BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: January 24, 2012
Action Agenda
Item No. 8.e.
SUBJECT: Update on Triangle Regional Transit Program -Alternatives Analysis and the
Locally Preferred Alternative
DEPARTMENT: BOCC, Manager's Office & Planning PUBLIC HEARING: (YIN)
ATTACHMENT(S):
A. Questions Regarding the Orange
County Transit Plan Alternatives
Analysis and Locally Preferred
Alternative
B. December 8 Agenda Outline and
Key to Attachments
INFORMATION CONTACT:
Frank W Clifton, Manager-245-2300
Craig Benedict, Planning Director-
245-2575
Tom Altieri, Comprehensive Planning
Supervisor, 245-2579
Darcy Zorio, Transportation Planner,
245-2582
PURPOSE: To receive additional information and questions on the Triangle Regional Transit
Program -Alternatives Analysis (AA) and the Locally Preferred Alternative (LPA) and identify
any remaining information that may be required for the Board.
BACKGROUND: Last year (May 19, June 7 and Dec 8) the BOCC held a work session and
regular meeting regarding the Triangle Regional Transit Program (TRTP) and the localized
Orange County Transit Plan (OCTP) and also known as the Orange County Bus and Rail
Investment Plan (OCBARIP). _
The Alternatives Analysis (AA) for the Triangle Regional Transit Program projects in the
Durham-Orange, Durham-Wake and Wake County Corridors were completed in July 2011. The
findings and recommendations developed through the AA process are contained in three
Detailed Definition of Alternatives Technical Reports. Each report covers an alignment plan and
profile information about the attributes of different technologies [i.e. Light Rail (LRT), Bus Rail
Transit High and Low (i.e. BRT-H &BRT-L)], cost estimates, travel time, traffic analyses, and
assessment of station's capacity for potential transit oriented development. A recommendation
from Triangle Transit for the most appropriate initial fixed guideway transit investment, known
as the Locally Preferred Alternative (LPA) for each corridor, is also included. In July 2011, the
multivolume reports for each of the corridors (i.e. Durham-Orange and Durham-Wake) were
posted along with all of the other information generated through the AA process:
www.ourtransitfuture.com.
In late August, 2011, as a result of ongoing technical evaluation, public involvement and
discussions with government agencies, the MPOs and other key stakeholders, an Addendum
was prepared for each of the Detailed Definition of Alternatives Technical Reports. This
additional information is also posted on the aforementioned project web site.
~~
Triangle Transit has stated that the LPA must be approved by the Durham Chapel Hill Carrboro
(DCHC) Metropolitan Planning Organization (MPO) Transportation Advisory Committee (TAC)
by mid-February 2012 to make the deadline for federal New Starts applications (mid-August
2012).
Attachment A, Questions Regarding the Orange County Transit Plan as it Relates to the
Alternatives Analysis and Locally Preferred Alternative
At its November 15, 2011 meeting. the BOCC received a presentation on the Triangle Regional
Transit Program -Alternatives Analysis (AA) and the Locally Preferred Alternative (LPA) and
identified additional information in preparation for tonight's work session.
Since the December 8t" 2011 Special Transit Work Session, county staff has met with a
majority of the Commissioners and compiled a list of questions concerning the Alternatives
Analysis and the Locally Preferred Alternative. The questions are organized into general
categories including ridership, commuting patterns, the preferred corridor (including Orange
County economic development potential) and technology (i.e. LRT vs. BRT).
Prior to this meeting, Triangle Transit was forwarded this list of questions and will be available
to respond.
Attachment B, Agenda Outline and Key to Attachments
Attachments (1-6), as referenced in Attachment B, were part of the December 8, 2011 Special
Transit Work Session. Additional materials were also included that Board members may wish to
review. Please bring this information with you to the meeting. It is available on the county
website under the December 8, 2011 Special Transit Work Session agenda:
http~//www co orange nc us/OCCLERKS/111208.htm
This discussion could lead to an informal vote of the BOCC on February 7, 2012 related to the
best technology (i.e. LRT or BRT) for Orange County as studied in the AA and the best corridor
for Orange County as reported in the study area of the LPA.
