount of the contract ~7t~7 minority business enierprises.
This percenta~e must be at least ten percent CI O° o). ar tha biddar must complete the back side of this frnm as vrell.
Ivi~E's will be employed as constr~uction subcontractors, vendors, suppliers or providers of professianal ser~~ices.
5uch ti~ork will be subcontr-acted to Yhe following fums lisfed below. If tlie 6idder intend, to subcantract, this form
mt~st be completed reearr.lless of the amo~mt or tack of ~,articigation attained.
Name and. Phone Indicate Descriptian
Number of Fizm MBE of Wark Dnliar 4'alue
The undersigned will enter into a formal agreement ~vith _vtinority Pirms for work listed in this schedule, conditicsnal upon
executian of a cantract with the County af Orange. Failure to I'ulfill this commihnant may constitute a breach of Yhe
contract~
The undasi~ned hzreby certifies that he or she has read the ternts of this con~mittnent and is authorized to bind t1~e
bidder to the carnmitment herein set forfih.
Date:
(Name ofAuthorized Qfficer)
Signature:
T itle:
~'e, do certify that we did undertake the
following steps in govd faith to procure inincxity enterprise. 'The bidder must cite that at least fiva stepc ware taken
1. Gontacted ruinority bwinesses tt~at reasonably could have been eapected to submit a
quote and that ti~era Imown to the contraotor ar available on these State or local
government-maintained lists af least ten (I 0) days befora the bid or proposal date and
ndtifying them of the natiue and scope of the ~xrork to be performed.
2. R~ade the cvnstruction ptans, specitications, and requiremei7ts available for re~~ew by prospective
minarity bnsinesses, or groviding these documents to them at least ten (1 ~ i da}~ befare
the bid proposals are due.
3. Brake dawn ar combined elaments of wer~ inio ecanomically feasihle units to facilit~rte min~rity
pazticipation.
MAR-07-2012 1a:30 From:
ID:1111
Pa~e:~Z1 R=93%
4. l~arkes3 with minority tradz, commtmitv, or coniractor organi2ations iderrtified by the Office o£
Historical UndenrtiFized Businesses and uzaludad in the bid documents that provided
assistance in racruitrnent of minoritybusinesses.
5, ~ttendzd any prebid mestings scheduled by Tlie ~ublic o~vnar.
6. Provided assistaxtce in getting requu-ed bonding or insurance or providing alternatives to banding
or insurance for subcantractors.
7. Negntiafed in good faith with inte.rested minority businesses and riid not reject t~em as unqualified
without sow~d reasons Uased en their capabili.ties. Any re}ection of a minority business
based on lack of qualifications should have the reasor~ documented in writing.
8. Provided assistance to an otherwise quaIified tninority business in need of eqt,ugrnent, loan capitaI,
lines of credit, ar iozni pay ag,reement, to secura loans, sugplias, or letters of credit,
including waiving credit that is ordinarily required Assisted minority businesses in
obteining the same unit pricing with the biddes's supptier in order to help the minority
businesses in establishixig credi~
9. Negotiated joint venture and partnership arrangements with minarity businesses in order to
increase o~ortunities far minarity business participatian on a pubiic consh-uction or
repair project when possible.
10. Provide quick pay agreemenLs and policies to enable minority cantractors azid suppliers to meet
cash flow demands.
MRR-87-2012 10:30 Frdm: ID:1111 Pa9e:022 R-93~
Al'PEidDIX C
LBTTF.R OF I~TTENT T~ PERFORM AS a SUBCOI~TI~:A~TGR GR
PRO~'IDE MATERfALS OR SERVICES
SUBIBCT:
Name)
(Praject
Td: (Name of
Prime Bidd~r)
Tha undersigned intends to gerform ~ork in eoruiecticm i~ifli the abave projeet as a Ivlinority BusiiZess Enterprise. Tha NSBE status
of the undersigned is certified Uy tha Siate ofN~rth Carolina.
The undersigned is prepared to perfarm the following describeti t~-ork or pravide materials or sen-ices in cannection u•ith Che abo~~e
project (specify in dekail particular work items, materials nr serviczs to be performed or ~ovided):
at die following price:
You have projecCed the following commencemeut date for such ~~c~rk, andthe undersigned is pr~jecfing completion of such work as
follows:
Projacted Projacted
Commencament Completion
Ttzms Date Date
Subcantracting at any ti~r mi~st be reparted and is subject to all MBE compliance requirements. This form shall be nsed for MBE
subcontracting at anv leval_
Date:
(Name of ARinority Cantractorl
By.
M~1R-87-2H12 ld:3t~ Fram: ID'i111 Pa9e•C~23 R=93~
APPE?v-DI}i B OR I~ MUST BE SL~~~IlTTFD 1~ITH BID
x1PPENDIX D
CERTTFICATION REGARDING SUBCGNTRACTIIvTG PRACTICES
~' a> - ~~-'~ "7£~ C`i P~ ~i ~'~, iy„~ _ hereby certify that it is
{I~rame of Bidder)
our intent ta perform 100% of the work required for the ~~`~f~ ~~ ~~ .
~..?#UI ~ ~~~~ "' ~~`t~ `
t.3f`~tit t°' ~ '` cantract
(Name of Proj t)
In making fhis certificati~, the Bidder states the following:
1. That the Biddea dcxs not custnmarily subcantract elernents of t2us ty~pe project, and nozmally
performs and has the capability to perform and wilY per~orm all elements oFihe work o~ tYtis
project with hislher own current work faroes; and
2. That the Bidder agrees to submit the follo«7ng .informa.tion after bid and before the a~vard of tl~e
contract:
" List the sccpa of services involved in this project.
List previaus projects of this t3~e that Bidder has performed with his,'her forces.
" Payrolls from the abova-mantioned jobs which illustrate Bidder's employees' iob
~lassifications needed to perform the elemextts of the v4vrk an the Project or a breakdow~
of Bidder's entire wark force ~vhich illustrates fhe number of empioyees in each job
classification.
° Name and phone number af the Field Sup~ervisors for these jobs.
" List of equipment Bidder's firm awns that bas been used on previous projects.
* Gopies of lease agreemant for equipment that was leased.
The ~idder agrcxs to provide any additianal information requested for the statement c~ntaine~ in paragraph ziumber
1 above.
The undersigne~i hereby certif`ies ihat ha or she has read ttus cerTification and is authorized to bind the Bidder to tha
commitments here' contained.
Date: ~%~"~~'7 !~ ~~Z-
(Name of Authorized Officerl
sr ~- ~~
~° '~-~`~~~==---~``~
~
T~ e:
MAR-~?-2fl1z 10:30 From~ ID:1111 Pa9e:@24 R=93~
3!7l2it2 3:25 PFi t(~iT) Fro~: QRF~E COlklTti' Pt~tGf#iSlMG 81~-644-3324 Ta: 125293~1,3~2 Page 25 nf 29
GUIDELINES FUR RECRLTIT~~ENT~N~ SELECTION UF'~.III~URITY BLTSNESSES
'These guidelines t~%ere adapted for use on tl~is ~rojec;t bythe C1UUnty of Orange fi~urn the
"CTuideluies for Recruitn~ent and Selectian nflliinarit~~Busii~esses for Participatic~ii u~ State
Constiucti~n Of~ice i'rojects", d~velopeci l~y t~ie State Constructic~n Office.
In accordance cvith G.S: 14~-128,2 (SB 914 ratified Deceniber b, ~Qt~l), the County of(7range
l~as enlcted a z~eri~iable ten percent (10°~'0) minority busiiiess participation gual for the tutal
monetary vaiue of'tliis project. These b icieiines 3re published to accomplish tliat end.
SfiCTION l: INTENI`
It is the ilitent of these Duid~lines thaf the County of (h-ange, ~s a~varding authorit}j for
construction projec#s, a.nci the conh•actors and subcontractc~rs per#orming the construction
contracts ativardad shall coaper~e and in gaud fai#h do all tlxul~s legai, praper and reasunable to
achieve the statlrtory ~oal c~f ten percent for participation bv rninority businesses in eaeh
constructio~~ project pzrmitted by SB 914. ~Vothing contained in tllese guidalines sl~call be
c~nsidered to require awarding authc~rities to a«iard c~ntracts ar to rnaka ptirchase of materials or
equipment from minority-business contrac#ars w~Iio do not submit the lot~~est responsible vid ~r
bids.
SECTI~N 2: DErINITICIN5
'~~inoritv- a person who is a citizen or lawful permanent r~sid~nt of the LTi1it~d States ;uzd
who is:
a. Blac1:, that is, a persou ha~ing ori~uis in any of the black racial ~roups in Africa:
b. Hispanic, that is, a person af Spai~ish or Poriugues~ culture v,ritli origius in
~fe~co; Sou~h or Central Auierica, or the Catibb~an Islands, regardlzss ofrace;
c. Asian Americau, tha# is, a person having origins in ~nyoftlae oi-i~inal pe~ples of
the Far East; Southeast ~sia and Asia, the Indian subcontinenf, the Pacific
Islatxds;
d. -American Indian or Alasl{ai~ NatitiTe, that is , a person ha~~ing origins in anv o#'tl~e
ariginal peoptes ofNorth America;
e. Female.
f. "S~cially di~~.dvantaged individual", as dsfined in 15 LT.S.C. G37. These are
u~di~-iduals wiia ha~-e "beeii subjected rto;•acial or ethnic preJudice ot cultural bias
hecause flf their identify as a member of a g~oup ~viihaut regard to their indivit~ual
t~ualities"; pf'
g. "EconomicaFI}~disaclvantaged indiz-idual'~ as dzfiried in IS LT.S.G. 637. This is un
indi~~idual "~~~ose al~ilityto compete in the free enterprise s~~stem has been
in~pau-ed due to dir~ninished capit~l and credit apparhznities as campared to others
in the same husiness who are not socially disadvantaged."
?~iinority I3usin~ss - means a business:
a. In which at least fi~=ane percent (~ 1°ia} is olnned by one ar more 2ninority
persons, or in The case ofa ct3rporation, in ~vhich at least fi.fty-c~ne percent (~1°la)
afthe stock is ol~nea hy orze or mare minority persans: and
MAR-~7-2~12 10:30 From:
ID:1111
P~9e:02~ R=93~
3R/20i2 3:25 Prl f(~1T?
3.
~.
5.
6.
7.
3.
Fr~a: QRAhGE CD~IIV PUR~iSit~ 9t8-644-3324 To: 1252439F~i22 Page 26 of 29
b. Qf w~icli the manageznent aiid daily business operations are co~itrolled by ane or
more ofthe minoritypersons tzthQ o~vn it.
Uvtner - The County ~f Orange.
Bidder - Any person, ~rm, partnership, corporatior~, associaticjn,, or joint t~enture seeki~ig
#o be av,•ardad a public cantract ar subcc~ntraci.
Contract - A mutually binding legal reiationship or any modifcation thereof ubligatiiig
the s~11er to fiu•nish equipinent, material or s~rvices, including cansti~ctinn, and
obli~atin~ tli~ l~u}-er to pay for then~.
Contrac#~r -~,r-y person, firni, partn~rship, cnrporati~n, assuciation, or jaint venhue
which has contracted ~vith the County of Oran~e to perf~rm construction ~vork or repair.
Subcontractor -~ firm under contcact uritli the Prime Contractor for supplying maierials
or labor and niaterials andtar installafi~n. The subcontractor mayo ur may nat provide
materials in his subcontr~:ct. ~'ark subcantracted in an emergency aad u~hich could n~t
have beeu antlcipated is excluded as a part of this ~arograan.
Veri~aable ~oai means that the a«rardina aufiharityhas adopted tiz~rrtten b idelines
sp~cifying the ac#ions that the p~-ime cantractor must tal:e ~o eiisure a good faith effort in
the F~ec~uitme~~t and selection of rninarity bi~sinesses for participation in conh~acts
a~tiarded; the required actiUns must b~ clflcumented in ~~riting t~y the con#raetor to tha
~:ppropriate a~varding authorify.
SECTIf.~N 3: RESPDI?SIBILITIES
1. l~~inority Business R•Qerarn of the Countv of Oraii,~e (h~rea$er referred to a Mitlority
Business Pro~ram~.
Tlie I~~f inarity Businzss Program will establish a prograxn pursuau# to ~vhich it shall certifv
to in#erested pe~-sons, businesses qualifying as Minori#Z~ Business Ente~-prises (14~iBE).
The infai~rnation solicited from t~~e applicant vvill be used l~y the Minarity Business
Program to:
a. Determine I~~BE certification, i.z,, that tho~e c~-tified ure MBEs under GS 143-
128 as a contract~r andlor suhcontractor.
b. Iclentify ft~ose areas of~-ork for w•hich there are certified 1~iBEs, as requestecl.
c. Prnvide interested parties with a list c~f~ros~ectiz-e czrtified 1~ZBE contractors and
~~bcontractors.
d. :~ssisf in the determination of technica.l assistance in the certification program ~hat
needs to be ~7ravided.
In addi#ion fo being res~onsible far thz certifiea#ion of tl~ose small and eme~•ging
businesses that ~=ant to participate, the Minorit,y Business Program will:
1. hiaintain a current list of eertified I~iBEs of thase certified. 'I'he Tist
furnishzd shall include the areas ofjvork in ~~hich each hiBE is in3erested.
2. Vy'ork with the North Carolina Association of l~~inorin~ Businesses, the
Caralitias Branch ~GC, the Caroli~ia Electrical Gontractars r~ssociatioat
~d the I'~orth Caral'u~a Association ofPl~imbing-Heating-Cooling
Contractors in developing and i~nple~n~nting a certification progam
intended to imprc~ye tlie ability of MBE's to comgete in this program.
2. O»ner
(''IR~-0?-2012 10:31 From:
ID:1111
Pa9e:026 R=93%
3l7r2912 3.25 PPI ((~') Fra~: Of~iNGE C~tTY FiAtt~if~ 919-644-3324 To: 125293~i22 Page 2? oF 29
The o~vner will:
a. Attend the scheduled prebid conference.
b. Irlentify o~~ determine thc~s~ wz~rk ar~as of a contract ~-liere h~IBEs may liav~ an
interest in performin~ contract v~~or~.
c. At least teii (IQ} clays prior to t~ie scl~eduleci dayof bi~i opening. the 4uruer «-ill
natify certified 1VII3Es of potential cantracting opportunities listed in the propasal.
The notifica~ion will include the follou°ine:
1. A description of the tivork for ~s=l~icl~ tlie bid is being solicited.
2. I'h~ date_ time and lacation ~vhere L~ids are to be svbmifted.
3. The name ofthe indi;ficlual ~~ithin the agency'institution w~o tiviil be
av~.ilable to answ~z- qu~sti~ns about ~lie praject.
~. ~~here bid doci~ments rnay be reviewed.
5. Any special ~~equu•eix~ents that mau e~ust, such as insurance, licenses,
bonds and fuiancial arra~~~ements.
If tliere are more tYzan tliree (3) certified l~iBEs in the general 1oc91ity c~fthe praj~ct ~vho
offer similar contracting or ~ibcontracting ser~-ices in the specific trade, the C}~~n~r shall
nU~ifv three (3) , but may cc~ntact tnora, ifthe Owner so desires.
d. ~iaintain docunientation of any contacts, catr~spondence, ar canversations cvith
~%IBE fi~-ms made in an attempt to meet tl~e goals.
Prune Contractor
Under the single prime contxac# syatem, the pritne oontra~toi v~~il1=
a. Attend the scl~.eduled prehi~ conference.
b. Identify or determzne those «-ork ar~as of a contrac[ tivhere MBEs may have an
interesf in performing contrac[ uork.
c. At least #en { 10} days ~rior to tl~e scheduled dajr of bid opei~in~, notifi~ certified
~iBEs ofpotential contracting opportunities listed in the proposal. Thz
notification ~vilt include the follo~ving:
1. A description ~f the ~vork for ~~hich the bid is be~~g solicited.
2. The date, tune and lacatioti w~ere bids arz to be submitted.
3. The nFUne ofthe inditi~idual vvithui tlie agency/institution x~o will be
avsziiable to ansr~er questions abnut the ~roject.
~}. Where bid d~c~unents may E~e reviewed.
5. Any special r~uu•ainents that may exist, stach as insurance, licenses,
l~ortds and financial arran~ements.
Ifthere are more than three (3) ~ertified i1~iBEs in the gen~ral locality of the prajecY ~h~ho
ofFer similar contracting or subcc~ntracting ser~cricas in the specific trade, the Contractor
shall notifyr tlu~ee {3) , but n1a}~ contact mare, ifthe Coirtractor sa desu-es.
d. Dt~ring tlze Fiidding pracess, comptywifih the con.lractor(s) rec~~tirements listed i.n
the proposal for tninority participati~n.
~. Submit with the bid a d~scription c~f that portion of the «-c~rk to be e~ecuted by
1l~BEs expressed as a pe~•c~ntage of the total price.
f. Identifj~ the ~IBEs tl~e bidder intends to use on the caFitract, alazlg ~vith thz dollar
anlount of the work to be ~~rformed by each minoriiy business.
