HomeMy WebLinkAbout2011-386a ED - Morlando Construction LLC for PFAP - gen. construction changes continued r Y CHANGE ORDER Distributed To: G701 ® Owner ® Contractor 0 Fly Architect ❑ Subcontractor ❑ Field ❑ Other PROJECT: Piedmont Food&Agricultural Processing Ctr. CHANGE ORDER NO: 2 Valley Forge Rd. Hillsborough, NC 27278 DATE: December 14,2011 PROJECT NO: 0910 TO: Morlando Construction Company, LLC CONTRACT DATE: November 15,2010 8604 Cliff Cameron Dr.Suite 155 Charlotte, NC 28269 CONTRACT FOR: General Construction The contract is changed as follows: fl C 1,r *.Wgi� � � 1"mbN 1 6,566.00 COC#14-Eelctrical Connection for Cooler/Freezer package-Panel to disconnect 2 19,934.00 COC#15-Freezer Floor Slab with Epoxy . 3 9,280.00 COC#16-Electrical Connection for Cooler/Freezer package-Disconnect to units �r 4 4,344.00 1 COC#17R-Electrical connections for used Fryer-Revised to upsize conductors,breakers&conduit 40,124.00 TOTAL The original Contract Sum was $ 802,470.00 Net change by previously authorized Change Orders CO#1 $ -13,536.00 The Contract Sum prior to this Change Order was $ 788,934.00 The Contract Sum will be increase by this Change Order in the amount of $ 40,124.00 The new Contract Sum including this Change Order will be $ 829,058.00 The Contract Time will be unchanged by. . . . . . . . . . . . . . . . . . . . . . . . . . . . ( 0 )days. The date of Substantial Completion as of the date of this Change Order therefore is May 5,2011 Accepted By: Morlando Construction, LLC Corley Redfoot Zack, Inc. Orange County, North C r lina CONTRACTO ARCHITECT OWNE By is Morlando y: rA:2jt(IV 45, FA Y: -t< �Jli�V1 Date Date Date Page 1 Of 1 TORGO SOFTWARE http:/Mww.torgo.net/01996-2007 ALL RIGHTS RESERVED COST OF CHANGE WORKSHEET COC# 014 Morlando Construction, LLC MC Project#: 1003 Prepared By: Dominic Morlando Date: 6/812011 Project:Piedmont Food Architect:Corley Redfoot Zack Unit Cost Description Qty Unit Labor Materials Sub Labor Material Subcontract Equipment Total $0.00 $0.00 $0.00 $0.00 Bill Muncey Electric(see attached) 1 $5,673.72 $0.00 $0.00 $5,673.72 $5,673.72 $0.00 $0.00 $0.00 $0.00 MC Field(see attached) 1 $130.00 $130.00 $0.00 $0.00 $130.00 $0.00 $0.00 1 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1 $0.00 $0.00 $0.00 $0.00 SCOPE: Contractors Subtotal $130.00 $0.00 $5,673.72 $0.00 $5,803.72 All Labor,Materials and Equipment to Supply and Install the Sales Tax $0.00 , "` $0.00 3 electrical per CRZ Field Memo#3. Payroll&WC Insurance 37% $48.10 4 $48.10 Contractors Total Cost $5,851.82 Overhead&Profit $585.18 Payment and Performance Bond $106.21 GL Insurance $22.90 Subtotal ' $6,566.11 Total Change Proposal Cost y ;e $6,566.11 By acceptance of this Cost of Change,the project duration