HomeMy WebLinkAbout2002 NS Housing - Housing Rehabilitation Contract Awards~RANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: August 20, 2002 Action Agenda ' Item Na ~t~ -,~-~ SUBJECT: Housing Rehabilitation Contract Awards DEPARTMENT: Housing/Comm. Development PUBLIC HEARI~~G: (Y/N) No ATTACHMENT(S): INFORMATION ~CONTACT: Tara L. Fikes, ~:xt 2490 Bid Results Work Specifications TELEPHONE NUMBER~: Hillsborough 732-8181 Chapel Hill 968-4501 Durham 688-7331 Mebane 336-227-2031 PURPOSE: To award one housing rehabilitation contract for the HOM1= and three contracts for the CDBG Housing Rehabilitation Program respectively. BACKGROUND: The Housing and Community Developrnent Department solicited bids from qualified housing rehabilitation contractors participating in the County s Housing Rehabilitation Program. The informal bidding process is governed by the North C:arolina General Statues §143-131 and does not require a minimum number of bids. Additionally, present program procedures provide that housing rehabilitation contracts be awarded i:o the lowest responsible bidder. Additionally, all contractors participating in the County's Re~habilitation Program are required to utilize current deconstruction and material recycling mE;thods during the repair process. Sealed bids were solicited from participating contractors on May 22 and 28, 2002 and June 17 and 24, 2002. Bid results are attached. Three bids were received far each potential contract with Taylor Home Improvement Company, Triple J Construction Company, William Long Construction Company, submitting the lowest bid respectively. FINANCIAL IMPACT: The HOME and CDBG Programs provide total iunding for the contracts. RECOMMENDATION(S): The Manager recommends awarding the following housing rehabilitation contracts: Dwelling Unit Bid Amount Contractor 6803 High Rock Rd., Mebane $14,220 Ta~~lor Home Improvements 112 Eugene Street, Carrboro $27,395 Tri~~le J Construction Co. 8809 Harmony Church Rd., Mebane $32,645 William Long Construction 222 Collins Ave., Hillsborough $31,910 Tri~~le J Construction Co. 2 RESULTS OF BID OPENING OWNER: Addie Bradshaw APPLICATION NUN~ER: ADDRESS:_6803 High Rock Rd. COST ESTIMATE:_$14,443 Carrboro, NC PERCENTAGE OF BID OVER CHECK ONE:JOB BID X COMPANY iTNDER 2 %_ JOB NEGOTIATED COST ESTIMATE BID AMOUNT 1. Williams Long Construction $19,280 2. Taylor Home Improvements $14,220 3. Jordan Construction Co. $17,930 4. 5. 6. BID OPENED BY: Roxanne Reynolds TIME OF BID OPENING: 2:00 PM DATE OF BID OPENING: May 28, 2002 WITNESSFD BY: Donna Galloway ****************************************************************** Lowest Acceptable Bid: $14,220 Negotiated Amount: N/A Contractor: Taylor Home Improvements NAME _605 Ruby Street; Durham, NC 27705 ADDRESS 919-220-0480 TELEPHONE NUMBER CONIIMENTS : Submitted by: Bid Approval Date Proceed Order Issued Tara L. Fikes Date 08-07-2002 3 RESULTS OF BID OPENING OWNER: Cheryl Mitchell APPLICATION NUN~;ER: ADDRESS: 112 Eugene Street COST ESTIMATE: $29,415 Carrboro, NC PERCENTAGE OF BID OVER UNDER 7% COS7.' ESTIMATE CHECK ONE:JOB BID X CONIPANY l. Triple J Construction 2. Taylor Home Improvements 3. Jordan Construction Co. 4. 5. 6. JOB NEGOTIATED BID OPENED BY: TIME OF BID OPENING: 2:00 PM _$27, 395 _$27,600 $29,965 DATE OF BID OPENING: June 17, 2002 WITNESSFsD BY: Donna Galloway ***************************************************y~************** Lowest Acceptable Bid: $27,395 Negotiated Amount: N/A Contractor: Triple J Construction Co. NAME 1808 Pinecrest St.; Burlington, NC 27215 ADDRESS 336-227-6125 TELEPHONE NUN~ER CONIlMENTS : Submitted by: Tara L. Fikes Bid Approval Date Proceed Order Issued Roxanne Reynolds DatE~_08-07-2002 RESULTS OF BID OPENING OWNER: Mary Haith APPLICATION NLTN~ER: ADDRESS:_8809 Harmony Church Rd._ COST ESTIMATE: $31,845 Mebane, NC -' PERCENTAGE OF BID OVER 3o UNDER COST ESTIMAT CHECK ONE:JOB BID X COMPANY 1. Triple J Construction 2. Diamond Builders 3. William Long Construction 4. 5. 6. BID OPENED BY: TIME OF BID OPENING: Tara L. Fikes Roxanne Reynolds 2:00 PM DATE OF BID OPENING: May 22,2002 WITNESSED BY: David Saconn ****************************************************************** Lowest Acceptable Bid: $32,645 Negotiated Amount: N/A Contractor: William Long Construction Co. NAME _3761 Phillips Chapel Rd.; Haw River, NC ADDRESS 336-376-0170 TELEPHONE NUMBER CONIl~SENTS : Submitted by: Bid Approval Date Proceed Order Issued 3a BID AMOiTNT $33,775 $34,979 $32,645 Date 08-13-2002 E JOB NEGOTIATED RESULTS OF BID OPENING OWI~TER: Dorothy Riley ADDRESS: 222 Collins Avenue Hillsborough, NC PERCENTAGT OF BID OVER lo CHECK ONE:JOB BID X COMPANY l. Triple J Construction 2. Diamond Builders 3. William Long Construction 4. 5. 6. BID OPFsNED BY: TIME OF BID OPENING: DATE OF BID OPENING: WITNESSED BY: Roxanne Reynolds 2:00 PM ]3ID AMOUNT $31,910 $33,871 $35,555 June 24, 2002 David Saconn ***************************************************,r•************** Lowest Acceptable Bid: $31,910 . Negotiated Amount: N/A Contractor: Triple J Construction Co. NAME _1808 Pinecrest St.; Burlington, NC 27215 ADDRESS 336-227-6125 TELEPHONE NUMBER CONlNIENTS : Submitted by: Tara L. Fikes Bid Approval Date Proceed Order Issued APPLICATION NUNg~ER: COST ESTIMATE: $35,395 UNDER COS7' ESTIMATE JOB NEGOTIATED 3b Date: 08-13-2002 4 ' J ~ . ORANG~ COUNTY HOUSING AND REHABZGITATION PROGRAM SPE~iCATIONS ~ FOR 6803 ffiGE( ROCS RD, FOR ADDIE BRADSHA,W PHONE: 563-3895 DATE: 0~4J1L02~ . BY: JIM AXELROD REHAB SPECIAIJ,ST NOTE TO CON1~tA(.'I'OR CONTR.ACTOI2 SHOIjLD REFIIt TO TI~ BASIC SPECg'iCATIONS, PROPERTY REHAB]LITATION STANDARDS, C~F~1~'"R AT. CONDTIONS, NORTH CAROLINA BUII.