~. Submit an affidavit that details the good faitl~ ~fforts tal:en to procure minoriiy
business part.icipati~n.
h. I"pan kaeing named ti~e apparent l~~~r bidder, the bidder shall ~~rovide the necessar}~
h1AR-07-201~ 1~:31 From:
II~: 1111
Paee:0~7 R=93:
3/7/2012 3:25 PM iGMT} Fro~: ORHNGE C~iTY PIktCF~Sit~ 919-644-3324 To: 12524~322 Fage 2& oF 29
dacumentation as listad in the contract docutnents. Failure #~ cc~mpl3Y ivith
procedural requirements as de#ined in contract docw~~ents mayrender that bid as
n<an-respunsi.ve ~.n.d may resutt in rejectipn o.f the brd anci award tc~ the next lowesi
responsible ~id respansive hidder.
i. lipon being nam~d apparent loi~ bidd~r, the bitlder shall ~rnvide an atlidatTit that,
lists tU~ prop~rkion oft~e ~~:ork to be pei•faimecl by MBEs. Ifthe 11~B~s da not
accoutit ~or teti perceni (IO°/a) af thz confract price, the b.idder must subinit an
AfCdavit that verifies the bitider's gaoci faith ef~~rts by e;ertiiying tt~at it has
uiidertaken at least iiti~e of the faIlc~tving ren (10) steps:
1. Contacted minority businesses ehat reasonabh~ c~uld ha~-e be~n expected
ta submit a qunts and that ~~vere knu~~+n to the contract or available an these
State or l~c~al gazTe~~nmc:nt-maintained lists at least ten (10) days before the bid
or propusal date and notifi~ing them afthe natut•e and scope ofthe
work to be perfoimed.
2. ~Iacie the construction plans, specifications, and requirements available for
reuie~N bsT pmspecti~;e minority- businesses, ~r ~rovidix~g these documents
to them at Ieast ten (10) day~s before the hzd prapasals are due.
3. Bro~:e do~in or coinbined e~enients of work into economically feasible
units to facilitate minarit_y participation.
4. ~4Torked with niinority trade, community, ar contr~ctat• ar~anizations
iden#ifred by the Offace ofHistorical Underutilized Businesses and
inc~uded iu tbe bid documents that pravided assistanee in recruitment of
ininority businesses.
i. Attended an_y-grel~id meetings schedulecl bz- the gublic owner.
6. Provided assistanee in ~ettin~ required bond'ul~ or insurance or pro~idz~~g
alte~~na.tives to bonding or insurance far suhcontr~ctors.
7. Ne~o#iated in gaod faith with interest~d nunority businesses and did not
~-eject theni as unqualified v~~•ithout sound reasons based o~l th~ir
capaUilities. Any~•ejection ofa mnicaritybusiness based nn Iack af
~ualif~cations should liave the r~asons documented "m writing.
8. ~rovided assistance to an othersvise qualified minorily business in n~ed of
equipment, loan ca~i#al, lu~es uf credit, or joint pay agreements to seatire
loans, sugplies, or letters of credi#, including ~vaiving credit that iS
ordinarily required. Assisted minar'rty businesses in obfaining tl~e same
unit prieing zvith the bidder's suppliers in order to help ~he minoritv
businesses in estahlishi~~g credit.
9. 1Vegotiated joint venture and partnership arrangernents ~~itlr minority
busixiesses in order t~ increase opprn-tuiuties for ininoritv business
~articipation on a puk~lic construc#ion or repair project u-hen passible.
l~. Pravid.e quick pa~r a~reements and policies to enahle inuiority contractors
and suppliers ta meet cash-flow demands.
j. I7urin~; the co.tistructi~n of the project, if it becomes necessary to replace an MBE
subcontractor, advise the owner of the circurnstances involved,
k. I~ duruig the canstructiQn of a project, additianal subcantra~ting opportut~ities
beconie a~=aiiable, make a~o~d faith e.ffort to solicit subbids from l~~IBEs.
. liiBE Respansihilitias
~~t~'hile RIBEs are nat requir~d to become certified in order to participate in tliis program, it is
recomnieiided that fliey~ b~con~e certified aiid s11ou1d Yake advantage of the apprapriate technical
4
MA~c-07-2012 10:31 From:
Id#1111
Paae:~28 R=93~
3/712012 3:25 PM (G~1T) Fro~; ~IGE Ct~ITY FURCHRSIF~ 919-644-3324 To: 12~29390371 Page 29 of 29
assisiauce that is niade available. In addition, ivlBEs w-ho are contacted bv o~~ners c~r bidciers must
respond promptlywllether or not they~vish to s~ibmit a bid.
SECTIU`T =~: DISPUTE PROCEDURES
it is the patic~r ol~ihis County tha.l disputes bet~~een an a~encyand annther persan that invatve a
persoti's ri~l~ts, duties, ar privile~~s should be settled through uifoz•mal procedures. To that end, 1~iBE
disputes arising under ihese guidelines should b~ resoli~ed, ~f passible, by informal proceedings
MAR-07-2@12 18:32 From: ZD:1111 Pa9e:029 R=q3~
~~aat~ ~! ~
~,o. ~:~_. : '°
+~£.,
~ ~~'°'•~;5
~ ~x
x~ ~;~
.~; ~ ~
're e.~a`'`}
~ Orange County
Financiai Senrices Department
ADdENDUtUI #1
Ma~ch 13, 2U12
Furnish & install Level 2 Efectric Vehicle Su i E ui t 4 sites 367-1649
1"o ali Vendors:
Modifica#ions to bid documents for the above named Request for Proposal are made as faflows and shall be
included in the prnposed amount.
Site #1: Skills Devetopmeot Center - 503 W Frankl@n Street, Chapel liiil
Furnish and install a new 200 amp subpanel at Skilis ~evelopment Center. To be mounted on the waU just behind the
panel DP which wauld feed this rtew panel. It is a Square D I Line styie panel with FA breakers with the AIC at 22K.
Indude the cost of the new sub panei in the lump sum price for site #1 on the bid form. Please list the cast for the panel
here ~j•
~ ~~ c~ ~~~ ~ ~~~ ~
$ (afso include on bid form)
A(I other terms and conditions shall remain the same
By: David E. Cannell, Purchasing Agent; dcanne3l(a}co.aranc,~e.nc.us ~(919) 245-2651
A signed copy ofi this addendum shalE be included with the bid submitted by your company
Company Name: ~ ~.~ ~(?fi~ ~ic~ (..~ r~~ ~"~
By: =~tl,~.,._ ``t ~t.,,~'rY3.t.lti.--
Date Rece'rved: ,~~~~, ~ Z ~ f ~
P.O. 8ox 8181 200 South Cameran Streef Hillsbc~rough, Narth Carolina 272?8
Telephones: Area Code 919 245-2651 Fax: 919 644-3324
Page l
~£aaAts e1 t3,
` M ~i
i ~
AJ l ~ ~ ~~~ x
n :r
~. I";M:
~:' ;"' s
`'ra e.x~'`~
Orange Caunty
Financiai Services Department
ADDEN[3lJM #2
March 14, 2012
Furrtish & install Level 2 Elec#ric Vehicie Su I E ui t 4 sites 367-1649
To all Vendors:
Modifications to bid docum~nfs far the above named Request for Proposal are made as follows and shall be
included in the proposed amount. In Addendum one the focation for the 200 amp panef was incorrect it should
have been Seymout Center. Addendum 2 clar[fies addendum 1, and correctly addresses pane( Skifls Development
C~nter
'[ .
Site #1: Skilfs bevelopmen# Center - 503 W Franklin Street, Ghapel Hitl
upgrade the eacisting SO amp panel at Sk'r(fs Development Center to a 100 amp panel and instail a nevv 100 amp panel and
feeder. Creating 2- 1Q0 amp sub panels. Fndude the cost of the new sub panel in the lump sum price for site #1 on the
bid form. Please list the cost for the panel here
~
$ ~ ~C~,' (a{so include on bid form)
2.
Site #2: Seymour 5enior Center - 2504 Hamestead Road, Chapel Hill
Furnish and install a new 20Q amp subpanel at Seymour. To be mounted an the wall just behind the panel DP which
would feed this new panel. It is a 5quare D(or equaf~ I Line style panel with FA breakers with the AIC at 22K. Include
the cast of the new sub panel in the lump sum price for site #2 on the bid form. Please list the cost for the panel here
~, ,,
$_ .~ ~ ..~ ''Y(also incEude on bid form)
All other ierms and conditions shall remain fhe same
By: David E. Canneli, Purchas[ng Agent; dcannell[~a_co.oranqe.nc.us ~(919) 245-2651
A signed copy of this addendum shall be ficluded with the bid submitted by your company
Company Name: ~ Z.... ~ '~7c~ u; ec. ~' r' ~v ~.,~
gY: ~~, ~. A.. ~ ~,a :e~=~,~~~--~
Date Received: ~'~ 1 ,~~1 / .-~G~,~~
, ~.
P.O. Box 8181 20'0 South Cameron Sfreet Hillsbora~gh, North Carolina 27278
Telephones: Area Code 919 245-2651 Fax: 919 644-3324
Page 1
Eaton's ARRA Buy American Provisions
~ Siga #n ~ Caniaci Us USA ~ Woridwida Sites qIi of Eaton ~~ Search
~~~~ ~'~~+~ Homa > fiune:iCan P,c~c.5;+~ry hr+. (~t:;n,~~;i;r;e;?1 Act ~I~kRk) > Eafon's ARRfe Buy American Provisions
~
Pesierrng Br.siness V~7orhAsi-'.x
R:nerican Recauery an~
~eir~ve ~iment Act
#S~R~iA)
Eaton`s ARRA Buy
kmerican Provisions
The Follow3ng Eaton products are manafacW rcd in the United Statea and meat the requirements of the ARRA as set foRh in fhe
regulatiana. If produeis other than those tisted tretow are required, canfact your local Eaton Sales Representative.
PfoCIUCtS $~ SCtVlC03
Sy Gategory
$y Neme
8y t~ianset
Praducts & Serviees ~ Custamer Suppart [ Sustafnabiiity [ Our Comgany
3 ~t
Eaton`s ARRA Buy American Pravisior~s
Page 1 of 1
; Search i
9f,66<9.91'~` 16:~AM.~T1t9-a5-2C17 .
Sectioo 1805 of the Ameriwn Recovery & Reinvestment Act (ARRA) reQuires ihat all the iron, steeE, and manufactured goods used in~ an ARRA
project for the cohskruction, alleralion, maintenance, or repair of public budding or pubHc wodc must be praduced in the United SfaEes. Pursuant to 74
Fed. Rag. 14623 {March 31, 2009) (FAR Interim Rule) and 74 Fed. Reg. 18449 (Apri! 23, 2009) (OMB Interim Final Guidancej, a manu(aclured goad
is considered a domestic consiruction material rrithout regard to the source ur origin of components as long as the construGion material used in the~
project is manufactured in !he United States. 74 Fed. Reg_ at 14624 & 14626; 74 Fed. Rep. at 18452.
• 402atIT Pashbuflons
•- Adjusiable Frequency Driues
• ARlA~p Relays
• Aulomatic Trensfer Swiiches
• 8usway
• Electric Vehicle Chat~gi;ig Sol~atinns
• ~IecUo Centers
• Enciosetl Circuit Ereekers
• Enc1o>ed Contral
• Iniegrafed Faoili:ies Saitchboards
• Liphting ConlaCOrs (C35 and A2D2)
•~ ~ighiinq Conirol
• F.9edium L'oltage Assem6lies
• h9edium Voltage Malor CorUal
w R4edium Voltage Sw7ichgear
• Mete:ing
s F~iota Conttot Centers '
~ Nenvo;k Praie¢tors ~ ~.
• Open NEMA pr~ducis (FreedAm. A26Q, Advaniage, iT)
• Panelbaards ~
• Paralleling 5vdtchgear -
• Power and EneTgy t~iesers
• Power Pactor ConecGon Caparitor Banlcs
• T2esidential Loadcenters ~
• Safety S++ilches and Disconnecis
• Sofl Startets (5601 8 5$11) ~
• Surge Protective Devices .
• Sw3tch4aards
• 51,vikchgear ~~..
• Unst SubslaGons
• Vacuum Centaciars
Special Note on faton's Ory•Type Transformers -EalorYS Distn'Gution dry-Type Tnansformers are assembied in Mewco of mosuy,4mcrican
made matsrials and wouid comply with the ARRA Rules for Fedel.a..t pJ:oJe~.t~ with a tatal ~alue > 88.8M per NAFTA. On projects less than $B.BM,.
Eaton caa tumish these transFortners from a U.S. saurce in compliance wiTh the RRRA. Some State arM Local projeds may nol recognize NAFTA
comp6ance. IT ihis 7s the case, please advise your Eaton Represantative of the naedfia Eaton lo supply Rmerlcan made tr~sfatmers for those
projects.
At the time of an order, Eaton would tie happy to confirm ihai the specitic products nrdered confarm lo the ARRA requiremenfs.
Thanking you in advance tor cFioosing Eaton products~ for your projects,
Oave Bucklew
Vice President Sales
Castomer Sugpnrt
Gsnerat Contacts
~ilerat~re
Rroti.uct Quick Saarch
Training
Sustainabitity OurCampaqy Subscrtbe SiteR!!ap
~}CCOti(if3bl~tlY $i fi~70i/21.75 ~~OG~fICa~ ~~W53E((@C
Transp~ency Gareers Fovrer C!ualily Nawsietter i'~ivacy Policy
Cuiture o€ Sustainability Q6[cu,} $usirsess Tem'ts 8 Conditions
prom tha Chstrman Etftiics & Cnmplisnce Follvw ': 20 + Eaton
Sustainatrle Cnmma;sfEy invaskot R9tations ~Eaton an FBC~book %~~U ~r~ aer, i~l! Fia~h~s
itlei
£
`
~
E
t
? RF'S87Y~J
Sustainabl~ Pracilces Nev+s & Events ~.
,.~
y
a
o:i on
w
L
i1 Eat
r Link
e~iln
n
S~SEaina6l~ SotuGons White Papers ~y
.
o
o~
G:7 Eaton NewsFeeds
http://www.eaton.com/Eaton/ARRA/EatonsARRAB uyr~mericanProv isians/index.htm
10/5/20 i 1
~~rt__~.._~
Selli~q PaiicY
EffectivE. t,levember 1, 2008 Paae 1
Supersedes Seiling Palicy 2ra-IX30, DOMESTIG U.S.A.
Pages 1-4, da#ed GENERAL TERIVfS AND
February 2D, 20a6 CQND1TiQNS tJF SALH
Distribution and
Cantro! Products
and Services
25-0f~0
TERMS AND CONDf1'IC1NS CtF 511LE
The Terms and Conc~itions of Sale set forth
herein, end sny suGplemeMs which may be
attached hersto, constitute the tuN and finai
expr~ssion ofthe co~ractforthe saleo(
products or services (hereinaftar referr~d to as
Protl~ct(sJ or S~rvicas by Eaton Gorporatlon
(herEinatterrEferredt~ asSeller}tothe Btayer,
and supersedes all pnor quotations, purchese
orders, correspondence orcommunications
whether wntten or ~ral between ihe
Seller and tt~e Buyer. Nolwithstanding any
car~ary language in the Buyer's purchase
r,rder, corrESpondence or uYherform of
acknovuledgmeni, 6uyershzll be boundby
these Terms and Conditions of Salewhen it
sends a purd~~ase arder ar othemsise indi~tes
aocsptance of this amtract, arwhen it accxn~ts
delivery frc,m Selier of the Pr~ducts or
Services. THE C~JNTRACT FOR S:~LE OF
THE PROQUCTS OR SERVICES !S
EXPRESSLY LIIvSITEC7 TO THE TERMS ANO
CONDITIONS OF SALE STATEO HE~EIN,
fWY ADD(TIONP.L OR DIFFERENTTERMS
PROPOSED BY BUYER ARE RE.JEGTED
UNLESS E,YPRE~SLY AGREEp TO fN
VrrRiTING BY SELLER. No contract shaH
exist sxcspt as herein prawided.
Complsts Agreemerrt
No amsndmant or mqdlfication hereto nor any
statement, reprssentation or warranty not
container] h~rein shall be binding on fhe Selier
unless made in wriiing by an auttiorized
representatiwe a( the Seiter. Prior dealings,
usaga af th~ krede ~r a cqurse of performance
shall not ~e relevant to detsrtn3ne the mear,ing
of ihis a~ntract even though tr~e acceptirrg
or ac~uiesc~ng party had knowledge of the
natura oflhe pertormance and opportundy
f~r objectipn.
C2uotations
Written quotations ars v~lid fcr 30 days from
its date unless ~therwise stated in the
quotation or t~eminaied sooner by notice.
Verbal quotations, unlass accepted, expi~e ths
same day they are made.
A complete signed arder must be recarred by
Se~lerwithin 20 calendarc~eys of notification c(
award, othenvise the price and shipmentwiEl
tre subjs~ to re-negotiatio~ t.
Terminatian and Cancotta#ion
Any ordPr may bz term:natEd by the 8uyar
cFr:ly by vrriften ncticE and upon p3yrnent of
r~a.onable termination cherges, induding
all costs plus ~rofit.
Seller shafl have the right to canctl any order
at anytime by wntten no8ce if ~uyer
breaches any al the terms her~ef, becomes
the Subjec[ o( any proceeding under state
or federai law for the relief of dabtors, or
athenvise becomes fnsolvent orbankrupt,
generaUy daes not pay its debts as !hey
become due ~r makes an assignment for
the berre6t c~t crecitors.
Prices
Ail prices are subjECt Yo change withnut
nolice. In the event of a pnce ehange, the
effective date of Ehg change wiil be ths datp
of the new price or discourrt shset, leiter or
telegram Ail quatations maoe or ardars
accep;ad afterthe efFective date will be on
the new basis. For existing orders, the pnce
of the unshipped purtian of an order wiii be
the Grice in effect at time of shipment.
Price Policy- ProdueYs and Servites
VvYsen prices are quoted as fi~m tor quotetl
shipmerEt, they are firrn provided the
folioaving conditions are mat
The order is released with complete
enpineenng details.
Str~ipment af Frcducts are mede, and
Services purehaseC arz prav:ded within
ihE quoted lead timE.