ACCEPTED DATE will,INCREASE days, DECREASE days, REJECTED DATE NOT CHANGE XX 1 1 Corlev Redfoot Zack, Inc. Field Memo/Project Instructions May 16, 2011 Page 1 Telephone 919-401-8586 Telefax 919-493-7306 Job#: 0910 Field Memo#: 003 No. of Pages: 2 Job Name: Piedmont Food &Agricultural Processing Orange County,NC Sent to: Dominic Morlando—Morlando Construction From: Chris Ford Please provide a cost proposal for any change in your respective scones of work as outlined in the field memo documents described below and as attached. Also please notify the Designer in writing if there is no effect by this field memo on your scope of work. Please contact the Designer if you have any questions regarding this field memo. See the attached SK032211-C for the revised electrical service requirements for the cooler/freezer being purchased by the Owner. Cc: Jeff Thompson David Taylor This Field Memo/Project Instruction does not constitute approval of any additional cost or time which a Contractor feels he may be due as a result of this communication from the Designer. All requests for additional monies or time must be submitted and approved per the Contract Documents for the project referenced above. it J B 3 .34 *N E* B-a O E.C. 0 VERIFY EXACT LOCATION OF DEVICES IN < CO RS & FREEZER PRIOR TO INSTALLATION. B-1 2 FREEZER MEAT PRODUCE B-1 O 130 COOLER COOLER J B a —10'F 12g 128 +357 +357 B-2 O 3 6,8 0 J J J J —7� PALLET B,A, B-2 B-16 B—RX2 — 4 PALLET RACK PANEL H swmutE DeecApNon\Remarks: sW1eE V ILA eCW W9t0.m41tm,U77.sA 1 SM sal»WI91,1,teem c"m On vaxm Co,r,@VW Land: W.W KVA. W M RZINS.WMAN 1 wr<wws,�,M AM ed7»e161Md1 WWYWW. 1/WeW WINIM FINE We IQW"■,E¢i1WF.LW.Zs ME-%W(IN A ( MW W PAae7'r WSWIMI CS We 140100.eeawMMIL co 2 WIE®WW»W»cmacme A6� WR WWea tab E»a WCps eI}p,Wl on E le» oIW �IMEM eaa Leo M eCPF.CMM nL MM 1 r eWe 1P m , s 1P-m an 1r 1 m um Com I= IC"E1LI.IWC SWW Cc" 1 VIP I.mW 1Fm 7 4 1F-m W W 1r 1 A!1/AW W»»L W W IFAIFA WIW eimuWl trap s e E W Mto• sna eWWWI tress , A e m r 1wE Wam WWLIWW uWr WARE 810M Iltim e B » e tlom �r IMOE CDW BWVM»e OW Nw.C»e»W Im 1 tr rme 1Fm it c » 1S 1 W.Stoll»[tW t fr. xCe IF-W W A N Ir-W W W tr 1 LIM»WL CDMM.Will e7C SMMK 1W 1 Ir 9M II-m W e » 1P Will! tr 1 A4 SW U 0)MM P W IFA1W s n e » r000e 4110- sevL,notm mmWW UWr NW.E WCHK t/Y 1r 7We » A W m r m x e W W 11We ylr sesL COM ECl/ICN»II COL LM W»WW91Wm RW.IILM 1/Y Ir WCe IM1W W C x 15 1/S" M SICWCE tx , 1r M ,Paa » A x 1P-n ,Woe Ir , m RW R ton LM MIKE 1 Ir Ww Ir m » e W Ir W W tr t M FME04 WOt IFNQ 7 x c x r 'fie- AN WNM 00-1) 1• e7e 0-»n » A a IMW ye nEmt Cam®W 1Wr t W a » e x W ,• Pot WWWa,Wr IN , Ir MDW tPaa x a x IBM Nor IN=LMSCMICe CCs Date 6/S 90=11-C IR WWWR N7 eW , tr t,WW IP-m » x is , � IEWWIlkieB»�Ir. Date s/16J11 �$. Pe!or"»N(W-1) 1 We ,P-m x • ,Paa WIYF mum ��r� IWE ooww We(W 1 1r We 110-0 N 4 ,P-m t►A»W®Wx � �,�/5_�� r��� y,.NITS ^u'_ L Dwg�.