~ING CODES MANUAI, AND pgANGE CO~JN'1-y HOUSING CODE DOCUMENTS, ' ~ IT bS NOT T~ IlV1~NT OF THE WRITER TO DIREC'I' Aivy CONTRACTOR TO A SPECIFIC SiJPPLIER OF MATER TA 7~ C~,~ FOR IN THLS WORK 'GVR1TE-Up ONLY TO SPECIk~'IYA TYPE THAT WOUI.D ACCEP'rA,BLE Tp T~ HOME~~VNIIZ AND ORA1~iGE COUNTY HOUSING REHABILiTATION . PROGRAM ~ . 5 Addie Bradshaw 6803 High Rock Rd. Mebane 563-3895 April ll, 2002 EXTERIOR: 1. Prepare the soffitt, fascia, trim, windows, doors, awnings and p~~rch ceiling for paint. Paint those surfaces with at least two coats of exterior seinigloss latex paint. Remove a11 rust from the wrought iron front porch columns. Prime and paint. Paint to cover a11 surfaces completely. 2. Install wrought iron handrails on the rear porch and steps. 3. Install one replacement foundation vent. 4. Install soffitt vents every eight feet in the front and rear soffitt. 5. Install four storm windows on the living room windows. ROOF: 1. Remove the porch and front section of the living room roof co`~ering to the sheathing. Install 15.1b. felt, aluminum drip edge and three tab ~iberglass shingles. Step flash the shingles against the siding. 2. Replace approx. 64 sq. ft. of sheathing. 3. Install a shingle type ridge vent ventilation system. 4. Remove the turbine vent. Repair the plywood. Install matching shingles. 5. Remove the shingles to the sheathing on the left side porch. In;;tall 151b. felt, aluminum drip edge and three tab fiberglass shingles. Step flash the shingles to the siding and brick. 6 Addie Bradshaw 6803 High Rock Rd. Mebane 563-3895 April 11, 2002 INTERIOR: LIVIl~TG ROOM: 1. Coyer the water stains on the ceiling. Paint the ceiling with ceiling white paint, the door with semigloss latex paint. Paint to cover completely. 2. Remove the e~sting door unit and storm door. Install a six panel metal insulated door unit with weather-stripping and aluminum threshold. Install lockset and deadbolt to be keyed the same. Install a wide-angle peephole. 3. Reinstall the existing storm door. HITCHEN: 1. Remove the kitchen base cabinets on the rear wall, counter top and hot water heater. 2. Repair the subfloor and finish floor. 3. Install'/a inch lauan plywood. Prepare the plywood for vinyl. 4. Install vinyl floor covering, metal trim and shoe mold. Vinyl to cost not less than $14/yd. 5. Reinstall the kitchen base cabinets and counter top. HALL: 1. Repair the subfloor and finish floor. 2. Install'/a inch lauan plywood. Prepare the plywood for vinyl. ~ Addie Bradshaw 6803 High Rock Rd. Mebane 563-3895 April 11, 2002 3. Install vinyl floor covering, metal trim and shoemold. 4. Install an attic access and trim. Prime and paint the trim. RIGHT/FRONT BEDROOM: 1. Remove all loose paint from the ceiling. Paint the ceiling with c:eiling white latex paint. Paint to cover completely. 2. Repair the damaged sheetrock. 3. Paint the wa11s with flat latex paint and the trim, windows and cioors with semigloss latex paint. FRONT HALL: 1. Repair the texture on the ceiling. SIDE PORCH: 1. Replace the broken glass. ELECTRIC: 1. Install GFT outlets in the kitchen and bath. 2. Install electric smoke alarms in each bedroom and the hall. 3. Install arc fault protectors on each bedroom circuit. 4. Install a~xture and switch in the crawlspace and attic. Addie Bradshaw 6803 High Rock Rd. Mebane 563-3895 April 11, 2002 5. Replace the damaged wire from the service to the receptacle on the rear porch and the attic. 6. Repair the light fixture in the lefdrear bedroom PLUMBING: l. Install a handicap commode, cutoff and supply line. 2. Instail a p-trap assembly, cutoffs and supply lines for the kitchen sink 3. Install a table top hot water heater. MECHAlvICAL: 1. Install a propane gas pack heat and air system. The system will have a 92% efficiency rating. Install insulated ductwork. INSULATION: l. Repair the insulation in the crawlspace. 2. Repair the 6-mill vapor barrier in the crawlspace. Provide a termite inspection and treatment 8 TOTAL: 9 REAR PORCH 6X11.5 KtTCFiEN 16X12.5 SIDE PORCN ( I U DEN 10X12 ~ ~ 16K12 BEDROOM , 10.5X12 HALL 11.SX5 BEDROOM 11.BX11.6 BRADSHAW LIVING AREA 1301 sq ft BE~ROOM' 9X'13.B HALL u BATH 9X7 6.5X7.5 LlVING ROOM 15.5X12.5 10 ORANGE COUNTY HOLTSIl~TG AND REHABII.ITATION PR~ SPE~iCATIONS . - F~R ~ . . I•L2 EUfENE ST. ' . FOR _ . G~RYL MY'rC ~'I.L. ~ . ~ . PHONE:732-5960. ~ DATE: 02fi1~02 , . . . ~ ~ . BY: ?IM A~LROD . ~ ~ . ~ REHAB SFL~tZA~yST NOTE TO CONTRACTpg CONTRACTOR S$OUL,~ R~R TO 1~ BASIC SPEQFICATIONS, FROP'ERTY REEiA.BILITATION STANDARDS, G~NERAL CpiV'DZZONS, NORTS CAROi3NA BUIII~ING CODES 1~SAI~UAL, AND ORANGE COUNTY~ MIIWi~~ICIM H+OU'SING , CODE DOCZT~I~ENl'S, . IT JS NOT 'I'HE IlV1~N'T QF T~ WRTTER TO DiRECT ANY CON11tACTOR TO A SPEC'IFIC SUPPLIr3t OP j~jATFR7AT C C_AT 7 Fl~ FQR jTJ Z~S 'p~OR$ WRITE-iJp O~II.Y TO SPECII'~iYA'TyPE THAT WOUI~ ACCEPTABI,,E 1'p Tf~ -' ' . ~ . HOMEO~R7NER AND ~RANGE COUN'TY HiDI7SIlV'G REHABIIITATIOI~T PR~GRA3~ ~ :,, ,. .. Cheryl Mitchell 112 Eugene St. 02/O1/02 928-9912 EXTERIOR: 1. Scrape and paint the front deck, posts and latticework. Paint to cover completely. 2. Install five manually operated foundation vents. 3. Remove the over hanging branches from both trees on the left ;~ide of the house. Wor~C to be done by a certified arborist. 