Loading...
HomeMy WebLinkAboutS ORD-2002-021 Orange County Soil Erosion and Sedimentation Ordinance Upon motion dul made by 1?vr�uo�.0 �� � , and duly seconded by Admg,� Ahe foregoing Ordinance was duly adopted by the Orange County Commissioners at a meeting held on the day of , 2002. �► Ayes: Commissioners Noes: . /�rw►tif � C��-� Absent or Excused: I, Beverly A. Blythe, Clerk to the Board of Commissioners for the County of Orange, North Carolina, DO HEREBY CERTIFY that the foregoing has been carefully copied from the recorded minutes of the Board of Commissioners for said County at a regular meeting of said Board held on ,u,"e. 7 , 2002, said record having been made in Minute Book No. �3/ of the minutes of said Board, and is a true copy of so much of said proceedings of said Board as relates in any way to the matters described in said proceedings. WITNESS my hand and the corporate seal of said County, this the—Ina� day of -Tu , 2002. •i*`��� "4w,A Bev y A. Blythe Clerk to the Board of Commissioners it ®���i Eas�ti�� 3 NORTH CAROLINA RESOLUTION AMENDING THE ORANGE COUNTY SOIL EROSION AND ORANGE COUNTY SEDIMENTATION CONTROL ORDINANCE WHEREAS, the Orange County Soil Erosion and Sedimentation Control Ordinance was originally adopted by the Orange County Board of Commissioners on December 30, 1975 and has been subsequently amended on the dates listed on the attachment, and WHEREAS, amendments are made to the Ordinance to enhance their implementation and applicability, and WHEREAS, the County Commissioners of Orange County, North Carolina recognize a great need to control soil erosion and sedimentation, and those activities which result in erosion and sedimentation within Orange County, and WHEREAS, Orange County recognizes the need for, and importance of, protecting the surface waters and the lands within its water supply watersheds, and WHEREAS, the Ordinance was amended on June 6, 1984 to increase protection of the waters within the University Lake protected watershed district, and WHEREAS, since adoption of the University Lake protection amendments, Orange County has created the Cane Creek and Upper Eno protected watershed districts, and WHEREAS, Orange County seeks to provide consistent and equal protection and regulation for all its protected watershed districts. NOW, THEREFORE, BE IT RESOLVED by the Board of Orange County Commissioners that: The Ordinance is amended as follows: 4 Section 2.1 Findings of Fact Relating to Sedimentation and Erosion inUniversity Lake Watershed University Lake, Cane Creek, �„r.�....�, Lake I and Upper Eno Watersheds The County Commissioners find that, without strict sedimentation and erosion controls, the development of land within the Uri veFs ty Lake Watershed University Lake, Cane Creek, and Upper Eno Watersheds will have a significant adverse impact upon the health, safety, and welfare of all persons served by theUniyemity .,U° water supply reservoirs within these watersheds. More specifically: A. Stormwater runoff carries pollutants into University ' water supply reservoirs, degrading water quality. These pollutants include, but are not limited to, organic and inorganic chemicals. B. The increase in nutrients such as phosphorus and nitrogen will accelerate eutrophication of Universe+„ water supply-reservoirs, adversely affecting flora and fauna. C. The improper channelization of watercourses and drainage areas in the I (nivemity Lake Watershed University Lake, Cane Creek, and Upper Eno Watersheds will increase the velocity of runoff, thereby increasing erosion and sedimentation. D. The alteration of the natural topography and removal of vegetation will increase erosion by increasing velocity of runoff. E. The siltation of water bodies resulting from increased erosion will decrease the capacity of the water bodies to hold and transport water, and harm flora and fauna. F. Sedimentation further reduces water quality because it transports pollutants into the water, then releases them in the water as it settles. G. Impervious surfaces will increase the volume and rate of stormwater runoff. This allows less water to percolate into the soil, thereby decreasing groundwater recharge. Increased velocity of runoff also reduces the filtering effect of the soil. H. Improperly managed stormwater runoff will increase the incidence of flooding and the level of floods which occur. Section 2.2 Objectives of Regulations Applicable to UniveMity -ake Watershed University Lake, Cane Creek, and Upper Eno Watersheds The regulations set forth in this Ordinance applicable to the ' niveisit„ Lake VyateFshed University Lake, Cane Creek, and Upper Eno Watersheds are designed: 1. To protect and maintain the chemical, physical and biological quality and integrity Of URiVeFSit" water supply reservoirs within these watersheds and other critical watershed areas. 5 2. To prevent harm to the residents of the community by prohibiting activities which adversely affect IJRiVe 6itY ' water supply reservoirs as a public water supply. 3. To encourage the protection of natural systems and the utilization of these systems in a manner which does not impair their beneficial functioning. 4. To discourage the construction of drainage systems which do not functionally approximate the natural drainage pattern. 5. To minimize sedimentation and erosion, within the watershed, and as a result, minimize the transport of sediment and pollutants to University 1 water supply reservoirs. 1 6. To protect and maintain the existing habitat of fish and wildlife. 