Loading...
HomeMy WebLinkAboutRES-2012-018 Resolution Amending the 2030 Comprehensive Plan 02— 1'- /� A Resolution #: P 1 y - C�1 S' A RESOLUTION AMENDING THE 2030 COMPREHENSIVE PLAN WHEREAS, Orange County initiated an amendment to the Orange County 2030 Comprehensive Plan, in accordance with Section 2.3 of the Orange County Unified Development Ordinance (UDO), to correct inconsistencies in terminologies and replace references to newly repealed ordinances, and WHEREAS, the requirements of Section 2.3 of the Unified Development Ordinance (UDO) have been deemed complete, and WHEREAS, the Board finds that the text amendments maintain internal consistency within the 2030 Comprehensive Plan in accordance with the provisions of the Comprehensive Plan. NOW THEREFORE BE /T RESOLVED by the Board of Commissioners of Orange County, North Carolina, that the 2030 Comprehensive Plan, is hereby amended as follows: = Proposed Text Strikethr nough= Deleted Text REMAINDER OF PAGE INTENTIONALLY LEFT BLANK Chapter 1: Plan Overview amendment with the Comprehensive Plan and any other relevant plans (such as a small area plan, a corridor plan, or a transportation plan) that have been adopted by the Board of County Commissioners. The Board of County Commissioners is also required to adopt a statement on plan consistency before adopting or rejecting any zoning amendment. These written comments are required, but do not limit the board's discretionary power to adopt or not adopt zoning amendments. The Orange County zing Unified Development Ordinance provides the authorization and legal framework for development and adoption of a comprehensive plan. The ordinance states that the plan "shall constitute an internally consistent and compatible statement of policies for the long-term physical development" of the County, and that the plan should include the following elements (or chapters): • Land Use Element; • Transportation Element; • Housing Element; ■ ., Natural and Cultural Systems Element); • ., Parks and Recreation Element}; • Economic Development Element; and • Services and Facilities Element-; and ■ County Profile (Data) Element. The Planning Board is given the express power to develop and recommend the Comprehensive Plan for adoption by the Board of County Commissioners. Before the board can adopt the plan, a public hearing must be held to provide an opportunity for the County's citizenry to comment on the plan. The zoning ordinanee Unified Development Ordinance also provides standards for amending the plan. (See Section 1.5.3: Amendments.) 1.2.3. GOVERNANCE STRUCTURE Orange County is governed by a seven-member Board of Commissioners, elected in partisan countywide elections. The primary duties of the board include adopting an annual budget, establishing the annual property tax rate, appointing various officials, planning for County needs, adopting local plans, and enacting local ordinances. The board also has the authority to call for bond referenda, enter into contracts, and establish new programs and departments. The board is advised by more than 40 different boards and commissions comprised of Orange County citizens that volunteer for their positions. Achieving the goals set by the County Commissioners is made possible because of this citizen input into programs, services, and general operations. Some of these boards have been established by state law and their authority is defined in the North Carolina General Statutes. Others have been created by the Orange County Board of County Commissioners to help them set policies for specific areas of service. Ora+ei Cap utity Campre e,Flaw Page 1-4 L a Chapter 1: Plan Overview 1.4.2. DEVELOPMENT OF POLICY/STANDARDS AND IMPLEMENTATION STRATEGIES Existing public policies, including the policies provided in the 1981 Orange County Land Use Element (See Appendix D: 1981 Land Use Element Policies), will remain in effect while additional specific policies, standards, and implementation strategies of this 2008 Comprehensive Plan are being developed and adopted. Additional policies or revisions to existing policies may be added to the Comprehensive Plan Elements on an incremental and case-by-case basis as new programs are identified and authorized by the Board of County Commissioners. 1.4.3. RECOMMENDED PROCESS FOR SETTING PRIORITIES Advisory boards and staff should review Comprehensive Plan goals and objectives on a regular basis and develop specific ideas on implementation strategies for presentation to the Board of County Commissioners. Setting priorities will be guided by the feasibility of accomplishing the strategies within a given year. Implementation strategies that are presented to the Board of County Commissioners should identify the following: • The corresponding Comprehensive Plan goal(s) and objective(s); • Estimation of fiscal impacts and staff resources required to implement the strategy; • Identification of responsible department and advisory board(s) and any contributing department(s) and advisory board(s) that will be engaged in strategy implementation; and • A timeline for implementation of the strategy. The Board of County Commissioners will consider implementation strategies submitted by advisory boards, consider fiscal constraints and opportunities, and provide guidance to the County Manager on priorities for implementation. 1.4.4. SUMMARY OF EXISTING IMPLEMENTATION TOOLS The County has several implementation tools that may need to be revised as new implementation strategies come on line in the County. These implementation tools include the following: ■ Orange County Zoning Unified Development Ordinance; • Building, plumbing, electrical, mechanical, fire and housing codes; • Capital Improvement Plan; and Ora4i#e-CCUNV y CowyPrehengVepZa� Page 1-12 ti r Chapter I: Plan Overview ■ Public Funding of Initiatives and Programs. Additional implementation tools may be identified during development of implementation strategies. 1.4.5. DECISIONS ON IMPLEMENTATION The Board of County Commissioners will, as needed and appropriate, prepare a work plan for Comprehensive Plan implementation strategies that identifies strategies to be initiated in a given year, the human and financial resources allocated to implementation of the strategies, and the parties responsible for implementing the strategy. 1.5. MONITORING AND EVALUATION PROCEDURES 1.5.1. PURPOSE The Comprehensive Plan is a "living" document. It should be revised and updated regularly to ensure its relevance as the guiding document for County decision-making. This chapter outlines procedures for ongoing monitoring and updating of the Comprehensive Plan. 1.5.2. PLAN REVIEW AND EVALUATION The following Plan review and evaluation procedures should be conducted according to the timelines given: 1. A set of evaluation criteria, including a set of sustainability and community building indicators, or metrics, together with specific action statements will be developed for each Plan Element by each Element Advisory Board with assistance of County staff within the first year after plan adoption. The evaluation criteria may include short-term (1-2 years), medium-term (3-5 years), and long-term (more than 5 years) measurements. Combined, these evaluation criteria will be used to inform periodic updates of the Plan. The evaluation criteria will serve as a "Report Card" and will describe how and where the County is making progress on implementation of the plan and where additional attention may be needed. 2. Comprehensive Plan Element Status reports to the Board of County Commissioners will be developed by respective Advisory Boards and staff. Status reports will include a review and evaluation of Plan goals and objectives using the evaluation criteria discussed above. The report will be developed every other year beginning one year after adoption of the Plan and will be delivered to the Board for review at its annual retreat. A specific format for reporting will be developed to maintain consistency in reporting. 3. The County Profile Element will be updated after data from the 2010 U.S. Census are available. Regular updates to the County Profile Element should occur to reflect new U.S. Census data in subsequent years. 4. Following the incorporation of 2010 data, a survey of County departments will be undertaken by the Planning and Inspections Ora*t elCou4,u Coi*tPrehevoMPLa.*w Page 1-13 Chapter 1; Plan Overview Department to determine the usefulness of the County Profile Element, and if annual updates would be beneficial. 5. A full review and update of the Comprehensive Plan will occur within 10 years of adoption of the plan, with a preliminary target of 2015. 1.5.3. AMENDMENTS Monitoring and reporting activities will identify opportunities for updating and revising the Plan. The Plan should be amended in a manner that maintains internal consistency between Elements and upholds the basic goals and objectives on which it was formulated. Request for amendments can be brought forward by the general public, County staff, and Advisory Boards, as well as the Board of County Commissioners. Plan amendments should be evaluated through a public review process. The specific procedure for initiating Plan Amendments is outlined in Section 2.2.14 2.3 of the Orange County Zoning Unified Development Ordinance. This procedure may need to be revised to reflect the new Comprehensive Plan model that incorporates the work of Advisory Boards and departments. In particular, the following issues should be considered for revision: • Review and amendment of Section 222.14 2.3 of the Orange County Zed Unified Development Ordinance to reflect the role of advisory boards, in addition to that of the Planning Board, in the amendment process. • A process should be developed and adopted that guides the coordinated dialogue of the advisory boards when making recommendations on Plan amendments. Ora+u iCcu,yo C&mprdw*v�e Pla. Page 1-14 Chapter 3: Economic Development Element INVESTING IN INNOVATION: THE ORANGE COUNTY ECONOMIC DEVELOPMENT COMMISSION'S FIVE YEAR STRATEGIC PLAN 12005-2010) The Orange County Economic Development Commission commenced a strategic planning process in 2002 to guide future efforts of the organization. The result of this multi-year planning effort is a five year strategic plan with the overarching goal to "create 5,000 new private sector jobs in Orange County and add $125,000,000 in new commercial property by June 2010." Four key areas for improvement were identified: • Improved Business Climate to enable businesses to create the needed jobs; • Infrastructure to enable the businesses to flourish; • Workforce Development to make sure workers have the skills needed to assume the new jobs; and • Quality of Place to ensure that Orange County remains a great place to live and work. Specific action steps were identified for each of these four areas of improvement. The objectives of this element were derived from the key goals identified in this plan. 2007 STATE OF THE LOCAL ECONOMY The Orange County Economic Development Commission published a report entitled State of the Local Economy in March, 2007. The report provides key economic and demographic statistics for Orange County. Key conclusions from the data analysis show improvement in some aspects of the County's economy, including decreasing commercial vacancy rates, increases in retail sales tax collections, maintenance of the lowest unemployment rate in the state, and increases in weekly wages. The report also highlights that the County's tax base continues to remain unbalanced at 86% residential and 14% non- residential, retail sales per capita were well below the state average, the cost of living in the area is still high, and the number of families on food stamps has increased since 2000. ESTABLISHMENT OF ECONOMIC DEVELOPMENT DISTRICTS Orange County has designated more than 2,450 acres in three strategically placed areas along Interstates 85 and 40 as Economic Development Districts. The purpose of these districts is to promote development of properties located along key transportation corridors and near urban areas for commercial or industrial development. These sites were selected because of their adjacency to the interstates, their proximity to rail facilities for the movement of goods and potential for future transit service, access to public water and sewer service, and the potential to divide large tracts in these districts into a range of building site sizes. Orange County's location, midway between the Piedmont Triad and Research Triangle metropolitan areas, makes these sites highly marketable. The districts offer development potential for light industrial, warehouse/flex space, office, retail, and business service. The specific types of developments that can be constructed within these districts are explained in the Orange County Oran. Cct"ttyCQmprehevsdve Plavv Page 3-4 Chapter 3: Economic Development Element Development Disti'mets E)esign Manual Unified Development Ordinance, ava"able through the ei-ange County Planning offiee. The manuall Ordinance provides standards for each district that illustrate the desired balance of economic development and environmental and neighborhood protection. The schemetties identify standards address three main areas: 1) primary development areas intended to accommodate the full range of light industrial, distribution, retail, office, and service uses; 2) secondary development areas that provide opportunities for less intense development including limited office and residential uses; and 3) open space areas that include environmental features such as steep slopes and floodplains that should not be developed. The three Economic Development Districts include: • f-85- Buckhorn Read District - This district is comprised of 845 acres located on the northeast and southeast quadrants of an 1-85 interchange at Buckhorn Road. Because the district is served by transportation and utility systems, the entire developable portion of the district has been designated as a primary development area; • Hillsborough District - This district encompasses all four corners of a major interstate exchange south of Hillsborough. It includes 724 acres. This area includes a mix of residential land uses and will require design solutions to buffer neighborhoods from future development; ■ Eno District - This district extends almost two miles along either side of 1-85. The district includes many land uses, including single-family homes, Manufactured Housing District developments, and small-scale service and commercial operations. Almost half of the district is designated as a primary development area. Design solutions will be needed in this district to transition from residential uses to more intense commercial and industrial uses. Map 3-1 below illustrates the locations of the Buckhorn, Hillsborough Area, and X0/1 85 Eno Economic Development Districts. 