FINANCIAL IMPACT: None at this time.
RECOMMENDATION(S): The Manager recommends the Board:
1. Receive the additional information;
2. Discuss and ask questions; and
3. Identify any additional materials that may be required to provide guidance to
Commissioner Gordon, Orange County MPO representative on Transportation
Advisory Council, for a proposed vote on February 8, 2012 by the DCHC MPO TAC.
ATTACHMENT A
QUESTIONS REGARDING
ORANGE COUNTY TRANSIT PLAN (OCTP)
ALTERNATIVES ANALYSIS (AA) and
LOCALLY PREFERRED ALTERNATIVE (LPA)
RIDERSHIP
1. How many riders from Orange County are projected to board in Orange County
and alight to destinations in Orange County?
2. Of the projected 1540 bus transfers (i.e. boarders) to LRT at UNC Hospitals,
what is their projected destination? If destinations are attracted to employment
zones and the vast majority of employment zones are along the proposed LRT
route in the 15-501 corridor, would it be a logical travel pattern for riders to take
the bus to and transfer at Gateway LRT station which is more direct, less time
consuming, and less expensive?
3. Is the decrease in park and ride spaces at Leigh Village from 3,000 originally, to
1,000, and now to 500 spaces in the NC 54 Corridor Study addressed in the AA
as it could affect ridership volumes? What are the consequences in ridership?
4. The ridership forecasts (Table D-2 of AA) for boarding (via walk access) in
Orange County at:
UNC 630
Mason Farm 340
Hamilton 220
Friday Center 70
Meadowmont 110
TOTAL RIDERS 1370
These numbers appear high since most populations in UNC are students who
would not be leaving Orange County via LRT for employment.
Is there any other insight on these numbers?
3
Page 1 of 5
4
COMMUTER PATTERNS/CORRIDORS
1. Due to the shape of Orange County and the proposal for light rail alignments in
its extreme southeast corner, many county residents with destinations in Durham
will continue to drive directly. Although a majority of the County's residents
reside in the Chapel Hill and Carrboro area, approximately 45% live elsewhere
(See Map).
2. The AA reflects a strong bi-directional commuter pattern between Chapel Hill and
Durham. However, there are additional commutes between Chapel Hill and
Research Triangle Park area that are not served via the regional transit plan.
Should there be two fixed routes to serve this unique condition?
3. Will the increases in park and ride spaces at Gateway and Patterson Place be
sufficient for commuters traveling from south Durham and western Wake County
-along I-40 and will it be difficult for commuters to drive 3 miles past their
destination route of NC 54 to UNC to back track with LRT along the same I-40
route?
4. The corridors could be (and not in order of importance):
a. Martin Luther King, as suggested in the existing OCTP but needs further
cost refinement and timed to address the north-south needs of Chapel Hill
Township and Carolina North with potential interlined use of the
Hillsborough 420 route.
b. 15-501 corridor which would service the needs of Chapel Hill and
Carrboro residents to businesses in the Orange County corridor as well as
employment connections further northeast to Durham. The AA supports
the benefits of this corridor because it is within the broader `study area'
although it was not studied for a specific route or ridership potential.
c. NC 54 corridor which would service the high commuter traffic pattern into
UNC from south Durham and western Wake. NC 54 is being studied for
expansion in the timeframe of the OCTP. New lanes should be dedicated
for dedicated bus ways. The BRT corridor would extend to I-40 and/or
NC751 which would correct overcapacity traffic conditions that LRT would
not correct or service.
Page 2 of 5
5
CORRIDOR STUDY
1. The LPA notes the environmental issues associated with the C-1 and C-2
alignments in the NC 54 corridor and through the Jordan Lake federal lands of
Little Creek Bottomland, page 3-28 thru 35 of "Volume 7: Detailed Definitions of
Alternatives Technical Reporl". 15-501 would not traverse federal lands in
Orange County and improve the risk assessment of the feasibility of LRT or BRT.