7. To prevent damage from flooding while recognizing that natural fluctuations in water levels are beneficial. 8. To protect the absorptive, purifying and retentive functions of the natural systems existing in the URiv°Y�L Lake !".got°:'c".°c' University Lake, Cane Creek, and Upper Eno Watersheds area. 9. To ensure the attainment of these objectives by requiring the approval and implementation of sedimentation and erosion control plans for all activities which may adversely affect the URiver '+„ Lake Watershed University Lake, Cane Creek and Upper Eno Watersheds. 10. To provide and enforce design and performance standards for control of post- development erosion and sedimentation in order to preserve the characteristics that existed in the WRiversity Lake !".rater6h°d University Lake, Cane Creek, and Upper Eno Watersheds Area prior to development. Section 3 Definitions As used in this Ordinance, unless the context clearly indicates otherwise, the following definitions apply: Cane Creek Watershed Area - comprises all the land area contributing water to Cane Creek Reservoir. Upper Eno Watershed Area - comprises all the land area contributing water to either Corporation Lake, Lake Ben Johnston Lake Orange or West Fork on the Eno Reservoir. Section 6 General Requirements for Areas Other Than University Lake Water-shed University Lake, Cane Creek, and I Upper Eno Watersheds A. Protection of Property 6 Person(s) conducting land-disturbing activities shall take all reasonable measures to protect all public and private property from damage by such activities. This requirement shall apply to any areas to be disturbed, regardless of the size of the area to be uncovered. B. Erosion Control Plan Requirement Prior to the commencement of any land-disturbing activity that will result in the uncovering of more than 20,000 square feet of land, the person(s) conducting the land- disturbing activity must prepare and submit an Erosion Control Plan for the proposed site. The Plan must be approved and a Land Disturbing Permit obtained prior to the start of the disturbance. Section 6.1 General Requirements for University-Lake : at4shed I University Lake, Cane Creek, and Upper Eno Watersheds A. Plan Requirement Except as otherwise provided in subsection B., an erosion and sedimentation control plan shall be prepared and filed with and approved by the Erosion Control Division prior to the commencement of any land-disturbing activity within the Univemity 1 ^�o I Water-shed University Lake, Cane Creek, and Upper Eno Watersheds. B. Plan Waiver The person(s) conducting the land-disturbing activity need not submit an erosion control plan if such person obtains an Erosion Control Plan Waiver Form from the Erosion Control Division. An application for this form shall be submitted and shall contain the name, address, and phone number of the developer and owner, a description and drawing of the proposed development or activity, the location of the development, and any other information requested by the Orange County Erosion Control Officer that is reasonably necessary to evaluate the proposed development. The Erosion Control Officer shall issue the Plan Waiver Form if he finds that: 1. The land-disturbing activity will not result in the uncovering of more than 10,000 square feet; and 2. The land-disturbing activity is not to be conducted in connection with any of the following types of developments: a. shopping centers b. industrial and commercial facilities c. major subdivisions d. roads. e. any activity involving the temporary or permanent storage (above or below ground) of any noxious, toxic, or hazardous substance, including fuel storage facilities. 3. The proposed land-disturbing activity will not: a. significantly increase or decrease the rate or volume of surface water runoff; b. significantly contribute to the degradation of water runoff; 7 c. have a significant adverse impact on a wetland, watercourse, or University I °U water supply reservoir; d. occur within a buffer area circumscribing University I a water supply-.reservoir. Section 8.1 Additional Standards for Land-Disturbing Activity in Uni-veMitT-LY Lake Wa :'c"'---- University Lake, Cane Creek, and Upper Eno Watersheds The provisions of Section 8 shall apply to land-disturbing activity within the t7nivcrsit >_ake Wa-t eFshed University Lake Cane Creek and Upper Eno Watersheds. In addition, the design, construction, and maintenance of drainage systems in developments within the W iv°r�Lake Watershed University Lake Cane Creek, and Upper Eno Watersheds shall also be consistent with the following standards, and these standards shall control to the extent that they are more restrictive than those set forth in Section 8. A. Channeling Runoff- channeling runoff directly into water bodies shall be prohibited. Runoff shall be routed through swales and other systems designed to increase time of concentration, decrease velocity, increase infiltration, allow suspended solids to settle, and remove pollutants. B. Alteration of Watercourses - natural watercourses shall not be dredged, cleared of vegetation, deepened, widened, straightened, stabilized or otherwise altered except in accordance with an approved erosion control plan. Water shall be retained or detained before it enters any natural watercourse in order to preserve the natural hydro- dynamics of the watercourse and to prevent sedimentation. C. Limit Land-Disturbing Activity-the area of disturbance by development shall be as small as practical. D. Land Alterations - no grading, cutting or filling shall be commenced until erosion and sedimentation control