V~fien drawings for approvai are re:uired
for any Produ~:ts, the drawings appii~able
ta those Products rrcusi be retumed
wifhin SO" calen~ar days from the date
~f tha ariginal mailin) of t~e drawings
by Seller. Ths retum drawirgs must tre
relaased for manufacture and shipmet'it
and must be ma:iced "ttPPRGVED`
ar';aFFRnVED AS NOTED.' Drawing
re-subrnittals wliich ere requi3~ed far any
othar raason than to rQrrect Seller errars
will nat extend the 30-day period.
;f khe Bus~r inftiatas orin anyway causes
deiays in shipmenf, provision cf Services
or retum of approwal drawings bayand the
periods stated above, the price af the
Pr~tlucts or Service= will be increased
1~~o Ger month or fractiun thereof up to s~
mazimum a# 13 m~nths from the da~e of
the Buyers order Fordalays resuinng in
s~ipme~t ar provisi~r~ of Service5 beyan~
" GO days inr nrdhrs th~ough coniract ors Ie ai€m.• iine Fm~ their
review and apprma! ~eiare and ;f@~ IransrriHing IhErr. to ihe'rc
LUSIORI2i5~
i3 manths from the date of the Buyet's
arder, ihe pr"rce must be renegoaated.
Price Poiicy- BLS
P.efer to Frice Policy 25-Q50.
Minimum Biii[ng
~r~fers less than $1,000 witt be assessed e
shipping and handling charge cf5"/a ofthe
price otthe order, rrith a minimum charge vf
$25,a0 unless rtoted different€y on Product
discount sheets.
Taxes
The prics does not indude anytaxes. Su)rer
sha11 he responsibie (orthe payment of af)
faxes applicabis to, or arising from, Ehe
transaction, the Praducts, lts sale, vaius or
use, or any Services performad ~n coRnection
therev¢itli regardiess of [he person or entity
actuaily taxed.
7EEtM5 OF PAYMENT
Products
Acc:eptance of ali ortiers is subject
to the Buyer meeting Selier's a~ed3t
requir~mgnts. Terms of payme~rt are
subject to change for faSlure to meet such
requireme~ts. Seller reseroes the right
at any time to demand fuii or partial
peyment be#ora proceeding with a
contrad ofsaie as a rasult ~f dianges
in the financia! condit~n ofths Buyer.
Terms of Payment arE either A~et 3Q days
fr~m the date ofirn+aice of each shipment
orcarry a cash discount based on
Proiiucttype. Speci6c payrneniterms
for Praducts ara ~utlir~ed in the
applicabfe Produ~ disr.ount schedules.
Servicts
Ter,ms of payrnent are net within 30 days
fr~m date ofirivoice fororders amourrting
to less than $5D,040.00,
Sel iing Po li cy 25-000
hfovember 1, 20C8
Page 2
~s~~~
Terms of payment for orders exceeding
$6d,000.00 shali be made axordino to
the foflaw€ng: v
1. Twenty ~ercent (204~) of a~der
value wiYh #he pur~hase order
Rayatrle 30 days Frpm da!e of
irnroi ce.
2. Eighfypercerrt(80~}afordervalue
in equal monthiypaymcnts over
the pertormancre penod payable
34 da~ from date of irrioice.
Ex~ept for rrork perfiormed (i) u~der a
firrn fixed price basis or(ii} pursusrrt tb
terms efs previouslypriced existinq
ca~r~ot hetween Sefi~rand Buyer,
inaoices forwark perfotmed by Se11er
shal! haue ~t}dad and n~ted on each
irnai~s a charge of 3°~ (rnrer and above
the p~ice of fhe work) which is retated #o
Se31er complianee with present and
proposQd environmental, heatth end
safety regulations associated with
prescribod raquirements aovenng
hazardous materials management and
employea trainirtg, communications,
personal proteetive equipment,
documerrtaEion and rscord kseping
associated therewith.
Adequate ,4ssurance s
IP, in the judgmerit af 5eiler, the financial
con~tion af ths Buyet, a# any time tluring the
period of the corrtraa, does not just~fythe
terms ofpayment specified, Ssllermay
ret~uire fuil or partial peymant in advance.
Delayed Paymerrt
If payments are not made in accordance vrith
these terms, a service charge will, without
prejudice #o the right oF Seller to imme~ate
payment, be added in an amount equal to the
lower ot 1.~4c per month or frection thereof or
the hi~hest legal rate ort the un~aid balance
Freight
Freigf-~t policy w~l be listed on the Rroduct
discount sheets, or at option o€ Sefier one
ofthe fuiiawing freight terms wilf tae quoted.
F.D.B. - P1S - FrtfPpd. and Irtvoiced
Products are sold FA.B. point of shipment
fraight prapaid ancJ invoiced to the 3uyer.
F.O.B. - P/S - FrLJPpd. ar9d Alloaved
Products sold are delivere~ F.0.6. pQint
of shiGment, feeighi pcepaid and included
in the pnce.
F.O.B. Dostinat€on - Frt.tPpd. and Altowed
At Buyers option, Seilsrwill dativertlie
Products F.fl B. destination freight prepaid
and 24'o wili be added to the net price
The term `freight prepaid" meansfhat traioht
cltarges wiU be prepaid to the eccessible
common carrier deEivPry point nearest the
des6naUar. ior sh;pme~ts within the United
States and Puerto Rico unless nated
ditferently on the Product discouni sheets
For any other destination, cxintact Geiler's
representative.
Shipment and RouYing
SellS~sl~~i1 select the poi~ of origm crf
shipment, the method oftransFortation, th~
Yype of carrer EGuipment arld the routing of
the shiGment.
If the Buysr spea~es a speaaE rc~ethod of
transpo~tation, type of carrier equipment,
reuting or deiivery requitemenE, Buyer shail
Ray ail spe:~al frsight and handling charges
Vtfien fr~ight is induded in the price, no
ailowance will be made inlisu of
transpo~taYion if the Buyer accepts shipment
at Nactary, w~rehouss or he(gh# staUan ur
c~thenvisa suppiies ~s own transpo~taNon.
Risk cf Loss
Risk of loss or demage to the Praducts shaEl
pass to Buyer at the F.O.B. point.
Goncealed Damage'
Except !n the event af F O.B. des6nation
shipmerrts, Seller will not participate in any
settlemerit of daims for concealed damage
V3h7en shipment has been made on sn F.O.B
destination basis, the Buyermust unpack
immediateiyand, if damage is discovered,
must.
1 Not move th~ Products from #he point
of examiration.
2. Retain shipping container and
~iac{dng material.
3. Notify the carrier in vwriting of any
appareM damage.
4. Notify Seller represenEatiue within
72 hours of delivEr~+.
5. Ser:d Seiler a copy of the carrier s
inspection report
Witness TestslCustomer tnspection
Standarci fa~tory tasts may be witriessed by
the Buyer at Seiler's factory for an a~ditianal
charye calculffied at the rffie of $2;500 per
day (not to excezd eight i8) hours)per
Producttype. Buyermay tiral Insped
Products atthe Sellers factory tor $500
per day per Rroduct type.
Witn~ss tests wiA a~id ona (11 week to the
schedWed shipping date. Seiler will notify
Buyer tourteen {14} calendar da/s priortc
scheduled wifness testing or inspection. ln the
everrt Buyer is unable to aitend, the Par~es
shall mutually agree on a rescheduled date.
Howevsr, Selier reserves the righrt to deem
tha vJitnass tests waived with the right to ship
and irrvoice Products.
Held Drders
For any order held, delayed or reschsduled
at ths requsst of the Buysr, 8eller may, at its
sole option, i1 } requirg payment ta be based
on any raasanabie basis, inGuding but not
limited to the contract price, and any
addRianal expanses, orcest rasu~ing fiam
such e deley; (2 ) store Products et the sole
cast end risk of ~oss ofthe Buyar, andtor(3)
chargeio the Buyerihase pnces un*Jer the
applicaDla prtce policy. Payment ft~r such
price, expenses and costs, in any such
ever~t, 5ha11 be due by Buyerriithin thirty {30)
days from date of Sellers irr~olce. finy order
so held delayed or rescheduled beyond six (6}
months will be trea'ed as a Buvertermination,
Dcdwing Approval .
Seller tvill design the Pruducts in fine with,
in Selie~s judgrosnt, good carrrmeraal
pra~itY3. If at drawing approvai @uyer makes
changes outside ofthe design as coverad
in FhEir speafications, Ssllarwiu then
be paid raasor~abis charges and allowred
a cammensut~te deley in shipping dats
basad on the cha~ges made.
Drawring ReSubmittal
When SeUeregrees ta do so in its quotation,
Seller shall provide Buyer with the firsi set
of factary a.~stomer approval drawing(s} at
Seiler's expense, The customer approval
drawing(s) wiil be delivetBd at the quoted
delivery date. If Buyer requests drawing
chenges oradditicns a&erthe initial factary
custamer approval drawing(s } have been
submitted by Seller, the Selier, aE its option,
m~y ~ssess Buyerdrawing chargss. Fadory
eustomer approval drawing ch~nges required
due to misinterpretetian by Selferwill b~
at Seilers expense. fipprovai drawings
generated by Bid-Managarare excluded
from this provision.
YY,AR(2AN71'
VYarrar~ty For Products
Setter warrarrts ihat ths Products
manufactured by it wili confarm to
Seiker`s applicable specifications and be
free from faiWre due to oe~cts irt
workmat~~hip and matgnal for oY~e {?}
year trom the date af installation ~f the
Product or eighteen (18) monihs #rom
the date of shipment of the Product,
whid~ever occurs first.
In the'event any Product faids to compEy
with the foregoing.wamanfy SailerwilE, ak
its option, either (a) rapair or repiaca the
defecfive Froduct, or defec[ive part or
component thereoi. F.0.8. 8elter`s
taafity freight prepaid, or (b} credit ~ayer
forthe purchasa prics of the Product. All
warranY~ claims shall be made in wn6r~g.
~~~~~ Seiling Policy25-000
~ Ntrvembel~ 1, 20pg
Pags 3
Seklerrequires a11 norrconforming
Prt,~ucts be ratumed at Sell~fs expens5
t~r eveluation ur~isss specifiailystated
otherxise in rriting bVSeller,
This ~+~rranty does r~t cover failu~ e
or dama~o duE t~ storage, mstalfation,
upsratic~n or maintenance not
in c~nformance with Selie~'s
recommendations and industry
st2,ndard ~rarkice or due ta ac~ident,
rnisuse, ak,usa or negiigance. This
avarranty aoes r~at cavar reimburs~,ment
f4r;eb~r, gaining axess, r2moval,
instaiiation, tempera.ry po~der or any
ather ex.penses, whi~ may be incurr~d
it~ conrredic~n with repair or r~placemenE,
Tnis warranty does not apply t~
equipment not manutactured by Seller.
Selier tirnits itself to extending .he same
warranty it receives from the su~iplier.
Extended Warrar~tyforProducts
If reques#ed by the Buyer and specifically
accepted in writing by Se;ler, tha
foreaoing standard warranty for Products
wiii b~ exiendad from the date of
shipmentfortha period andp~ice
indicated below:
24 months - 2% of Contract Rrice
30 months - 3% Gf Contract Price
36 monihs -4% of Coniracf Price
Special Vsfarranty (tn and Dut) for
Produsts
if rr;quesY~d by the Buyer and specifically
a~cepted in writing by Sei[er, Sellerv~+ilt,
during th? warraE~ty pericd for Produets,
at an aiiditional cost of 24~a of the
coniract prica, be re5ponsEble farthe
direct cost of:
1. Removing the Product ~rom the
installed location,
2. Transportatian to the tepair fac~lity
and retum lo the sGta.
3. Reinsteilatian an ~ite.
The totel Iit~biliEy of SeNSr forthis Gper{al
Warranty for Products is limit2d to bU°!o
af the contract price ofthe particular
Prvduct beinq repaired and aYCludes
expenses torremoair~g adJacant
apparatus, ~valls, ~,iping, structures,
temporary ser~~ice, ete.
Ntan^anty For Se rvi ce s
Seller v~!arra~s that the Serv ces
~ertormed by it hereunderwill be
pertarmed in ac~ordan; e tivith generally
acwpted professiona{ stan~ards,
The Sen~ices, which tlo not sn confortn,
shall be correct?d by SElier upon
natification in ~.ti•nting try the 8uyer
r~ithin one (1) yaar after comp!etion
of the SeN~res_
Untess otherrvise agceed tc~ in wriiing Cy
Seller, Seli~rassumes no resp~msik~i6ty
w<th respect to :he su tability cf the
Buyet's, orite cust~~mer's, e~uipmerd
or rrith respect t~ any latent d~fecYs in
equipmarrt n~t sup~lipd ty Ssllzr. This
waRanty does nat rover damage Eo
Euyers. or its oustomer's, equipment,
components crr parts r~sulGng in ~vho e
or in part from im~rropermcirrtenan~e
ur operation or Yrom their deteriorated
condi5on. Buyer~roill, st its cost, provide
Sellararith unobstrvcted acc2ss to thP
det2ctive Senlices, as well as edequate
free workirrg space in the immediaYe
viciniYy of the def~ctive Seroices and
suct~ Naa€ities and systsms, including,
wi~out limitalian, docks, crenes ~ind
utilityd~sconnects and connects, as may
be n9cessary in orderfhat Seller may
pefiorm sts warranty oGlig~tions. The
conducting of any tests shall be mutually
agreed upon and Seller shail be notifisd
of, end may be present at, all tests that
may he rr~ade.
I+Varcanty for Power SysEems Studias
Sellerwarrants that arty prnner systems
studies performe8 byitwili conforrn
te generally accepted profzssional
standards. Any portion of the study,
which does ~ot so conform, shall be
corrected by Seiler upon notification 3n
v~riting by#he Buyerwithin six (G) monttts
aftercomp(etior oFthe study. All
warranty woric shaii be performed in a
single shift straight tme basis Monday
through Friday. In the event ihat the
s!udyrequires correctiqn ofwarcanty
items on an overtime schedule, the
premium portion af such overtime shali
be forthe Buyer's account.
Limikatfon an WarraMias for Products,
Serv[ces and Power 5ystems Studies
THE FOREGOiNG WARRANTIESARE
EXCLUSIVc EXCEF'T FQR 4VARRP,NTY
UF TITLE. SELLER DISCLAlMS ALL
OTHEh WPJ2RANTIES INCLUGIfJG
fWY IMPLIED WAF2RANTlES OF
MEFCHANTABILITY P.ND FITtJESS
FOR APFkRTiCULRR PIiRPO~E.
CORRECTION QF Nc~PJ-
CONFORiv~ITiE51N THE h2=tNfdER
AND FOR THE PERIGD OF TIME
PROVIDED ABO~~E SHALL
CONSTITUTE SELLER'S SOLE
LIABILITY AND BUYER'S EXCLUSIVE
REMEDY FOR FAILURE OF SEL~ER
TO MEEf iTS VJARRRNTY
06LIGATIONS, i!utiETHER CLP,IMS
OF THE BUYER ARE BASED W
CONTRACT, IN TO~T ((fdCLUDIP~G
NEGLIGENi:E OR STRICT LIABILITYj
OR GTHERVVISE.
Asbestos
Fad6r~,l Law r~quir~s that buil~ing or facility
rn^anee~ identifythe presence.locetion a~~d
quarti~y of asb~stc~s cortairting meteriai
(herainafter'ACh9" } a: w~rk sites. S61l2r is nat
lic~nsed to ehete?~CF+1. Ac~x,rdin~ly, for anu
!Untract Mrhidi inclu~jes the provisiun of
~Frvices, ~rior tr~ +,i ) cummencement of w~r;c
at cny site un~iera s~ecifi~ Purct~3ss Order,
{ii) a char~r~e in the worY. scohe of any
Pur~ase Ordar, the BuyErwill certifythai
the wark area assoaated with the Seilar's
scope of arork includes the handling o{ Class l
AC:M, inclutling but not limited to gsneratot
wed~es and high temperatur~ gaskets tkhich
indude asbsstos matariei5. Tha Buver shaii,
at its expense, ~,ronduct ebat€,ment should
the remooai, handling, modi6caYion ~r
reinstaliation, qr some or all of thsm, of sai~
Class II ACM be likelyto genarate airGume
asbestos fibers; and shouid su:~~ aGa:emsnt
affECt the cast of oriime of perfo~nance of
the work then Seller shall be entitled to an
equitable adjustment in the schedule, price
end other pertinent affected prouisions of
the cantract.
Compliance vr€th Nuciear Regutatiarr
Sellers Products are sold as commercial
grade Produc~s not intendeJ for application
in fadlities or a~ivities licensed by the United
States Nuclear Regulatory Commission
far atomic ~urposes. Further ce~ificatlo~
will be required tor use of the Prr,dus~s
in any safe#y-related app(ication m any
nudearfacility Iicenssd bythe U.S.
Nuclear Reguiatory Commission.
Returning Prodncts
AuYhorization and shippirrc~ instru~ions for
tha retum of any Products must ba obtainad
from Seiler befcre retuming the Rrnducts.
When retum is accasioned due to Seller errar,
full credit inrluding aU tfan;portation ChBrgas
vrill be allowed.
Product htotices
Buyer shall pravida the user (inciud~ng
its amployeas} of the P~ucts with ell
Seiler supplied Product notices, raarnings,
instruc~ions, recommendations and
similar matenals.
Force Majeure
Salfer shall not be IiaGle for failure to Ge:~orm
ordelay'sn pertormance due to 6re, flaod,
strike or othar labr~r diffiwity, a~t of ~od, ad
of any govemmenta! a~~thority or vf the Buyer,
riot, embargo, fuel or energy shorage, car
sr~artage, ~vr~cics ordelays in trarspc~rtation,
~r due to any othet cause Geyond Seiler's
reasonable con5-ol. in the event of d-elay
irt parfartnanca due ta any suc~ causa,
thc date af delivery ~r 6me fvr com~letion
4vill bF extended bV a perioo of time
reasonably nec~ssary to everceme the
effed otsuch de(ay.