Can 15-501 be included as a locally preferred alternative?
2. The AA notes the higher acquisition of properties for BRT High and Low versus
LRT on page 3-25 and 27. If BRT can be designed within the scheduled or
current expansion of existing road corridors of 15-501 and/or NC 54 as either
HOV, dedicated bus way, mixed traffic or bus on shoulder (BOSS) why is BRT
reported as having higher properly impacts?
3. The September 3, 2010 `white paper' from TTA regarding the Triangle Regional
Transit Program and the Durham-Orange Corridor notes that "The Town
requested that Alignment 3 (i.e. 15-501) be considered since (a) over 10 years
elapsed since the adopted alignment was initially selected, and (b)
redevelopment along the US15-501 corridor within Chapel Hill has become a
higher priority for the Town. Orange County agrees with this assessment that
economic development within Orange County has been greatly accented in
recent years (after 2035 LRTP decisions were made) because sales tax
distribution is based more on point of sale versus population based. Therefore
the revenue sharing for other sales tax receipts as well as a potential % cent
mobility sales tax has new relevance and revenue based on location. Since
revenue sources for regional mobility are county based and initiated, the return
on mass transit investment needs to be linked to economic development tax
base return within the same county.
4. Investments have been made along the NC 54 corridor in anticipation of fixed
route service. BRT can service that same investment and match investment with
the land use density that is proposed or exists in the corridor. Is greater than 25
dwelling units per acre proposed to support LRT in Hwy 54? BRT high has also
shown to positively affect land use patterns.
5. The NC 54 Leigh Village Alignment (C-1 or C-2) parallels in large part I-40
thereby limiting access (from population or employment) from one side. In
addition, that alignment traverses a wide environmental area where no access is
possible. The efficiency and investment is therein decreased as evidenced by
the higher levels of ridership from Gateway to Alston from the AA.
Page 3 of 5
6
6. The September 3, 2010 report (page 5) from TTA notes that Leigh Village
representatives `have indicated a willingness to accommodate park and ride' of
an amount mentioned previously, 3500 spaces. This is no longer the case
(suggested at 500 parking spaces) and therefore LRT and park and ride would
not serve the high traffic flow along the NC 54 corridor.
7. Park and ride opportunities are reported to be difficult in the NC 54/I-40 region
(now and in the future; page 5 -September 30, 2010 TTA Report), however, due
to the unserved direction of fixed route to the RTP area, vehicles will need park
and ride to switch to LRT or BRT. This need is noted in the NC 54 corridor study.
8. Right-of-Way Availability, (page 7 -September 30, 2010 TTA Report), notes that
alignment right-of-way has been `preserved' at `possibly no cost' in the C-1
alignment. That may be true for the area in Meadowmont but not along the
majority of the route including the traverse of federal environmental lands.
9. Since the New Starts application is a six-month process for its first submittal and
decisions about `final' alignment may still be 3 to 4 years out, could 15-501 be
offered as a preferred alignment since it is within the study area of the AA?
BRT/LRT DECISIONS
If it is decided that fixed route (LRT or BRT) would better serve Orange County
and its connection to Durham County via the 15-501 corridor as a complement
and/or a supplement to the NC 54 corridor, what process is suggested?
2. BRT cost estimates for the Durham-Orange Route appear to be about 55 million
a mile vs. 81.2 million a mile for LRT. Although the BRT cost is 31 % lower,
Federal Transit Administration (FTA) study of 2001 (and 2009) and US General
Accounting Office (GAO) of June 2003 report that BRT is typically $13.5 million
for dedicated bus way and $9.0 million for use with high occupancy vehicle lanes.
Could BRT routing be designed in such a way to reduce capital costs, and
thereby allowing multiple BRT links in 2-3 corridors as noted previously?
