Loading...
HomeMy WebLinkAbout2012-017 AMS - Warren-Hay Mechanical Contractors for Link Geothermal Well $13,080i+ ~ ~~ ~Nfi1N~~Rs REECE, NOLAND 8~ McELRATH, INC. 409 North Haywood Street • P.O. Box 540 Waynesville, North Carolina 28786-0540 Waynesville 828-45Cr9851 • Toll Free 822-849-0486 Fax 828-456-6205 • Email rrrr; a)rnr;i:=T~in~ rs.c~~rr~ CHANGE ORDER NO. 1 PROJECT: John M Link, Jr. Government Services Building HVAC Renovation CONTRACT FOR: Mechanical Construction TO: Warren-Hay Mechanical Contractors, Inc. You are directed to make the following changes in this Contract: ^'igr5~~_o~7 cS soiz,- oa 3 g_~_~olJ 8~ Provide ABC stone as required to fill trenches back to 4" below asphalt in lower parking lot. Provide trucking to remove excess soil /dirt from trenches to county site as per item #3 on addendum #2. Provide ABC stone even to the top of asphalt in small upper lot and from top of hill (entrance) to the small lot. The original Contract Sum was $679,326 Net change by previous Change Orders $0 The Contract Sum prior to this Change Order was $679,326 The Contract `mlot to Exceed" Sum will be increased by this Change Order $13,080* T'he new Contract "Not to Exceed" Sum including this Change Order will be $692,406* *Actual change order amount will be based on the unit prices below. Actual quantities hauled off and provided will be verified by the engineer. Unit Price for haul off and stone replacement: Unit Price for stone only to fill ditch to grade The Contract Time will be unchanged $42.00/cubic yard 300 cu/yd estimated $32.00/cubic yard 15 cu/yd estimated 'j? Y:\Orange Co Link Geothermal 2011019.00\Correspondence\change order #1.docx DESIGNER: REECE, NOLAND & McELRATH, INC. _ } By: t Date: CONTRACTOR: Warren-Hay Mechanical Contractors, Inc. BY w Date: /-~o- 7~/ Zi OWNER: Orange County, NC By: Date: ., This instrument has been pre-audited in the manner required by the Local Government Budget and Fiscal Control Act. Orange County Financial Services Director Y:\Orange Co Link Geothermal 2011019.00\Correspondence\change order #1.docx Regular Meeting Thursday, September 8, 2011 7:00 p.m. Department of Social Service Building, Hillsborough Commons 113 Mayo Street, Hillsborough, NC c. Bid Award: link Center Geothermal HVAC and Aaaroval of Budeet Amendment # 11=B APPROVED as AMENDED The Board will consider awarding the bid and approving a construction contract to Warren Hay Mechanical, Hillsborough, NC, in the amount of $679,326 for the installation of geothermal HVAC system a John M. Link, Jr. Government Services Center to replace the existing system and authorize the Chair to sign subject to final review by the County Attorney.