Seliing Po{icy 25-f~OD ~i~• ~
November1,2008 ~
Page4
I
Liquidated Damages
~ur~~ads which inGUdz Iiquidated damage
clauses for failure ta me~t sh~pping orjob
pmpleti~n promises ore r~ok acce~tabls
or binding on SeUer, unless such dauses
are speci(~cally ac: epted in veriting by an
authorized represer~tatrve of khe Selizr at
its headquart,ers office.
Patent i ttfri nge ment
Sellerwiif defend ar, at i~ option, settle
any suit or proceeding GrGUght against
Buyer, or Buyer's customers, to the
ex.tent it is hased upen a claim theY any
Protluct ar part iliereof, manuhactured by
Selier or iis subsidiaies and fumished
hereunder, intringes any United Stat6=
gatent, atherthan a claim of infringemerit
b~sed upon use of a Preduct ar part
thereq~f in a process, ~provided Selleris
no~fled in reasonable tims and gn+en
suttrority; informa6on and assistance
(at Saller's exfignse) forthe defense of
same. Seller shaEl pay afi legaE and court
eosts and expenses and court assessed
damages awarcled #herein against Buyer
resulting Uom or incident to such suit or
proceeding. In addition to the foregoing,
if at a~y timA Seiler determines there i=_ a
subskar~ti~ question of infringement of
qny United States pafent, and the use of
suctt Product is or may be enjoined,
Setler may, at its option and expense:
either (a) procure for Buyer the right fo
coratinue using and seliing the Product;
(b} replace the Product with non-
infringing apparatus; {cJ modifythe
F~roduct so it becomes non-infrin.ging; or
(d} as a last r~esart, remcwe the Product
and re(und the purchase price, equitably
edjusted far use and ~bsolescence.
In no case does Selier agr~e to pay any
r~coveryhased u~n its Buya~'s savings
or profit fhrou~ use of Selters Products
whethsrthe use be speciai orortiinary.
Ths fore~oing states d~e enEire liahility
af Selier forpaterrt infringement.
The preCeding paragraph does not apply
to ariy daim of in~ingemei~t 4ased upon:
(a) any mcrdi5c~ion made to a Pro~iuct
other than by Selier; (D ) sny dasign analor
specificaBOns ~f Buyerto which a Product
was manufactured; o~ (a} the use or
combination of Product ~ith other products
whers the Product does not itself infrings,
As te the aGwe-ida~tified daim situa#ions
where #he przceding paragraph does not
appiy, S;.~yer shall defend and'nold SeUer
hartnless in fhe same mannEr and to the
e~ctgnt as Seller's ohligations ~escn5ed
in the preceding pzragraph. Buyer shall
be responsible for obtaining iat Buyer's
expense) aii license right~ required for
Sellerta be able to use soRware products
in the possession of Euyerwhere such
use is requirad in orderto perform any
Seevice fpr Buyer,
With respect to a Product Gr part there3~f not
mahufactured by Seileror ts subsi~iaties,
Sellerwill aitempt to obtain for Buyer, from
the.suppGer(s}, the patem mJemnificatian
protection normail,~ provided by the
suppl{eA,s) to customer.
Complianca with OS1iA
Salder o€fers no warranty and makes no
representa~on that its Rroducts compiy
vaith the provisions or standards oftne
Occupational Safety and Nealth Ad of 1870,
or erry regulskion issued thereunder. !n rro
avent shail Sel!erbe liab~e foranyloss,
dama3e, flnes, penalty or expenses arising
under said Act.
Limitat€on ot~iabititiy
THE REMEDIES O~ THE BUYER SET
FORTH IN THIS CONTRACT ARE
EXCLUSIV°E AN6 ARE tTS SOLE
REMEDIES FOR ANY FAILURE QF SELLER
TO COMPLY WITH 17S aBLlGATIC~NS
t{EREUNDER.
Nt7TWITHSTAN~ING ANY PFOVISION IN
THIS CONTRACT TO THE CONTR~Y,
ITJ NO EVENT SHALI SELLER BE UA6LE
IN CONl"RACT, IN TQRT (INCLUDIN~
NEGLIGEN~E OR STRIGT LIA6ILITY~ OR
OTHERWISE FC~R DAMAGE TO PROPERTY
OR EQUIPMENT QTHER THAN PRODUCTS
SOLD HEREUNpER, LOSS OF PROFITS
OR REVENUE, LOSS OF USE OF
PRODUCTS, COST UF CAPITAL, CLAIMS
OF CUSTOMERS OFTHE BUYER OR
ANY 5PEGIAL, I~dDIRECT, INCIDENTAL
OR CONSEL1UEhTI.AL DAMRGES
WHRTSOEVER, REGARDLESSOF
WHETHER SUCH POTENTIAL DAtviPGES
ARE FORESEEAILE OR IF SELLER HAS
BEEN qDVISED OF THE POSSIBILITY
OF SUGH DAM,AGES.
TH~ TOTAL CUMULATI4'E L;ABILITY OF
SELLER ARIStNG FROM QR RELATED TO
THiS CONTRACT VvHEfHEF THE CLAIMS
ARE BASED W CONTRACT, lN TORT
jINCLUDING NEGLIGENGE OR STRICT
LIP,B3UTY) OR OTHERWISE, SNALt NOT
EXGEED THE PRICE OF THE PR~DUCT
OR SERVICEB ON Wt-iICH SUCH L(AB[UTY
IS BASEO.
Ent~n Gorporation.
1000 Gherringkon Pa~kway
Moon Township, PA 1510~
Unite~ Statas
TQI: 1-8QU-525-2000
Eaton.cam
~ 200~ Eaton Corppration
,SI[ Riahts Reserved
?rinted in USA
Publication No. SF0304000?E
Z77~~
~~~~'~~~~ ~~ ~~~~~~~~~~~ ~~ ~ ~~ ~~~ '~~~~~~,~~ ~
~~ ~
i ~~~ ~ ~~~st ~~~~~~, ~I~.~~~~~ r~~~~~°ir~ ~~ ~~~~~ ~,-~ ~~~c~ ~°€~~r~~~-~
~
Powering Businass Worldwide
C3verv~ew
Plug-in electric ~tehicles offer impraved fu~l econt~my, lc~wer
emissions and str~ng acceleration with quief operatiot~-
all from a domestic er~etgy source, Therefare, it is no surpris~
that autamal<ers are bringing plug-in eleciric vehicles to ft~e
muss mar)cet. ln fact, industry fareeasts preditt ar~ annual
volume ~f 40a,~O~ ~Jdttft'~ 2I2CtT1C 11~F`:7t~25 3'T1 NOt't}t
America by Zd20. T#~ese electric ~rehict~s will require a
sUb~tankial rasid~ntial, camm~rciat and pu~lic irfr~structure
i~ support thcm.
~~~~}~'' ~rc~~;c~e= ti}-~~ r~rsst r~~~~t, ~,~~:ia.~t~ eff~~~r~g
cs~ ~?~ct~~~~ ~~i,:c~~ ~~a~~3Y ~~at~rr~~~r;t t~~~=~~~ e~7
~~r~ rr-~~rl~~t. Eaton's Fow-R-Statian family af sol€~tiorss
is #he electric transpartation industry's premier EVS~.
Eat~n"s Paw-R-Station e~ectric t~~hicle charging ~tations supplY
the tonnect~t~n t~ the grid wY~ere vel~ieles {~ark-stre2t-side,
garage or p~rking tot-and provide the car's onboard chargF~r
wit1~ the electriciiy it nee~s to ref;Il the batt~ry.
~fexitaility for an
emergirtg snarkeY
Whether you have a fleet
of electric vehicles or you are
plugging in while away from
home, Eaton has an electric
vehicie charging station targeted
to meet your commercial needs.
The Level 2 Pow-R-Station
electric vehicie charging station
is NEMA~ 3R ~ated-suitable for
indoor or outdoor use-and is
housed in a heavy-duty aluminum
enclosure with a powder-coat
paint finish for durabifity and long
life, The charging station can be
wail-mounted for commercial
garage installations, or it can be
configured as a freestanding
pedestal.The Level 2 AC stations
are equipped with a device panel
to easily upgrade later with the
addition of a payment or authori-
zation periphera{.
N~;v it t~~rorks
When the driver connects the
J1772'" connector to the elecVic
vehicle, the Level 2 Pow-R-Station
EV charging station confirms that
it is an electric vehicle by "waking
it up" through one of the pins
in the connector. Once the station
has confirmed the connection
the charging station will respond
by indicating its avaiiable line
current (ALC). Ths ALC is the
maximum current the electric
vehicle is allo~roed to draw,
depending on the circuit size
or ihe commands of a load-
management system and/or
ihe requirements of a utility.
Ospsnding on the battery size,
the Levei 2 charging station
wili easily fill a depleted efectric
vehicle battery in as little as four
hours while ihe owner is at work
or play.
C~~e~razing
YEARS
i~~eals ;~-:Mt Er~vurL
~~~ ~~ ~~.~ ~~ ~~ ~~ ~~ ~~~`~ ~ ~ ~~a ~ ~ ~ ~ ~ ~ ~ . ~~~ 4~ ~
ltser safety
The variaus communications
between the electric vehicle and
the Pov,~R-Station EV choFging
stetion are in place to ensure user
safety.These safety checks verifiy
that there is no chance of injury
to the user or the equipment.
For example, urrtii the vehicle
has confirmed it is connected
to an EVSE, the five pins on the
connec#or have no AC power.
In addition, the charging station
has cqmpleted certification
testing ta the applioable UL~
and CSA~ standards for EVSE.
tnsta€latiar~
Installation of the Lsvel 2
Pow-R-Station EVSE can be
performed easily tiy any quali-
fied efecirician. The wall-mount
design is much like the instalia-
tion for an electriC stove circuit,
and the pedestai is comparable
ta the installation of a lighting
bo{lard circuit. An electrician
can also verify whether the
size af the branch circuit is
correct per NFRA~ 70 and
NEC~ 625_14 standards.
Eaton manufactures a(i products
ihat may be needad to support
an elec#rica{ sysYem upgrade,
if it is required for instaflation.
For commereia! installations,
Eaton's Electrical Services
and Syst~tns iEESS1 team
of electricai engineers is avail-
able nationwide and can be
augmented by Eaton's ne2work
o# national, locai and speciahy
certified electricai cantractors.
Gommunicatinn features
The Level 2 Pow-R-St~tion
EVSE is equipped with native
RS-485 communications, allow-
ing an Application Programming
Interface tAPI} to be accessed
via Madbus~ RTU.The Modbus
proYocol allows for integraiion
in~o a building's er~ergy manage-
mer~f system (EMSa to manage
fhe charging statian's deployment
with status and usage statistics
for the who~e #acii'rty:
Fiemc~te rnanage:~ent
and contro!
~ptionally the station can be
networked with other power
statio~s. using Eston's Network
Manager software. With
Network Manager, the power
stations can be operated or
managed by one antity, a group
of users or a third-party via an
easy-to-use web-based portal
or via a secure public API.
Eaton's Pow-R-Station Network
Manager Software prnvides
remote-management and control
services for The charging station
or network. Netwqrk Manager
Software ailows a user or a fileet
ma~ager to check the status
~f the station, including if it is
id~e or in use, the amount of
power flowing to the vehi~le,
and any required preventative
maintenance. Further, the user
is able to gazher usage daYa and
rapa~ts, manage and controf
how fast charging takes place,
and access maps of where
each station is focated, ali from
Intemet portel dashboards.
Eston Carporetion Canadian Operations
Electrical S=_ctor Eatan
1777 SuDe~ior Ave. 5D50 RFain~+vay
~':eveland, OH 4~in4 Eurlinylon, ON Vl 527
U~:ted States Canada
877-ETN-CARE i$%7-3862273) 80~~-2fiE-357&
Eators.c~m Eator,cansda.ca
~ ~ 20t1 'caion Cerporat;cn
j~~ All Riqhu ftes9;w_d
~ Prirttec :n VSA
Pub!icacioc No. Pa0EVa0^etE,` BG:D5
PrnveringBusinessWoddwide sePrmns~ z;;n
Authenticatian
To meet your application needs,
Eaton can interface with third-
party authentication systems
including but not fimited to:
• Outdoo~rated credit
card swipe.
• Secure access FiFID
• RFID with user identification #~
Synd~ronous-code keypads
~Fi~£}f7 .S<°`~E:`S C7~$i.'£.'".
~ Wnen osed wirh Eaton's
Network Manager software
Further, the optional integrated
synd~ronous-code keypad can
be used in conjunction with
parking Iot management sys-
tems commonly depinyed today
tti provide a mezhod for both
enabiing payment and restricting
access to the charging stations.
o~. a
~,. .~
•
.....- . ~ ~ .
Eaton is a r2gistered hademark
of Eau^.n Corpora:io~~.
Ait other trademsrks are praper,y
oi The~r respeciive owners.
Ftrr rr~c~r~ drsfcarrna2ion, s~asit www.eafan.ccrrrtlplugin,
c~#J t-855-ETN-EVSE /7•Ss.'`i•;~~5-3~r'31, c~r ca81 g~c~ur lc~cal
~;'~•N
Pawering Business Worldw+de
Produe# famity overview
The electric vehicle (EVi revolution is here, and
with it the need for a robust and accessible EV
charging infrastructure. Eaton meets that need
with a family of EV charging stations specifically
dasigned for use in the piaces where people
work, Shop, and piay.
Available as a~ option is the ePort~ EDGE'"
from USATechnologies the number one
supplier of point-of-sale 1P05) systems in the
United 5tates for una#tended retaiL The ePort
EDGE accepts payment from all majo~ credit
cards, and USATechnologies handles the entire
transactional process, via the eP4rt Connect~
service package-a PC!-compliant, end-to-end
suite of cashless payment and telemetry services
specially tailored to fit the needs of the seif-
service retail industries. The ePort Connect
encompasses card processing services, wirefess
connectivity, anline sales reports, customer
support, settiement, data security, over-the-air
updaies, and machine health alerts.
Product description
The ePort EDGE credrt/debit card reader provides
users with a secure and intelfigent solution to
their payment needs associated with EV charging.
When equipped on Eaton's Pow-R-Station family
of EV charging stations, chatging commences
after the user's selection of a pre-defined charge
session end time and the authorization of psyment.
Charging continues until eithar the pre-defined
session has expired or Yhe user canceis the
session. All transactionai data for the unit wit(
be recorded and securely accessible via the
Web.The ePort EDGE features a 16-character,
2-line LCD display, an LED indicator for trars-
action status, and an END button to complete
or cance! transactions.
Celebrating
~ YEARS
fdeals that Endure
Credit card reader opt~on
for Pow-f~-Stat~ar~ electric
v~~hic~e c~harging station
Technical Data TDOEV44006E
Effective Fe6ruary 2011
Standard features
~ Transaction and sates reporti~g through ihe USALive wetrsite
• Mag stripe onfy supporting alI majar credit cards
- Remote, over-the-air (OTA) update af software
• Bright, fiashing blue attraci ~EDs
S~t~nclards compliance
• CSA~ UL~ FCC, PTCRB
USQLiVe~
,„' ~; .~.,.: ~ ,:~ ~
,,. .. _
~~ -:
~..K ,,. W >~~_
...., ...__ _~.: ;.-,
w.,._....,...: _:-~ :..............
r»,.nw.yo.~.
i'
F r . ~~~~_ ._
F'sgare 1. Sales Reportiag Eor Account Managemeni
Figure 2. Transaction Reporting Cash and Cashtess
Figure 3. Settlement, Driver Accounta6ility, and Aadit
E=T•N
Powenng Etniness 4Yoddwide
Eatcn Corporaxion
Electncai Secior
1`]t SuperiorAve.
Cleveland, ON ca It4
Un~tetl States
E77-ETN-GARE ;877-'s862273i
~atOn.Cpm
@ 2Ci1 Eator CorporaFion
All Rigs7t Fsserved
Prin;ed m USA
Puolicaiwn Nc, TGOt'.'OCOQ6E / 270825
March 2077
Credit card reader option for Paw-R-Station
e[ectric vehiale charging station
Tsble 1, Technical Specifications
Description
GrediYcard prpceSsing Ali major credit cards
SecuriYy ACf-DSS, V15A CISP, PTCRB, Trustwave~
intacmation sacurity and eompliance
Reporting USALive website #or transaction ar~ saEes
Software updates Aemote, over-the~air (OTA)
Tab[e 2. Physicat and Environmental Speci~caiaons
besGription
Dimensions N x W x D inches {mm1 4.17 x 3.34 x 1.72 (105,9 x 84.6 x 43.7-
Siatus indicators 16 x Z icharacter x lir~J lGD dispiay and
tED indicator for uansaction status
Pus6buttons END 6utton to comptete or cancei transaciions
7em{rerature--operating 20to-~70°C
Table 3. Gommunications SpecificaYions
Description
CeHular 6SM/CDMA {iridependent o# EVSE
charge session data communication)
Antenna Integrafed
Table 4. Default Payment Canfiguration
Deseripiion
t hnur 50.50
Z ri:DUf3 $1.~
3 haurs ~1.50
4 hours~ $Z:DO
5 hours $2.50
6 haurs $3.00
Y hours $~.5Y, where Y is an integer value
between t and 2A
Note: To chenge hour increments or rates, call USATechnologiss
Tech Services ai $88-561-4748,
Product activation
!n order to begin coilecting revenue thtough the ePort EDGE,
the ownar ot the charging station must compiete and submi# the
ePort Connect Services Agreement, the Electronic FundsT~ansfer
Authorization form, and the ePort RegisirationJActivation farm to
USATechnologies Customer Service team. Following registratio~
(typicaliy one to two business days), the station wili be capable
of processing creditldebit transactions, and the owner will receive
log-in information to the USALive website.