devices have been installed between the disturbed area and water bodies, watercourses, wetlands, or adjoining properties. E. Wetland Protection - wetlands and other water bodies shall not be used as sediment traps during development. F. Maintenance Requirements and Responsibility - erosion and sedimentation facilities shall receive regular maintenance to ensure that they continue to function properly. Temporary basins shall be cleaned out when they are filled to fifty (50) percent of their design capacity. G. Artificial Watercourses - any artificial watercourse (where the need is demonstrated) shall be designed considering soil type so that the velocity of flow is low enough to prevent accelerated erosion. H. Buffer Area Requirements - soil and pollutants carried overland, primarily from roads, trails, and/or land-disturbing activities, can be effectively trapped by leaving a relatively undisturbed strip of vegetation parallel and adjacent to the watercourse. Properly managed overland water flow can be directed into this buffer area in a manner that will reduce velocity and cause dispersion of the water. Sediments carried by the 8 water will settle out as a result of this slowing and dispersion process. The width of these buffer areas shall depend on the type of stream or drainage area. The width of the buffer strips shall be as follows: 1. Creeks and tributaries - (i.e., permanent streams flowing directly into uniyeFslty ..Lo a water supply reservoir within University Lake Cane I Creek, and Upper Eno Watersheds and permanent streams flowing into such streams). Measure along a line running perpendicular to the edge of the floodplain (or if no floodplain has been demarcated, the center of the stream)fifty feet from the edge of the floodplain (or if no flood plain has been demarcated from the edge of the water) plus an additional distance equal to: 4 x slope x 100 where "slope" is expressed as a percentage derived by dividing by 100 the rise in elevation between the floodplain boundary line (or if no floodplain has been demarcated, the centerline of the watercourse) and a point one hundred feet from that point along the above described perpendicular line. 2. Intermittent streams flowing into creeks and tributaries. Measure along a line running perpendicular to the centerline of the intermittent stream fifty feet from such stream centerline. 3. Intermittent streams flowing directly into WniveFsity Lake water supplv reservoirs within University Lake, Cane Creek, and Upper Eno Watersheds. Measure along a line running perpendicular to the centerline of the intermittent stream one hundred feet from such stream centerline. 4. Intermittent streams flowing into streams which flow directly into University water supply reservoirs within University Lake, Cane I Creek, and Upper Eno Watersheds. Measure along a line running perpendicular to the centerline of the intermittent stream fifty feet from such stream centerlines. 5. I Iniyersity Water supply reservoirs within University Lake, Cane I Creek, and Upper Eno Watersheds. Measure along a line running perpendicular to the high water mark or floodplain boundary (whichever is farther from the Lake) one hundred feet from such high water mark or floodplain boundary (whichever is farther from the Lake) plus an additional distance equal to: 4 x slope x 100 where "slope" is expressed as a percentage derived by dividing by 100 the rise in elevation between the high water line of the Lake and a point one hundred feet from that point along the above described perpendicular line. 9 The existing natural vegetation in the designated buffer areas shall not be disturbed in any way that would reduce the area's effectiveness in achieving the objectives set forth in this subsection. In addition, buffer areas from which the vegetative cover has been removed shall be planted or otherwise provided with ground cover devices or structures sufficient to allow the buffer area to accomplish the objectives set forth in this subsection. Buffers shall not be used as temporary erosion control devices during construction. Section 9 Stormwater Outlet Protection A. Control of Discharge in University Lake `" ater-ee°d University Lake, Cane Creek, and Upper Eno Watersheds Provisions shall be made for the control of stormwater discharges for the types of development as specified below. After development of the site, the peak discharge of stormwater runoff resulting from a ten-year storm shall be no greater than that which would result from a ten-year storm on the same site prior to development. This requirement shall apply to: 1. Commercial, industrial, office, and institutional developments 2. Multi-family residential developments of more than 10 units 3. Single-family detached residential developments where more than 3 lots are to be created. B. Control of Velocity Persons shall plan and conduct land-disturbing activity so that the post- construction velocity of the 10-year storm runoff in the receiving watercourse to the discharge point does not exceed the greater of: 1. the velocity established by the table in paragraph 3 of the subsection; or 2. the velocity of the 10-year storm runoff in the receiving watercourse prior to development. If conditions (1) or (2) of this paragraph cannot be met, then the receiving watercourse to and including the discharge point shall be designed and constructed to withstand the expected velocity anywhere the velocity exceeds the "prior to development" velocity by 10%. Standards 1. Acceptable Management Measures Measures applied alone or in combination