0ra4WC0U*1ty Co-mpre,hevt,&Uve Pla� Page 3-5 Chapter 3: Economic Development Element Work within the Orange County government system to identify and resolve existing policies which may be at odds with historic preservation goals, green building approaches, and workforce and affordable housing efforts. LAND USE Objective LU-1.1: Coordinate the location of higher intensity / high density residential and non-residential development with existing or planned locations of public transportation, commercial and community services, and adequate supporting infrastructure (i.e., water and sewer, high-speed internet access, streets, and sidewalks), while avoiding areas with protected natural and cultural resources. This could be achieved by increasing allowable densities and creating new mixed-use zoning districts where adequate public services are available. Objective LU-3.1:- Discourage urban sprawl, encourage a separation of urban and rural land uses, and direct new development into areas where necessary community facilities and services exist through periodic updates to the Land Use Plan. Objective LU-3.2: Coordinate land use patterns to facilitate the expanded use of non- auto modes of travel, the increased occupancy of automobiles, and the development and use of an energy-efficient transportation system. Objective LU-33: Discourage new intensive non-residential land uses, or the expansion of existing intensive uses, in the area designated Rural Buffer. Objective LU-3.5: Encourage energy and water use in an efficient manner by industries and encourage energy efficient industries to locate or expand in the County in Rural Industrial, Commercial/Industrial, and Economic Development Nodes. NATURAL AND CULTURAL SYSTEMS Objective AG-2: Pursue new measures (some of which may require special legislation) to make farming more profitable, such as additional programs for tax assistance. Objective AG-3: Develop programs and associated infrastructure facilities to make local farms more economically viable, including local farm product processing, development of a distribution center, and marketing initiatives. Objective AG-6: Ora 4iW-1 CountyCamprehevi -,ve Pla4v Page 3-23 Chapter 4: Housing Element LAND USE Objective LU-1.1: Coordinate the location of higher intensity / high density residential and non-residential development with existing or planned locations of public transportation, commercial and community services, and adequate supporting infrastructure (i.e., water and sewer, high-speed internet access, streets, and sidewalks), while avoiding areas with protected natural and cultural resources. This could be achieved by increasing allowable densities and creating new mixed-use zoning districts where adequate public services are available. Objective LU-2.10: Develop design standards or guidelines that address scale, density, and aesthetic considerations for residential, mixed-use, industrial, and commercial land uses to promote community aesthetics and the protection of the visual and cultural environment of the County. Objective LU-4.1: Support the use of individual manufactured housing units as a useful housing resource in the County by increasing the opportunities where these units can locate by-right. Objective LU-4.2: Review and amend the Orange County Zoning and Subdivision des Unified Development Ordinance to identify and eliminate existing regulatory impediments to objectives identified in the Comprehensive Plan. Such objectives include the development of energy efficient buildings within the County, and development of affordable housing. Objective LU-4.4: Encourage the provision of a range of affordable and suitable low and moderate income housing by means of development incentives in order to provide a balanced housing stock for the residents of Orange County. NATURAL AND CULTURAL SYSTEMS Objective CR-3: Work within the Orange County government system to identify and resolve existing policies, which may be in conflict with the preservation mission. SERVICES AND FACILITIES Objective WW-2: Coordinate the provision of potable water and sanitary sewer services with the County's Land Use Plan and Orange County-Chapel Hill- Carrboro Joint Planning Agreement and Land Use Plan, targeting these services to urban, transitional, and economic development districts in a manner that does not endanger environmental resources. OraWCou*ity Covw,prehevtsdve Plan Page 4-18 Chapter 5: Land Use Element Efland-Mebane Small Area Plan was adopted in June 2006 and includes implementation recommendations for water and sewer, land use, transportation, housing, parks, recreation and open space, communications, inter-governmental agreements with Mebane, and design overlays for the US 70 Corridor and Efland town core. NC HIGHWAY 57 SPEEDWAY AREA SMALL AREA PLAN. In 2007, Orange and Durham County completed a Small Area Plan for the 930-acre North Carolina Highway 57 Speedway Area. This area is located in the northeast corner of Orange County near the border with Durham County. The area was selected as an opportunity for further long-range planning because of multiple factors 1) existing businesses of non-conforming status, 2) the area's location within a protected watershed, and 3) Orange County's desire to encourage compatible non-residential development that protects the existing rural character of the area. The planning process included an identification of issues and concerns for the area, public feedback through scheduled meetings, and drafting of the plan for public review and consideration. The plan includes nine goals for guiding future planning efforts in the area, as well as objectives and policies for implementing the goals. The NC Highway 57 Speedway Area Small Area Plan was adopted by the County Commissioners in August 2007. The implementation of recommendations included in the Plan is forthcoming. PANTRY STUDY The Pantry Study was to ensure that subsequent developments were in accordance with municipal and County land use objectives and included participation from the Town of Hillsborough. The plan established development standards for transition areas and additional protection for environmentally sensitive areas. The plan was approved by the BOCC in July, 1986. HOW SMALL AREA PLANS INFORM UPDATES TO THE COMPREHENSIVE PLAN Development of Small Area Plans has allowed the County to take a more detailed look at targeted areas in the County. The goals and objectives of these Plans provide a foundation for improving the County's Comprehensive Plan to effect needed change in these locations. In general, these Small Area Plans have highlighted the need for the County to: 1) Pursue additional interlocal agreements; 2) add additional partners to the Water and Sewer Management Planning and Boundary Agreement; 3) amend the County's Future Land Use Map (contained within the Land Use Element); and 4) amend the County's Zoning Unified Development Ordinance text and map for consistency and to implement the recommendations that have been included in the adopted Small Area Plans. 5.3. THE LAND USE PLAN One of the fundamental planning tools used to achieve the stated goals and objectives of the Comprehensive Plan in Orange County is the design and application of a Land Use Plan and Map. Land Use Element implementation is accomplished primarily through the application of zoning, although a variety of land use ordinances are available for various aspects of implementation. A key feature of land use planning in Orange County is the requirement for consistency between the Future Land Use Pfart Map and the application of zoning. A The Land Use and Zoning Distriet Matrix identifies matches each of the Land Use Plan 0ravV,e1Cou*ity Co-mprehev«iveiPLavv Page 5-14 Chapter 5: Land Use Element eate�e�ie� classifications with compatible, eorrespoii&mg zoning districts. If a zoning district is not listed as compatible with th-e a land use category classification emitained in the Matrix, re-zoning cannot take place unless the Future Land Use Plan Map is amended. (See Appendix F: Relationships Between Land Use C- s r ssifications and Zoning Districts Matt .) The Future Land Use Map defines the location of coordinated and appropriate land use classes and is designed to accommodate a particular combination of land uses that would achieve a desired pattern of development. The linkage between the 1981 Plan and zoning has helped to guide new development to appropriate locations in the County. As a result of the County's strong commitment to the Future Land Use Kan Map, it can be and is used as a primary tool by staff, the Planning Board, and elected officials during review of re-zonings. The Map also provides the development community and staff with clear guidance to the locations in the County where re-zonings may be appropriate and where they are not. T-he-There are three basic land use categories (Developed, Transition, and Rural) and a series of overlays used on the Map. are based on five basie eategories, wvhoch All have been refined into a more detailed classification system to meet the specific development needs of the County. These five The land use categories and overlays consist of the following: " , and eciiservatoom DEVELOPED LAND USE CLASSIFICATIONS Urban Land that is within the corporate limits or Extra-Territorial Jurisdiction (ETJ) of a town and, therefore, under the planning and zoning jurisdiction of the town. Existmna Urban Activity Node - Land corresponding to "activity eemers" designated by the Towns 0 Chapel 1 1011 and Carrbore and similarly identified for the Towns e Land corresponding to proposed "aetivity centers" designated by the Towns of Ehapel 1 101' and Garrbero. TRANSITION LAND USE C TEGQRlEr CLASSIFICATIONS 10-Year Transition Land located in areas that are in the process of changing from rural to urban densities and/or intensities, that are suitable for higher densities and/or intensities and could be provided with public utilities and services within the first 10-year phase of the Plan update or where such utilities and services are already present or planned. Non- residential uses implemented in accordance with small area plans and/or overlay districts may be appropriate. 20-Year Transition Ora*WCmoityCvmpr`OW4U e/Plan. Page 5-15 Chapter 5: Land Use Element Land located in areas that are in the process of changing from rural to urban, that are suitable for urban-type densities and should be provided with public utilities and services within the second 10-year phase of the plan. Commercial Transition Activity Node Land focused eii designated located at major road intersections or near major transportation routes that could be provided with public water and wastewater services and within either a 10 year or 26 year transition area that is appropriate for retail and other commercial uses. Commercial-Industrial Transition Activity Node Land near major transportation routes that could be provided with public water and wastewater services and is appropriate for retail and other commercial uses; manufacturing and other industrial uses; office and limited (not to exceed 25% of any Node) higher density residential uses. Economic Development ETransition3 Activity Node Land in traitshtien areas of the County which has been specifically targeted for economic development activity consisting of light industrial, distribution, office, service/retail uses, and flex space (typically one-story buildings designed, constructed, and marketed as suitable for use as offices but able to accommodate other uses such as a warehouse, showroom, manufacturing assembly, or similar operations.) Such areas are located adjacent to interstate and major arterial highways, and subject to special design criteria and performance standards. Uses.EE)MMUNITY LANE) USE EATEGORY Land focused on designated. roon-d intersections which seme as modal cressroads for the surrotinding rural eommunity and is an appropriate !Ocation for amy of the following uses, church, fire station, small-150'st Office, school, Or Other similar institutiomal uses and ome or niere RURAL LAND USE EATEGE)nIrr CLASSIFICATIONS Rural Buffer Land adjacent to an urban or transition area which is rural in character and which should remain rural, contain very low-density residential uses, and not require urban services during the plan period. Rural Residential Land in the rural areas of the County which is appropriate for low intensity and low-density residential development and which would not be dependent on urban services during the plan period. Agricultural-Residential Land in the rural areas where the prevailing land use activities are related to the land (agriculture, forestry) and which is an appropriate location for the continuation of these uses. Ora+iq,e/C&u*ity Cavnprah 4vive1Plaat1 Page 5-16 Chapter 5: Land Use Element Rural Community Activity Node- Land focused on designated road intersections which serve as nodal crossroads for the surrounding rural community and is an appropriate location for any of the following uses: church, fire station, small post office, school, or other similar institutional uses and one or more commercial uses. Rural Neighborhood Activity Node Land focused on designated road intersections within a Rum Residential or Agricultural Residential the rural area that is appropriate for small-scale commercial uses characteristic of "Mom and Pop" convenience stores and gas stations. Rural Industrial Activity Node Land focused on designated road intersections within a--Rural Residential or Agricultural Residential the rural area that is appropriate for small scale industrial uses which do not require urban type services. Extractive U_ Land designated to encompass operations desr'9-111-�U' PrUTTIaIlly IVI UIC mining and quarrying of those substances which are legally removable which qualify for or are listed for, use valtie tax ati Land vvoth'n the bo—d-Ii-I — , ie 4,696 acre Stoney Ereek Drainage Bashi southeast of the Town of Hillsborough in portions of Hilsborough, Eno, and Chapel 11711 Townships. The area is triangular On shape an Spur of Southern Railroad to the east, and NE I lighway 86 to the West. CONSERVATION LAND USE CATEGORIES i OVERLAYS Public Interest Area Ora+tgeCatwv►.ty Coinprehevu:ve,Plaw Page 5-17 Chapter 5: Land Use Element Land which contains public or quasi-public uses such as publicly owned land, research forests or known archaeological or historical sites. Water Supply Watershed Land draining to existing reservoirs which serve as public water supplies, or to potential reservoir sites or stream intakes for drinking water withdrawal which have been designated for protection against threats to the water quality of future water supplies, in accordance with County watershed protection programs and the North Carolina Water Supply Watershed Protection Act of 1989. Watershed Critical Area, County Designated The land area within one-half mile of the normal pool elevation (or designated elevation) of an existing Class II water supply reservoir, or the ridgeline of the watershed, whichever is less; and the land area within one-half mile of the normal pool elevation (or designated elevation) of a proposed water supply reservoir, or the ridgeline of the watershed, whichever is less; and the area within one-half mile on each side of streams flowing into Class I reservoirs, as designated for protection within the Zoning Ordinance. Watershed Critical Area, State Required The land area within one-half mile of the normal pool elevation of public water supply reservoirs in which an intake is located (i.e., Class I reservoirs), or the ridge line of the watershed, whichever is closest to the normal pool elevation of the reservoir. Reservoir. Class I A body of water, such as a pond or lake, confined by a dam or other barrier to be used for public water supply from which water flows by gravity or is pumped directly to a treatment plant or to a small intervening storage basin and thence to a treatment plant. Reservoir. Class II A body of water, such as a pond or lake, confined by a dam or other barrier to be used for public water supply from which water flows by gravity or is pumped to a Class I reservoir prior to final entrance to a water treatment plant. Resource Protection Area Land designated as Primary Conservation Area which contains sensitive environmental resources, historically significant sites, and features considered unbuildable because of their limitations or unsuitability for development. This includes wetlands and floodplains along drainage tributaries, steep slope areas, (15% or greater), natural areas, wildlife habitats and corridors, and significant historic and archaeological sites. These areas form the basis for a conservation network within which other land uses are situated. New Hone Creek Corridor Open Space- Some of the land in the Resource Protection Areas and a portion of the Public Interest Area designated as significant and worthy of protection