� Ell WIRE MIAM tr-m W A « 1Paa sIIW etWM WAY R�EOO�P ZACKR %0 Mtch 11 Cools/t'1VlY.GA 3pm DRUM IF-0 » e lFie rm mum ......san.aa 0-10-0-0-0-0-nt.Aawul ChanM WIN mum ,vim » A W WCs Ir 1 1170 CVaLr WOa ItItM 1n � ' / rose l»I.Iay.I mW axO S.xr� I t 1 110-.110-1 �� iIOYWA/LI Food�aAUTAJA WME mum 1PaD W e W t d�Th�o WAE[WIr7M Iv m W C » tr m WW WO"M North M RMANDO CONSTRUCTION 8604 Cliff Cameron Drive, Suite 155,Charlotte, NC 28269 Phone:704.547.5058 Fax:704.547.6217 Extra for coordination work associated with CRZ Field Memo#3. Labor: Tim Knight—4 hours at$32.50/hour=$130.00 EWE Hill Muncy Me rtee Bill Muncy Electric PO Box 532 Mooresville, NC 28031 Office (704) 895-6200 Fax (704) 895-6283 Lic. 17688 Date: 6/8/2011 To: Morlando Construction Re: BME Proposal for Piedmont Food Project Dominic, per the plan SK03221 I-C you sent to me dated 5/16/11, I quote a lump sum price of$5673.72 for the electrical portion as outlined in the plan. The breakout is; Labor-64 hours at $48/hour(2 men, 4 days)=$3072.00 Material-$2085.92. I have attached our suppliers quote Profit-$515.80 Total-$5673.72 If you have any questions please call. Thank You, Tom Murph 704-657-0066 cell N T C.E.S. (Concord) QUOTATION 815 Gretel Ave NW, Concord, NC, Q 28027• CRD/004065 Phone: 704-795-7311 Valid From: 08 Jun 2011 Fax: 704-795-7316 Valid Until: 08 Jul 2011 Email: Concord0003 @ces-us.net 6 Page 1/1 BILL MUNCY--PIEDMONT FOOD & AGRICULTRAL PO BOX 532 Entered by: Shane Harrelson MOORESVILLE, NC Sales Rep: Shane Harrelson 28115 Phone: 1 Account No. : 00030548013 Fax: 1 Order Number: PIEDMONT FOODS Qty Item Description $ Price Per $ Goods 500 THHN-6-STR-BLK-CU THHN-6-BLK-I9STR-CU 723.93 1000 361.97 500 THHN-I2-SOL-BLK-CU-500 THHN-I2-SOL-BLK-CU-500S/R 173.89 1000 86.95 500 THHN-I2-SOL-RED-CU-500 THHN-I2-RED-SOL-CU-500S/R 173.89 1000 86.95 500 THHN-I2-SOL-BLU-CU-500 THHN-I2-BLU-SOL-CU-5005/R 173.89 1000 86.95 500 THHN-I2-SOL-WHT-CU-500 THHN-I2-WHT-SOL-CU-500S/R 173.89 1000 86.95 500 THHN-I2-SOL-GRN-CU-500 THHN-I2-GRN-SOL-CU-5005/R 173.89 1000 86.95 200 MADISON 620330 3/4 L-T MTL CONDUIT UL 10OFT COIL 241.02 100 482.04 30 TOPAZ ELECTRIC 472 3/4" STRAIGHT LIQUID TIGHT CONN 353.62 100 106.09 3 P & S CSB20AC2-W 20A 120/277VAC B&S WIRE COMM DP SW WHT 9.68 1 29.04 3 RACO 800C 1 TOGGLE SWITCH COVER 407.42 100 12.22 1 C-H DG322NRB 60A 240V 4SN SW NEMA3R 144.34 1 144.34 3 LITTELFUSE FLNR060 250V RK5 TD FUSE 7.66 1 22.98 3 C-H DG321NRB 30A 240V 4SN SW NEMA3R 96.23 1 288.69 12 LITTELFUSE FLNR030 250V RK5 TD FUSE 4.48 1 53.76 Please do not hesitate to contact us if we can be of any further assistance. Sincerely