^~
,
~ Eatan i: ; rsgister~l trademark ot Eater,
Cwporation.
~ All ocher tratlemsrks ate pr~erty o` xheir
respecfivo owners.
~n~tal~atior~ and Service Man~ual
Leve12 AC Pow-R-StationTM Electr~c Vehicle
5upply Eauipment {EVSE~
~,:'~iN
Pnwering Business Warldwide
Contents
descriptiott Page
1. Important Safety Instructinns- Please Read ,. 2
2, Symbols and Definitions . . . . . . . . . . . . . . . . . 2
3. Abovt the Pow-R-Station EV Charging
Station ......................... ......3
4. Instalfation . . . . . . . . . . . . . . . . . . . . . . . . . . . .4
instalking 2he Electrical Service. . . . . . . . . . . .6
6. Instaping to the Premise . . . . . . . . . . . . . . . . . i
7. Termination and Confiiguration . . . . . . . . . . . . . 9
8. Confirming Installation and Frst Use . ...., 11
9. Speciiications . . . . . . . . . . . . . . . . . . . . . . . . 13
10 Appendix ....................... .....i5
Instruction Manual IMOEV00002E
Effective November 2011
1. Important Sa#ety Insteuctions - Ple~se
Read
~,, WARNINC ELECTRICAL
THIS EQfJIPMENT SHQULD BE tNSTALLED, AOJUSTED, AN~ SERVICED
SY QUALlF1ED ELECTRlCAI PERSUNNEL FAMELIAB WITH THE GONS7RUC-
TIOW ATlD DPERATEON OF TH1S TYPE QF EQUIPMENt AN~ THE HA?ARDS
INVOLVED. FAtlURE TO OBSERVE THiS PNECAUTION GOUlO RESULTlN
DEATH OR SEVEREINJURY
READ TNiS MANUAL THOROllGHLY ANQ MAKf SURE YOD UNOERSTAND
THE PRUGEDURES BEFORE YOU A7TECVC~'T TD C6PERATE tHiS EQUFPMENT.
7HE PURPOSE OF THiS MANUAL !S TO PR4VIDE YOU WIiN INfQRMATIQN
[rtECES3ARY TO $AEEIY OPEAATE, MAINTAIN, AND TROU6LESHQOT THIS
EQUIPMENT. KEEP TH[S MANUAL FOR FUTUBE REfERENCE,
00 NUT USE THtS PRODUCT IF TH@ EV CABIE tS FNAYEQ, HAS OAMA6ED
INSUTATION t1B ANY OTHER SIGN OF DAMAGE.
D4 NDT pSE THIS PR04UCT 1F THE ENCEOSIIRE OR THE EV GONNPGTOR
IS SR4KEN, CRACKED, OPEN, UR SHOW ANY OTHER INDICATIpN QF DA11~-
AGE,
(NTENDEO FOR USE W[TN PIUG-[(d ELEGTRIG VENICLES ONLY
PREMtSE VENTILATION NOT REt1UIRED.
THE INFURMATION GUNTAINED (N THIS MANUAL tS StiBJECT TO CHANGE
WtTHOUT NQTIGE
2_ Symbols ar~d Definitions
~ WARNING ELECTRICAL
TH[S SYMBOL tiVD1CATES HIGH VOLTAGE, lT CALLS YOUR ATTENTIUN Tp
tTEMS Ot3 DPERATIONS THAT COUtD BE UAMGEROUS Tfl YOU AHD OTHE6
RERS~NS OPERATtNG TH1S fQUtPMENT. REAp THE MESSA6E AND f01-
LOW THE INSTRUGTi0N5 CAREWLLY.
~ WARNING
INA1CAfiES A POTENT1ALiY HAZAR~OUS 51TUATION WHECH, IF NDT
AVOIDED, CAN RESULT 1N SERIOUS INJURY DR DEATH.
t~ cAUr~aN
INDIGA7ES A POTENTIAE HAZARDQUS SRUATIQlY WHIGH, If NOT RVOtD-
ED, CAN RESULT -N MINOR Ta MOdERATE IPt.IURY, OR SERIOUS QAMAGE
TO TNE EQli1PMENT 7HE StTUATION UESCRIBED IN THE GAUTION IVIAY,
IF NtlT AYOIDE~, LEAD TO 5ERIdUS RESUL7S. tMFORTANT SAFETY MEA-
SURES ARE DESGREBEU IH CAUTlON (AS I+YEI! AS WARNtNGI.
L1 tMIPflRTANT
tNDiCATES A PARTICUEAR 1TEM Oit INSTRiJCTION THfS 1S IMPORTpNT TO
CONSI~ER.
SaveThese Insinucticrns
EATON CORPORATION www.eaton.com
Instaliatian and Service Manual
LeveC 2AC Pow-R-StationT"' ElectricVehicle
Supply Equipment (EVSE)
Definitions
AG - Al,ernating Current. The type of power available in most buikd-
ings and on utility poles. The Pow-R-Sta;i~n EVSE protects Users and
uehicles by allowing AC power to flow through it ta the vehicie. The
vehicle then converts the AC to DC {DirecT Current} to charge tfie
traction ba4tery,
ALC - Available Line GurrenY. The Pov~R-Station EVSE teils the
vehicle through the J1772T"+ connector's pilot pin how much current
iin amperes) it is aflowed Lo puil on the circuit. This altows the car to
not exceed the circuiYs maximum cuRent rating.
EVSE - Electric Vehicle Supply Equipment, EVSE is a general term
used for alI of the equipment used to suppiy electricity to the car,
such as ths Eaton Paw-R-Station EVSE.
GFGI - Graund Fault Gurrenf Interruptec GFCI protects Users from
faufts invoiving leakage currents going to grou~d, rather than the
proper retum path of the circuit.
J1772TM -The SAE Recammended Practice #ar conductive charging
of hybrid and electric vehicles. This standard spells out Yhe physical
dimension5 of the J1772 connectqr and the pilot communicaiion
between the plug-in vehicle and EVSE.
Rilot -Tha signal through the J1772 connector. This signal te(Is both
the vehicle and the EVSE when both are ready to charge and how
much current it is allowed to puil. This signa! is a SAE standard,
PCug Session -The tirne.whiie the EV5E is plugged into a vahicle.
It starts by plugging in the J'1772 conneccor and ends when unplug-
ging the same ~onnector.
SAE - Society of Automotive Engineers. The group fhat organizes
and leads committees of trensportatian experts to create s#andards,
such as J9772, far the t~ensportation industry,
Traction Battery -The large battery on a plug-in eiectric vehicie that
is used to store and relsase energy for propulsion. This is dii#erent
than the 12V battery #hat is used to start the vehicle initially and run
accessories such as tHe radio.
UI-The User fnterface part of the unit.
TH -The Terminal Block is where the incoming field pawer will be
terminated in the EVSE unit;
AClA - Americans with Disabilities ACT.
tnstaliation and Service Manual
Level 2 AC Pow-R-StationT"' Eiectric Vehicle
Supply Equipment (EVSE)
3. About the Pow-R-Station EV Charging
Stafiion
Eaton's Pow-R-Statian is Electric Vehicie Supply Equipment (EVSE}
and is compatibte with the Society o# Automotive Engineers J1772TPA
standa~d for charging plug-in hybrid and al!-electric vehicles.
The Pow-R-Station EV Gharging Station has severai safety features:
• Protects Users with interlocked power - the cabis and pins have
no power on them until the connector is safely plugged into a
vehicle
• Protects Users {rom temporary faults - and automaticalfy resets*
so no User interaction is needed.
• Instructs the vehicle on how much curren[ to draw- keeps the
upstream circuit protection from 'nuisance tripping'.
• Allows integration into authorization and management systems
- keeping only authorized personnel able to use units and power
usage levels to predefined levels.
Sae section 'Specifications' for more details
Automatic Reset feature must be enabled during installation -
see page 15 for more information.
Moving,Transporting and Starage instructions
Store this unit indoors and in its original packaging until iY is ready to
be installed. Storage temperature should be between -30° and
80° C: When moving or lifting the unit always grasp the unit encla
sure. NEVER attempt to lift, move, or carry the unit by the EV cable.
DO NOT carry the unii by the cable hook assembky.
Improper storage or ftandling may cause damage ie the unit,
8efareYou Begin
,#~, WARN}NG ELECTRICAL
WARNtNG - UNLY QUALtFlEi1 PERSQNh[EL FARAIUAR iMTH THE
OPERATIdN AND CaNSTRIlCTION OF THIS £4111PMENT SMQULD INSTALL,
ADJ4lST, MUDIFY, AND SERVICE THlS ECtU1PMENT, FAtLURE TD fOtLOW
THE INSTRUCTIONS COUl~ RESULT iN SEYEFtE BODILY IIYJURY QR OEATN.
0 IMPORTANT
THE U5ER IS RESPQNSI6LE FDR CONFURMtMG TU ALL LdGAI AND
NATIONAI ELECTREC GODE~I STANDARiIS APPUCABLE IN THE EMVIRUN-
MENT 7HQT THE FOW-R-STATION IS BEtNG tNSTAlLEO ANO COMMIS-
SIONED.
Rep(acement Parts List
7abte 1. Replacement Parts List.
Part Part Number
Pratection and Control Board PCBA Consult Factory
Cabie ; Connector Assemhly Consult Factory
Iniet Housing Consult factory
ftibbon Ca6ie for User Interface Consuft faeiory
User Irrterface Unit Consult Factory
Co~tacior 12bV 30/~ Consuh Factory
Instruction Manual IMOEV04002E
Effective November 2011
ADA Standards for Accessihle Design
It is very important to consider aii STANDARDS FOR ACCESSIBLE
DESIGN for Americans with QisabilRiss when choosing the location
and placement flf el1 Electric Vehicie Supply Equipment. The follow-
ing is a direct excerpt from the 2010 ADA Standards far Accessible
Design thtto //www ad~,govlregs2010/201QADAStanda~ds/2010ADAs
tandards.Mtm#c3!
"The Department of Justice published revised regulations forl'itles
II and lii of the Americans with Disabitities Act of 1990 "ADA" in the
Federai Register on September 15, 2Q10. These regulaYions adapied
revised, enforceabte accessibility standards cailed the 201D ADA
Standards for Accessible Design "201Q Standards" ar "Standards"
The 2010 Standards set minimum requirements - both scoping and
technical - for new(y designed and construcied or altered 5tate and
local government facilities, public accommodations, and commercial
iaci(ities to be readily accessible ta and usabie by individuals with
disabilities.
Adoption of the 2010 Standartls also establishes a revised reference
point for Title q entities tha# choose to make structura{ changes to
axisting faciliiies to meet their program accessibiiity requirements;
and it establishes a similar reference forTitle ili entities undertaking
readily achievable barrier removal.
The Department h~s assembied this oniine version of the ofificial
2010 Standards to increase its ease of use. This version includes:
2010 Standards for State and Lacal Government Faei(iiies
Titte If; and
20't0 Standards for Public Accommodations and Cammercial
Facilities Title I II.
The Department has assembied into a separate publication the
revised regulatian guidance that applies to the Standards. The
Department incfuded guidance in its revised ADA reguiations pub-
tished on September 15, 2010: This guidance provides detailed
information about the Department's adopiion pf the 2010 Standards
including changes to the Standards, the reasoning behind thpse
changes, and responses to pubiic commsnts received on these
topics. The document, Guidance on the 2D10 ADA Standards for
Accessi6le Des€gn, can be downloaded }rom;
h~t p://www.ada.gr~v
For information about the ADA, including the revised 2010 ADA regu-
lations, please visit the Deparment's website www.ADA.gov; or, for
answers to specific questions, call the toli-free AdA Information Line
at 800-514-0301 {Voice) or 800-514-0383 (TTY}.
EATON CORPORATfON www.eaton.com
Instruction Manual IM4EVOOOa2E
Effective November 2011
4. ~f1S~$~~A'~IQEI
Choasing a Lacation
L•d [MPORTANT
THtNGS TQ CdNSIDER BEf08E CHO~SENG A LOGATION TO MOUNT THE
UNIT:
1. 2a10 5.TANDARdS Fd8 ACCESSEBLE DESIGN.
2. CGNSULTATION WfTH AN ARCNI7EGT MAY BE NEEDED IN ORDER
TO CONFORM'TO ALL GOVERNING STtkNDARDS FUR IUCATION AND
P[ACEMENT OF ELECTRIC VEtf{CLE SUPPLY EQUIPMENT.
3. LOCA110N OF AN AVAILABLE MOUNTING SUPP~RT - THE WALL-
MQUNT UNIT MUS7 BE AMCHQREQ IN70 A AAOUMTING SUPPORT
SUGH AS A 1 x A STUD UR SOWR GUNCRETE WALL, UStNG N[OUNT
ING HARDWARE THkT IS APPttOPNIATE FOR THE SUtiFACE ON
WHICH YOU ARE MOUNTIN6. DO NOT MOUNT THiS E1Nt7 TO A
STUGGO/D RYWALL/WALLBOARD.
4, LOG14710N OF AN AVAlt14BlE ELECtRICAL SOURGE - POWER WIRES
NfUST BE RUN THROUGH AN APPROYED GONDUiT OR JACKET
FROM THE CIRGUIT PANEL TO THE UNtT.
5. Lt1CAT10N OF THE VENIGLE'S GHARGING INIET 1NH(LE RARKE~ -
THE UNiT MUST BE IOCATE6 SO 1T5 RESPECTIVE CA6LE LENG7N IS
R1GHT-SIZED TO WHERE THE VEHlGLE'S INLET IS FOR PLU6-IN
IA-~THOUT UNDllE 1NAREUI/ERING.
______ _
Note: These installation locat;an recommendstions are based upon genaral
purpose parking, trying to serve the most Eikely plug-in vehicle drivers. For
specific parking, such es at home or in a captive fleet scenario where the
User kno~vs where the vehicie's iNei will be, Iocate the PaW-FI-Station appro-
priately,
Each piug-in electric vehicle manufacturer has a different locafion for
where the charging inlet is located an the vehicle.
Fgure 1. Vehicie In1et Locations Differ by Manufacturer.
EATON CORPOfiAT10N www.eatan.com
lnstaliation and Service Manuai
Leve1 2 AC Pow-R-StationT"" ElectricVehicle
~U~1~~~/ ~CjUI(~TTI@tlt (~V~~}
In North Amenca, it is recommended to install Pow-R-Station EVSE's
with a high focus on orieniaiing the station toward the front and
driver side of parking spaees. Suggestions for different types of park-
ing layo.uts are illusirateci below.
Pow-R-Station EVSE
~ ~
Front
Or $ack
Vehicfe
Figure 2. 90 Degree Parking.
Paw-R-Sta#ion EVSE
~ ~~ ~
Front
Or BaCk
Vehicle
Figure 3. 45 Degree Parking.
Installation and Service Manual
Level 2 AC Pow-R-Stationr"' Electric Vehicle
Supply Equipment (EVSE}
~. ~.~.~.Wall
~ Vehic(e
Front
~ POW-~{-StBtlOh
~ ~ EVSE
~e . ~.. . ..... . Wail
Figure 4. Parking Bay/Garage.
Note: The wall-mount sryle of Pow-R-StaYion can come with a much longer
cord, so in Parking Bays and Garages, length of the cord is less of a problem
for mainxenance.Protecting the Location
Eor outdoor installations, creative use of pratectivs bollards and
wheel stops are necessary. Vehicles can and will damage the units
if left unpro#ec;ed.
P~w-R-Statian EVSE
~~ ~
Froni ~ ~
Or Back
Whesi Stop
Vehicle
figure 5. Pratecting the Pow-R-Station EVSE with Wheel Stops
for Genera) Purpose Parld~g.
lnstruction Manual lMOEVOQOb2E
Effective November 2011
Wheel stops are recommended to be installed at a minirnum dis-
tance of four feet from the front of the Pow-R-Station EVSE to the
vehicle side of the wheel stap for general purpose parking. This
distance takes into effect when larger vehicles, IikE the backing up of
a pickup truck with a irailer hitch, back into such a space. Far fleet
customer with specific vehicles or for parking restricted to p1~g-in
vehicles only, the wheel stop ir~stallation distance may be different.
Pow-R-$taticn EVSE
~
Prntective Bollard
~mended Bollard Installatiart
Area (Refcrance Only1
Figure 8. Protecting the Pow-R-Station EVSE with Botlards {for
Reierence Only).
PratectiVe bolkards are recommended to be installed in the erea in
close proximity of the Pow-R-St~tion EVSE. See local jurisdiction
requiremenis for actual speci#ications.
EA70N CORPORA770N www.eaton.com
Instruction Manual IMOEVOQOfl2E
Ef#ective Novem6er 2019
5, [nstalling the EIectrical Service
Checking the E)ectrical Requirements
The Natianai Electric Code~, Article 625.21 states "Overcurrent
protection #or feeders and brandi circuits supplying electric vehic(e
supply eauipment sha11 be sized fior continuous duty and shall have
a rating af not less than 125 percent of the maximum load of the
electric vehicle supply equipment" A load study of ihe location's
e{ectrical service may be needed to determine the avaifabifity of
adequate electrical service. Take the nameplate amperage rating of
the Pow-R-Station, and multiply by 125% fior the minimum upstream
circuit protection rieeded.