3. Assuming revenues of approximately $5 million per year from'h cent sales tax
and $700k from vehicle registration fees and on the expenditure side, $4.9 million
for bus hours countywide, how will Orange County accumulate $82.5 million for
LRT within the timeframe proposed? That represents only approximately $1
million per year after expenditures to "save" for LRT or BRT.
Page 4 of 5
ECONOMIC DEVELOPMENT/FINANCIAL
Both the Durham and Wake County transit plans propose a commuter rail
component that would be scheduled to be operational in the mid-term (2018)
versus the longer term (2025) for potential LRT. Could Orange County be
studied and monies estimated for Commuter Rail to Hillsborough as part of the
longer term? Paul Morris, NC Deputy Secretary for Transit spoke recently of
state interest in upgrading commuter lines and freight lines to assist in economic
development, which would be the case in the Efland-Buckhorn economic
development zones west of Hillsborough.
2. Could a circulator route be added to the bus service element within the Chapel
Hill and Carrboro area to provide better access to shopping opportunities within
Orange County for Orange County residents? Bolstered sales revenues can be
reinvested within Orange County.
STAFF POST NOTE
Although it is difficult to summarize the technical and philosophical questions from the
BOCC related to the AA and LPA and how it comports to the unique challenges of
multiple travel patterns and corridors and status of economic development opportunities
in Orange County, staff has made a reasonable compilation. In summary, they asked
how can our regional fixed route transit investment of over $80 million, not including the
$5 million annual investment in bus service, be spent to serve the needs of Orange
County residents and businesses in a manner that will create return benefits of land
use, environment and economic development that matches the vision of Orange County
residents (i.e. matching the corridor and technology to the appropriate scale of the
Durham-Orange corridor).
Page 5 of 5
I (
' 9
!
i
i
_-------------------------------------------------- ------------------------�
I
!� I
i
i
I
! !
! !
I
! I
I �
, I
,
i
City,of 1 i
Mebane' ` I I
Town of i
i Hillsborough
v i
, r
7 ® ..
i N
y Durham /
I
, rs,.
'1Town ofr "I
i `,,Chapel'Hill
i Town of
Carrboro
---------_-_ l -------------- ------------
l '
7 City of
7 Raleigh
S
1
1
I
,
1 inch=4.5 miles
RDU Airport
0 1 2 3
Hospital ®Miles
/ Orange County Planning and Inspections Department
J Clty uf711tS ; GIS Map Prepared by Brian Carson.1/20/2012
Attachment B
Orange County BOCC Transit Work Session -Thursday, December 8, 2011
Agenda Outline and Key to Attachments
(Please see December 8, 2011 packet for referenced attachments)
A. Mobility Regional Purpose
1. House Bill 148 (Attachment A1)
2. Local (Att. A2)
B. Alternatives Analysis (AA) (Mode of Transit)
1. Bus Plan (Att. B1)
2. BRT (Att. B2)
3. Light Rail (Att. B3)
4. Commuter Rail (Att. B4)
5. UNC - D (Att. B5)
C. Locally Preferred Alternatives (LPA) (Corridor)
1. C-1 - Meadowmont (Att. C1)
2. C-2 - Hillmont
3. Alignment Alternative Comparison (Att. C3)
D. Orange County Bus and Rail Investment Plan (Financial Plan/Model)
1. Cost Sharing Discussion
a. Durham/Orange Triangle Regional Transit Program Financial Plan Draft (Att.
D1 a)
b. Cost Sharing Map (Att. D1 b)
c. Revenue Sharing (Att. D1c)
2. Ridership
a. Assumptions (Att. D2a, incl. 4-charts)
b. Demographics (Att. D2b)
c. Employment and Population (Att. D2c)
3. Plan A; Core Transit
--Bus (See Att. B1)
Plan B; Enhanced Transit
--Light Rail
--BRT
--BRT (See Att. B2)
--Bus
--Commuter Rail (See Att. B4)
E. Intergovernmental Agreements or Memorandum of Understanding
1. Municipalities (Att. E1)
2. Triangle Transit (Att. E2)
11
F. Referendum Decisions
G. Timeline (Att. G)