Ora",eC&u*tty CcvVreRev4iNePlaw Page 5-18 � 4 Chapter 5: Land Use Element according to the New Hope Corridor Open Space Master Plan completed in April of 1991. This classification is part of a system of open space in Durham and Orange Counties along New Hope Creek and its tributaries between Eno River State Park and U.S. Army Corps of Engineers land north of Jordan Lake. The New Hope Corridor Open Space is made up of critical environmental areas such as stream beds, floodplains, steep slopes, and larger tracts of historic, educational, or recreational value. Stoney Creek Basin- Land within the boundaries of the 4,696 acre Stoney Creek Drainage Basin southeast of the Town of Hillsborough in portions of Hillsborough, Eno, and Chapel Hill Townships. The area is triangular in shape and is bound generally by 1-85 to the north, the University Spur of Southern Railroad to the east, and NC Highway 86 to the west. For each land use classification and overlay, sets of criteria have been developed that describe the physical and environmental context, the projected population change, and resulting land requirements. (See Appendix G: Land Use Platt Eery-Classification and Overlay Locational Criteria.) Map 5-4: Future Land Use Map, designates the areas where these classifications are applied. Ora iW,Cm"tty CoTnprehe+vsive Pla w Page 5-19 Chapter 5: Land Use Element 4„ There are, however, positive signs of community commitment to land and watershed preservation with Orange County establishing a Lands Legacy Program and the Triangle Land Conservancy increasing the acreage it owns in the County. In addition, private land owners have taken positive steps towards protecting environmental resources through the provision of conservation easements. By the end of 2007, a total of 20,400 acres (8% of the County) were protected through various public and private means. One of the goals of the Plan is to protect 10% of lands in the County by 2010. Even if this goal is achieved, more will need to be done to protect the integrity of the natural landscape in Orange County. Given the forecasts for continued growth in development in the County, land planning efforts will need to direct growth to designated areas and away from prime natural areas. TRANSPORTATION TRENDS The County's population has become increasingly dependent on the automobile for transportation. Since 1990, approximately 70% of the County's workforce has driven alone to work each day, with an average 22 minute commute. Looking at travel data, the North Carolina Department of Transportation expects that the total daily vehicle miles traveled will increase from 2000 to 2015 by 51%. County vehicle registrations increased by 33% between 1990 and 2005, showing that more and more cars are driving on County roads. This increased travel has, in turn, increased vehicle emissions in the County. In 2004, Orange County was declared part of a "non-attainment” area by the U.S. Environmental Protection Agency for violating federal ozone standards. In late 2007, however, the EPA approved a request from the State to redesignate the Raleigh-Durham-Chapel Hill area to "attainment" and it is now in a maintenance program to follow a State plan for maintaining the ozone standard through 2017. The increase in vehicle use has contributed to impaired local air quality and increased traffic congestion. Changing these trends will require coordinated planning efforts, both locally and regionally, to provide alternative means of transportation. DEVELOPMENT CONSTRAINTS In addition to regulatory constraints to development, such as zoning regulations that limit densities and use types in certain zoning districts, Orange County's physical features, including topography, suitability of soils, and drainage areas or floodplains serve as constraints on future development in some areas of the County. Map 5-8 illustrates the locations of these development constraints. Some of these areas are also identified on the Future Land Use Plan Map 5-4, shown previously, as Resource Protection Areas. The construction and engineering industries have seen great improvements in building technologies over the last few decades. Natural development constraints that would once prohibit development from occurring can now be overcome through new building materials and engineering designs. In response, the County has been very successful at regulating development to reduce soil erosion, sedimentation, and stormwater flows from new developments, and is seen as a leader in the state in terms of watershed protection. These efforts should be continued into the future. Ora vtgw,Coi,*ity Coinprahetvs,ive Flaw Page 5-32 Chapter 5: Land Use Element 4.y use policies, plans, regulations and ordinances. And it is this Comprehensive Plan and implementation of its objectives that will guide the development of Orange County's future land use ordinances, regulations, and a coordinated land use plan that is based on community values. Much has been accomplished in planning for future land use patterns in Orange County, but more needs to be done. Specific needs follow: • The County's Future Land Use Warr Map needs to be updated and re-drawn to reflect current policies and plans, to provide guidance and information to residents and property owners. The revised Future Land Use Wain Map needs to be drawn to include the following: — Chapel Hill-Carrboro,joint Planning Area Land Use Plan; — Hillsborough-Orange County Strategic Plan; — Most Current Economic Development Districts; — Most Current Rural Activity Nodes and other growth opportunity areas; — Most Current Inventory of Natural and Cultural Resources; and — Identification of Preservation Areas. ■ Inter-local Agreements are needed between the County and the Towns of Hillsborough and Mebane, similar to the agreements with Chapel Hill and Carrboro, to jointly plan for and regulate development on the edges of those municipalities. ■ Following updates to the Future Land Use Map, the County's Zoning Unified Development Ordinance will need to be assessed for necessary adjustments. These zoning changes should encourage meeting the objectives that promote sustainability including mixed-use development patterns, transportation linkages, economic development, and diversity in housing opportunities. • Adjust zoning regulations and apply zoning categories in preservation areas to discourage intensive and unsustainable development. • Continue to study mechanisms for transfer of development rights from preservation areas to areas targeted for growth. • The County needs to refine policies to encourage green building practices for public and private construction projects. This may entail an assessment of current building codes and development ordinances to identify barriers to using green construction practices, and/or creating incentives for private developers to use more environmentally friendly construction and demolition techniques. Deconstruction for the purpose of reuse is preferred over demolition. 0ra4i#e,Cou*ity Co-mprehe wive Plate Page 5-38 Chapter 5: Land Use Element Land Use Goal 2: Land uses that are appropriate to on-site environmental conditions and features, and that protect natural resources, cultural resources, and community character. Objective LU-2.1: Maintain the rural, low-density land surrounding Chapel Hill and Carrboro Transition Areas as Rural Buffer land, as designated on the Future Land Use Pfarr Map. Future consideration should be given to designating Rural Buffer areas around other municipalities where such interest exists. Objective LU-2.2: Continue to protect valuable resource land such as productive agricultural areas, natural areas, historic sites and properties, and potential reservoir sites through the County's Lands Legacy Program, and by directing incompatible development away from these areas through land use and zoning policies and regulations. (See also Natural Areas Objectives NA-5 and NA-1 7, and Water and Wastewater Objective WW-14.) Objective LU-23: Require non-residential and higher-density residential developments within Transition Areas to use Best Management Practices (BMP's) for stormwater control, as outlined within the Orange County Zoning Unified Development Ordinance , to ensure that potential adverse impacts on the water quality of existing and proposed reservoir sites are avoided. (See also Erosion Control EC-1 and Natural Areas Objective NA-4.) Objective LU-2.4: Evaluate the development potential in rural crossroads communities to identify whether current regulations permit appropriate development that is in character with these communities, and whether potential development in these areas would require significant expansions or cause depletions of public services. Objective LU-2.5: Adopt and implement policies that specify appropriate land uses and intensities of development in Protected and Critical Water Resource Areas that will not have potential adverse impacts on water resources. (See also Water and Wastewater Objective WW-1 5.) Objective LU-2.6: Protect prime reservoir sites from adverse development impacts and ensure that regulations for these areas are appropriate. Objective LU-2.7: Refine green building standards to guide the design, siting, construction, and management of publicly owned and managed buildings in a manner that conserves energy and/or uses non- polluting renewable energy sources. Explore the development of green building standards for private development. (See also Air and Energy Objective AE-1 1.) Ora WCoUwnty Comprehevw ve,plaw Page 5-41 Chapter 5: Land Use Element Objective LU-2.8: Develop performance standards for development on lands with non- renewable resources to ensure a sufficient level of environmental protection for these resources. Objective LU-2.9: Evaluate the carrying capacity of groundwater and surface water resources of the 15 watersheds in Orange County. (See also Water Resources Objective WR-7.) Objective LU-2.10: Develop design standards or guidelines that address scale, density, and aesthetic considerations for residential, mixed-use, industrial, and commercial land uses to promote community aesthetics and the protection of the visual and cultural environment of the County. (See also Housing Objective H-3.1 .) Land Use Goal 3: A variety of land uses that are coordinated within a program and pattern that limits sprawl, preserves community and rural character, minimizes land use conflicts, supported by an efficient and balanced transportation system. Objective LU-3.1:- Discourage urban sprawl, encourage a separation of urban and rural land uses, and direct new development into areas where necessary community facilities and services exist through periodic updates to the Land Use Plan. (See also Economic Development Objective ED-2.8.) Objective LU-3.2: Coordinate land use patterns to facilitate the expanded use of non- auto modes of travel, the increased occupancy of automobiles, and the development and use of an energy-efficient transportation system. (See also Transportation Objective T-1.1 , Economic Development Objective ED-2.3, and Air and Energy Resources Objective AE-8.) Objective LU-3.3: Discourage new intensive non-residential land uses, or the expansion of existing intensive uses, in the area designated Rural Buffer. (See also Economic Development Objective ED-2.8.) Objective LU-3.4: Recognize the right to farm and discourage the location of new non- farm development, particularly more intensive residential development, within farming areas to minimize the incidence of complaints and nuisance suits against farm operations. (See also Agriculture Objectives AG-1 and AG-3.) Objective LU-3.5: Encourage energy and water use in an efficient manner by industries and encourage energy efficient industries to locate or expand in the County in Rural Industrial, Commercial/Industrial, and Economic OraWCouy►.LyCovnprehevt4ivPiP4m Page 5-42 Chapter 5: Land Use Element Development Nodes. (See also Economic Development Objective ED- 2.9.) Objective LU-3.6:- Establish consistency between the Land Use Plan and the Water and Sewer Management Planning and Boundary Agreement and Map. (See also Water and Wastewater Objective WW-3.) Objective LU-3.7: Ensure that new development patterns in non-residential nodes encourage a clustered, walkable development pattern and discourage strip development. Objective LU-3.8: Develop a process for implementing small area plan recommendations through the revision of County policies and regulations. Objective LU-3.9: Create new zoning district(s) which allow for a mixing of commercial and residential uses, a mixing of housing types, and creates a more pedestrian friendly development pattern. New districts should be applied in areas where public services exist or are planned for in the future, in areas that promote higher intensity and high density uses on the Future Land Use Pfan map. Objective LU-3.10: Identify prime viewsheds along major transportation corridors and other areas, and amend County land use ordinances to ensure long- term protection of viewsheds. (See also Natural Areas Objective NA- 16, Parks and Recreation Objective PR-5.4, and Transportation Objective T-1.5.) Objective LU-3.1 1 In response to development plans at Carolina North, including the possible relocation of Horace Williams Airport, review County land use ordinances and amend if needed to protect the interests of Orange County's residents. Land Use Goal 4: Land development regulations, guidelines, techniques and/or incentives that promote the integrated achievement of all Comprehensive Plan goals. Objective LU-4.1: Support the use of individual manufactured housing units as a useful housing resource in the County by increasing the opportunities where these units can locate by-right. (See also Housing Objective H-4.1.) Objective LU-4.2: Review and amend the Orange County Zenimg and Subdivision Unified Development Ordinance to identify and eliminate existing regulatory impediments to objectives identified in the 0ra4WCcu*ity CcTnpre�e e,Pla� Page 5-43 Chapter 5: Land Use Element b„ Comprehensive Plan. Such objectives include but are not limited to the development of energy efficient buildings within the County, water efficiency standards for new development, and development of affordable housing. (See also Housing Objective H-4.4 and Solid Waste Objective SW-4.) Objective LU-4.3: Determine how private developments can best accommodate or provide public and private commercial recreational facilities to serve Orange County's residents. (See also Parks and Recreation Objective PR-1.3 and Natural Areas Objective NA-10.) Objective LU-4.4: Encourage the provision of a range of affordable and suitable low and moderate income housing by means of development incentives in order to provide a balanced housing stock for the residents of Orange County. (See also Housing Element Objective H-4.3.) Objective LU-4.5: Work within the Orange County government system to identify and resolve existing land development policies that may be in conflict with historic preservation goals. (See also Cultural Resources Objective CR- 3.) Objective LU-4.6: Prepare an analysis of subdivision trends in the County, providing pros and cons of Minor, Major, and Exempt Subdivisions, and recommendations on any ordinance amendments that may be appropriate. Land Use Goal 5: Life, health, and property safe from hazards. Objective LU-5-1: Prohibit new development in special flood hazard areas as defined by the Federal Emergency Management Flood Insurance Rate Map, effective February 2, 2007. Objective LU-5-2: Continue to implement the Orange County Hazard Mitigation Plan. Objective LU-5-3: Develop and coordinate an emergency disaster plan and community education program to increase awareness of the dangers of natural and human-made emergency events and understand how best to prepare. Land Use Goal 6: A land use planning process that is transparent, fair, open, efficient, and responsive. Objective LU-6.1: Undertake a comprehensive effort to inform and involve the citizens of Orange County in the land use planning process. 