Check your local jurisdictions for any other electrical requirements
Rur~ning #he Wires
Once the proper electrical overcurrent device has been installed,
wire nee8s to be run from it to the Pow-R-Statibn EVSE. For a typi-
caI installation, the oniy field wires will be for the incoming electrical
service. If the EVSE has a Level 1 option, additional service and
wiring wiil be needed, !f the EVSE unit has a remote management
option, a sYandard CAT5/6 network cable or 3-wire shielded cahle
typical for a R5485 type network could also need to be run to the
unit.
fie Pow-R-Station operates on a single-phase service - twa hots,
and one ground.
Note: Use Copper Conductors ONLY
~ 1MPORTANT
- THE 30A LEVEL 2 EVSE REQUERES A DEDICA7EQ
208/240VAC 40A UPSTREAM BREAKER,
- OPTIONAL LEVEL 7 flUTLET REQUIRES dEDICATED
120VRC 20A UPSTREAM BREAKER.
- DQ NOT USE GFGI BREAKERS. GFCI EXI3TS 1N EVSE
AIVD ON LEVEL 1 QUTLET.
For detail an termination of Level 1 option see page 10.
Instaliation and Service Manual
Leve12ACPovsi-R-StationT"' ElectricVehicle
Supply Equipment {EVSE)
~ WARNING ELECTRICAL
WARNING - LUGKOl3T(TAGOUT ALL ELEC7'RlCAi SDURCE GIRCUISS
FEEDING THE UNF7(S} IN THE OPEFY POSI710N BEFORE BEGINNING
WiRING OR TERMINtATfONS. FA{L116E T~ ~OttOW THE lNSTRUCTIDNS
G~ULlI RESULT !N SEVERE 64DILY IN.IURY OR DEATH.
6 UVARNING
THIS UNfT IS RATEQ POR lNDOUR OR DUTDOOR INSTALLATION. tF TNiS
UNiT IS MOUNTEQ 4UTDOOAS, THE NAROWA6E FQR CUNNECTIN6 TNE
CONDU{TS TU THE UNIT MUST SE RATED FOR OUTDOOR INSTALLAT[ON
ANO BE INSTALLED PROPERLY TO MIIAlNTAIN THE PROPER NEMA 3R RAT
tNG ON TNE UN1T:
8 [MPORTANT
CONFIRM W1TN THE LOCAL ELECTRiGAl3iEQUIREMENTS fOR THE GAU6E,
TEMPEflA'fURfi RATIN6r ANO TYPE QF WIRf MATERIt1L OSED FOR TNE
OVERCURRENT RATING FUIINB BEL04V. THE CHART SHOWS A GENERAL
REC{1NIMENDATfUN.
Table 2. Electrical Wire Chart
Sryta Nemeplate Over~urcent Suggested Suggested Suggested
Rating VYite Gauge ~re Type Wire Temp
Ratiag
Wa1(-mount
SAF_B~ 30A AOA 8 AWG Copper 75 degrees C
Pedestai
SBR_B" 30A 4DA 8 AWG Gopper 75 degrees C
EA70fd CORPORATtON www.eaton.tom
{nstallation and Service Manual
Level 2AC Pow-R-5tationT"" EEectricVehicle
Supply Equ~pment {EVSE)
6. lnstalling to the Premise
The three typical installation methods ot installing Paw-R-Station
EVSE's ta the premise are found be€otv. Some installazions require
insYalling the wail-mount style of Pflw-R-Station EVSE to a wa(i or
unistrut.
Mounting to a Wafl
Prep~ring the Site
Once a proper site has been chossn and ihe electrical service has
bQen run to the location, you can begin installation.
~ GAUTION
OD NOT MUUN7 UNi7 TO ONLY STOGCO)DRYWIILIJtM1lALE86AEiD. i10 NOT
USE TOG6LE BOLTS, 21P ANGHpRS, NQR PLASTIG WALE ANCHORS MEANT
FUR THESE RAATERIALS BECAUSf TNEY DO NOF HAVE THE STRENGTN
NEEDED TQ SUPPORT THE 4fNIT. THE UNIT MUST BE MOUNT~D TQ A
SQLID SUPPQRT SUCH AS: WUOD, CONGRETE WALL, CUNCRETE BLOCK
WALL, OR EQUIVALENT.
Step 7: Remove the mounting p(ate from the back of the EVSE unit
by placing the unit on a so!id non-scratch surface and open-
ing the unit by turning the latch on the side. Remove the
three nuts on the 10-32 studs that attach the mounting plate
to the unit. The location of these mounting sYUds can be
seen in Figure 7. Save these nuts and ~n~ashers as they wili
be needed to re-attach the unit later in the i~stalfation.
Step 2: Using the mounting plate as a template, mark the holes ta
be used for mounting, Make sure the mounting piate is
level. if mounting on a waod stud wall use the two center
holes. If mounting on a solid vJali such as cancre#e, brick, or
concrete block, use the four outside square holes.
Step 3: Pre-driU maunting holes if mounting into a wood stud or drill
appropriate sized holes in a soiid wall fpr use with the type
of anchor you will be using.
Step 4: Attach mounting plate ta the wali as shown in Figure 8. If
instaliing on a wood siud, use 5/16" ~r 3/8" x 3" long ~ag
screws and washers. These should be galvanized or stain-
fess steel for weather protection if mounting outdoors. If
mounting onto a concrete, biock, or brick wali, use an appro-
priate anchor for the type of wall on which you are insta0ing
the unit. Again, these should be appropriate for weather
conditions if mounting ouYSide.
E45E
E1~3E 1032 MOtJNTtNC StVbSlHOLES
MOUNT3NG l,OGS70N FCM
~ - -_ wooasru~3nuca.evozc
MOUMTING LOCq'1QN3fpR
CO^N`..RE7[ N71sLL. f:ONC:RETE B~tSCK
RftICK OR GFSA~i. $7RtJT
_..__...--- EvSE hiOUVTiNG Pf.ATE
AiDUNFMG LO(':A7iON TO
Ye'40F) 3T(1J151NG~G ?flEL-
~. ~
._-"_____ EY"3E~ 10-J: AfOiINTiNG `3Tl/b1Hpi.E
Figure 7. Unit an@ Mounting Piate.
Instruction Manual IMOEVOfl002E
Effective November 2011
WOOD S1UD -
l`
" { tAdUFtT(N6 PtATE
EVSE 10-32
' EVSE 70-32
h40UNTiPlG STitD
~ ~ MOUNTlNG STllb
~'. _
LAG S~REYJ -
~;.
Z
EVSE 10-32
MOUNTING STUD~ .
, `
~
' ~
~
~
_. f b~ ~:, ~ t -
~
- ~
~ ~'~
~
s ~"~- i
°~ e-i
~
r
~ ~
' ~ , .
~ `
62.5~
+f3: 78` dS ~ES"
I
I ~ ~~
Figure 8. Typical Wall MounYing.
Step 5: After ihe mounting pfate is sacure to the wall, mount the
EVSE unit to the mouniing plate using #he ~vashers and nuts
renioved in Step 1.
EATON CORPORA310N www.eatan.com 7
Instruction Manual IMOEV~OOfl2E
E#ective November 2011
Mounting to Uni-Strut
dnce a proper site has been chosen and the electricai service has
been run to the location, you can begin installat+an.
Step 1: Remove the maunting plate from the back of the EVSE unit
by placing the unit on a solid non-scratch surfa~e and open-
ing ihs unit by turning tha latch on the side. Remove the
three nuts on the 10-32 studs that attach the mounting plate
to the unit. The location of #hess mounting studs can be
seen in Figure 7. Save these nuts and washers as they wiil
be needed to re-atta~ the unit later in the installation.
S#ep 2: Using the mounting pla#e as a tempiate, determine where
the anchors shoufd be pfaced to be used for mounting. it
Installation and Service Manual
Level 2AC Povv-R-StationT"" EleetricVehicle
Supply Equipment (EVSE)
is recommended in high wi~d and use area, ccoss-arms
shouid be used to avoid twisting which can occur in a single
pole installation. Make sure the mounting plate is level.
1f mounting on a singie pole use the two canter holes. If
mounting utitizing cross-arms use the four ou#side square
holes.
Step 3: Attach mounting plate using as shown in Figure 9. Use
appropriate hardware making sure it is galvanized ar stain-
less steel for weather protection 'rf mpun#i~g outdoars.
Step 4.After The mounting plate is securely attached to the mount-
ing s#ructure, maunt the EVSE unR to ¢he mounting plate
using the washers and nuts removed in SYep 1.
Figure 9. Typical Unistnrt Mounting.
Fg~ere 10. DimensionaE Detail far Unis#rut Mounting.
8 EATON CDRPORATION www:eaton.com
insialiation and Service Manuai Instruction Manual IMOEVOOOt?2E
Level 2 AC Pow-R-Station7N1 Electric Vehicle ~tfective November 2011
Supply Equipment (EVSE)
~~~~~ Of ~~.'Ct~Str~~ .`~`~~r'~~fOll
1.DC3 1.5t~~2y 5.15 1.sQ{2)
(REF)
~.5t3(3 (6)
~ ~
#.~5{2)
~~ .
4.13~2)
~ - ~ .
'I ,DD(REF)
Figure 1i. Base Detail #or Pedestal EVSE.
Pedestal Floor Mounting
Preparing the Site
Once a proper site has bsen chnsen and the electrical service has
been run to the iocation, you can begin installation.
Step 1: Open door using the latch an the side of the unit. Ths key
will be secured inside the unit.
Step 2: Remove the bottom pan by puiling upward and then angiing
outward. Best if performed when door is held opened.
Step 3: The hole paitem for the base of the petiestal mount is
shown below in Figure 11. Use six, 3/8 UNC Grade 5 stain-
less bolts torqued at 5D ft-Ibs fot mounting base to the
ground.
Note: if using a concrete pad, pfease be mind?ul oi the overa}i height bf the
unit due to ADA CompGance. Please reference the ADA Compliance section
of this document.
7.Termination and Canfi~uration
~ WARNING ELECTRtCAL
WASNtN6 - LOGKOUTlfAGOUT ALl ELECTRICAL SDURCE CtRGUiTS
FEEAIM6 THE UNITIS) IN TNE UPEN POSITION B€~ORE BEGINNING
WlRING OR'tERM(N~lTiONS. FA[LURE TQ FOLLUW TNE INSTRUCTIONS
COULU RESULT IN SEVERE BDDILY I:NJURY UR DEATH.
WARNING - QNLY QUALfFiED PERSQNNEI. FAMELIAR W17H THE
pPERAT#QN AMD G4NSTHUGTION OF THIS EQUIPNIENT SHOULD INSTALI,
ADJUST, M01}EFl; kND &ERVICE THIS EElUIPMENL FAiLURE TO FQLLQW
THE INStRUCTiONS COULD RESUlT IN 5EYERE BOdILY INJURY OR [lEATH.
Wire Terminatians
For a typical irtstallation, ths only field wire terminations will be the
incoming electrical service wires. lf the EVSE unit is configured for
Pow-R-Station Network Manager or other remote management so1u-
tion, a standard CAT5/6 network cable or 3-wire shielded cabfe for
RS-4E5 Cflmmunications.
Elecirical Service Wires
Terminate the incoming elect~ica! seroice v~~ires to the Pow-R•Station
EVSE's provided terminal block, follov. ing the designations far eaeh
wire. L1, L2, and G(see Figure 121.
EATOT! CORPORATION www.eaton.com
Instruc#ion Manual IMOEVOODOZE
£ffective.November 2011
Instailation and Service Manual
Level 2 AC Pow-R-Station7A" ElectricVehicle
Supply Equipment (EVSE)
~ ~
~ ~
z z
r r rr rr'rr r r r-r r rr r rr rr r
~" JU W-P Ut Q~ ~.I 0~ ~0 '-' N W-P CJl 0~ ~J ~ t0 0~~
r,nou~m ~enEZwnrr ta+e~wnur
U+mS i~tm}
INGOMINfa ELECTi2iCALSERifICE TERMSNATF~IS
TOROUE,kiJtis(Nm}2Z1~-28.5(2:5.3)
UxCopparCot~ducbrOny ~
COUPkE,padbRNm)?2,1-26,6(2,it33
Caiduda~is da wNta.ssulemant
Figure 12. ElectricaE ServiceWiring.
Note: Torque for incQming field service wiring -12;1 - 28.& in-Iti (2.5 - 3.0
Nm1- Use Copper Conductors Only.
Grounding Instructions
This product must be conr~ecied to a grounded, metal, permanent
wiring system; or an equipmen#=grou~ding conductor musi be run
with the circuit conductars and connected to the squipment ground-
ing terminal.
Qptionai I~evet 7 - "120YAC Outlet
When the EVSE is equipped with a Level 1- 120VAC Outiet perform
the wiring instructions outfined below in Figure 13.
Level 1 Field Connection Dfagrem
GFG[ Receptacie
BAGK'VIE4Y Scr~srltermine!#tfllars:
Ground"mg Terminei i~roenk Green = gmunding terminat
Cnonectian fnr 6ere Silver =whKe termineSs
cppper or yreen wire ~'^~ ~~~ -t ~~ Brers = hoi terrtenalx
` ~ ~
CINE
LtNE
'~' • y~} Hotterrninal IBrassS:
Eonnection ior the
VJhite terminsl {S~vet}: ~
~ LINE cehle'a dlsck
Connsctipalntthe UNE ~i~r~t1 wi~e
caWe'suvi~+Fewire ~ ~J'~
~ ~4 ~
~ Ayellowsticker
~t1
LOAD~
~ COY@f5
iB
~
~ / ierminais. Do nat
o
u~_
'rlr^SiT~ - fC[116VB~{85LCkEf32
L~AD -- ~- ~- ---y thisfime.
WhitaMrminat{S~veF4: - ~j ~' - "`~.,,, LOAD
Gatnectiontorthe ~ ~6 I ~I ~ Notterminal(Brass~:
LOAQ ca61s'a whim wira Connection #nr the
~
~
~.,~ ~ LUAD eaB{e`s b.aCk
~'
~
~ j^: Wjff,
Fgure 73. Optional Level 1-120i/AG Clutiet
Figure 14. 6FC1 Receptacte Loca#ion - Referenc8 Onty
Controi VYi~es
RJ~5 CAT5~6 network cable or a 4-wire shielded Balden cable for
Modbus cammunicatian may be needecl based upon the configura-
tion of your Pow-R-Station. Terminate these wires before applying
the electrical service wires, if nane present, skip this step and go ~to
the next section.
~igure 15. Control Wiring.
IiJ451GAT5f6
; N£TWflRKCONNEC310H
~
~ ~ ~g~~ ~ COMM6ri ~ ~ OATA LENE' B
CDNNEC170N i ~ SIiIELQ ~--1 ~ ~; DAtA LINE A.
;i ! ~. t ~
.~.. ~.....a--- - -;~-i°=tT.
-r-~ ~,.._....
_ r ~ '•~~ L7ULT~t~ "~7`~~=L~~
.,. v`1J15 : ~ 5 ~ 92t .~a 3.21
' ~
~
~
= I_'__ i ~J
Jit .
i
~
CM19LE TO
: WTERFACE~ -
MODBU9 RTLL GQNNEC'ItONS. -'
s,a, ,
~.. ..
, i ~~z ..._......._.___.__...._._ iA
' ~J^~
; i~ { 3 ~ FIEIAY ~ - ~
} ...
'
~
s
S
~
; !
'
.
- __._
:16 5 ! ....._.._._.__~
i
~ I
: w
.
,
NElAY : ~..
~.v
;~n!e?J7-F
~ _
~ +s t
-: ;
-
~
~
.....--.-..._._._.
'
t
~ fs, e_I
r~~s;
'
t
! lii.~:'°; d2-F
~ ;
3 rl : n ; ,-.. PCB-GND
"3? :'.1.'_ _ ;
~ - "
Lri°
_
.
.._
SO EATON CQRPORATION www.eatan.com
Installation and Service Manual Instruction Manual IMOEV00002E
Leve12AC Pow-R-StationT"" ElectricVehicle EffectiveNovember2017
Supply Equipment (EVSE}
8. Canfirming Installation and First Use
Charging #s~fi~star
Pow~r tr~3ict~L~csr I~inished tnd~~Eaat
Sertrice
i~ae~tax
FKeFnat~iy 7ernparary
C-verrid~ Button Contrr~IleK1 Fa~ult R~set Buttacs
tLr~f! Button} tndicator lrtdicatar d1~~~ht ~utinn~
~ma~~.~ Ss~a-su~ I~i~~icar~
Figure 16. Status indicators.
Step 4: Ensure thaT the electrical service wires are landad accord-
ing to this manual. Make sure the station access deor is
closed.
Step 2: Powar ON the Disiribution Breaker.
Step 3: During initial EVSE boot-up, the User interface will cycle all
ICONs.
Step 4: After boot-up, the Povr~er ICON ~vill be either STEADY or
BLINKING per above table. If this is not the case, please
verify tnat all incoming service connectians are landed
appropriately and that the dPstribution breaker is in-tact. Ifi
the Po~ver ICON still does not appear, please caR technical
support.
Step 5: 1f the Power ICON is BLINKING, Ruihorization is needed,
Please consult the Authorization section of this documert
below. !f the Pawer ICON is STEADY, piease proceed to the
next step.
Sxep 8: If a SAE J1772 Compliant El~ciric Vehicle is available, please
connect the EV Connactor to the Vehicle Iniet, You m~y also
use an Eaton Vshicle Simulator.
S#ep 7: 3he GHARGING INDICATOR will begin to blink.
Step 8: Almost immsdiately, the vehicle will engage a charge ses-
sion Sthe contactor wiil cfose and power will be supplied to
the vehicle).
SeeTable 1~: Normal Operation User fnierface Indicators, ;n
the Appendix, fio~ more deteils.
