HomeMy WebLinkAbout2002 S Purchasing - Proposed Contract with Haden-Stanziale for Conceptual Design and Site Planning at Little River Regional Park/"~~ ~-~~~0~
Haden•Stanziale
k' L i1 h' V t R 5 :\ I~' I) L A V f) 5 (-. i~ f t
May 7, 2002
Pamela K. Jones Diredor
Department of Purchasing & Central Services
P.O. Box 8181
129 East King Street
Hillsborough, North Carolina 27278
RE: Little River Park Design
Dear Pam,
A N (~ H I T E (~. -f 5
We appreciate your invitation to present this proposal for Landscape Architectural services for the
Master Planning and Construction Documents for Phase I- Little River Park. The work includes
planning and design of all hardscape and softscape forthe entire entrance drive and 15-acre
meadow. We have visited the site and reviewed the conceptuai site pian and base information
provided by the County. HadenStanziale will assist you by p~ogramming, conceptualizing, master
planning, designing and providing construction documents and assistance in bid award.
I. PROJECT UNDERSTANDING
HadenStanziale understands that Orange County wishes to rna~t~et ~ the ent~ance to
the pa-ic and the area generaliy bound by the 15-acre me~r. tA~ ~~nty rwiU master
plan the balance of the park, however HadenStanzisrle v~i l~ artt~~4e kar pl~rt~n~
and designing the link trail system to the proposed Coun#y d~3~1d WrN ~y~n. This
link will be approximately'/. mile in length.
HadenStanziale understands that the County wishes to pertom~ ~~d'lv~iu~ tt~
existing buildings and make recommendations as to the end u5e of the fac~tities. It is our
understanding that this task will require an onsite visit by an architect and written
recommendation as to course of adion(s).
HadenStanziale further understands that the County wishes to be provided construction
documents, plans, details, specifications and bid documents sufficient for the project to
be bid under North Carolina law for alt Phase I Improvements. HadenStanziale also
understands that the County desires assistance in providing bid review and
recommendation of award.
It is HadenStanziale's understanding that all of the above listed design services be
completed in a 90-120 day time frame.
II. SCOPE OF SERVICES
Based on our understanding of the project and our discussions, we propose the following
Scope of Work:
Phase One - Site Tour 8 Evaluation
. Project kick-off meeting / Site familiarization / ~econnaissance
• Preliminary base mapping
. Site inventory/assessment
. Site suitability
Haden•Stanziale, P.A. • Coordinate survey Durham
First Union Plaza
2200 W. Main Street, Suite560 Charlotte
Durham, NC 27?0~
919.286J440 F 919.286J889
F-mail DurhamQhadenstanziale.com ~ Wilmington
May 7, 2002
Pam Jones
Page 2 of 4
. Issues and constraints
. Base map finalization
Phase Two - Review of Proposed Park Facilities
• Presentation meeting of Phase I and programming meeting to determine
park facilities - combined
• Rank facilities for development priority (By Orange and Durham County)
• Develop phasing options (By Orange and Durham County)
• Review of historical archftectural components
• Develop facilities spacial requirements and functional relationships (bubble
diagrams)
. Determine regulatory criteria
• Owner development criteria
• Presentation meeting
Phase Three - "Sketch Design"
• Utilizing issues and constraints map delineate development pods
. Special articulation of facilities considering pedestrian and vehicular
circulation
• "Sketch Designs" of altemate facilities configurations
. Site visit for validation of design
• Presentation meeting
Phase Four- Draft Conceptual Designs
. Review comments from "Sketch Designs"
. Incorporate comments and develop a conceptual site plan (hand drawn)
Once the conceptual site is prepared a conceptual grading plan will be
prepared to establish the relative volume of earth for the estimate of probable
construction cost.
• Develop phasing/implementation plan (By Orange and Durham County)
• Develop estimate of probabte construction cost
. Refine conceptual design
• Public meeting for concept presentation
Phase Five - Preliminary Site Plan
. Review and incorporate comments from Phase Four public meeting as
appropriate.
• Prepare a preliminary hand rendered site plan drawing to scale establishing
horizontal geometry for all proposed improvements. Drawings will be colored
• In association with this plan a preliminary grading plan will be prepared so
that initial erosion control and storm water design can be undertaken.
• Sketches of detailing and ouUine specification will also be prepared at this
time.
. Once the above plans have been prepared a detailed unit quantity estimate
of probable construction cost will be prepared.
• Incorporate comments into plans
. Prepare written summary of entire design process in anticipation of submittal
to the two county boards.
• Public presentation meeting to subcommittee of joint boards
May 7, 2002
Pam Jones
Page 3 of 4
• Upon obtaining approval HadenStanziale will prepare detail plans and
specifications along with contract documents sufficient for Orange County to
bid, award and construct the project.
• Prepare and submit packages to regulatory agencies for their review and
approval
Phase Six - Bidding and Award
• Review bids, tab bids and make recommendations of award
Phase Seven - Contract Administration
• HadenStanziale will visit the site at your request appropriate to the stage
of construction or as otherwise agreed by HadenStanziale in writing to
become familiar with the progress and quality of the work and to
deterrnine in general if the work is proceeding in accordance with the
Contract Documents. This work is optional and will be billed hou~iy if
utilized (see attached schedule)
Note: All construction drawings and detailing will be in AutoCad
III. COMPENSATION
Compensation for those services outlined above will be on a lump sum fee basis as
follows in accordance with the attached General Terms and Conditions.