0 CCU4' y C&mp#,ahev► e,Plc w Page 5-44 Chapter 5: Land Use Element processing, development of a distribution center, and marketing initiatives. Objective AE-8: Improve transportation efficiency: promote more public transportation, ride sharing, and alternative transportation such as bicycling and walking. Objective AE-1 1: Improve the energy efficiency of buildings through several action steps: 1) upgrade existing buildings, including County and school buildings; 2) educate planning and building inspection officials about the technologies and techniques of energy efficient construction; and 3) encourage the use of LEED "Gold" (or equivalent) as a standard in new construction. Objective CR-3: Work within the Orange County government system to identify and resolve existing policies, which may be in conflict with the County's historic preservation mission. Objective NA-4: Encourage adequate stormwater runoff controls in existing developed areas and require these controls for new subdivisions to protect sensitive downstream aquatic habitats. Obieective NA-5: Prohibit development that would cause adverse impacts on highly significant natural areas and wildlife habitat. Objective NA-10: Require that all major subdivisions (defined as having more than 5 lots according to the Orange County Subdivisiom Regulatiems Unified Development Ordinance) include within their boundaries open space suitable for low-impact recreation and wildlife habitat. Objective NA-16: Create a system of public and private open space and conservation areas, including parks, nature preserves, and scenic vistas representative of the Orange County landscape. Objective NA-17: Maintain and protect land that contains valuable productive resources, such as prime farmland and prime forestland, by directing incompatible development away from these areas. Objective WR-7: Promote land use patterns that preserve the natural hydrologic system and maintain a sustainable "carrying capacity" balance for the future between ground water and surface water resources. PARKS AND RECREATION Objective PR-1.3: Develop a land use planning mechanism for securing new parks through the development approval process. 0ra*WCou.nty C&mprehev e,Pla4v Page 5-48 Chapter 5: Land Use Element Objective PR-5.4: Encourage development of a system of private open space and conservation areas, including nature preserves, parks, linear parks, and scenic vistas compatible with the character of Orange County. SERVICES AND FACILITIES Objective WW-2: Coordinate the provision of potable water and sanitary sewer services with the County's Land Use Plan and Orange County-Chapel Hill- Carrboro joint Planning Agreement and Land Use Plan, targeting these services to urban, transitional, and economic development districts in a manner that does not endanger environmental resources. Objective WW-3: Maintain and add new partners to the existing Water and Sewer Management Planning and Boundary Agreements with the Towns of Chapel Hill, Carrboro, and Hillsborough and OWASA. Work to establish similar agreements with the Cities of Mebane and Durham and Orange-Alamance Water System. Objective WW-5: Maintain a cooperative joint planning process among the County, the municipalities, and water and wastewater providers and guide the extension of service in accordance with the Comprehensive Plan, the Orange County-Chapel Hill-Carrboro ,Joint Planning Agreement and Land Use Plan, and the policies of the municipalities. Objective WW-14: Designate prime reservoir sites in the County, and protect those sites from adverse development. Objective EC-1: Continue to use Best Management Practices (BMP's) for stormwater control, as outlined within the Orange County Zoiiing Unified Development Ordinance, Stormwater Ordinanee, and Sedimentation to minimize potential adverse impacts on the water quality. Objective SW-4: Use land use planning, zoning regulations, and the process of development approvals to enable the appropriate environmental controls and oversight of necessary solid waste facilities. TRANSPORTATION Objective T-1.1: Increase the occupancy of automobiles through ridesharing and other means; and expand the use of public transit (including bus and rail), walking, and biking as primary modes of travel. Objective T-1.5: Identify prime viewsheds along major transportation corridors and protect these areas for their scenic and natural resource values. Ora Ut CCU*Tty C&mpre.;✓wv s ve�i late Page 5-49 Chapter 6: Natural and Cultural Systems Element STATUS OF RARE PLANTS AND ANIMALS The conversion of natural lands to urban or suburban uses results in habitat loss for native plants and animals, and can result in loss of native species. The North Carolina Natural Heritage Program maintains a list of rare plant and animal species and classifies them as endangered, threatened or species of concern. The status of Orange County's rare plant and animal species is provided in Appendix L. Since 2002 three species (Carolina darter, sharp-shinned hawk, small whorled pogonia) were changed from the "Current" to the "Historic" category, meaning that they have not been observed in Orange County during the past 20 years. The 2004 update of the Inventory of Natural Areas and Wildlife Habitat for Orange County, North Carolina confirmed the previous documentation of several rare species within the county's natural areas and added one new species, the Carolina Ladle Crayfish. LAND PROTECTION EFFORTS Early efforts to conserve land in Orange County include Duke University's purchase of large tracts of land (including abandoned farmland) in the 1920s and 30s. The land was managed for forestry research and education, and later for timber production. Duke Forest continued to grow and many sections were recognized for their conservation value. In 2004, Duke University registered 1 ,220 acres for voluntary protection with the North Carolina Natural Heritage Program. Today, Duke is the largest landowner in the County, owning more than 5,000 acres of land. Duke Forest provides an excellent model of sustainable land management. The State of North Carolina began purchasing lands for the new Eno River State Park beginning in the 1970s. The linear park was established around large natural areas associated with the river. Acquisition of land along the Eno from Durham to Hillsborough continues today pursuant to the state park master plan. Now more than two-thirds of the state park (3,160 acres) is in Orange County. The State has also acquired 160 acres along the Eno near Hillsborough for Occoneechee Mountain State Natural Area. In the 1980s the Orange Water and Sewer Authority (OWASA) started acquiring lands in Bingham Township for the Cane Creek Reservoir and later acquired more land in the watershed to protect drinking water supplies. In 1984 the University of North Carolina dedicated 367 acres as the Mason Farm Biological Reserve. During the 1980s and 1990s the Triangle Land Conservancy, the Eno River Association, and others used the aforementioned inventories and plans to protect critical resource lands along important river corridors. Significant natural resource lands are also protected as part of the development approval process administered by the Orange County Planning Department. The Unified Development Ordinance requires that important natural resources be identified and avoided. Some of those areas are set aside as private open space or are dedicated to the County for open space and low- Ora4WCourity Compre,h.ev�&P la w Page 6-63 Chapter 6: Natural and Cultural Systems Element impact recreation purposes. The County encourages private preservation of open space areas through education and outreach. LANDS LEGACY PROGRAM In 2000 Orange County accelerated the pace of conservation by establishing the Lands Legacy program -- the first comprehensive county land conservation program in North Carolina. Lands Legacy was the first focus of the new Environment and Resource Conservation Department, a department established in 1998 to make environmental protection a separate function of county government. Through Lands Legacy the County collaborates with local land trusts, OWASA, area universities, and other partners to protect some of the County's most important natural and cultural resources before they are lost or irreparably damaged. The types of land protected include natural areas and wildlife habitat, parkland, prime farmland, historic and cultural sites, and stream buffers. The County also works with its advisory boards to help guide its acquisition priorities and sets those priorities every two years through the adoption of the Lands Legacy Action Plan. To date, Lands Legacy has protected nearly 2,300 acres, as described in Table 6-3. TABLE 6-3: LAND PROTECTED THROUGH LANDS LEGACY PROGRAM (2007) Fee Simple Acres Acquisitions -Parkland 670 -Natural lands/Other 307 977 acres Conservation Easements (privately-owned lands) -Prime farmland 1,088 -Natural areas 210 1,298 acres Total Protected Land 2,275 acres CURRENT ESTIMATES OF PROTECTED LAND The County's Environment and Resource Conservation Department (ERCD) maintains a comprehensive database of protected lands throughout the County, including public parkland, nature preserves, and other public and private open space dedicated for conservation. The data includes conservation easements held by local land trusts, OWASA, Orange County and several other entities. OravV�ee,Cou*ityCovnprehev,,Cve P4 vv Page 6-64 Chapter 6: Natural and Cultural Systems Element Natural & Cultural Systems Goal 7: A balanced and healthy diversity of native plant and animal populations. Objective NA-1: Conserve high-priority natural areas and wildlife habitats, including wetlands, rivers and streams, floodplains, steep slopes, prime forests, wildlife corridors, and other critical habitats. (See also Water Resources Objective WR-1.) Objective NA-2: Conduct more frequent updates to the County's inventory of natural areas, and include previously unsurveyed areas of the County. Objective NA-3: Develop a more detailed and consistent methodology for monitoring changes in forest cover throughout the County, and specifically the extent of mature hardwood forest. Objective NA-4: Encourage adequate stormwater runoff controls in existing developed areas and require these controls for new subdivisions to protect sensitive downstream aquatic habitat. (See also Land Use Element Objective LU-2.3 and Erosion Control Objective EC-1 .) Objective NA-5: Prohibit development that would cause adverse impacts on highly significant natural areas and wildlife habitat. (See also Land Use Objective LU-2.2 and Water and Wastewater Objective WW-14.) Objective NA-6: Develop a way of monitoring common indicator species as a way to measure the "state of biodiversity" in Orange County. Objective NA-7: Ensure that significant natural areas and wildlife habitat located on County-owned lands are protected with adequate ecosystem management practices and stewardship. Objective NA-8: Encourage forest management practices on both public and private land that minimize disruption and fragmentation of intact hardwood forests. (See also Agriculture Objective AG-9.) Objective NA-9: Encourage long-term productivity of farms and timber lands through best land-use management practices and conservation agreements. (See also Parks and Recreation Objective PR-1 A.) Natural & Cultural Systems Goal 8: Networks of protected natural, cultural and agricultural lands. Objective NA-10: Require that all major subdivisions (defined as having more than 5 lots according to the Orange County Unified Development Ordinance) include within their boundaries open space Orangw_1County Compre e*v,,,ve1Plan. Page 6-69 Chapter 6: Natural and Cultural Systems Element suitable for low-impact recreation and wildlife habitat. (See also Land Use Objective LU-4.3 and Parks and Recreation Objectives PR-1.3 and PR-4.1 .) Objective NA-11: Develop a comprehensive conservation plan for achieving a network of protected open space throughout Orange County, which addresses 1) threats to important natural areas; 2) connectivity between protected areas; 3) coordination with neighboring counties; and 4) sustainable management of critical natural resources. (See also Parks and Recreation Objective PR-5.4.) Objective NA-12: Establish a system of nature preserves that protect large areas of undeveloped land (including significant natural areas) surrounded by low-density development and working farms and managed forests. (See also Parks and Recreation Objective PR-5.4.) Obmective NA-13: Promote clustering of residential development and dedication of large areas of undisturbed land for low-impact recreational use by residents and for wildlife habitat. Where feasible, these areas should be contiguous to neighboring tracts of undisturbed land. (See also Parks and Recreation Objective PR-5.1 .) Objective NA-14: Encourage developers and neighborhood associations to protect undeveloped community open space through formal conservation agreements. Objective NA-15: Protect land in and around biologically significant areas, and connections between these areas, to allow for the maintenance of native wildlife and plant populations and their functional relationships. Objective NA-16: Create a system of public and private open space and conservation areas, including parks, nature preserves, and scenic vistas representative of the Orange County landscape. (See also Land Use Objective LU-3.10, Parks and Recreation Objective PR-5.4, and Transportation Objective T-1.5.) Objective NA-1 7: Maintain and protect land that contains valuable productive resources, such as prime farmland and prime forestland, by directing incompatible development away from these areas. (See also Water and Wastewater Objective WW-14, Land Use Objective LU-2.2, and Natural Areas Objective NA-5.) CONCLUSIONS The County has been a leader in land protection efforts in the State of North Carolina, and more work can be done. With this chapter, the County is setting a vision of preserving an interconnected system of natural preserves, parklands, and other natural areas jointly owned and managed by different entities as one cohesive system for land 0 r"IyR,C m"tty C"LprelAe� e,PIa4 V Page 6-70 Chapter 6: Natural and Cultural Systems Element Name of Study Year Findings/Results impervious limits) in 1992. State Watershed 1991 Examined proposed state minimum Protection Rules and rules. After rules changed, County opted Implications for to keep original more protective Oran a County standards in place. Cane Creek 1999 Stringent land use controls needed to Watershed Technical protect against future Study degradation/sedimentation. Led to land use controls (lot size, impervious limits), with some open s ace provisions. Jordan Lake 2004 Technical study for large regional lake Watershed Technical and focused on areas of concern - including Study and Proposed ongoing Upper New Hope Arm (southeast Nutrient Management Orange). Proposed reductions in Rules nitrogen (25%) and phosphorus (5%) currently being considered. The ultimate result of the many technical studies and state watershed rules is that much of the County's land area is comprised of small to medium sized water supply watersheds, which by their nature require special protection measures. The limited potential for future water supply sources makes increased protection of the existing sources and better characterization of the fractured crystalline rocks all the more critical. All of the County's major water supply watersheds have been the subject of technical studies, except for the Upper Eno watershed. This watershed has been the subject of conservation studies, but a full technical study has not