4. Pressure wash the siding, soffitt, gutter and downspouts with a detergent formulated to clean vinyl siding. 5. Install matching vinyl siding, trim, fascia and soffitt on the rea~• addition. 6. Remove all trash from the rear of the house including the trash in the storage building. 7. Install gutter and downspouts on the rear addition. Install one d.ownspout on the right rear corner of the house. Extend that downspout through the deck. Reinstall the downspout on the right/font corner. Install plastic splashblc~cks under each downspout. 8. Install metal, helmet leaf guard system on all gutters. Rear Deck: 1. Remove the 4x16 deck on the right side of the house, the railing and 4x6 posts on the main deck. 11 2. Brace the deck. Remove the e~cisting 2x8drop girder. Install a ctrop girder on concrete footers. 12 Cheryl Mitchell 112 Eugene St. 02/01 /02 928-9912 3. Install pressure treated 2x8x8 at the center of each set of joists. 4. Anchor the deck to the house with 5/8 inch galvanized bolts. 5. Install a 2x10 band on the deck with 5/8 inch galvanized bolts. 6. Instal14x4 decorative posts, 2x4 rails and 2x2-scalloped pickets. 7. Install a 4x4-foot landing on concrete footers on the right hand side of the deck. Install steps, rails and pickets to match the deck. ROOF: 1. Remove the shingles to the sheathing. Install 151b. felt, three tab, fiberglass shingles, new plumbing boots and aluminum drip edge. Install flashing and counter flashing on the chimney. 2. Replace approx. 64 sq.ft. of sheathing. INTERIOR: Living Room: 1. Remove the front door. Reinstall the door unit properly. Install a deadbolt to be keyed the same as the lockset. Install a wide view peephole. Paint the door and door frame with exterior, semigloss latex paint. Pa.int to cover completely. 2. Install an aluminum over wood storm door with pneumatic closure and vinyl sweep. Door to have self-storing glass and screen, push button lock, key and a lifetime warranty. 13 Cheryl Mitchell 112 Eugene St. 02/O1/02 928-9912 3. Paint the ceiling with ceiling white latex paint and the trim and door with semigloss latex paint. Paint to cover completely. Install two coats of latex polyurethane varnish on the paneling. 4. Repair the floor at the front door with like size flooring. 5. Install carpet and pad. Carpet to cost not less than $14/yd. Kitchen: 1. Install %2 inch sheetrock on the ceiling. Tape and finish the shee-trock smooth. 2. Install 1 3/a inch bed mold. 3. Install '/4 inch luan plywood on the floor. Prepare the floor for ~vinyl. 5. Install vinyl floor covering, shoemold and metal trim. Vinyl to cost not less that $14/yd. 5. Install matching baseboard. 6. Paint the trim and door with semigloss latex paint, paint the ceiling with ceiling white latex paint. Paint to cover completely. Install two coats c~f latex polyurethane on the paneling. 7. Install a new bottom for the sink base cabinet. Repair the top drawer of the right drawer cabinet. 8. Clean the cabinets and install two coats of gloss latex polyureti:~ane. 14 • Cheryl Mitchell 112 Eugene St. 02/O1/02 928-9912 Hall: 1. Install %z inch sheetrock on the ceiling. Tape and finish the sheetrock smooth. 2. Paint the ceiling with ceiling white and the trim and doors with semigloss latex paint. Paint to cover completely. Insta.ll two coats of latex polyurethane on the paneling. 3. Install an attic access in the center of the hall. Bath: 1. Remove the existing tile, sheetrock around the tub and the window trim. 2. Repair a11 damaged framing. Install matching trim. 3. Install MR sheetrock azound the tub. Tape and finish the sheetrock smooth. 4. Install a plastic tub enclosure with comer shelves. 5. Remove the existing vanity. Patch the holes in the wall and floor. 6. Install a prehung door unit and privacy lockset. 7. Insta111/a inch luan plywood on the floor. Prepare the floor for vinyl. 8. Install vinyl floor covering, metal trim and shoemold. 9. Install a recessed medicine cabinet. 15 Cheryl Mitchell 112 Eugene St. 02/O1/02 928-9912 10 Install a five piece accessory kit to include a paper holder, two towel bazs, soap dish and tumbler holder. 11. Prepaze all surfaces for paint. Paint the walls, ceiling, doors an~i trim with semigloss latex paint. Paint to cover completely. Left/Front Bedroom: 1. Remove the existing door unit. Install a prehung door unit and ~~riva.cy lockset. 2. Install two coats of satin gloss polyurethane on the paneling. Pr~:pare all other surfaces for paint. Paint the ceiling with ceiling wlute latex pa,in.t and the trim and doors with semigloss latex paint. Paint to cover completely. 3. Insta.ll carpet and pad. Carpet to cost not less than $14/yd. LeftlMiddle Bedroom: L Remove the wall and ceiling coverings. 2. Install lx4 furring strips on the block walls 16 inches O.C. Caiilk all searns. Insta113/a inch styrofoam insulation between the furring strips c~n the exterior wall. Caulk a11 seazns. 3. Install %2 inch sheetrock on the wa11s and ceiling. Tape and fini sh the sheetrock smooth. 4. Install matching baseboard and window trim. 5. Paint the walls with flat latex paint, the ceiling with ceiling white latex paint and the trim and doors with semigloss latex paint. Paint to cover campletely. 6. ~ Install carpet and pad. Carpet to cost not less than $14/yd. 16 Cheryl Mitchell 112 Eugene St. 02/O1/02 928-9912 7. Install a strike plate for the door. Center/Middle Bedroom: 1. Remove thhe wall and ceiling covering. 