Yours, Shane Harrelson (QUOTE ONLY. NOT A RECEIPT) Goods Total: $1935.88 Tax Total: $150.04 Total: $2085.92 Prices may be subject to change from manufacturer at the time of dispatch. When ordering please use above quotation number. Seller assumes no responsibility for quoted materials meeting job specifications unless specifically stated in writing. Substitution of similar quality material is permitted. All special order material is non-returnable or subject to the manufacturer's return goods policy. E&OE COST OF CHANGE WORKSHEET COC#015 Morlando Construction,LLC MC Project#:1003 Prepared By:Dominic Morlando Date:7/5/2011 Project:Piedmont Food Architect:Corley Redfoot Zack Unit Cost Description Q Unit Labor Materials Sub Labor Material Subcontract Equipment Total $0.00 $0.00 $0.00 $0.00 B&D Drywall see attached 1 $1,175.63 $0.00 $0.00 $1,175.63 $1.175.63 $0.00 $0.00 $0.00 $0.00 MC Feld Coordination see attached 30 32.5 $975.00 $975.00 $0.00 $0.00 $975.00 $0.00 $0.00 $0.00 $0.00 Skyrock Construction(see attached) 1 $5,330.00 $0.00 $0.00 $5,330.00 $5,330.00 $0.00 $0.00 $0.00 $0.00 Mackem Construction see attache 1 $7,473.00 $0.00 $0.00 $7,473.00 $7,473.00 $0.00 $0.00 $0.00 $0.00 PO Equipment Increase 1 $2,275.00 $0.00 $2,275.00 $0.00 $2,275.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 SCOPE Contractors Subtotal $975.00 $2,275.00 $13,978.63 $0.00 $17,2$0.63 All Labor,Materials and Equipment to Install floor vents,stone, Sales Tax $176.31 $176.31 insulation,concrete slab,concrete ramp at the Freezer only and 4'X Payroll&WC Insurance 37% $360.75 $360.75 18'concrete condensing unit pad. Includes Quartz Aggregate Epoxy Contractors Total Cost $17,765.69 floor and base finish in Freezer and Coolers. Overhead&Profit $1,776.57 Payment and Performance Bond $322.45 GL Insurance $69.53 Subtotal $19,934.24 Total Change Proposal Cost $19,934.24 By acceptance of this Cost of Change,the project duration ACCEPTED DATE will,INCREASE 90 days, DECREASE days, REJECTED DATE NOT CHANGE sae[23'-6 �-444!'[tr-0 19 1-1 ,i q xi zi FRI EZER COOLJ R COOLER m PRELIMINARY DRAWING NSF CONSTRUCTION EMBOSSED GALVANIZED FINISH 4- XPS INSULATION c eoclt w X lw " DOORS: 60" X 84" �. `m`wr 80, ar g * PANELS ON= P.O. : Isar - I APPROVE THIS DRAWING SOUTHE AST COOLER CORP. d� �ll��i/• ��tG��� �° ,-,[• FOR MANUFACTURE LITHIA SPRINGS,GA SIGNATURE: SCN_E: DRAWN BY:hU DATE: DATE:OL 212011 APP.BY: phf#I[MUTER-BILT fttit:662-04- 49 Toil F d:t*8Ob-11-39fi6 efr1getdV b Sortrt Ens P-*all,pl+es(omastar-bllt cam*.webtife:iwaiui�riiasttr-bilttor<t WAREHOUSE SELECTION FORCED A[R..VENT -sl(5TE- ATER?BILT INMASSL ED.W>tiLL PANEL ` 'MINIMUM� TH .'REIN'F00G8D #ZE'fE:V4rF.:A iNCB.FLOOR EXI Fi OIT LINE (2?:�"TlilirKLA YERS UC#ETHANE