FEE
Phase I- Site Tour and Evaluation $3,170.00
Phase II - Review of Proposed Park Facilities $4,070.00
Phase III - Sketch Design $1,850.00
Phase IV - Draft Conceptual Design $7,570.00
Phase V- Preliminary Site Plan $10,000.00
Phase VI -Bidding and Award $460.00
Phase VII - Contrad Administration (Optionan Hourly
TOTAL BASIC SCOPE OF SERVICE $27,120.00
Compensation for those services beyond the scope of services outlined above will be on the
basis of actual time expended not to exceed the above listed numbers and the attached General
Terms and Conditions. In addition, all out of pocket expenses would be billed in accordance with
the attached General Terrns and Conditions, which should be incorporated by reference.
The fees listed above shall be subject to renegotiation under the following conditions:
A. If the scope of the project changes materially, and / or design revisions are required
beyond the original approved plans.
B. If services covered by this proposal have not been completed within twelve (12) months
of the date of this proposal.
May 7, 2002
Pam Jones
Page 4 of 4
We look forvvard to this opportunity to work with Orange County. If the above meets with your
understanding and approval, please sign the enclosed copy of this proposal, initial and date the
attachments, and return it to me for our files. The retum of the signed contrad wili also senre as our
notice to proceed.
Res ully Submitted,
PAUL C. EMBLER, JR. ASLA
Senior Project Manager
Attachments -
1. Copy of Same
2. General Terms and Conditions
3. Hourly Rate Schedule
CC - George Stanziale
Robyn Dickinson
APPROVED: :`~
The County of Orange
DATE
Haden•Stanziale
V L i\ ti' N F R 5 1 N I7 L ~\ IJ I) S (~. A I' C A K (' H I 1 C (- I .
GENERAL TERMS AND CONDTITONS
The General Terms and Conditions outlined below are part of the attached letter ageement
and are hereby incorporated by reference.
2. The Owner shall provide Haden•Stanziale with program information regarding the
requirements and objectives for the Project. Additionally, Haden•Stcmziale shall be entitlerl to
rely upon the accuracy of any services, information, and survey reports supplied by the Owner
or by others.
3. In addition to professional fees outlined in the attached letter agreement, the Owner shall pay
all reimbursable expenses which are defined as actual expenditures made byHaden•Strnrziale,
their employees, or professional consultants in the interest of the project and include expense
of transportation and living when traveling in connection with the proj ect; long distance calls
and telegams; and expense of reproductions, postage and handling of drawings and
specifications, excluding those for office use and presentation to the Owner. Reimbursable
expenses will be calculated as actual cost plus a ten percent (10%) administrative fee.
4. All fees and reimbursable expenses will be invoiced bi-weekly and are payable upon receipt.
In the event payment is not, however, received within thirty (30) days of invoice date, the past
due balance will be subject to an interest penalty of one and one-half percent (1-1/2%).
Invoices which remain outstanding shall be subject to interest at the rate of one and one-half
percent (1-1/2%) per month. In the event payment is not made within sixty (60) days,
Haden•Stanziale will stop work on the project until payment is received. Stoppage of work
by Haden•Stanziale will not be deemed as a default under the terms of this letter agreement.
In some cases, an additional fee will be required to stop and restart work due to non-payment.
5. The Owner agees that this letter agreement shall be interpreted according to the laws of the
State of North Carolina, and agrees to reimburse Haden•Stanziale for reasonable attorney
fees that it may expend in enforcing this letter agreement.
6. Payment of the advance deposit, if required, and signature of the letter agreement will signify
the Owner's acceptance of all the Terms and Conditions stated herein and the Owner watrants
that the necessary funds are available to pay Haden•Stanziale for the services and expenses
outlined in the letter agreement and that these funds are not encumbered or contingent upon
subsequent sales, approvals, permits or financing commitments.
Haden•Stanziale, P.A.
First Union Plaza
2200 W. Main Strec~, Suite ~60
Durham, NC 27705
919286J440 F 919.286J889
F-mail DurhamOhadenstanziale.com
Durham
Charlotte
Wilmington
.. ,.
Haden•Stanziale
I' L ~ N N [ k ti i\ N I) I. n N f) $ l- n P E
HADEN - STANZIALE. P. A.
RATE SCHEDULE
Principals
• James F. Haden
• George E. Stanziale, Jr.
Senior Associates
• Jon Wood
• Tim Snyder
• Dan Weeks
• Todd Parrott
Senior Project Manager
• Paul Embler, Jr.
Associates
• Eric Wolfe
• Dan Blackman
Design Staff
• Karen Weston-Chien
• Rod Florence
• Sara Chambers
• David Barnes
• Ryan Bouma
• ` Robert Shunk
• Tonya Swartzendruber
• Elliot Buff
• Albert Lynn
• Tyla Bedenbaugh
• Kevin Mitchell
• Katie Thomas
Clerical
• Robyn Dickinson
• Lanett Frey
• Candi Coate
Haden•Stanziale, P.A.
firsl Union Plaza
2200 W. Main SUeet, Suite SGO
Durham, NC 27705
9192f3GJ440 f- 9122f3GJY189
f:-mail DurhamOhadenstan zialc.com
A F! (~ I-1 I I I: (~. ~I ti
$125.00 per hour
$90.00 per hour
$100.00 per hour
$75.00 per hour
$65.00 per hour
$55.00 per hour
$50.00 per hour
$40.00 per hour
Durham
Charlotte
Wilmington