2. Install furring strips on the exterior wall. Caulk all seams. Install3/4 inch styrofoam between the furring strips. Caulk all seams. 3. Install %z inch sheetrock on the walls and ceiling. Tape and finish the sheetrock smooth. 4. Install matching baseboard and window trim. 5. Paint the walls with flat latex paint, the ceiling with ceiling white latex pa.int and the trim and doors with semigloss latex paint. Paint to cover completely. 6. Install carpet and pad. Carpet to cost not less than $14/yd. 8. Install two prehung door units and privacy locksets. Extend the jamb on the door to the rear bedroom. Left/Rear Bedroom: 1. Remove the existing rear entrance door. Replace approx. eight feet of sill with pressure treated lumber. 2. Replace approx. eight feet of band with pressure treated lumber. 3. Reinstall the metal insulated door unit. Install a deadbolt and lockset to be keyed the same as the front door locks. Install a wide- angle peephole. 17 Cheryl Mitchell 112 Eugene St. 02/O1/02 928-9912 4. Install an aluminum over wood storm door with pneumatic closure and vinyl sweep. Door to have a self-storing glass and screen, push button lock, key and a lifetime warranty. 5. Paint the walls with flat latex paint, the ceiling with ceiling white latex paint and the doors and trim with semigloss latex paint. Paint to cover campletely. 6. Install carpet and pad. Carpet to cost not less than $14/yd. Master Bath: l. Paint the walls, ceiling, door and trim with semigloss latex pai~lt. 2. Install a five piece accessory kit to include two towel bars, tu~.bler holder, soap dish and paper holder. ELECTRIC: 1. Install a 150-amp meter center, mast and weather head. 2. Install new outlets, switches and outlet and switch covers. 3. Install new fixtures in each room and the exterior entrances. 4. Install arc fault breakers for each bedroom. 5. Install electric smoke detectors in each bedroom and the hall. 6. Install GFI outlets in the kitchen and bath. 7. Install a porcelain pull chain fixture in the attic and crawlspace.. 9. Install aluminum box extenders on each switch and outlet in t1~e paneled rooms. Cheryl Mitchell 112 Eugene St. 02/O1/02 928-9912 10. Provide an underground connection at the meter center. Seed and straw the ditch made by Duke Power. PLUMBING: 1. Install a 36-inch vanity, molded top and washerless faucet in the hall bath. Install new p-trap, supply lines and cutoffs. 2. Install p-trap assembly, supply li.nes and cutoffs in the kitchen. MECHANICAL: 1. Install a gas pack heat and air system with insulated ductwork. Unit to be at least 92% efficient. Make all necessary electrical and mechanical connections. INSULATION: 1. Install R-19 under in the crawl space. 2. Install R-30 in the attic. Provide a termite inspection and treatment. 18 TOTAL: 19 ~ A / j ` ~~ ~ ~~... ~ ~ t ~ ~- ~' ~ `7 ~n~~r ~ . . ' ) ~ l _ ~ ~ -- 4 5-` , L1VI1V~ ARE.4 ~ 232 ~sq ft : .. . Mi~che!{ ~ ~ ~~ 20 ORANGE COUNTY HOUSING REHABILITATION PROGRAM SPECIFICATIONS FOR 8809 HARMONY CHURCH RD. FOR MARY HAITH PHONE: 563-8481 DATE: 7/10/02 BY: DAVID SACONN REHAB SPECIALIST NOTE TO CONTRACTOR CONTRACTOR SHOULD REFER TO THE BASIC SPECIFICATIONS, PROPERTY REHABILITATION STANDARDS, GENERAL CONDITIONS, NORTH CAROLINA BUII~DING CODES MANCJAL, AND ORANGE COUNTY MINIMUM HOUSING CODE DOCUMENTS. IT IS NOT THE INTENT OF THE WRITER TO DIRECT ANY CONTRACTOR TO A SPECIFIC SUPPLIER OF MATERIALS CALLED FOR IN THIS WORK WRITE-UP ONLY TO SPECIFY A TYPE THAT WOULD BE ACCEPTABLE TO THE HOMEOWNER AND ORANGE COUNTY HOUSING REHABILITATION PROGRAM. 21 Mary Haith 8809 Harmony Church Rd. Mebane, NC 27302 4/2/02 EXTERIOR: Cover all door and window frames with white coil stock. 2. Remove all old gutters from boxing. Dri113/o" holes between rafters to allow air into the attic. Install vented soffit on all overhangs. 3. Cover all facias, eves and overhangs with white coil stock. Cover the front and side porch ceilings with white solid soffit. Nail lx4 inch lumber across ceiling joists on the side porch to receive the solid soffit. Wrap all exposed wood on the exterior. 4. Install continuous aluminum gutters and downspouts. Install splash blocks under each downspout. 5. Install ten (10) automatic foundation vents around the perimeter of the foundation. 6. Repair the left front porch foundation wall. Use mortar to fill in the damaged area. Stucco the entire foundation with block bond found:ition mix. Use an off white color. 7. Prime and paint the two (2) access doors and frame. Use semigloss latex paint. Paint to cover completely. 8. Replace the old wooden tree posts on the side porch: Install new tre;ated 6 x 6 posts. Pour a 24" x 24" x 10" pier footing for the corner post. Prime and paint the 6 x 6 posts with white exterior latex paint. 9. Install a shingle type ridge ventilation system on the main roof only. Cut a 2 3/a - 3 inch section from the ridge and install the ridge vent. WINDOW5: 1. Install8 insulated vinyl replacement windows on the lst and 2"d floor. The windows shall have at least one openable sash, screen, windov~~ lock and trim. The trim color shall match the windows. 22 Mary Haith 8809 Hannony Church Rd. Mebane, N.C. 27302 4/2/02 MECHANICAL: Install a 2%2 ton propane gas pack heat/air system with insulated ductwork. Make all necessary electric and mechanical connections. Install the headair system for the main floor only. The heat / air system shall pass all N.C. Mechanical Codes. INSULATION: 1. Install insulation in the attic to achieve an R-30 rating. 