EATUIV CORPORATION www.eaton.com 71
ICON 1CDN SYetus
BGnk Steed
! ~
#'`+.'..+~
\
Payment / Autharizatian Needed
Unit Ready for Charge Session
~ Vehicle Connected, EVSE Ready,
Waiting on Vehicle y~}~~cle Chazging
~
~/A Vehicle Has Enda~ Gharge 1May begin
again at anytime)
~f Rate of Charge Contofled Remotety and Rate of Charge Conirotted Aemo#e!p and
Chsrging Setto tNACT1YE Charging ACTIVE
Instruction Manual {MOEVQ0002E
Effe¢tive November 2011
Step 9: When power is being suppfied to the.vehicie, the
CHARG[NG IN6ICATOR wili move from a BL1NK status
to STEADY status signifying that current is flov~ing to the
vehicle.
Step 74: You may naw ~emove t~e connec#ar from the vehicle at
your leisure.
Authorization 1Veeded:
if Authorization is needad, the Power 1GON wili have a BUNK pat-
tem. This signi#ies to the end User that either payment activaiion is
needed or RFtD autMorization.
Ground FaultTest
"fhe ground #autt detection feature is self tesked every time the unrt
starts a piug session to charge a vehicle. A User can ma~ualiy test
the ground fault feature at any time by pressing and holding the
reset trutton (right button) for seven seconds. If the test passzd suc-
cessfully, tha fault light wiil flash oncs. If iY deiects a problem, the
power icon will turn off and the service light (wrench icon) will have
a medium single blink untii power is eyc(ed to the unit. See Table 19:
EVSE fauli or Error User Interface indicators, in theTroubleshooting
Section in the Appendix, for more details.
Dip Swttch Sefiti~gs
a cAUrioN
MODiFYtNG THE UIP SWITCN GONHGt1RATI0N t)f THE 11N[T CUULD
CAUSE THE llNIT NOT TO OPEiiATE AS t1ESIRED. PLEASE QNLY MODIFY
DIE' 51lftITGH SfTTING51f YOU A6Shc.[lTELY UNQERStANQ THE tMPACT
TO TNE UNIL
Automatic Reset Feature
Frorn the manufecturer, the Pow-R-Station is seY to require a manua!
reset aftet a tempotary €auli. The User has to opt-in to enable the
automatic reset feature.
During ins#allation, the Automatic Reset setting can be either leit dis-
abled as it came from the factory, or the ~Jser oan decide to enable
the feature. To enable or disable this feature, a Service Technician
must c~ange the position of a dip switch on the control board.
12 EATON GORPORATION www.eaton.com
Installation and Service Manual
Level2AC Pow-R-StationT"" ElectricVehicle
Suppiy Equipment {EVSE-
• To Enable Automatic Reset: Dip Swi2ch Bfock SW2, Position 6
must be 4N,
• Ta Disable Automatic Reset: Dip 9witoh Bfock SW2. Position 6
must be Q~F.
For board repiacements or basic confirmation of settings, Tabie 3
contains the explanation of the dip switch settings fo~nd in the
corner of the EaYon Protection and Gontro1 Baard (EPCBI near the
FS232 Serial port, labeled SW1 and SW2.
7able 3. Dip Switch Seftings.
6ip Dip Feamre ON QFP Deseription
$WItG~I $WItCh
Block Position
SW2 1 Voltage US i20V U5 Voltage
Configuration 2~8124DV Gontiguration of
the Unit. for i20V
Config~ration - A
Wire Jumper
rreeds to be added
betu+een i2 and N
on ~igure 12 of ihis
DoCVment
SW? 2 Operating 6DHz 50Hz North America is
Frequency SOHz
SW2 3, 4, Reszrved fot Reserved for factory Use.
aRd 5 Factory Use
SW2 6 Auto-reset Ena6{ed Disabied Gomes from tfie
after fault factory disabled. A
vehide fauit must
be reset maou-
ally - the rnvner
can eas+ly enabie
this feaYUre via this
dip switch. ~oing
so, will enabte an
auto-reelosure nn a
nuisance fip
SWZ 7 Soft 5tart Default in DFF Position. I# ON, the EVSE wili
perform a ramp up of currer~ to the Availabte
Gne Currern (ALC) or Nameplate Rating over a
30 secand time period. fiis is done through
the SAf J1772 handshake with the vehicie by
mndifying the Duzy Cycle on the Pii~ Signai.
SWZ 8 Reserved for Defauii in OFF pasition
SWt 1 Reseroed for Default in OFF position
SWt 2 and 3 RS485 Baud fiee Baud Rate Dip Switch Ta61e - Default is
Rate aIl ON
SWt 4, 5, 6, 7, ftS485 Range Dx00 to Oxtf using bi~ry addressing
and B Address (Most Significant Bii bei~ SWi- Position 4).
Defaalt is ali OFF exeapt Position 8, i.e. flx01.
Tabte 4. RS485 Baud Rate Dip SwitchTable.
Baud Rate SiN1- Position 2 SW1- Position 3
9600 OFF OFF
19204 OFF ON
38400 ON Off
i ~ szna ot~ or~
~gure 17. Graund FanitTest.
Figure '[8. EnablioglDisabling Automafic Reset.
Instai(ation and Service Manual Instruciion Manual (MOEVOOD02E
Leuel2AC Pow-R-Sta#ionT"" ElectricV~hicle Ef#ectivsNovember2011
Supply Equipment (EVSE)
SW2 SW1
~ ~I~ I~ f~
~'~ L u t ~
L_~ ~~ `~ ~ `°
~uJ~ ~~
~ .; I u i °
3..~~ M ~ tn
~N
~ ' ~ I~N
L~
o "`-'---' ~ c ~=-' r
Figure 19. dip Switc~ Settings for a 20St240V, 60Hz, 30A Pow-R-
Station vuith Auto-reset DTSABLED.
9. Specifications
The Eaion PovwR-Station EVSE is compliant with the folfowing stan-
dards:
• Society ot Automotive Engineers (SAE) J1772TM 2010 EV
Conductive Charge Coupler and 5tation.
• NFPA 70 National Electnc Code, Article 625 Eiectric Vehicle
Charging System.
• UL 2231 Personnel Protection Systems for EV Charging Circuits.
• UL 2594 EV Supply Equipment (Outline of investigation).
• UL 1996 Software in Programmable Components,
• FCC compliant, Part 15.
Table 5. Electricaf and Meahanical Specificatians.
Deserip66n 30A
I
Incoming Voltage 208 YAC
240 VAC
120 VAC
InpotFreqvency 50/60Nz .
Incoming Amperage AD A
~utput Voliage Same aslncoming
Output Frequeney $ame as Incoming
Output Amperage - Maz Continuaus 3DA
Intedocked Power Outpui Yes
Dvercurreni Rating Output Amperage + 5%
Ground Fault Interruption 20mA
{UL2231-1N12233-2 Personnel Pcotection)
Automatic Reset afier Nuisance Trip
Feature Available - Fie1d Enahled
Randomized Restart On Power Failure
(delay befae charging resumes aher a
pawer tailure) Yes
Mechanica! Ope2tions 1d,04~ cycles IEVConnedor, replacea6kej
1p0,000 cycles tContactat replacea6le)
Incoming Field Electrical ServiceTerminal
6lock Torque in in-Ib (Nm1 22.1 -2E.fi(2.5-3)
Incoming Modbus Connections Tarminal
Block Torque in in-Ib {Nr~] 4.4 -5.3 (.5 -.6)
EATON CORPpRAT10N www.eaton,com i3
Instruction Manual IMOEV00002E
Effective November 2011
TabEs fi. Physicai and Environmental Specifications.
Description Wal[-mount Pedesta{
Dimensions - H x W x 0 22" x 15" x 8" 525U'" z i 5" x S"
(Add 9" befow fnr cabie
hanger}
5tatus IndicaYOrs 6 LEDs: 'Power', 'Charg+ng', `Gomplete'.'Aemotely
Gantrolled','Temporary Fault', and'Service'
Push Svttons 2 Buttuns:'Override' and'Reset"
Ingress Protection IP14
Type Rating 3R
Temperatuae - Qperating -25 to 40 degrees Celsius
Temperature - 5torage -30 to 80 degrees Ceisius
Humidity 90% RH, nan-condensing
Tabte 7. i!O Specificatians.
Descripfion Wall-maunt Pedestal
J1772TM' Pistol Grip EV Seme as Output Rating
Connector
Permissive Run Contact NC dry crontact input
Available Line CuRent 4- 20mA analog input
Control
RS-485 Modbus-flTU 4-wiie port
Memory SD Memory Slot
E[hemet RJ45, IEEE 802.3, TGP/fP, P.Aodbus TCP
~eld Diagnostics and RS-232 DB9 f HyperTerminal'fM Supportl
Upgrade Port
10. EAT4N CORPORATION www.eaton.com
lnstal}atian and Service Manual
Level 2 AC PQw-R-Stationi"' ElectricVehicle
SuPPIy Equipmsnt (EVSE)
Table 8. Optianai Specificatians.
Description Wa![-mount Pedestal
T}tro~gh-teed IDaisy Chainl No Yes
Compaiible
Network controUer Enables cnnnectivity te Pow-R-Stetian Network Manager
with reai-time stakus and historical infomration
Wireless Wi-Fi (VJPA ~r WPA2j
RFID basic Basic fock/uniock with card or keyfob
Rf14 Uset Third-party database of Users integrated €or
authenticatinn
Cei3ular GPRSIGSM
Credit Card Processing PCI-DSS
Network Management PoK~-R-Station Network Managemertt Solution with
Real-iime Status and Nistorical Information
Table 9. Optional Level 1 12~VAC 20A Outfet .
Incoming Voltage t20UAC
InpuiFrequency BO Mz
Output Voltage Same as incorning
Output Frequency Same as incoming
tlutput Amperage - Max Continuous 20A
Installation and Service Manua} Instruction Manual IMOEV00002E
Level 2 AC Pow-R-StatianT"" EIL'Ct~lC VBIIiCIe Effective November 2011
Supply Equipment {EVSE}
Appendix
Tahte iU. EVSE Normat Operation User Interface IndicaYors
M .~ .~ • ' i ~ ~ ~
In#erface Snap Shat EVSE Meaning
Definition Action Raquired
V
Remove EV Connectar frona EVSE and Mate to
Steady Unit is Ready #or Use your Electric Vehicle. Plug-In to Vehide tu Begin
Charge Session
~
A) If the EVSE has a RFlLI reader, ptease present
Singie
Biink
Authorizatian is required your keyfub or other Ccedetrtial ta activate.
g) (,hhervvise proceed to proeess psymeM via
Credit Card Payment System on the front af the
unit. After payment is rendered, EVSE wili
activate and Power ICON
~ „°°•
5teady
Singls None - VYsiting on Vehide ta 8egin Chatging. If
B~~~k Vehicle Connecfed, EVSE Ready, Waiting on vehicle does not begin charging momentarily,
Vehicle ptease check intsmat scheduting system or
remave and rainsert-EV Connector
c'~ u
Steady Steady Vehicie Connected and Veh'sale Chsrging Wait for Futi Charge qr Aisconnect YUhen you are
Ready to Leave
~''~'1 j~f You caa now watk away from the unit. Charging
~~~ ~-•~~ wilt begin with Building Nianagement System
Steady Single ~Iehide Connected and Gharging is Ramotely Allows.
s~~~k Controlled by Building Management Sys#em -
~ Charging Set to INACTIVE Qepending aa Facility Setup, Local Override may
Single be avaitable by pashmg the "Qverride
Btink Pusfibutton"
~ ~ Yau can naw walk away from the unit. Charging
Steady Singis Vehicte Cannected and Chargiag is Remotely wPll begin when Vehicfe Engages Charge Session.
81ink
~ Gontrolled by $uilding Mlanagement System -
Q~Pending on Pacilky 5etup, Loca! Override may
Gharging Set ta AGTIVE but at a reduced
Steady
~eV~~• be available by pushing the "Qverride
Pushbutton" This will request to charge at fult
capacity.
t
~
U
~
At anytime, you may remove the EV Connector
Steady Single
Blink Steady
Vehicie Cortnected and Current Charge and Re-Dock it to the EVSE. If the vehicle wants
Sessian is Complete. to engage a charging again at a later2ime while
you are away, it may do so at anytime. No
additional activity is regu@red by you.
~ ~ ~
Steady
Single
Steady At anytime, you may remave the EV Connector
g~~nk
Vehicle Connected and Curcent Charge and Re-Dack it to Yhe EVSE. If the vehicle wants
Session is Complete. to engage charging again at a fater time while
you are away, it may do so at anytime. No
additional activity is required by you.
EATON CORPORATION www,eaYOn.com ~ y,
Inst~uction Manual fM0EV00002E
Effeativs November 2017
Table 11. EVSE Fault or Error User IntefFace tndicators
Installation and Service Manual
Level 2 AC Pow-R-StationT"" ElectricVehicle
5uppty Equipment (EVSE)
. . . .
~11 present itseN in a blink pattem In atl EnorslFaults, tfie
~If present itself in a
~ blink psttero or a /'~. '~ ar a staady icon. Typically is a
r' 1\ vehide related concern. Eaton j~ Power ICON will be ON or
-~~~ ~}( i Blinking. On a fiew of tha
steady iwn. Typical3y ~ i i defines tt~is as a Temporary fault or ~ Errors the Ctiaf'ging tCON
~
an intemal EV&E ~+-~~~ in rere oecurances a Nuiscance 7rip_ ~ wilt BIINK to describe the
Concern specifie Error.
icon Pattern FaulUError Desci tion Recommendation 7,Action
~ - Press Manual Reset Pushbutton to qear Error.
~+"~`~ j'~ SAE.l1772 Concem It AutoR=closure is ENA8LE0. the EVSE wifl
;y,~/ l,",~,~ atYO clear th~s error after ~15 miitut¢s.
Stesdy Fast Doubk Raraly Oeeurs: Vehicle Nuiseance Trip - Startirtg a new Plug Session w~l also clear
~'"k Continually Qocurs: Vehicle SAE J7T72 the eaor. A new Plug Session is deHned as
CompatibiGty Concarn ramoving the EV Connector fram the Vehicte
In1et and re-inserting~ it into the Yehide Inlet
~ • Press Manual fleset Push6utton to Clear E+aor.
~~~~ j~i f"~~
~
~
J
~ SAE Jt772 Concem
,~+
~J
..•
Steady Slow SinpN Faat Ooubte paroiy Ocsurs: Vahieb Nui&tnnce Trip = StpRing s nsw Piug Session wiq elso cEear
eiink giink. ~ntinually Occurs; Vehicle SAE J17T2~ e enar. A new Plug Session is dafined as
CompatibiGty Concem temo~ing the EV Connector from the VefiieEe
Ie1et ancf ro•irdserting k inta'the Vehicle lnlet.
- Press Maauat Reset Pushbutton #o. Clear EROr:
(_,.~.,,' ,~ t,/`~~ {~~,,
'~.../ 4.'~1 L,a~} Ground Fauk Cnncern
Steady s~ow Sinpie Stcaey Rarely Occurs: Vehide Naiscarwe Trip - Startn+g a+Eew Pfug Sesswn wilt also elsar
8~1ok Continualty Occurs: Ground/Leakage CuErnM the error. A oew Plug Sesaton ts de#'med as
DMeetian romuving tt~e EV Connectnt from the Yehicle
~ Inlet and re-inseKing it irrto tF~e Vehicka Inist..
Veh~Ia Tried M PuN more PowertMe the EVSE '~e~ Manual Reset Pust~button fo Clear Error.
~
~ u ~ t}
n
~ h~ instructed it to puH.
.
SteaGy Slow Single siuw singie - Stariing a new Plug Session will alsa elear
etink BIinM Raraly Occurs: Yohide Nuiscanca Trip ~e ~~,a. p new Piug Session is deflnsd es
Continuaily Occurs; Yehicie SAH J1772 remav3ag the EV Connectwiram the Vshicte
CompatibTrty~ Concem ~~~..~~ and re-inserting it into the Vehicle bilet
~ Max Temporsry Fauks for Qne Plug Session
~ T
~
Ff this occurs
S vehirAe related eoncerns Startirn3 a new Plug Sassian will claar the error.
, A new Plug Seseion is deflned as remov[ng the
5t
p~~f3um snnk happaned during S Plug 5essiun. A Plug Sesseon EV Coanector from the Vehicle Inlet and rr
is defined as the~ momentthe user plegs the EV
~nserting it inta ihe Vefiicie lalet
Connecfor inW hh/dervehide in1M and than
ramoves k.
~C
~
Steady Assymetric Gf 7est Failuro Prinr to Engaging Chatge Session Call Ttahnical Suppert - 1-855•ETN•EVSE
Double Blink
• Ensoro that the Inwming Electrical Wires are
Landed accordi~g to the Instaliatton Maau:l.
,.~•,, - the EVSE Requires an L1, LZ. and Ground.
4-^~~ ~`~
~ Coatactor FmiEure Piease eonsukMe Instattation Guide for
Steady 5tea0y furfhu deYails.
~ ~ The occuranct of Yehida Related Errors bava
steady slow singk 61ink. reached a maxiam. The unft is umporarily Cail Tethnical Support • 1-855-EhV•EVSE
disabled so tt~at an investigation can 6e done.
~ 3~C
52eady Very Fast Unk is laekad out and not apera6k Call Technicsi Suppuet - 1-855-ETN:•EVSE
Biink
~ ~fi
~~
Steady Asymmetric Unit is Eacked out and not aperabie Cali Tachnkal5upport - L85SETN-EVSE
Oo~ble Blink
1S EATON C6RPORAilON www.eaton.com
y- ~ c ~ ~
~~ ~
~f
I~
1 L~
IN
> z~~
~~m
ze'
~ ma
e xZ .