been undertaken. The County's overall approach to watershed protection, as noted in the introduction, is to pursue a non-structural approach. This involves protection of water quality at the source, by using land use measures to control impervious surface, the number of housing units (and hence wastewater systems), the infiltration of stormwater on-site, and the protection of stream buffers to further filter water as it moves from the watershed to the stream corridors. Minimum lot size limits help achieve the goal of limiting human impacts and is a broad tool that is widely in use. Accompanying limits on the amount of land that can be impervious to water infiltration helps reduce sheet flow runoff into streams and encourage infiltration into the soil. Orange County's stream buffer provisions are a key component of the County's watershed protection approach. Implemented through the Zoning Unified Development Ordinance, the overall size and width of protected stream buffers are based on a calculation that takes into consideration the slope of the land and the existing vegetative cover along an identified water body. At a minimum, stream buffers are required to be fifty (50) feet in width along both sides of a stream, with an additional fifteen (1 5) or thirty (30) feet of protected buffer required Oravu#e Cou my C&wtprehevuuve.,Pla v Page 6-80 Chapter 6: Natural and Cultural Systems Element based on severity of slope. Protected stream buffers are measured from the edge of the stream bank of defined special flood hazard areas. Floodplains are mapped areas of the County adjoining streams in which a frequency of flooding may be expected to occur in a given timeframe. The most frequently used floodplain measure is the special flood hazard area. This denotes the floodplain area subject to a chance flood occurrence of one percent (1%) in any given year. Map D-11 of the County Profile Element, located in Appendix A, illustrates the location of special flood hazard areas in the County, along with other development constraints. One of the impacts of land development over time is an increase in surface water runoff during storm events. Another type of land that is of significance in terms of both natural areas and water quality is wetlands. Wetlands in Orange County and other upland areas are primarily associated with streams and water bodies. Wetlands are important to overall health and environmental diversity, providing habitat for aquatic and riparian species, and also serving as in important natural water filtering device. More information about the wildlife habitat associated with wetlands may be found in section 6.4.4 SURFACE WATER QUANTITY Surface water quantity and availability is, as previously noted, considerably limited due to the "headwaters" nature of the County. A standard measurement of the amount of water in reservoirs and water systems is the calculation of "safe yield." While definitions of this term vary, and the term for safe yield is changeable, safe yield is generally defined as the demand for water that can be met under drought conditions. For example, a 30-year safe yield is the demand that a water system can support under drought conditions that would occur on an average of once every 30 years (or have a one in 30 chance of occurring in any one given year). The following table, Table 6-6 illustrates existing and planned expansions of water supply sources in Orange County, their owner, and safe yield of supply. Ora*iq-e,Couvity Co-Ynpreh 4uive'Pla+w Page 6-81 Chapter 6: Natural and Cultural Systems Element decades to gather data, explore solutions, and implement actions to protect precious surface and ground water resources. The County can serve as the coordinator of water resource planning efforts; creating a comprehensive approach that addresses watershed planning at the regional, local, and site levels. 6.5. LINKS TO OTHER ELEMENTS Natural and Cultural Systems are interconnected to economic development, housing, transportation, park and recreation facilities, and community services planning. Linkages between specific natural and cultural systems goals and objectives have been identified in this element. The following summarizes the objectives from other Elements that are linked with natural and cultural systems objectives. ECONOMIC DEVELOPMENT ObLctive ED-1.1: Focus public education efforts on sustainability issues, looking at the social, economic and environmental contributions of local businesses. Objective ED-1.7: Enhance Orange County's tourist industry. Objective ED-4.1: Enhance historic character by supporting organizations' efforts to preserve, promote, and maintain historic structures, and identify Orange County policies that may be in conflict with these efforts. Objective ED-4.4: Enhance rural and agricultural community character by supporting local agriculture markets, supporting complementary conservation and management tools, and considering tools to make farming more profitable. HOUSING Obiective H-3.6: Work within the Orange County government system to identify and resolve existing policies which may be at odds with historic preservation goals, green building approaches, and workforce and affordable housing efforts. LAND USE Objective LU-2.2: Continue to protect valuable resource land such as productive agricultural acreage, managed forest areas, natural areas, historic sites and properties, and potential reservoir sites through the County's Lands Legacy Program, and by directing incompatible development away from these areas through land use and zoning policies and regulations. Objective LU-2.3: Require non-residential and higher-density residential developments within Transition Areas to use Best Management Practices (BMP's) for 0ra+W CauntyC&wtpreh +v, ve,Plaw Page 6-94 Chapter 6: Natural and Cultural Systems Element stormwater control, as outlined within the Orange County Zoning Unified Development Ordinance mid Sedimentation eontr_l E)rdimaii._ to ensure that potential adverse impacts on the water quality of existing and proposed reservoir sites. Objective LU-2.7: Refine green building standards to guide the design, siting, construction, and management of publicly owned and managed buildings in a manner that conserves energy and/or uses non- polluting renewable energy sources. Explore the development of green building standards for private development. Objective LU-2.9: Evaluate the carrying capacity of groundwater and surface water resources of the 15 watersheds in Orange County. Objective LU-3.2: Coordinate land use patterns to facilitate the expanded use of non- auto modes of travel, the increased occupancy of automobiles, and the development and use of an energy-efficient transportation system. Objective LU-3.4: Recognize the right to farm and discourage the location of new non- farm development, particularly more intensive residential development, within farming areas to minimize the incidence of complaints and nuisance suits against farm operations. Objective LU-3.10: Identify prime viewsheds along major transportation corridors and other areas, and amend County land use ordinances to ensure long- term protection of viewsheds. Objective LU-4.3: Determine how private developments can best accommodate or provide public and private commercial recreational facilities to serve Orange County's residents. Objective LU-4.5: Work within the Orange County government system to identify and resolve existing land development policies that may be in conflict with the historic preservation goals. PARKS AND RECREATION Objective PR-1.1: Acquire and /or retain public ownership of parks, recreation facilities, open space, and conservation areas that will serve Orange County. Objective PR-1.3: Develop a land use planning mechanism for securing new parks through the development approval process. Objective PR-4.1: Developers shall provide for adequate and appropriate open space suitable for active/low-impact recreation in residential developments. Orc+.vt#e,Ca"ty Co-mprehevt e,Pla Page 6-95 Chapter 6: Natural and Cultural Systems Element Objective PR-5.1: Locate parks and recreational facilities close to residential areas to encourage informal interaction with nature, encourage walkability, and create areas of wildlife habitat with appropriate recreational facilities within the more populated areas. Objective PR-5.4: Encourage development of a system of private open space and conservation areas, including nature preserves, parks, linear parks, and scenic vistas compatible with the character of Orange County. SERVICES AND FACILITIES Objective WW-1: Maintain a sustainable and high quality supply of ground and surface water so that available resources meet existing and projected needs. Objective WW-5: Maintain a cooperative joint planning process among the County, the municipalities, and water and wastewater providers and guide the extension of service in accordance with the Comprehensive Plan, the Orange county-Chapel Hill-Carrboro ,Joint Planning Agreement and Land Use Plan, and the policies of the municipalities. Objective WW-11: Increase educational efforts that increase citizen understanding of water quality problems and the need for water conservation. Objective WW-14: Designate prime reservoir sites in the County, and protect those sites from adverse development. Objective WW-19: Establish a continuing wastewater treatment inspection program within identified Protected and Critical Water Resource Areas. Objective EC-1: Continue to use Best Management Practices (BMP's) for stormwater control, as outlined within the Orange County Zoning Unified Development Ordinance, stermwater erdinance, and Sedimentation to minimize potential adverse impacts on the water quality. TRANSPORTATION Objective T-1.1: Increase the occupancy of automobiles through ridesharing and other means; and expand the use of public transit (including bus and rail), walking, and biking as primary modes of travel. Objective T-1.5: Identify prime viewsheds along major transportation corridors and protect these areas for their scenic and natural resource values. Objective T-1.6: Ora WCcu*tty C&"Vrehev rive-Plc v Page 6-96 Chapter 7: Parks and Recreation Element NATURAL AND CULTURAL SYSTEMS Objective NA-10: Require that all major subdivisions (defined as having more than 5 lots according to the Orange County Subdivision Regulations Unified Development Ordinance) include within their boundaries open space suitable for low-impact recreation and wildlife habitat. Objective NA-11: Develop a comprehensive conservation plan for achieving a network of protected open space throughout Orange County, which addresses 1) threats to important natural areas; 2) connectivity between protected areas; 3) coordination with neighboring counties; and 4) sustainable management of critical natural resources. Objective NA-12: Establish a system of nature preserves that protect large areas of undeveloped land (including significant natural areas) surrounded by low-density development and working farms and managed forests. Objective NA-13: Promote clustering of residential development and dedication of large areas of undisturbed land for low-impact recreational use by residents and for wildlife habitat. Where feasible, these areas should be contiguous to neighboring tracts of undisturbed land. Objective NA-16: Create a system of public and private open space and conservation areas, including parks, nature preserves, and scenic vistas representative of the Orange County landscape. SERVICES AND FACILITIES Objective E-2: Continue to work with parks and recreation providers in the County to identify opportunities for co-location and shared funding of school and public recreational "joint use" facilities. TRANSPORTATION Objective T-1.5: Identify prime viewsheds along major transportation corridors and protect these areas for their scenic and natural resource values. 7.8. OTHER KEY DOCUMENTS Several documents were used as resources in the development of this Element and are listed below. (See Section 1.2.5: Where to Look for Related Information if you would like to obtain one of these documents.) • Master Recreation and Parks Plan (1988) • Recreation Dedication/Payment-In-Lieu Report(1 995) • Executive Summary - Report of the .Joint Master Recreation and Parks Work Group (2000) 0 ra4UJel C&U*tty ComprdwvvivevPla� Page 7-15 Chapter 8: Services and Facilities Element Objective WW-6: Develop and implement a process whereby the responsibilities and duties associated with the operation and management of package sewage treatment plants are specified as a requirement of the permitting process for such facilities. Objective WW-7: Revisit and revise the Water Sewer Management Planning and Boundary Agreement to ensure consistency with the Future Land Use Map and land use categories. (See also Land Use Objective LU-6.2.) Objective WW-8: Reduce the number of requests from utility authorities and others for plan and zoning amendments needed to accommodate public water and wastewater facilities. Objective WW-9: Ensure that public water and sewer services are provided in those areas that can be practically and efficiently served by these facilities, as provided in the Orange County-Chapel Hill-Carrboro joint Planning Agreement and Land Use Plan, and as delineated in the Water and Sewer Management Planning and Boundary Agreement, as well as any inter-local government agreement that implements the Agreement. Services and Community Facilities Goal 2: Adequate, safe, and healthy groundwater withdrawal and wastewater disposal systems with minimal impacts upon water and land resources. Objective WW-10: Ensure that all development projects of a dense character have access to clean, safe, and reliable water supplies. Objective WW-11: Increase educational efforts that increase citizen understanding of water quality problems and the need for water conservation. (See also Water Resources Objective WR-2.) Objective WW-12: Prohibit package sewage treatment plants in the Watershed Critical Areas. Objective WW-13: Prohibit the establishment of public water and sewer services in the areas designated as Watershed Critical Areas, except to address emergency public health situations. Objective WW-14: Designate prime reservoir sites in the County, and protect those sites from adverse development. (See also Natural Areas Objectives NA-5 and NA-1 7 and Land Use Objective LU-2.2.) Objective WW-15: Prohibit commercial and industrial land uses from locating and/or expanding within identified Watershed Critical Areas. (See also Economic Development Objective ED-2.7 and Land Use Objective LU- 2.5.) Ora4WC0V*1ty Compreh�e PLanv Page 8-13 Chapter 8: Services and Facilities Element 8.4.2. EROSION CONTROL AND STORMWATER MANAGEMENT Orange County's Erosion Control Division is charged with enforcing Eounty the Erosion Control and Stormwater Ardinanees provisions of the Orange County Unified Development Ordinance, including inspections of land development, and review of erosion control plans. These provisions of the Ordinances regulate land development activities to ensure that watersheds are protected from adverse affects of development, and that grading and site development do not create hazardous stormwater flows. The division also administers the Neuse Buffer Rules and participates in regional watershed planning initiatives. The Erosion Control division reviews land disturbance activities and erosion control plans countywide, including parts of Durham County annexed by Chapel Hill. Disturbance of more than 20,000 feet in a non-protected watershed and disturbance of more than 10,000 square feet in a protected watershed must obtain pre-approval from Erosion Control and applicants are required to submit an erosion control plan. The County holds several agreements with the municipalities for enforcement, including enforcement of Hillsborough's National Pollutant Discharge Elimination System Phase II Stormwater Program and erosion control enforcement in Chapel Hill, Carrboro, Hillsborough, and the portion of Mebane in Orange County. In addition, the division develops educational materials and conducts educational programs related to erosion control, stormwater runoff pollution, stream buffers, and water quality protection. Of the 32 local governments in the Neuse River Basin, Orange County was the first and only to receive delegated authority from the state Environmental Management Commission to enforce the Neuse Rules. Any land disturbance in University Lake, Cane Creek, and the Upper Eno watersheds are reviewed by the division. Entities with the power of eminent domain, such as the Department of Transportation, University of North Carolina, OWASA, and School Districts, are regulated by the state. Orange County does monitor some of these entities through various voluntary agreements, such as a written request from the Chapel Hill-Carrboro School System to monitor Carrboro High School. Map 8-3 identifies the watersheds where Neuse River Basin erosion control measures are required. Ora*qe,Co uity Ccawpre wwt,&ive Pla vv Page 8-15 , Chapter 8: Services and Facilities Element • Needed improvements to ongoing surface water mapping in the County; and • Needed additional water quality data to inform inspection and watershed protection programs. 