2. Install insulation in the crawlspace to achieve an R-19 rating. 3. Install R-30 insulation in the bathroom ceiling and R-15 in the three exterior walls. 4. Install a 6 mil vapor barrier in the crawlspace. INTERIOR: LIVING ROOM: Install a new aluminum over wood core storm door with pneumatic closure and vinyl sweep. Door to have a self-storing glass and screen, push button lock and key and a lifetime warranty. page 2 2. Remove the window stool and all door and window casing to facilitate the installation of sheetrock. 23 Mary Haith 8809 Harmony Church Rd. Mebane, N.C. 27302 4/2/02 LIVING ROOM: 3. Install %2" sheetrock on the walls and ceiling after the electrician ha s rewired the living room. Finish the sheetrock smooth. 4. Extend the door and window jambs to allow for the %2" sheetrock. 5. Install new door and window casings. Install new window stool anci apron on both windows. 6. Install new baseboard in the living room. Insta113 '/a" colonial baseboard. 7. Install new 3 inch crown molding in the living room. 8. Prime the sheetrock with new sheetrock latex primer. Paint the walls and and ceiling with flat latex paint. Paint to cover completely. 9. Prime all new and existing woodwork. Paint the casing, jambs, crown molding, doors and baseboard with semigloss latex paint. Caulk all cracks in the trim and molding before painting. 10. Weatherstrip the door leading to the upstairs. Weatherstrip the jaml~ and install a threshold . The bottom of door must be airtight. 11. Install a new handrail leading up the stairs. BEDROOM # 1: 1. Remove the window stool and all door and window casing to facilitate the installation of sheetrock. page 3 2. Install %z" sheetrock on the walls and ceiling after the electrician h~~s rewired the bedroom. Finish the sheetrock smooth. 3. Install jamb extensions on the door and windows frames to allow f~r the sheetrock. 24 Mary Haith 8809 Hannony Church Rd. Mebane, NC 27302 4/2/02 BEDROOM # 1: 4. Install new door and window casing to match. Install 3'/a" colonial baseboard. Install new window stools and aprons on the windows. 5. Prime the walls and ceiling with new sheetrock primer. Paint the walls and ceiling with flat interior latex paint. Paint the interior of the closet. Paint to cover completely. 6. BEDROOM # 2: 1. Repair the buckled ceiling tiles. 2. Paint the walls and ceiling with flat latex paint. Paint to cover completely. Paint the trim and doors with semigloss latex paint. page 4 3 Frame a 26" x 60" closet. Cover the walls with %2" sheetrock and finish smooth. Install 3'/a" baseboard on the inside and outside of closet. Install a shelf and rod. Install a 4' bifold door unit. Prime and paint the walls with flat latex paint. Prime and paint the trim and doors with semigloss latex paint. Paint to cover completely. 4. Install new 1%z" doorstop on the bedroom door. Prime and paint and with semigloss latex paint. Paint to cover completely. HITCHEN PLUMBING: Prime a11 new woodwork with interior latex primer. Prime the existing trim and doors with oil based primer. Paint all trim with semigloss latex paint. Prime and paint the exterior of the closet. Paint to cover completely. Caulk all cracks in trim and molding before painting. Tie the kitchen sink and washing machine drain into the main line leading to the septic tank. Install a mechanical vent under the sink area. 25 Mary Haith page 5 8809 Harmony Church Rd. Mebane, NC 27302 4/2/02 KITCHEN PLUMBING: 2. Install a 40 gallon gas hot water heater. Install the heater in an exterior aqua hut located on the back side of the house. Make all necessary plumbin~; and mechanical connections. The aqua hut shall not be under a window . Check plumbing and mechanical codes for proper installation KITCHEN: 1. Remove the gas floor heater and gas line in the kitchen. 2. Remove the ~lectric hot water heater in the kitchen. Remove the su.pply lines and electrical wires leading to the heater. 3. Remove the masonry thimble in the kitchen wall. Install matching sheetrock. T'ape and finish the sheetrock smooth. 4. Install a new 9light metal insulated door unit with aluminum threshold and weatherstripping. Install a new lockset and deadbolt to be keye;d the same as the front door. Prime and paint with sernigloss latex paint. 5. Install a new aluminum over wood core storm door with pneumatic; closure and vinyl sweep. Door to have a self storing glass and scre~~n, push button lock and key and a lifetime warranty. 6. Wash down the walls and ceiling and prepare for paint. Fill all hol~;s and cracks with sheetrock filler. Paint the ceiling with flat latex paint. Paint the walls, trim and doors with semigloss latex paint. Paint to cover completely. 7. Remove the plywood door leading from the kitchen into the living room. Install a new 1 3/8" six panel door. Install new hardware and lockset. Remove the old door stop and install new 1%z" doorstop. Prime and paint the door and trim with semigloss latex paint. Paint to cover completely. 8. Remove the corner cabinet to allow for the new 32" bathroom doo:r. 9. Trim down the corner cabinet and reinstall. 26 Mary Haith 8809 Hannony Church Rd. Mebane, NC 27302 4/2/02 BATHROOM: Remove the tub and commode. Remove the wall and ceiling sheetrock to the studs and ceiling joists. 2. Repair the damaged subfloor and floor joists. Install new 2 x 8 treated floor joists. Repair the damaged sill plates with treated lumber. 