INSULATION `}NIlT1 FiFJIMS.PTAGGERED 130TH Qftr.110.k5 ✓ A'SHED • Ij R-A-t`0 K .P.,VV f1"F�11?ES G. V'El FILL• $Pkceb 0 4'0 CE MfER;I1i1j4XiMUM S NIILVIS' UEEN_YM-09,BAR..M,�R:W..hii MiN{N11rN;36"' APS rLAR .IQ'E3ESl`A4El 9V1TH'1JAP17R.t15 'i►il' Att�r� ou Wau •1=LO.OR rN�uwtl�N i LR k yr' 1..: /',�r�/•...;: r'� $AND W1TH.HeA"t'" EXISTING-FLOOR w � 1 AH spedfca6i mswbie¢t•to change without 00m,-'P-.02 B&D Drywall & Acoustical, Inc. WBE 3800 Oak Grove Ave. Greensboro NC, 27405 Ph: 336-273-7595 Fax: 336-273-7595 Mobil: 336-240-6881 Date: 5/4/2011 To: Morlando Construction, LLC Att: Dominic Project: Piedmont Food Building Change Order 1. Add 6"x 2" - 16 ga track drill 1/4" holes 6" on center both sides of track and fastened to the freezer floor 20' in length by 4' on center Material $480.63 Labor $695.00 Total $1,175.63 Thank You Betty Presnell I� 1 Thursday MaEy,d,kJ4.0k-42,Rif Skyrook nstruatk►n U4.,s�10=268=s1 0� p,4I �x ab�kllm :a�gryl(Ujln�UfUI IIIIIU�11�ghlUlp2$?� 4 titfq "ram €�Ilirl i� 2 's t�c�oc:t. �i� t �t2f►�!otl�y:tn}aa�6it�uE IIII��tl �IIUU ttustiaiti r Enforrrl tote - ftto)act t4ormalien r a `.lr: >wt e�tlo;t iof�0ii �Fls}urrivi :Ct� ;j.40,4 :N?O# �?1 R adl.#� tsF 4029�s alh9�hiib 10. , '. S11& Dr Wotk Pfotii: '7d �4�N ,4�Ilfri s Y Rc3 att OW Oki .r�-��naal(nfa7'�'+Hfi1�rw x. •'Ni F„„� ''�4�'4'�fi It 'F'�,��`rliSH Ei11!lt�ti?� N��M��SO 000 0410: f�OW# **'4 v�ItAY Itvih' LOot�FLOP, Ir Iitx6l` 11D k aet8grii� �Tf�o l f�i� � q��+►ttR� uh[I: ;4 P:.r.l6. i Qa iIrnVI 'p r'pu ns WQ D,Mftgil u l�fl1'WRCAM PXP T bRon;[ QQ ;�f���`tt 0 AQ., .. �u W�l,tc+r p�drintrtfoti n' ��►za . I?urcMas�a. f�l� > �fya� �p�r!;tnia I�i%t►►tEY i�bk I���• gmwj�topaa�'�Inbutiffvn,VapoF wtsrtaly Cof Itant: cta►ggpry '!'p�.7�flt$ ii►.t�f►t11Y W plot: ug friadoi[hvfiri. iorilerrytte� W'rip':c1tio`b',y!Iirtf' ,�h. c4fiEG'`°rv+ Y[uitht 'orktNXll.ittlxt%pttg�!t4k-�4a!tsti (e; #00 tl 009 M' tto kh, s rtd M b jldf6 flq t6I ERt klr .16v t w,syabioa�an Tn a ful Rrt � d cif habff! Cor'ai spprnp laftr asd i ►t£vatr n rl t ah'd'remei fs a ioiit+[n.t er�h a�altna Unt im cr �i�Telf31:3ade WOO ddntrMt� 'Any.�ll�atrru4��►c�rt�►�fe��tb,�fro�i d�e'•�#��q;a���lilputYO.I;�n+�aivlfi�. �t�'nob't�r M!t. �g aH+soutwd�rr�yntp�i ilrlitt�ri i>�'drg��iFtt�'in"1!bax'�3i�ia an�x�a afa���+�r,a,�d�sb ttta��t��ti��Pk��grepm��t���t�,gai►t'�.�n�' k���asa3�ents`�rvtiiayg pejrrsncf.titir�ontral,,c�vs�tif�r.}o star bra;,,toy?1�tRS1,�nda��rnar��.��rYthsy!�nd��pan.a,>�rrrt3w,rrt�1� ��. �a.���tr�s��dn.