8.4.2.3. OBJECTIVES The intent of this Plan is that this list of objectives will help guide regular and ongoing decisions-making by the County related to regulation of erosion control and stormwater systems. Each objective has a recommended timeline for completion. (Definitions of timelines provided in Section 1.4: Administration and Implementation Guidelines.) Services and Community Facilities Goal 5: Efficient and effective drainage, stormwater, floodplain management, and erosion control systems. Objective ECA: Continue to use Best Management Practices (BMP's) for stormwater control, as outlined within the Orange County Zoning Unified Development Ordinance, Coiitre' Ordinance, to minimize potential adverse impacts on the water quality. (See also Land Use Objective LU-2.3, Natural Areas Objective NA-4 and Water Resources Objective WR-20.) Objective EC-2: Protect and maintain the chemical, physical, and biological quality and integrity of water supply reservoirs. Objective EC-3: Prohibit activities that adversely affect surface and ground water systems that may serve or do serve as a public water supply. Objective EC-4: Use low-impact stormwater design principles when developing new or retrofitting existing drainage systems that do not functionally approximate the natural drainage pattern. Objective EC-5: Minimize sedimentation and erosion to reduce the transport of sediment and pollutants to surface waters. Objective EC-6: Protect and maintain the existing aquatic, riparian and terrestrial habitats-of fish and wildlife. Objective EC-7: Prevent flood damage to public and private property. Objective EC-8: Protect the absorptive, purifying and retentive functions of the natural systems existing in the County. Ora WCotu ty C&vnpreRe+u e�Plaav Page 8-18 Chapter 8: Services and Facilities Element away from these areas through land use and zoning policies and regulations. Objective LU-2.3: Require non-residential and higher-density residential developments within Transition Areas to use Best Management Practices (BMP's) for stormwater control, as outlined within the Orange County Zoning Unified Development Ordinance to ensure that potential adverse impacts on the water quality of existing and proposed reservoir sites. Objective LU-2.7*: Refine green building standards to guide the design, siting, construction, and management of publicly owned and managed buildings in a manner that conserves energy and/or uses non- polluting renewable energy sources. Explore the development of green building standards for private development. (See also Air and Energy Objective AE-1 1.) Objective LU-2.5: Adopt and implement policies that specify appropriate land uses and intensities of development in Protected and Critical Water Resource Areas that will not have potential adverse impacts on water resources. Objective LU-3.1*:- Discourage urban sprawl, encourage a separation of urban and rural land uses, and direct new development into areas where necessary community facilities and services exist through periodic updates to the Land Use Plan. (See also Economic Development Objective ED-2.8.) Objective LU-3.2*: Coordinate land use patterns to facilitate the expanded use of non- auto modes of travel, the increased occupancy of automobiles, and the development and use of an energy-efficient transportation system. (See also Transportation Objective T-1.1, Economic Development Objective ED-2.3, and Air and Energy Resources AE-8.) Objective LU-3.6:- Establish consistency between the Land Use Plan and the Water and Sewer Management Planning and Boundary Agreement and Map. Objective LU-4.2*: Review and amend the Orange County Zoning and Subdivision erdinanees Unified Development Ordinance to identify and eliminate existing regulatory impediments to objectives identified in the Comprehensive Plan. Such objectives include the development of energy efficient buildings within the County, and development of affordable housing. Ora4V.e,Cawity Cotnprehetu ve,Pla. Page 8-49 Appendix F: Land Use and Zoning Matrix Appendix F. Relationships Between Land Use Categories Classifications and Zoning Districts Mafri'xx Per the Orange County Zoning Unified Development Ordinance, zoning districts are applied to each the Land Use Elerrtemt tategeries classifications and overlays as follows in accordance with this appendix. A matrix is provided at the end of this appendix that yes links the zoning districts applied to eategery the land use classifications and overlays listed. TRANSITION LAND USE CLASSIFICATIONS CHAPEL HILL AND CARRBORO TRANSITION.- On November 2, 1987, a Joint Planning Agreement was adopted by Orange County and the Towns of Chapel Hill and Carrboro. The Agreement became effective on November 14, 1988, following the adoption, by Orange County, of zoning plans prepared by the two municipalities for their respective Transition Areas. The applied zoning districts are those contained in the Chapel Hill Land Development Ordinance and the Carrboro Land Use Ordinance, and are consistent with the land use plan categories contained in the Orange County Chapel Hill Carrboro Joint Planning Land Use Plan. Reference should be made to the appropriate municipal ordinance and zoning map for a description of the districts and applicable development standards. Under the terms of the joint Planning Agreement, the Towns of Chapel Hill and Carrboro are responsible for permit administration within their respective Transition Areas. ,COUNTY RESIDENTIAL:TRANSITION 10-YearTransitionr- Identifies areas changing from rural to urban in form and density. All densities of residential development would be appropriate. Non-residential uses implemented in accordance with small area plans and/or overlay districts may be appropriate. The applied zoning districts include: R-1 (low density Rural Residential); R-2 (Low Intensity Residential), R-3 (Medium Intensity Residential), and R-4 (niedium density Medium Intensity Residential); and R-5 (High Intensity Residential), R-8 (High Intensity Residential), and R-13 (high density High Intensity Residential) residential uses, and Zoning Overlay Districts. r'QUISITY RE IRENT1 AI T__R kNSITIA�1 X20-Year Transition _ _ I_Tl V 1�1 l Identifies areas changing from rural to urban in form and density. All densities of residential development would be appropriate. The applied zoning districts include: R-1 (1"ow—de" Rural Residential); R-2 (Low intensity Residential), R-3 (Medium Intensity Residential), and R-4 (meditim de Medium Intensity Residential); and R-5 (High Intensity Residential), R-8 (High Intensity Residential), and R-13 (h gh--de" High Intensity Residential) residential uses. COUNTY Or"#e,,Ccu -0 Ccvnprehe�e Pla w Page i=1 Appendix F: Land Use and Zoning Matrix chmighig frorn rural to urban in form and density All of development would be appropricUc. tmes implemented n aecordance with small area plans and/or overlay distriets may be appropriate. The applied zonitig districts inelude, R 1 (low density), R 2, R 3, and R 4 (niedium density), and R 5, R 8, and R 113 (high density) residential uses, and Zoning Overlay EQ-b�COMMERCIAL TRANSITION ACTIVITY NODE: Identifies areas changing from rural to urban in form and density. A full range of intensities of commercial development would be appropriate. The applied zoning districts include: LC-1 (Local Commercial); NC 2 (Neighborhood Commercial); CC-3 (Community Commercial); GC-4 (General Commercial); and 0/1 (Officezaltd Institutional). , and ED (Economic Development). C9 COMMERCIAL-INDUSTRIAL TRANSITION ACTIVITY NODE-- Identifies areas changing from rural to urban in form and density. A full range of commercial and industrial activities would be appropriate and allowed. The applied zoning districts include: 1-1 (Light Industrial); 1-2 (Medium Industrial); 1-3 (Heavy Industrial); LC-1 (Local Commercial); NC-2 (Neighborhood Commercial); CC-3 (Community Commercial); GC-4 (General Commercial); and 0/1 (Office/Institutional). and Eeomomie Development). 00— "" LANE) CARRBOROTRANSiTiON-. 6W�;;mber 2, 1987, a joint Planiiing Agreement was adopted by 6range EountyF and the Towns of Chapel I lill and C-arrboro. The Agreement became effeetive oft prepared by the two for their respective Transition Areas. The applied zening distriets are those contained in the Ehapel Land Development Ordinance and the Garrboro Land Use Ordinance, and are cenMstent with, -1h,e 'and tire plan categeries contained in the erange Eotinty Chapel Hill Eari-bore joint Plaiinhig Lajid Use Plan. Referenee should be made to the appropriate rMt1mic*paI ordinance and ?onijig map for a description of the districts and applicable development standards. Under the ternis of the Joint Planiiing Agreement, the Towns of Ehapel 1 1:11 and Eart-boro etre responsible for permit administration within their respeetive Transiflon Areas. ECONOMIC DEVELOPMENT TRANSITION ACTIVITY NODE:- Identifies areas along major transportation corridors that may be in proximity to 10- Year or 20-Year Transition areas of the County which have been specifically targeted for economic development activity.. consisting of light industrial, distribution, flex space, office, and service/retail uses. Such areas are located adjacent to interstate and major arterial highways, and subject to special design criteria and performance standards. The applied zoning districts are EDB-1 (Economic Development Buckhorn Lower Intensity), EDB-2 (Economic Development Buckhorn Higher Intensity), EDE-1(Economic Development Eno Lower Intensity), EDE- 2 (Economic Development Eno Higher Intensity), EDH-1 (Economic Development Hillsborough Linear Office), EDH-2 (Economic Development Hillsborough Limited OrafW�CCUmy ConVrah.en4; &Flaw Page F-2 Appendix F: Land Use and Zoning Matrix Office), EDH-3 (Economic Development Hillsborough Limited Office with Residential), EDH-4 (Economic Development Hillsborough Office), EDH-5 (Economic Development Hillsborough Office/Flex). RURAL LAND USE CLASSIFICATIONS RURAL BUFFER. Only very low density residential and agricultural uses are appropriate in the Rural Buffer. The applied zoning district is RB (Rural Buffer). RURAL RESIDENTIAL. Identifies rural areas to be developed as low intensity and low density residential. The applied zoning district is R-1 (fow-de ) Rural Residential). AGRICULTURAL RESIDENTIAL. Agricultural activities and associated residential and commercial uses predominate. The applied zoning districts reflect this primary land use and include: AR (Agricultural Residential) and AS (Agricultural Services). RURAL COMMUNITY ACTIVITY NODE. Identifies rural crossroads communities throughout the County where small scale commercial activities serving the community and surrounding area are appropriate. The applied zoning districts include: LC-1 (Local Commercial) and NC-2 (Neighborhood Commercial). RURAL NEIGHBORHOOD ACTIVITY NODE. Identifies areas in the County where small scale commercial uses serving the population in the surrounding area are appropriate. The applied zoning districts include: LC-1 (Local Commercial) and NC-2 (Neighborhood Commercial). RURAL INDUSTRIAL ACTIVITY NODE. Identifies rural areas in the County where small scale industrial activities would be appropriate. The applied zoning district is 1-1 (Light Industrial). OVERLAYS PUBLIC INTEREST AREA. These lands are considered valuable for recreational and research purposes and are afforded special treatment. The applied zoning district is PID (Public Interest District). Development) Ora WCou*tty Compreh'?'+ ve platy Page F-3 Appendix F: Land Use and Zoning Matrix Page intentionally left blank. Ora VV CM 1.ty Conprehe vU e,Flaw Page F-4 O n C� -H U v co m ;h LY ro h'] r a ro O N O a k� ZONING DISTRICTS N x � q oo w Special U Land Use Classifications _ a .� �; �? v� - 04 ; CC Zoning Overlay A & Overlays ,4 District Q. Chapel Hill Transition Permit Administration by Municipalities under the provisions of the Joint Planning Agreement - Carrboro Transition Contact appropriate Municipality for applicable Zoning Standards I0 -Year Transition ♦ ♦ ♦ ♦ • • • County Residential X20 -Year o Transition) o Go Commercial ♦ ♦ • • ♦ • j mo Transition Activity Node L F� Eam�Commercial- Industrial Transition • • • • • • • ♦ • Activity Node Economic Development • • Transition Activity Node I � Rural Buffer ♦ • Rural Residential ♦ • Agricultural Residential ♦ • • i Rural Community Activity • Node • • AC Rural Neighborhood Activity Node • • Rural Industrial Activity Node d Public Interest Area • 0 LY ro h'] r a ro O N O a k� Appendix F: Land Use and Zoning Matrix Page intentionally left blank. Ora4I#e/COU*Itty ComPre wwive1Plaw Page F-6 Appendix G: Future Land Use EnteqM Classification and Overlay Locational Criteria Appendix G. Future Land Use Category Classification and Overlay Locational Criteria The land use classifications and overlays are determined by a set of locational criteria specific to each classification. Land in the County was evaluated using the following set of criteria in order to determine the suitability of certain locations to contain various land uses. The locational criteria include: • Land/Slope • Hydrology • Flora and Fauna • Soil Conditions • Public Services/Utilities • Transportation System • Energy Use • Existhig Land Use Placement • Agriculture and Forestry • Population Density • Historic and Cultural Features Table OC 1 provides the specific locational criteria for each land use classification. TABLE G-l: FUTURE LAND USE CLASSIFICIATION AND OVERLAY LOCATIONAL CRITERIA Future Land Use PI&n Classifications and Locational Criteria Overlays OrafWCou*ity Cc-nVreJievi,,Cve PLa,w Page ra-1 Appendix G: Future Land Use Categor Classification and Overlay Locational Criteria Future Land Use Wan Classifications and Locational Criteria Overlays • Land/Slope: No evaluation. • Hydrology: No evaluation. • Flora and Fauna: No evaluation. • Soil Conditions: No evaluation. • Public Services/Utilities: Located in areas which are or could be M reasonably and effectively served by centralized public services and W utilities. o Urban {BfVELEPEB) ■ Transportation System: No evaluation > ■ Energy Use: No evaluation. p Placement: Located within the municipal boundaries or transition ar Extra-Territorial Jurisdiction (ETJ) of the Towns of Chapel Hill, Carrboro, Hillsborough, and or the City of Mebane. • Agriculture and Forestry: No evaluation. • Population Density: No evaluation. • Historic and Cultural: No evaluation. - Land/Slopeo No evaluation. - Hydrology. No evalti L­_ - Flora and Fauna: No eva'tiatRon. I • . utilities.reasonably and effectively served by centralized publie serviees and O Existing U,ban Transportation System. No evaltiation -@ Activity N - Energy Use: No evaluation > OPEB� ` Existing Land Use Placement: Located v6thmn the identified Urban tnd Forestry. No evaluatiom. poptilation densities. Historoc and Cultural. Located away from areas where development tild have a detrimental impact on state or federally acknowledged • • 0raA0.e/Cou+Uy Cc"Vre wvts-ve,Pkwt. Page G-2 y Appendix G: Future Land Use f;ategary Classification and Overlay Locational Criteria Future Land Use err Classifications and Locational Criteria Overlays ■ Land/Slope: No significant slope or topography problem that would unreasonably increase the cost of extending water and sewer lines. ■ Hydrology: Located outside of 100-year flood prone areas as identified by the Corps of Engineers. Where special flood hazard areas and wetlands exist, protection shall be provided through proper site design and construction practices in accordance with County, State and Federal requirements. ■ Flora and Fauna: Located away from sites that would, if developed, create a threat to unique or endangered species as identified by the state or federal government. ■ Soil Conditions: Located in areas where general soil conditions are suitable for urban uses because of good drainage characteristics and load bearing capacity for site development. ■ Public Services/Utilities: Located in areas which are or could be = 10-Year Transition reasonably and efficiently served by centralized public services and o utilities. & 20 Year Transportation System: Located in areas that have very good road IA c Transition access, as well as service by rail lines. These areas should have the i Areas most complete transportation network in the county's planning F- jurisdiction. ■ Energy Use: Located within less than a 5-minute commuting time from small-scale commercial uses and a 5-10 minute commuting time from major commercial uses or an Urban area. • Existing Land Use Placement: Located in areas which are in transition from rural or low-density uses to urban or higher density uses. ■ Agriculture and Forestry: Located away from areas where development would have a detrimental impact on productive agricultural uses and managed forest land. ■ Population Density: Located in areas with moderate to high population densities. ■ Historic and Cultural: Located away from areas where development would have a detrimental impact on state or federally acknowledged historic-cultural sites or county identified Public Interest Areas. Ora*tge,Cottnty Covvprehe wwe Plow Page G-3 Appendix G: Future Land Use Categer Classification and Overlay Locational Criteria Future Land Use F4ait Classifications and Locational Criteria Overlays, ■ Land/Slope: Located on land with slopes of less than 15% grade. Where slopes of 15% or greater are present, protection shall be provided through proper site design and construction practices. ■ Hydrology: Located outside of 100-year flood prone areas as identified by Corps of Engineers. Where special flood hazard areas and wetlands exist, protection shall be provided through proper site design and construction practices in accordance with County, State and Federal requirements. ■ Flora and Fauna: Located away from sites that would, if developed, create a threat to unique or endangered species as identified by the state or federal government. ■ Soil Conditions: Located in areas where general soil conditions are suitable for urban uses because of good drainage characteristics and load bearing capacity for site development. ■ Public Services/Utilities: Located in areas which are or could be Commercial reasonably and efficiently served by centralized public services and c utilities. Transition Activity Transportation System: Foeus-ed—err Located at the intersection of Node arterial and/or collector highways or in proximity to other major Im (TRANSIT-1 transportation networks. and extending 0.5mi es beyond nterseetions or within one mile of an hiterstate ■ Energy Use: Located within less than a 10 minute commute from an Urban area. ■ Existing Land Use Placement: Located within identified Ten or Twenty Year Transition areas. Located in areas near major transportation routes that could be provided with public water and wastewater services and is appropriate for retail and other commercial uses. ■ Agriculture and Forestry: Located away from areas where development would have a detrimental impact on productive agricultural uses and managed forest land. ■ Population Density: Located in areas with moderate to high population densities. Historic and Cultural: Located away from areas where development would have a detrimental impact on state or federally acknowledged historic-cultural sites or County identified Public Interest Areas. 0ra.vge.Caunty Co-mpprehe,v e,PI c vv Page G-4 Appendix G: ire Land Use Categer Classification and Overlay Locational Criteria Future Land Use Pfait Classifications and Locational Criteria Overlays ■ Land/Slope: Located on land with slopes of less than 15% grade. Where slopes of 15% or greater are present, protection shall be provided through proper site design and construction practices. ■ Hydrology: Located outside of 100-year flood prone areas as identified by Corps of Engineers. Where special flood hazard areas and wetlands exist, protection shall be provided through proper site design and construction practices in accordance with County, State and Federal requirements. ■ Flora and Fauna: Located away from sites that would, if developed, create a threat to unique or endangered species as identified by the state or federal government. ■ Soil Conditions: Located in areas where general soil conditions are suitable for urban uses because of good drainage characteristics and load bearing capacity for site development. ■ Public Services/Utilities: Located in areas which are or could be Commercial- reasonably and efficiently served by centralized public services and C Industrial utilities. Transition Activity Transportation System: Focused-on Located at the intersection of = Node arterial and/or collector highways or in proximity to other major L transportation networks. nterseetioiis or within one mile of an interstate interchange and within 1,000 feet of ra" lines. ■ Energy Use: Located within less than a 10 minute commute from an Urban area. ■ Existing Land Use Placement: Located within identified Ten or Twenty Year Transifien areas. Located in areas near major transportation routes that could be provided with public water and wastewater services, which are appropriate for non-residential and higher density residential uses. ■ Agriculture and Forestry: Located away from areas where development would have a detrimental impact on productive agricultural uses and managed forest land. ■ Population Density: Located in areas with moderate to high population densities. ■ Historic and Cultural: Located away from areas where development would have a detrimental impact on state or federally acknowledged historic-cultural sites or County identified Public Interest Areas. OravWC&u*itty Co"Vrahevw-ive,,Plavv Page G-5 Appendix G: future Land Use Catego , Classification and Overlay Locational Criteria Future Land Use Wait Classifications and Locational Criteria Overlays ■ Land/Slope: Located on land with slopes of less than 15% grade. Where slopes of 15% or greater are present, protection cart-shall be provided through proper site design and construction practices. ■ Hydrology: Located outside of 100-year flood prone areas and areas where wetlands are present. Where flood prone special flood hazard areas and wetlands exist, protection cast shall be provided through proper site design and construction practices in accordance with County, State and Federal requirements. ■ Flora and Fauna: Located in areas where detrimental development impacts on local, state, or federally-acknowledged unique or endangered species, and wildlife habitats and corridors can be mitigated through proper site design and construction practices. ■ Soil Conditions: Located in areas where general soil conditions are suitable for development because of good drainage characteristics and load-bearing capacity for development. ■ Public Services/Utilities: Located in areas which are or could be reasonably and efficiently served by centralized public services and facilities. When located in areas where such services and facilities are not present or planned, general soil conditions must be suitable for on- = Economic site sewage disposal systems. o Development Transportation System: Located in areas adjacent to interstate and N {Transition3 major arterial highways, particularly those with the potential for = Activity Node providing access to public transit facilities. e� Energy Use: Located within 10 minutes commuting time from an Urban area and designed so that business uses provided within developments limit the number of short distance commutes for goods and services. ■ Existirig Land Use Placement: Located in designated Ten or Year Transition Areas. Located in areas adjacent to interstate highways and other major transportation routes specifically targeted for economic development activity, such as light industrial, distribution, and retail uses. ■ Agriculture and Forestry: Located away from areas where development would have a detrimental impact upon productive agricultural uses and managed forest land, and/or where the existing landscape character can be maintained through proper site design and construction practices. ■ Population Density: Located in areas with moderate to high population densities. ■ Historic and Cultural: Located in areas where detrimental development impacts on local, state, or federally-acknowledged historic, cultural, and/or archaeological sites, or county-designated Public Interest Areas does not exist or can be mitigated through proper site desi n and construction practices. OravWCou*-ty CamprMe4u,ive'Pla vv Page G-6 Appendix G: Future Land Use Categot Classification and Overlay Locational Criteria Future Land Use Pf&n Classifications and Locational Criteria Overlays • Land/Slope: No evaluation. • Hydrology: No evaluation. • Flora and Fauna: Located away from sites that would, if developed, create a threat to unique or endangered species as identified by the state or federal government. ■ Soil Conditions: Located in areas where general soil conditions are suitable for on-site sewage disposal and agricultural uses. ■ Public Services/Utilities: Located in areas that will not require urban- Rural Buffer type services. 3 ■ Transportation System: No evaluation. Ce ■ Energy Use: No evaluation. ■ Existing Land Use Placement: Located in areas directly outside of Transition and Urban areas where prevailing uses are rural residential and agricultural in nature. • Agriculture and Forestry: See Existing Land Use Placement. • Population Density: Located in areas with a very low-density rural population. ■ Historic and Cultural: Located away from areas where development would have a detrimental impact on state or federally acknowledged historic-cultural sites or County identified Public Interest Areas. ■ Land/Slope: Located on land with an overall slope of less than 15% grade. Where slopes of 15% or greater are present, protection shall be provided through proper site design and construction practices. ■ Hydrology: Located outside of 100-year flood prune areas as identified by the Corps of Engineers. Where special flood hazard areas and wetlands exist, protection shall be provided through proper site design and construction practices in accordance with County, State and Federal requirements. ■ Flora and Fauna: Located away from sites that would, if developed, create a threat to unique or endangered species as identified by the state or federal government. ■ Soil Conditions: Located in areas where general soil conditions are Rural Residential suitable for on-site sewage disposal systems. Public Services/Utilities: Located in areas that will not require urban- type services. ■ Transportation System: No evaluation. ■ Energy Use: Located in areas at least 5 minutes commuting time from an activity node. ■ Existing Land Use Placement: Located in association with other low- density rural residential uses in general proximity to developed or developing activity nodes. ■ Agriculture and Forestry: Located away from areas that would, if developed, have a detrimental impact on productive agricultural and managed forest land. ■ Population Density: Located in areas of rural population density, generally one dwelling unit per acre. ■ Historic and Cultural: Located away from areas where development would have a detrimental impact on state or federally acknowledged historic-cultural sites or County identified Public Interest Areas. 0 ra iW,Cau*-t y C omp re4wAuiive,P law Page G-7 r Appendix G: Futur¢ Land Use Catego, Classification and Overlay Locational Criteria Future Land Use Plan Classifications and Locational Criteria Overlays • Land/Slope: No evaluation. • Hydrology: No evaluation. • Flora and Fauna: No evaluation. • Soil Conditions: Located in areas where general soil conditions are good for agriculture production. ■ Public Services/Utilities: Located in areas where urban-type services, especially water and sewer lines, are not needed and should be Agricultural- discouraged. Residential ■ Transportation System: No evaluation. ■ Energy Use: No evaluation. a Existing Land Use Placement: Located in areas where the prevailing activity is agriculture or forestry and which is outside of non-farm clusters of population. • Agriculture and Forestry: See Existing Land Uses Placement. • Population Density: Located in areas of very low population density which is dispersed in a manner typical of agriculturally productive areas. ■ Historic and Cultural: Located away from areas where development would have a detrimental impact on state or federally acknowledged historic-cultural sites or County identified Public Interest Areas. • Land/Slope: Located on land with slopes of less than 15% grade. • Hydrology: Located outside of 100-year flood prone areas as identified by Corps of Engineers. Where special flood hazard areas and wetlands exist, protection shall be provided through proper site design and construction practices in accordance with County, State and Federal requirements. ■ Flora and Fauna: Located away from sites that would, if developed, create a threat to unique or endangered species as identified by the state or federal government. ■ Soil Conditions: Located in areas where general soil conditions are suitable for on-site sewage disposal systems. ■ Public Services/Utilities: Located in areas that will not require urban- _ Rural Community type services. e° Activity Node ■ Transportation System: Focused on the intersection of arterial and/or collector highways and extending 0.5miles beyond such intersections. • Energy Use: No evaluation. • Existing Land Use Placement: Location characterized by a cross-road that serves as a focal area for the surrounding rural and farm population and contains three or more commercial or institutional land uses. ■ Agriculture and Forestry: Located at sites within rural areas that would not unreasonably intrude upon the existing landscape character. ■ Population Density: Located in areas which would serve the surrounding low-density rural and agricultural population, generally 1,000-5,000 persons. ■ Historic and Cultural: Located away from areas where development would have a detrimental impact on state or federally acknowledged historic-cultural sites or County identified Public Interest Areas. oraytW,Coanty C&wLprehe,�&?slaw Page G7-8 Appendix G: Futur Land Use Cam. Classification and Overlay Locational Criteria Future Land Use P+&n Classifications and Locational Criteria Overlays ■ Land/Slope: Located on land with an overall slope of less than 