~ ~~
mo
~ ~ N
~`
L ~ Z
K
~ A
Za
~
~ r„~ r
*~
N
~
C e
~
~ ~j ~ ~
p V so 4
1 }3:
! } ~' J ~
, ~ Z `~ r i _
~ ~ '%F ~ 'N
m ~FZa} ~_
;q}YSn
i .kv: ~' '
r ~t;'~~< f ~.. M u
. ~ . ;Py;`P ~ `lfl~.. -
. f ~ s ~{'y~j y ;T .
. $ ~ ~3k°~L y~ ~~~~.
~ F~ a-~,~~'.~.° ~a
}sZn; ~ aZ ..
tl fL~' ~ 00
z i ri~ , =
~ F g ~5:~• ¢U x ~~.%
. c
/ ~ . . . . ~ ~ ~ ~;~'`~`~~=x W O
j ~ ~ > >U
~~ ~ l Z ~
~ ~~ `~.~o ` . W
N
/ ~/~ O ~ N _ J~ - 4
~. {~~ £:~~~`~, x '~
x:i0 um ~.g :i
nZYy
..U~Vw.. . '
c~ w „ ~ °
~ "r~ ¢ `v.
~" ~
r
`im'..~ S ~~_j '
~~`-;R
~ ~a
' €
, ' i~
N 3y},?~~.,~ ~ s,i :k ~ N
~ 6661 - WS~bIA 3YYSd
HLIA; 3~2~0@497Y 1:!
dae e a sr~ar,n~n~
3
m
~ >
' ~
„> ~
~° ~
a
~ _
Lr
i
t
n
0
(V
l`5
N
~~ N
N
O M
O ' ~ ~
M
~
t . ~ ._-- -j-[_
~ O j i 3
; m , ' m
~ > ~ o I w >
; ~ ~ , ~ ~
; - o ~ ; o
~ ~ ~ ~ ~
~~J ~~ _ i
~--- <
~
. '__..v_ ~,e
__-J ~
~ ~
~
~ss ~
t~
~ ~
T
a u m a
O V m
G
n
~ ~
~ N
U
~
rn
~ `
N ~
V ~
2 =
~ ~'-'
d W
4 ~ ~~
U
~
m ~
^ ,~ ~ ^ i ~
~ ~
~ r ~ ~ ~~ / ~
i
~ ~
c ~
E ~ ~ Q ~
<
Ii i ~ ~ / ~ `~
N { $ ~ ~a'+
~ ~ ' ~ ~ a
N i ~
~~ ~ ~ ~
~. ~c
~
~ o
i ~
I `
; °
i y
h ~ ~
E ~
~^, ,~ ~ ~ u°~
N ,a m ~ ° iu
~ I m m
1 =
~ ~
~ d
~
~ N
~ ~
~
4 ~.. ~
i i ~
~ i ~
,' ~ ~, I ~
o ~
~ ~ M
i ~- ~ CO
~ ~ W
, 1 ~ ~
`~ ' ;~~ r r
f~ .: , ~-,
~\ /!~~
~~'~~ -~-~ --~i
' --~--~
<
P
~
~+
_ I
O ~J
s Q
p U m G
~ ~~~ ~~';~ m
1 ~~. ~ "4 ~ .....
M ~-•~ a~
' ~ +~.t~a...., .~.: ~
b s ~'~.? • 'V' ^
~ r =
\ . ff ~ ~iE>j~~.. 2 tCI ..!c
~ U
~----- ~ ~ e~$~~;y'., ~ r ~.
~+ ~„` ~ f ~.s ` . W E p~'
s r
~i ~s t:~~`.~.,u~ ~..
F a
~ f ~a'oZ
~.~t S.,Lj _
! ~z £T "g~ .~Q U
J % \ ~ ~ 2 ~k: ~2 Nlil
~ F &yi a~ JZ .
~ ' ~ C)~~ ~ °' > p
/ ~~ > ~ ~wu '~ '. o
7~~ ~ N Y J W ~~. . UI
~
Ifi ~ ~ ~o = ~ W
jy C.~ ~ ~ _~ `~ k
Z ym ~
~ ~ 4 V .
~y. W
. ~~~ ~J ~~ ~ ~ ~ ¢ ~
~U~ I~ ~~'::~
~$d:d
a a; :
~
i
N
y t
~ h~ 3~!a ~ ~ r ~f
~~~- ~ ~ b66L - WS"b4A 3WStl~ ~
HllM?~k'Y'JNC~B k1
~ . d313Hdli LR5380~ ~MO'SH'•CvYJ
N 3
~ m
>
m
a
~ ~ ~
m ~
~
~ ~ ~
~
M
1 ii; i
1I i
i
i I I
! ~ a
~ ~ O ^
} ~ i
i ~ ~ ~
,, ~
~ ~? ~ ~ ' ~ ~ j o
~ ~ ~,_.~._" _"%` ti
i ~t ~ ~ ~ ~
4 f ~
~
~
< t6
N
~ rv I
Q ~~ i
.ys N
Y / t1} ' ~ ~
a v m ~
~ U m
4
~
~
a ~
h ~~
» ~
o
.~ U
~ ~
~
N
C
v
~i
p
~ k ~!
` ~
i~
~- ~ ~ ~
'
g
~
~ ~ ~
~
~ z "'
a
¢ ~
.~ ~ ~~
~~
~
`
1 ~ ~ ~
~ U
}
`{ (e'}
``;~a..,
~ S
~ 4
`~+ ~ \ ~ ~D (
1f 11
~ D
~ v~s
< '
a
` ~ ~
t ~ f !~ 3
~ l m c 3 ~,-
w
~\
~j Q
~
O
O r
a
~
~
~ \
~ ` ~, ~
~ ~
~
p ~
s <
a
~'
~ ~~ ... .
~~
/ ~
~
UJ u"5 ~ ~
Q `~
- O1
~ d
N
~ ,, (
1
~ ~
/
, -~
i9
~
'
2 CC
~ d
~
W
>
!f/ VCp U
O ~
~~yf
O '
y m
c t ~ ,
U
~ 5r
c
2 0
" ~Om
Em
~s c3
~m
m
c
~
V!
a~ a ~
p,~m
c ~
c ~ o c
~ u
)
~
~
p
g
~ ~ w
_~
~
~o
~
/~
/ /
~
W /
"
` ~ r
~
~ /
/
~ f
l ~ ~ /
. r
1
l
\
\ ~ ~
,,/ ~~
f ,
I ~ ~, %~ ~ %
`
'
g
~
d
~,,~ ; ~'
!
; ~
~
a
m ~ ~.
~
o ~" ,/
0
;
,
~- f.C) €~ ;
j~
/'` ar
c
~
o
~
~,
.
~ ? ~~Y~ ~~/ /~ r
- f~
~
~
N
a f~
o f ( ~-- ~
~ J
o ~ ~ ~
~ ~ /~,r
~ /
~ 7 y/
~ ~~' •!//
~ ~ 'l~l ' o
~
_'
v
~
y
~
'J V O
a
o u m
a
h
O ~r~j ~
O °'
Y
1' 1n ~ ~a
m ~ ~
~ ~
~ ~
i
~l ^ ~
' ^ ~z ~o t
k~
' I ~ l ;~ ^ ~ ~ t
~
o~
- -- ~ _
G
~ ~ w
J N LY
~ :~ 4 J
~ l\ ~ F U
~ E ~ >
a f { cyi
~ t c6
~ m
E
m
x
~ a ~ c
~
m
M
~ U
N °~
~j N
k
~
M I 9 I fl M
V
i ~ ~l
~ ~ a
I i Y
~ a ~ ~
~ °
~ o
,T=t. m
~~~
N
~
1
( J. .; . D
I___._L
l~ !~~ - ~
Q 1 ' ~If ~m--{
~ ~. o ~
Y
~ ^
~
a u m .~
Buy Signpost far Parking Signs: 6-Foot Green U-Channel Sign Posts
Page 1 of 2
~ I My a~ca,nt ~ si~ up k cuscomer service ~ shopping cart
F1~EE ~FI1PP(FJCs OV~Ft $99 s~" su
0 ftemc, ~S6.Q0 -$98.OG LEkT 66FORE fREE SHIRPING
ADA Braille and Guide Signs
»>
Security Signs »>
Parking Signs »>
Attemattve Fuel -Hybrid Parking
Signs
Church Pazkfng Signs
Enicartce and Ex3t Signs
F'ue Lane Signs
Handiwp PaAcing - Califomia
Hand'irap Parking - Nationa! Signs
Handfcap Parking - SFate Signs
HosPital Parking Signs
Hotel ParMng Signs
ND Parlcing S(gns
Parking Lol Signs
Reserved Parking Signs
Srhnol Parking Signs
Time Limit Parking signs
Custom Signs Online >»
Road 8 Treific Signs aa>
Property Mgmt Signa »>
Posts & Hardware »>
Oiher Products »>
cugton, s~g~ ca~oee: a~>
Clearance Sigas On Sate! »>
STOPSig nsAndh9are.cam
To f l-Free:1-888-931.1 T93
aales~STOPSkgnsAqdN{ot~e_com
Fax:7fi0-931-6800
rr.`r~
~ ~~
~ ~e~• +.~~;~~
Posts & tiatdware >» -. 6.Foot Green U-Chaanel Sign Posts - Medium Gauga
6-Faot Green U-Channel Sign Posts - Medium
' Gauge
~. Pnce: $32~~5
_...._
1 ary
~ E-matl this arQ~ct to a hiend
, F~
~~. 5:/,U: F~1t2G•3Ji.5
_.... .....__ .. __ ..... .... ... . .
Quaniity Discounrs
2-4 SA 10-14 45-19 2D-30
S3Q.95 ea. 529.95 ea. 528.45 ea. 528.d5 ea. ~2;:93 ea.
_ _ _ _ __ _
~ Reconuner~6 `. ~ Send B? the first of your iriends Yo recornmend W Is
Six Foot Green Signpost
6-Foat ~reen U-Channe# S} n Pasts - Medium Gauge t1.2LBSfFT?
rust-resistant steel signpos~
This medE~m weight post {1.2 pounds per finear foat) provic~as strength and
durability fdr m~t parking lot envirarrments.
However, for snow-belt environments where plows may pile up snowbarsks in parking lats, we recommend
our heavy gauge po&ts.
Green steel U-Ehannei posis come with gredrHled hules to maich the pre-drilletl hores in air signs, malcing
tor easy sign installadon. Sigrrpost has a tapered end fo~ easier ground insfaltatlon.
7 received my signs a few days ago and wanfed to lef you knaw tt~at 1 Hi1nk tbey are
' very high quafify-! was honestly expecYing mach fhinner metal and was pleasentfy
5urprised that they were so robust in consbuction. They a,e afsa very bright a»C super-
' visibk. Yori are oHering a g2at product at a great pifce - fhank you. I will highfy
~~ rrcommend yourprodacts."--Kevin, Whitetfiom, CA {Np Parkina Sians~, Handican
Parlrase SiCns, No Parkina Sicns)
We Make Ofiicial Sused Limii Sians, Park4nv Sians and Custom Sians, and Other Signa for
Praperiy ManagemenC ADA Cornol~ant Access Sians, No Parkina Sipns, N2ndicap Partuna Siqas, No
Trespassina Sians and Udeo Securitv Sidns, Cuslom Siqns, 6ilinv~el Sia~is, Lta Noi EMer Sfons, Pa'rkina
SIOIRS., No Smokuia Siarts, ~ntrance ancf Exit Sians. DonY see ffie Prapeny Managrment Signs that}rou
need~ Cali us snd we71 make them [or you! 1-888-937-1793
ReiBde~! Pri~iiit:ts
~ ~ asa sesany: +~
s'~. c~<. ,
6-Foot Green U-Channei 6-FOOt Galvanized U-Channel
Sion Posts - Heavv ~ i4ht ~ tdn osts- Heaw auge
http ://w~tiv. stopsignsandmore. com/p-2~ 8-6-foot-green-u-channel-sign-posts-inedium-gaug... lll 9l2012
Electric Vehicie Charging Station Signs Page 1 of 2
~~ ~ My AccouM ~ Sign Up ( Custtrmer Service ~ Shopping Cart
FREE SHiPPiNf3 QVER $99 search Su
~ items, $O.Dp •$89.tID L~FT BEFQRE FREE SHIRPlNG
ADA Braiile and Guide Signs
»> Parkina Sians >» ..... f,Itemaiive Fuei - Hxbrid Parkirtn Sians -. Elecxric VahiGe Charging StaSan Signs -12xi8
Securiry Signs »>
Parking Signs »> _... _....__........_........._....
~ r~ ElecVic Vehicle Charging Station Signa -12x18
AltemaUve Puel - Hybrid Paiic(ng ~~~ y
5€gns
i
Church pa~king Signs } ~ ;.tltl V.+ea[her & Gra;fiti A'ata^C oh-O~t3y 57 85~
En~r3qCB efld E7df $~gOS .__.:. ....__._._ __.. ...__.. . _ _._.._.. ..__..~.,
~, No POP • Pnce. 532 95
.. .
._..... , _ _
.... ,
.
:
t~
Fire Lane Signs .
.
,
..,_. .. ..._._....~ __
..
~{
Handicap Parking - Califomiz 1 Pnc 532 95
•
Handicap Parking . Nationai Signs ~
Hantlicap Parking - State Signs _
Hospita3 Parking Signs ~~. Choose ihe Color of your Sign...~
_.... .. _ _,
Hotei Parking Signs
~ Rty
NO Parking Signs ___._~..._
Partc[ng Lot Signs
~~-~~~ ~~s product to a friend
Reserved Parking Signs J ~
~+ll: ~'I~-19,,a
Sdwol Parking Signs
Time Limit Parking signs . . .. . .. . .. . .. . . .... . . .. .__ ... . . . . ..
. ... . .... .. .. ... .
', Quantity biscounts ~
Custom Signs Online »>
. 2-4 5-4 10-~14 15-20 20-90 -
Road 8 Tra$ic Signs »> . 531.95 Ea. $3C.95 ea. 529.95 ea. ~28.95 ea. ~~27.95 aa. ~
Property Mgmt Signs »> _ __ _ _ _ _ .. . .
Posts & Hardware »> Reconirnerx} ~~ ge ~ F~~ of yaur friends Yo feco:nmend this.
OtRerProducts»> Electric Venicle
~~5=omSi~~Q~o=~»> Charging Station S~gn
c+@a~„~@s;~~$ a~ sa~e, »> Electric VehicEe Charging Station Sign -12x'f8 - Reflectlve Rust-
Free Heav}/ Gauge Aluminum Electric Vehicle Parking Signs
ST6P SignsAnd Mos~e.~~m Efectric Vehtcte Charging Station Signs are availabte itr Green, Blaek, Blue, and Red
Tol!-Free: 1-888-931~-1793
sales~STOPSipnsAn~4MOre.com ~ ^~ ~~~jved si ns a iew da 5 a and wanted to 7et
~" g Y~ 9~ you know that I ihink tfrey e~e
Fax:750-99S~b800 very Aigh qua!'rty-1 was honesEty expec6ng much tfiinnermefa! antl was pleasanUy
swprised that they were so rob~st !n construction. They ere also vary brigbt and super-
L~ ~a"" " visibie. You are oKedng a great product af a 9rea; prkre - thank you. 1 will highly
~ - ~ recommand yaurprodutts.°-Kevin, Nfiitethom~, CA (No Park"tna Slans, Handicsp
~~"~`O~~X~~'~ ~
~..~ ~+.~ . ~,,. ..~~' ,_ Parkina Sians, No Park6~n Siansl
..` ~L~ `k .. . . .
~uil4c~tzc..4+ ~r ~::~ ': El~tric VefiiGe Charging Station 5igns are construCed of rust-free, heavy gauge, duraMe aluminum
~ ~,;;-' "
~. ~at
;
~ Electric Ve3~ide Charging Sfation Signs are made with 3M Engineer Grade Reflec[ive sheating aod 3M
..._
~
- -.._._. ____ _, inks
~~~~ Eledric Vehide Cfiarging Station Signs are rated 4y 3M fnr at ieast 7 years no-fade servlce
~~~
mm~rrw~rrr Electric Vehide Charging Station Signs come wiih holes drilled ac top and battom center for easy
~~~~~ mounUog
~ ~~~~ ~ ~- ~- DOUBLE the workinq INe bt ycur Parki~g SignE fp~?%ytri~ Rnd Fillema#ive ~uel Veh~;les Ay adding 3M Frot~r.!ivC
Ovx~ay Film tPpF)! 3M's high-te W POF proleds sign faces againsi fading pused by Ihe sun and harsh
~i
Ml1D~S IN THE USA
. weat~er-aM makes graffiti and sticker defacement damage easy te Gear away without harsb a6rasives.
secynr}:u~~xrex',
/
if We Make E(¢ctric Vehide Paricing Stgns and More tor Parktng Lots, Signs forSchools, and Signs
Cert
ed ~ . for Paci~ities Managers: ADA Compiiant Access Sians, No Parkino Siqns, Handicao Parkina Sians, No
Tresoassina Siqns and Udeo Sswritv Siqns, Custom Sians, Bilinaual Siqns, Do Not Emer Sitms, ed
Limit Sions, No Smokina Sians, E~Irance and Exil Sions. Don'! see ihe Property Management Sign that
~
~ ~ 9's~ tutiny. e1
~ e ii ~
thc'. !:. ^~.9i-i¢tr
~ you need? Call us and we7l make it /or you! 1-888-931-1793
Recominenrled Proeucts
http://w~~v.stopsignsandmore.coinlp-429-electric-~~ehicle-charbing-station-signs-12x18_aspx t/19/2012