�n�t?aria.t.t��ttf�tnsf��c�;�n��'a►!n twt IUor t�iiuer �KY�rvtilt'GCJ`lsi�l7� 4Nlf,�±: Pro p#plIC`r .EiC GlNi3T 1 IAN r~1 ,. Asd'4 0! Y MORMANDO CONSTRUCTION 8604 Cliff Cameron Drive,Suite 155,Charlotte,NC 28269 Phone:704.547.5058 Fax:704.547.6217 Extra for field coordination for work associated with the installation of the Freezer Floor concrete work and Epoxy work at freezer and coolers. Tim Knight-30 hours at$32,50/hour=$975.00 Mackem Construction, LLC Bid Proposal PO Box 1205 Carrboro, NC 27510 Date Estimate# 6/15/2011 1973-73 Morlando Construction,LLC 8604 Cliff Cameron Drive Suite 155 Charlotte,NC 28269 Project: Description Total Su ns x co a Supply and install a Quartz aggregate broad cast epoxy floor system in freezer(1)and coolers(2) 5,320.00 Supply and install a epoxy base in freezer(1)and coolers(2) 2,153.00 Total $16,148.30 COST OF CHANGE WORKSHEET COC# 016 Morlando Construction,LLC MC Project#: 1003 Prepared By: Dominic Morlando Date:7/22/2011 Project:Piedmont Food Architect:Corley Redfoot Zack Unit Cost Description Qty Unit Labor Materials Sub Labor Material Subcontract Equipment Total $0.00 $0.00 $0.00 $0.00 Quality Refrigeration(see attached) 1 $9,098.00 $0.00 $0.00 $9,098.00 $9,098.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1 0.00 1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 SCOPE: Contractors Subtotal $0.00 $0.00 $9,098.00 $0.00 $9,098.00 All Labor,Materials and Equipment to Install the down stream Sales Tax MAMA $0.00 $0.00 electrical per attached quote. Payroll&WC Insurance 37% $0.00 $0.00 As agreed,there will be no fees paid by the GC for any utilities used Contractors Total Cost $9,098.00 on this project during construction. Overhead&Profit $0.00 Payment and Performance Bond $150.12 GL Insurance $32.37 Subtotal $9,280.49 Total Change Proposal Cost $9,280.49 By acceptance of this Cost of Change,the project duration ACCEPTED DATE will,INCREASE days, DECREASE days, REJECTED DATE NOT CHANGE JUL.16.201.1 1=aiPP1 OFb4NZ CTY PLRCH . Pay•Lao Esfdmalm sit omweit o w xo�set��ztz� 336.785-W Pitons �f19V�atI s11i� Nwa/Afty r 8 pTc CLOW COLD", MCFWANQALMV)M P"RA$d 1pos"1181 .- Emhwmkm MN ►osW FIX Noon MI ► Z- a:ApMt NO 1 * RAP TO 14•L AM14- 3.SO LAW Co wr f MAMMA CWK Cod d 12 p�aIft Aw 7t b Madrtt acmom*- or dwst&e ooW@d BWALLATMLASM boat mbe i 14A OMW ow"12 pup wbe hwAsda odltiMCmom lostaulas of ow"a000* kodmn oteorooata o-disWoOmmumbd Mrboi ripe l�! . Ftill�r�oratiaa oa0/rot�0 800m diiwmoat pmt Dlroordt+Sp�Epo�idN vi'� Wf I I ym bubo btu( x,0®8.14 ow"Tax (O.QQ) !C pp TOW, { COST OF CHANGE WORKSHEET COC# 017R Morlando Construction,LLC MC Project#: 1003 Prepared By: Dominic Morlando Date:8/1812011 Project:Piedmont Food Architect:Corley Redfoot Zack Unit Cost Description Q Unit Labor Materials Sub Labor Material Subcontract Equipment Total $0.00 $0.00 $0.00 $0.00 Bill Muncy Electrical(see attached) 1 $3,871.01 $0.00 $0.00 $3,871.01 $3,871.01 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 SCOPE: Contractors