15% grade. ■ Hydrology: Located outside of 100-year flood prune areas as identified by the Corps of Engineers. Where special flood hazard areas and wetlands exist, protection shall be provided through proper site design and construction practices in accordance with County, State and Federal requirements. ■ Flora and Fauna: Located away from sites that would, if developed, Rural create a threat to unique or endangered species as identified by the Neighborhood state or federal government. Activity Node ■ Soil Conditions: Located in areas where general soil conditions are (RURAL) suitable for on-site sewage disposal systems. ■ Public Services/Utilities: Located in areas that will not require urban- type services. i Transportation System: Focused on the intersection of arterial and/or collector highways and extending 0.25 miles beyond such intersections. ■ Energy Use: Located at least two miles from another Rural Neighborhood Activity Node. ■ Existing Land Use Placement: Located in an area surrounded by rural or agricultural residential uses and containing one or two commercial uses. ■ Agriculture and Forestry: Located at sites within rural areas that would not unreasonably intrude upon the existing landscape character. ■ Population Density: Located in areas which would serve the surrounding low-density rural and agricultural population, generally less than 1,000 persons. ■ Historic and Cultural: Located away from areas where development would have a detrimental 'impact on state or federally acknowledged historic-cultural sites or County identified Public Interest Areas. Orai#e,Cou ityComprehevm e.,Pla. Paget-9 Appendix G: Futur Land Use Categoy Classification and Overlay Locational Criteria Future Land Use PJ&n Classifications and Locational Criteria Overlays ■ Land/Slope: Located on land with an overall slope of less than 15% grade. ■ Hydrology: Located outside of 100-year flood prone areas as identified by the Corps of Engineers. Where special flood hazard areas and wetlands exist, protection shall be provided through proper site design and construction practices in accordance with County, State and Federal requirements. ■ Flora and Fauna: Located away from sites that would, if developed, create a threat to unique or endangered species as identified by the state or federal government. ■ Soil Conditions: Located in areas where general soil conditions are Rural Industrial suitable for on-site sewage disposal systems. Activity Node Public Services/Utilities: Located in areas that will not require urban- type services. Transportation System: Focused on the intersection of arterial and/or collector highways and extending 0.5 miles beyond such intersections. ■ Energy Use: Located at least five miles from another Rural Industrial Activity Node. ■ Existing Land Use Placement: Located in an area surrounded by rural, very low-density residential uses, or agricultural uses. ■ Agriculture and Forestry: Located at sites within rural areas that would not unreasonably intrude upon the existing landscape character. ■ Population Density: Located in areas with a very low-density rural population. ■ Historic and Cultural: Located away from areas where development would have a detrimental impact on state or federally acknowledged historic-cultural sites or County identified Public Interest Areas. 0ravWCM"Aty C"Trehe+i4i &Pla n. Page G-10 Appendix G: Futur@ Land Use ferry Classification and Overlay Locational Criteria Future Land Use Wait Classifications and Locational Criteria Overlays - Flora and Fauna. No eva-huatoom. agriculture produetiom7 esPec ally water and"evver lines, are not meeded and should be Agrmeukura' Areas °age�d- ro (RURAL) = Transportati d in areas with access to rcads that ean be used for product transportatio-n- L _ . • Existing Land Use Place ere the prevailing activity is-agrieulture-and otitsode of nom fiarm clusters of popu4atioj-f-. • Population Ben Setym-t-t�Y..ed in areas of very low Population de-r-la-Ity which is dispersed in a mum". liculturally produetive areas.. wou'd have a detrimental imPact On state or federally acknowled--j - Land/Sloppe. Located on, I'and w6th slopes of less than 1596. might affect water quality. Flora and Fauna. Located away from S:tes -tII_j :.0 r-vm d, i, developed, ereate a threat to unique or endangered spedes as identmffe�lte state or federal government. - Soil Comelotmons. Located-i.1-1 -areas vAe-re som' conditions and stability are suitable for extractive operatloms-. - Pubk Servoces/Utilities. Loeated im areas where urban type servi..., especially water and sevver are not meeded and should be a i discouraged.- roads that are designed for heavy veHele operati - Energy Uses No evaluation. � E A sting Land Use Place --ent. Located im areas where the preVaililig Transportation System. Located om or neor mr-as with aceess to a Agrocufture and Forestry. See Existing Land Uses Placement. - Population Density, Located in areas of very low Population density which is dispersed in a manner typical of rural areas. Hmstorme and--E-ultural- Loeateud away from areas where VCTUPTn wou'd have a detrimental impact on state or federally aclknovVII 4 4 Ora*WCm"Ity Cot"rohen e�Ptc. Page G-11 n,,• `hen Appendix G: Futup Land Use Categot Classification and �4 Overlay Locational Criteria Futum-e Land Use Pittn Classifications and Locational Criteria Overlays • Land/Slope: No limitation. • Hydrology: Located in areas that may be within 100-year flood areas. • Flora and Fauna: Located in areas that may contain unique and endangered species as identified by state or federal government. • Soil Conditions: No limitation. • Public Services/Utilities: Located in areas where urban-type services, especially water and sewer lines, are not needed and should be discouraged. a Public Interest • Transportation System: Located in areas where arterial or collector tv Area highways would not exist or be needed. ■ Energy Use: No evaluation. p m Existing Land Use Placement: Located in areas containing specialized uses, generally owned by public or quasi-public institutions. • Agriculture and Forestry: No limitations. • Population Density: Located in areas which by their nature would have an extremely low-density population or contain no permanent residential population. Historic and Cultural: Located in areas that may have historic or cultural values as identified by state or federal governments or the county. ■ Land/Slope: No limitation. ■ Hydrology: Integral to Land Use Plan Category Overlay. ■ Flora and Fauna: No evaluation. Water Supply ■ Soil Conditions: No evaluation. !� Watershed ■ Public Services/Utilities: Located in areas where urban-type services especially water and sewer lines should be discouraged unless a Teri p 10-Year or y20-Year Transition area is present. • Transportation System: No evaluation. • Agriculture and Forestry: No evaluation • Population Density: No evaluation. • Historic and Cultural: No evaluation. Ora*tge/Co-u.nty Comprehens-�ve/Flaw Page (�-12 Appendix G: Future Land Use Categor Classification and `••�`'' Overlay Locational Criteria i Future Land Use ?Farr Classifications and Locational Criteria Overlays • Land/Slope: No evaluation. • Hydrology: Located in areas which drain directly to a water supply impoundment by overland flow and interflow or which drain directly to the main channel of trunk stream feeding the impoundment. ■ Flora and Fauna: No evaluation. Watershed Critical ■ Soil Conditions: No evaluation. ro Area ■ Public Services/Utilities: Located in areas characterized by low- to residential minimal non-residential development. > ■ Transportation System: No evaluation. O ■ Energy Use: No evaluation. Placement: Located in areas which are characterized by a low density residential and minimal non-residential development. • Agriculture and Forestry: No evaluation. • Population Density: Located in areas with low population densities. ■ Historic and Cultural: No evaluation. • Land/Slope: No limitation. • Hydrology: Located where a body of water, such as a pond or lake, confined by a dam or other barrier, is to be used for public water supply from which water flows by gravity or is pumped directly to a treatment plant or to a small intervening storage basin and thence to a treatment plant. ■ Flora and Fauna: No evaluation. >, Soil Conditions: No evaluation. 5 Public Services/Utilities: Located in areas where urban-type services Reservoir, Class I especially water and sewer lines should be discouraged unless a 10- O Year or 20-Year Transition area is present.' • Transportation System: No evaluation. • Placement: Located where a body of water, such as a pond or lake, confined by a dam or other barrier, is to be used for public water supply • Agriculture and Forestry: No evaluation • Population Density: No evaluation. • Historic and Cultural: No evaluation. Orp vtq,e,C&"+Itty C&mpreh.e�na e Plc Page (�-13 Appendix G: Riture Land Use Categoy Classification and Overlay Locational Criteria Future Land Use Wait Classifications and Locational Criteria Overlays • Land/Slope: No limitation. • Hydrology: Located where a body of water, such as a pond or lake, confined by a dam or other barrier, is to be used for public water supply from which water flows by gravity or is pumped to a Class I reservoir prior to final entrance to a water treatment plant ■ Flora and Fauna: No evaluation. ■ Soil Conditions: No evaluation. • Public Services/Utilities: Located in areas where urban-type services Reservoir, Class II especially water and sewer lines should be discouraged unless a 10- 0 Year or 20-Year Transition area is present.' • Transportation System: No evaluation. • Placement: Located where a body of water, such as a pond or lake, confined by a dam or other barrier, is to be used for public water supply • Agriculture and Forestry: No evaluation • Population Density: No evaluation. ■ Historic and Cultural: No evaluation. • Land/Slope: May be located in areas where slopes are 15%or greater. • Hydrology: May be located in areas with wetlands and 100-year floodplain areas along drainage tributaries or adjacent to steep slopes. ■ Flora and Fauna: Located in areas that contain significant and natural areas and wildlife habitats, including connecting wildlife corridors, as identified by local, state, or federal inventories. ■ Soil Conditions: Located in areas that contain alluvial and/or hydric (wet soils). ■ Public Services/Utilities: Located in areas where urban-type services will not be required and should be discouraged. Resource ■ Transportation System: Located in areas where arterial or collector to Protection Area highways would not exist or be needed. ■ Energy Use: No evaluation. p m Existing Land Use Placement: Located in areas that are best left undeveloped because of their limitations or unsuitability for development, and/or preserved because of the presence of environmentally sensitive features and/or historically significant sites. • Agriculture and Forestry: See Existing Land Uses Placement. • Population Density: Located in areas which by their nature would have no permanent residential population. ■ Historic and Cultural: Located in areas containing historic and/or archaeological sites listed on the National Register of Historic Places, included on the National Register Study List, designated as a local historic district or landmark, and/or identified as having a high otential for archaeological remains. Ora+tqeCowv►.ty Compreheui vePla� Page G-14 Appendix G: Future Land Use Categoi Classification and Overlay Locational Criteria Future Land Use Ptan Classifications and Locational Criteria Overlays ■ Land/Slope: Located in areas where slope varies from gradual along floodplains to 20%and above. ■ Hydrology: Located primarily along New Hope Creek and its tributaries, including the 100-year floodplain. Designated as "Important Regional Wetland" by the U.S. Fish and Wildlife Service. ■ Flora and Fauna: Located in areas which contain great diversity, including regionally rare plant species, hardwood trees of size and number uncommon for their location, and important wildlife habitat. ■ Soil Conditions: Located in areas where soils vary from well-drained, moderately steep firm clay to nearly level alluvial soils subject to New Hope Creek flooding. Corridor Open - Public Services/Utilities: Located in areas where urban-type services Space will not be required and should be discouraged. ■ Transportation System: Located in areas where the principal form of ro transportation will be bike paths and pedestrian trails located adjacent > (refer to the New to the rights-of-way of interstate highways and minor arterials. Hope Corridor Open ' Energy Use: No evaluation. Space Master Plan Placement: Located in areas that are generally for details.) undeveloped due to slope or soil limitations, in addition to specialized use areas in Duke Forest, and paths/trails adjacent to or within road rights-of-way. Located primarily along New Hope Creek and its tributaries, including the 100-year floodplain. ■ Agriculture and Forestry: Located in areas which may be suitable for agriculture and forestry, with the exception of steep slopes. See also Existing nd-Use Placement. ■ Population Density: Located in areas which by their nature would be very low density residential areas. Portions in Duke Forest are not for residential use. ■Historic and Cultural: Located in areas which may have sites and/or structures of historic or cultural value as identified by federal, state, or county government. Ora+W Co- *Lty C&mprehevv,dve Kct,v Page G-15 Appendix G: mare Land Use Categot Classification and Overlay Locational Criteria Future Land Use PM-n Classifications and Locational Criteria Overlays Stoney Creek Basin ■ Land/Slope: No evaluation. ■ Hydrology: Located within the boundaries of the 4,696 acre Stoney Creek Drainage Basin southeast of the Town of Hillsborough in portions (refer to the Spring of Hillsborough, Eno, and Chapel Hill Townships. 1995 UNC Students' ■ Flora and Fauna: No evaluation. Report - "Three ■ Soil Conditions: No evaluation. ro Development ■ Public Services/Utilities: No evaluation.. Options: ■ Transportation System: No evaluation. OConventional, ■ Energy Use: No evaluation. Density-Neutral, Placement: No evaltiatiom. Located within the Neo-Traditional" and boundaries of the 4,696 acre Stoney Creek Drainage Basin southeast of the Stoney Creek the Town of Hillsborough in portions of Hillsborough, Eno, and Chapel Basin Small Area Hill Townships. Plan for more ■ Agriculture and Forestry: No evaluation. details.) ■ Population Density: No evaluation. ■ Historic and Cultural: No evaluation. Ora.vWCounty Co-vvprehev,Gve,Pla,v Page G-16 Future Land Use'Element.-t Map Attachment 4 v��v of the Orange County Comprehensive Plan Caswell County 1 sRo -�en 1 Rp�E h�"�` / { � � Person County 4ria,0. r " -_.' -- _.GpAY..„. ,. .ti..,..,,. _ e 1 •I '. ....:4''' „... '. ''.::--141P8,P1♦ � O'p.l� YY.. - I-,-.: ' /1', 4,1,- . rs i„. .. ' .--- T4 7 —1' ,.. ' ..' -''s.- , ' ' .V6. opoi -.�4�5g' 100 �.;% at�T"€) f '`�r`,v,A, ,oa, rte,- :RI r '.r"`k -`n 0., "#‘ WA..''-'464.1 . . ''. ''''''.' ,-—.1' k 7-4-, .--., --,---'7' Vf-li 4 4 i - r r S A+ !'vit"°/ems �' S'y -y j �, - , _ r ♦-,t1 o•R ' �T ^nl`' ,I t y •�' `ill. ,� ! !I' ;L!. ' �. �' �. .9„..i..461), E `o i - 'fit ✓ r �' ":: Upon motion of Commissioner seconded by Commissioner the aforementioned 2030 C mprehensive Plan amendments were adopted this the day of 2012 and shall become effective upon adoption. I, Donna S. Baker, Clerk to the Board of Commissioners for Orange County, DO HEREBY CERTIFY that the foregoing is a true copy of o much of the proceedings of said Board at a meeting held on 2012 as relates in any way to the adoption of the foregoing and that said proceedings are recorded in the minutes of the said Board. 9�- ITNESS my hand and the seal of said County, this day of , 2012. zy s>. Donna Ba er, erk, range County Commissioners jL