3. Frame up the bathroom window with 2 x 4 studs. Cover the outside with %z" plywood and wrap with white coil stock. 4. Reframe the door opening for a 32" door. Install new casing and jamb. Install a new 32" interior door. The door shall swing opposite the sink and commode. Install a privacy lockset. Prime and paint the door and trim with semigloss latex paint. Paintto cover completely. Install new sheetrock on kitchen side where necessary. Finish the sheetrock smooth. Install %2" MR sheetrock on the walls and ceiling. Finish the sheetrock smooth. 6. Prime and paint the walls and ceiling with semigloss latex paint. Paint all trim with semigloss latex paint. Paint to cover completely. 7. Install new 3'/a inch baseboard and shoe molding. Prime and paint with semigloss latex paint. Paint to cover completely. Install a baseboard style door bumper. 8. Prepare the floor for vinyl. Install %4 inch lauan plywood over the subfloor. Install a new vinyl floor. Vinyl to cost not less than $ 14/yd. Install metal trim at the door opening. page 6 27 Mary Haith $809 Hannony Church Rd. Mebane, NC 27302 4/2/02 BATHROOM PLUMBING: Install a new 60 inch 2 piece tub & shower modules with acrylic gab baxs and slip resistant textured bottom. 2. Install new supply lines for the tub and shower. Install a combinati~~n tub/shower washerless faucet with a hand held shower. Install a w;~ll clip for the hand held shower. Install a new drain kit for the tub. 3. Install an accessory kit. The kit should include two towel bars, tumble holder, paper holder, and soap dish. 4. Install a new recessed medicine cabinet with mirror. 5. Install a new handicap commode. Install a new supply line and cutoff. 6. Install a new 24 inch vanity base cabinet. Install a new 24 inch molded marble sink. Install a new washerless faucet, p- trap, supply lines and cutoffs. Secure the cabinet to the wall. 7. Install new PVC drain lines from the bathroom to the main 3 inch drain leading to the septic tank. Refer to floor plan for location of bathroom fixtures. page 7 28 Mary Haith page 8 8809 Harmony Church Rd. Mebane, NC 27302 4/2/02 ELECTRICAL: Rewire the entire house to the current new code. Install a 200 AMP breaker panel in bedroom # 1. Install GFI receptacles in the kitchen and bathroom. Install Arc Fault breakers in all sleeping rooms. Install underground service to the residence. 2. Remove all old switches and receptacles. Remove the main panel box from the front porch. Remove the old meter base, mast and weatherhead. 3. Install electric smoke detectors with battery backup in all sleeping rooms. Install one located at the bottom of the stairway and one at the top of the stairs. 4. Install new light fixtures in all lst and 2°a floor rooms. Reinstall the fan /light in the kitchen. 5. Install exterior light fixtures on front and side porches and one on the back of the house. 6. Install an exhaust fan controlled by a wall switch in the bathroom. Vent the exhaust through the boxing. Install an exhaust cover in the overhang. 7. Install a service light in the crawlspace. The light shall be controlled by a switch located within five (5) feet of the crawl space door. 8. Install an unvented range hood over the oven. Install any necessary framing to attach the hood to the wall. TERMITE TREATMENT: 1. Provide a termite inspection and treatment. TOTAL LABOR AND MATERIALS 29 Q ~ ~ Q ~ ~ ~ z ~ ~ ~ J ~ r ~< ~ ~ ~ ~ ~ ~ ~ ~ m D ~ ~ ~, O T Z ~ ~ X ~ N ~ ~ ~~ _ ~ m 0 ~ 0 0 ~ ~ ~ ,~ r ~. < ~ ~ r ~ O ~ O O ~ O ~ . N ~ 'T1 .'-~ ~ 30 m m 0 ~ 0 0 ~ ~ N ~ Z z ~ °o ~ ~ ~ ~ ~ ^ ~ ,_ ~ ~ n _ rn z 0 o~ ~ c° m° ~~ _ D rn ~~ _ nz~ ~~~ w~= N ."i7 ~ ~ °a ~m ~ a ~ ~ o O~ ° o ~ _ o ~o o ~ _ . . c ~ 31 ORANGE COUNTY HOUSING REHABILITATION PROGRAM SPECIFICATIONS FOR 222 COLLINS AVE. FOR DOROTHY RILEY PHONE: 732-3202 DATE: 7/10/02 BY: DAVID SACONN REHAB SPECIALIST NOTE TO CONTR.ACTOR CONTRACTOR SHOULD REFER TO THE BASIC SPECIFICATIONS, PR_OPERTY REHABILITATION STANDARDS, GENERAL CONDTTIONS, NORTH C,~ROLINA BUII.,DING CODES MANUAL, AND OR.ANGE COUNTY MINIMUM HOUSING CODE DOCUMENTS. IT IS NOT THE INTENT OF THE WRITER TO DIRECT ANY CONTRACTOR TO A SPECIFIC SUPPLIER OF MATERIALS CALLED FOR IN THIS WORK WRTTE-UP ONLY TO SPECIFY A TYPE THAT WOULD BE ACCEPTABLE TO THE HOM~;OWNER AND ORANGE COUNTY HOUSING REHABILITATION PROGRAM. 32 Dorothy Riley 222 Collins Ave. Hillsborough, NC 27278 5/1/02 EXTERIOR 1. Brick up the old foundation vent holes. 2. Install 18 automatic foundation vents around the perimeter of the foundation. 3. Remove the large crawlspace doors and install new 3/a inch plywood doors. Install new heavy duty T hinges and locking hasp. Prime and paint the doors and frame with semigloss latex paint. Paint to cover completely. 4. Adjust the locking hasp on the small access door. Prime and paint the door and frame with semigloss latex paint. Paint to cover completely. 5. Paint the foundation with approved masonry paint. Match the existing color. Remove all loose paint. Fill all cracks with mortar before painting. 6. Paint the front steps with a non-slip masonry paint. Match the existing color. Pressure wash and remove all loose paint. Apply 2 coats of paint. 7. Nail all loose and twisted deck boards on the front porch. Clean and prepare for paint. Paint the porch with two coats of oil based floor paint. Paint the front porch rails with an oil based metal paint. Paint to cover completely. 