to satisfy the intent of this subchapter are acceptable if there are no objectionable secondary consequences. Innovative techniques and ideas will be considered and may be used when shown to have the potential to produce successful results. Some alternatives are to: io a. avoid increases in surface runoff volume and velocity by including measures to promote Infiltration to compensate for increased runoff from areas rendered impervious; b. avoid increases in stormwater discharge velocities by using vegetated or roughened swales and waterways in lieu of closed drains and high velocity paved sections; C. provide energy dissipaters at outlets of storm drainage facilities to reduce flow velocities to the point of discharge; these may range from simple rip- rapped sections to complex structures; d. protect watercourses subject to accelerated erosion by improving cross sections and/or providing erosion-resistant lining. 2. Exceptions - This rule shall not apply in areas other than the URiveFsity Lake Vyate,s„ed I University Lake, Cane Creek, and Upper Eno Watersheds where it can be demonstrated that storm water discharge velocities will not create an erosion problem in the-receiving watercourse. Section 11 Access and Haul Roads Temporary access and haul roads, other than public roads, constructed or used in connection with any land-disturbing activity shall be considered a part of such activity. With respect to development in the ' iR*Ver°;+„ Lake Watershed University Lake, Cane I Creek, and Upper Eno Watersheds, these access and haul roads shall have gravel pads placed at the entrance of the site of a land-disturbing activity. Section 15 Existing Uncovered Areas A. Existing Sites All uncovered areas existing on the effective date of this Ordinance which (1) resulted from land-disturbing activities not excluded under Section 5, and (2) if such areas are outside the WRive ity Lake Watershed University Lake, Cane Creek, and Upper Eno Watersheds and exceed 20,000 square feet, and (3) are subject to continued accelerated erosion, and (4) are causing off-site damage from sedimentation, shall be provided with a ground cover or other protective measures, structures, or devices sufficient to restrain accelerated erosion and control off-site sedimentation. Section 17 Permits A. When Required .No person shall undertake any land-disturbing activity which would require the uncovering of 20,000 square feet or more of lam land, or any land-disturbing activity if within the University Lake, Cane Creek, or Upper Eno Watersheds without first obtaining the required approvals and permits from the Erosion 11 Control Officer. Permit Application forms must be signed by the landowner or his authorized agent. The agent signing must have a signed letter of authorization from the owner. No permit is required for the following activities: 1. For the purpose of fighting fires. 2. For the stock piling of raw or processed sand, stone, or gravel in material processing plants and storage yards, provided that sediment control measures have been utilized to protect against off-site damage. 3. For disturbances that do not exceed 20,000 square feet in surface area. In determining the area, lands under one or diverse ownership being developed as a unit will be aggregated. B. Erosion Control Plan Approvals An Erosion Control Plan must be submitted to the Erosion Control Officer when the proposed land disturbance is greater than 20,000 square feet, or for any land-disturbing activity within the University Lake, Cane Creek, or Upper Eno Watersheds. C. Land Disturbing Permits Before starting a land-disturbing activity greater than 20,000 square feet, or an land-disturbing activity if within the University Lake Cane Creek, or Upper Eno Watersheds, the owner or his agent shall obtain a Land Disturbing Permit from the Erosion Control Officer. Erosion Control Plans must be approved before a Land Disturbing Permit will be issued. Land Disturbing Permits may be obtained when the Plan is approved or prior to the start of the land disturbance Section 18 Erosion and Sedimentation Control Plans A. Plan Requirement An Erosion Control Plan shall be prepared for all land-disturbing activities subject to this Ordinance whenever the proposed activity is to be undertaken on a tract comprising more than 20,000 square feet, if more than 20,000 square feet are to be uncovered - or as otherwise noted in this Ordinance. Three (3) copies of the Plan shall be filed with the Erosion Control Officer, one copy of which will be simultaneously forwarded to the Orange Soil and Water Conservation District, at least 30 days prior to the commencement of the proposed activity. 12 Upon motion duly made by , and duly seconded by the foregoing Ordinance was duly adopted by the Orange County Commissioners at a meeting held on the day of , 2002. Ayes: Commissioners Noes: Absent or Excused: 1, Beverly A. Blythe, Clerk to the Board of Commissioners for the County of Orange, North Carolina, DO HEREBY CERTIFY that the foregoing has been -carefully copied from the recorded minutes of the Board of Commissioners for said County at a regular meeting of said Board held on , 2002, said record having been made in Minute Book No. of the minutes of said Board, and is a true copy of so much of said proceedings of said Board as relates in any way to the matters described in said proceedings. WITNESS my hand and the corporate seal of said County, this the day of , 2002. Beverly A. Blythe Clerk to the Board of Commissioners g:\ErosionControlDivWmendments\ESCOrdAmendmentsResolution