8. Remove the window from the left front foundation wall. Frame up the opening with treated 2x4 lumber and %2 inch plywood. Cover with vinyl. 9. Cover all the window frames with white coil stock. Repair all rotten wood before installation of coil stock. 10. Cover the back door frame with white coil stock. 11. Remove the gutter on the back section of the house. Drill 1" holes between rafters around the entire house. Install vented soffit in all overhangs. 12. Remove the rotten and warped ceiling boards on the front porch. Install a vented section of soffit across the full length of the porch. The vented soffit will cover the 2ft x 2ft vent holes already in the ceiling. Install solid soffit over the rest of the porch ceiling. 33 Dorothy Riley page 2 222 Collins Ave. Hillsborough, NC 27278 5/O1/02 EXTERIOR CONTINUED: 13. Install vinyl solid soffit on the back porch ceiling. 14. Cover all facias, eves and overhangs with white coil stock. Repair all rotten wood before installation of coil stock. 15. Remove the tin that is covering the damaged asbestos siding at the t~ase of the foundation. 16. Remove the exterior window frame on the right/rear corner. Install composite siding to match the existing siding. 17. Repair all broken, cracked, and missing asbestos siding. Install composite siding to match the existing asbestos siding. Pressure wash the exte~ior and paint. Paint the siding with at least 2 coats of flat latex paint. Paint to cover completely. Caulk all voids and cracks before painting. 18. Install D-5 vinyl siding on the dormer windows and wrap the facias. eves, overhangs and window frames with white coil stock. 19. Remove the window in the laundry room. Frame up the opening with 2x4 lumber. Install %z inch plywood over the studs and cover with vinyl siding. Insulate with R-15 insulation and install matching paneling on the iiiside. 20. Remove the roof covering from the back section of the house. Repai.r the bottom section of lx6 wood. Cover %z" CD plywood, black felt and matchir.~g 20 year shingles. Insta115V Corrugated metal on the low pitch. Install ridge cap on the hips. 21. Install a shingle type ridge ventilation system. 22. Install continuous aluminum gutters and downspouts. Install plastic splashblocks under each downspout. 23. Prepare the front door frame for paint. Remove all loose paint and prime with an oil primer. Paint the door frame with two (2) coats of white semigloss paint. Paint shall cover completely. 34 Dorothy Riley 222 Collins Ave. Hillsborough, NC 27278 5/O 1/02 WINDOWS: 1. Install 13 vinyl insulated replacement windows on the lst floor. The windows shall have an openable sash, screen, window lock and trim. Install a new vinyl replacement slider window in the bathroom. Insta114 vinyl insulated replacement on the 2°d floor. 2. Install foam weatherstripping on the dormer windows. MECHANICAL: 1. Install a 3%z ton gas pack heat / air system with insulated ductwork on the lst floor. Make all necessary electric and mechanical connections. The heat / air system shall pass all N.C. Mechanical Codes. INTERIOR: LIVI~IG ROOM: Install a new %z glass white aluminum storm door. Door to have a self-storing glass and screen, lever action handle, key, pneumatic closure and vinyl sweep. Door is to have a lifetime warranty. _ 2. Install a new, keyed lockset to match the deadbolt on the front door. 3. Prepare the walls and ceiling for paint. Fill all holes and cracks with sheetrock filler. Paint the walls and ceiling with flat latex paint. Paint the trim and mantle with semigloss latex paint. Paint to cover completely. page 3 4. Remove the masonry thimble. Install matching sheetrock. Tape and finish smooth. 35 Dorothy Riley 222 Collins Ave. Hillsborough, NC 27278 5/O l/02 HALLWAY & FOYER: 1. Prepare the walls and ceiling for paint. Fill all holes and cracks wit]~ sheetrock filler or latex caulk Paint the walls and ceiling with flat latex paint. Paint the doors and trim with semigloss latex paint. Paint to cover completel:y. _ 2. Scrap and paint the beaded wood walls around the stairway. Prime and paint with semigloss latex paint. Paint to cover completely. Caulk all cracks with latex caulk before painting. 3. Install a lockset on the door leading to the laundry room. FRONT / RIGHT BEDROOM: 1. Install a new strike plate on the door. LEFT / CENTER BEDROOM: 1. Remove the crown molding. Nail any loose or buckling ceiling tile~~. Install %2" sheetrock over the existing ceiling tiles. Finish the sheet~~ock smooth. Reinstall the light fixture. 2. Install new three (3) inch crown molding. 3. Trim the closet door so that it will close properly. 4. Prepare the walls and ceiling for paint. Fill all holes and cracks wit:n ' sheetrock filler. Prime the new sheetrock and crown molding. Paint the walls and ceiling with flat latex paint. Paint the doors and trim witY~ semi- gloss latex paint. Paint to cover completely. page 4 36 Dorothy Riley 222 Collins Ave. Hillsborough, NC 27278 5/O1 /02 REAR / LEFT BEDROOM: Remove the crown molding. Install %2 inch sheetrock and finish smooth. 2. Install new three (3) inch crown molding. 3. Prepare the walls and trim for paint. Fill all holes and cracks with sheetrock filler. Prime the new sheetrock and crown molding. Paint the walls and ceiling with flat latex paint. Paint the trim and doors with semigloss latex paint. Caulk all cracks and joints with latex caulk. Paint to cover completely. 4. Remove the old carpet and pad. Install 1/a inch lauan plywood and vinyl. The vinyl to cost not less than $ 14/yd. Install metal trim at all door openings. BATHROOM: 1. Remove the crown molding. Install new '/4 inch sheetrock on the ceiling. Finish the sheetrock smooth. 2. Install new two (2) inch crown molding on the ceiling. 3. Prepare the walls and ceiling for paint. Prime the new sheetrock and crown molding. Paint the walls and ceiling with semigloss latex paint. Paint the door and trim with semigloss latex paint. Paint to cover completely. 4. Remove the commode and the shoe molding. 5. Install a new vinyl floor. Glue the vinyl to the existing floor. The vinyl to cost not less than $ 14 yd. Install new shoe molding azound the vanity and baseboard. Caulk the vinyl at the tub. Prime and paint the shoe molding with semigloss latex paint. Install metal trim at the door opening. Trim bottom of door if necessary. page 5 6. Reinstall the commode. Install a new cutoff and supply line. 37 Dorothy Riley 222 Collins Ave. Hillsborough, NC 27278 5/O 1/02 HITCHEN & PANTRY: page 6 1. Prepare the ceiling for paint. Fill all holes and cracks with sheetrock filler. Paint the ceiling with semigloss latex paint. Paint the doors and trim with semigloss latex paint. Paint to cover completely. 2. Install a new vent for the kitchen sink. Install the new PVC vent tlv-ough the roof. Install a vent boot on the line. 3. Install '/4 inch lauan plywood over the existing vinyl floor. Install a new vinyl floor. Vinyl to cost not less than $ 14/yd. Install shoe moldin~;. Stain the shoe molding to match the paneling. Install metal trim at all door openings. 4. Install a vent ~ess range hood over the oven. Install any necessary framing to secure range hood to the wall. DEN: 1. Remove the gas floor heater and gas line. 2. Cover the flue opening with %2 inch sheetrock. Glue the sheetrock to the masonry wall. Finish the sheetrock smooth. Prime and paint with ilat latex. Install shoe molding around the edges. Prime and paint with semig;loss latex paint. 3. Prepare the walls and ceiling for paint. Fill all holes and cracks with sheetrock filler. Paint the walls and ceiling with flat latex paint. Paint the doors, mantle and trim with semigloss latex paint. Caulk all cracks in trim and paint to cover completely. 4. Install carpet and pad. Carpet to cost not less than $ 14/yd. Install nietal trim at all door openings. 38 Dorothy Riley 222 Collins Ave. Hillsborough, NC 27278 5/O1 /02 LAUNDRY ROOM: Install a new nine (9) lite metal exterior door unit. Door to have a lockset and deadbolt keyed alike. Prime and paint with semigloss latex paint. Paint to cover completely. Reinstall the existing storm door. 2. Install a passage lock on the door leading into the hallway. 3. Install '/4 inch lauan plywood over the existing floor. Install a new vinyl floor. Vinyl to cost not less than $ 14yd. Install stained shoe molding to match the wall paneling. Install metal trim at the door openings. 2ND FLOOR: Remove all loose paint on the walls and ceiling. Prime all bare wood. Paint the walls and ceilings with semigloss latex paint. Paint atl trim and doors with semigloss latex paint. Paint to cover completely. Repair the damaged wood below the left/rear window. ELECTRICAL: 1. Install a GFI circuit and receptacle in the kitchen, and one in the bathroom. 2. Install an arc fault interrupter on each bedroom circuit. 3. Install electric smoke detectors with battery backup in all sleeping rooms. Install one located in the hallway and one at the top of the stairs. 4. Rewire the light and receptacle on the back porch. Install a weather- proof cover and a GFI receptacle. 5. Install a new exterior light fixture on the front and back porch. 6. Install a new ceiling fixture in the hallway beside the stairway. page 7 7. Install a new light switch for the living room ceiling light. 39 Dorothy Riley 222 Collins Ave. Hillsborough, NC 27278 5/O 1/02 ELECTRICAL: 8. Remove the baseboard heat registers in the living room. ~ Disconnect the wires from the breaker panel. Install matching wood baseboard. Prime and paint. Paint shall cover completely. 9. Remove the old receptacle mounted to the baseboazd in the center/left bedroom. Install a new wiremold receptacle mounted to the basebo:~rd. 10. Install a recessed light fixture in the bathroom. CRAWLSPACE: Repair approximately 8ft of rotten band/girder located at the front porch. 2. Install 20 metal pole jacks in the crawlspace. The pole jacks must re;st on a concrete or masonry pad. 3. Add a 6 mil vapor barrier to the crawlspace. M ISCELLANEOUS: l. Remove the storage building to the foundation and haul off debris. 2. Repair the busted water line running to the spigot beside the back door. 3. Install a 24" x 30" access opening in the 2na floor ceiling. Install weather- stripping around the opening and install a plywood door. Prime and paint the access door and frame with semigloss latex paint. Paint shall cover completely. page 8 40 Dorothy Riley 222 Collins Ave. Hillsborough, NC 27278 5/O1 /02 INSULATION: 1. ~ Insulate the entire attic to provide an insulated envelope. Install R-15 in attic walls and R-30 blown insulation in the 2°a floor ceiling. Install baffles to ensure air flow from the overhangs to the ridge vent. TERMITE TREATMENT: page 9 1. Provide a termite inspection and treatment. . Dorothy Riiey 222 Coliins Ave. LIVING AREA Hiilsborough, NC 27278 1 fi90 sq ft 9 st Fioor 41 42 Fixed Windows ~rothy Riley Collins Ave. rough, NC 27278 :nd Floor LIVING AREA 583 sq ft