Subtotal $0.00 $0.00 $3,871.01 $0.00 $3,871.01 All Labor,Materials and Equipment to Install the electrical Sales Tax r3 °' $0.00 $0.00 connections and circuits per attached quote for field memo#004 and Payroll&WC Insurance 37% $0.00 ' a, $0.00 revisions. Contractors Total Cost $3,871.01 Overhead&Profit J I $387.10 Payment and Performance Bond $70.26 GL Insurance � � ®� �i �� � � $15.15 Subtotal F ��� $4,343.52 Total Change Proposal Cost $4,343.52 By acceptance of this Cost of Change,the project duration ACCEPTED DATE will,INCREASE days, DECREASE days, REJECTED DATE NOT CHANGE EWE Bill Muncy Electric PO Box 532 Mooresville, NC 28031 Office (704) 895-6200 Fax (704) 895-6283 Lic. 17688 Date: 8/18/2011 To: Morlando Construction Re: BME Proposal for Piedmont Food Project Dominic, per field memo #004 and the revisions that you sent to me, I quote a lump sum price of$3871.01 for the electrical portion as outlined below. The breakout is; Labor-38 hours at $48/hour (2 men, 2 days)=$1824.00 Material-$1573.18. I have attached our suppliers quote Tax-$121.92 Profit-$351.91. Total-$3871.01 If you have any questions please call. Thank You, Tom Murph 704-657-0066 cell DESCO INC Mooresville Quotation 260 Rolling Hills Road Lake Side Industrial Park -- - �- Mooresville NC 28117 : 1?QFE flAT ....... 704663-1633 Fax 704-663-2997 08/05/11 S 17 9 9 5 9 0 ORDER T0: ......._.......... .._............... D6SCO INC Mooresville -T- 260 Rolling Hills Road Lake side Industrial Park 1 Mooresville NC 26117 QUOTE TO: SHIP TO: BILL M ELECTRIC BILL M ELECTRIC P.O. BOX 532 P.O. BOX 532 MOORESVILLE, NC 28115 MOORESVILLE, NC 28115 ��tSfD4fEB t1�fM&EK �f53QMBR Q�DRR NUMBER �{EkE�C�E SIUN�ER SAI $PE $Bft 4134 PIEDMONT FOOD & AG _ Brian Taylor _— — _:�F.. ...T.�....Q... NREFER ..... vTa .......:. :::::::;:•::.•::•:.::: :: HIE:;RAT :: .::.R� GN.. ? k.:•....... Brian Taylor 10 10TH NET 25TH 07/22/11 No -- - - - - - .fir. -r - - ::::::: : i:.:...N# . > St RPER•:4f v:::: 2:::>;2; A.f?3:::1f4.::•::: .....RTY3 ;!?siZ L:::.f ......... ............................. 120ea 11880 EMTl 0.805 96 .62 1 INCH EMT CONDUIT 8ea 7035 C-H652 0 .560 4 .48 1 EMT CMP CONN 24ea 7375 C-H662 0.685 16 .44 1 EMP CMP CPL 500ea 1711 THH-10-STD-GRN 0 .281 140.73 10 THHN STRANDED GREEN 1000ea 29925 THH-6-STD-BLK-R1000 0 .654 654 .08 6 THHN STRANDED BLACK J1000 2ea 27824 NNO 330 .413 660 .83 SIEMENS BQ3B02500S01 3P60A SHUNT TRIP BOLT ON BRKR TAXES NOT INCLUDED ------------------- ---- ------ ------- ----- ------------------- --------- ----------------- --- ----------------------- * This is a quotation * Subtotal 1573.18 Prices are firm for 30 days S&H CHGS 0 .00 Except for WIRE, CONDUIT and MC CABLE. ______________________ Applicable taxes extra! _-,mount_-Due 1573 .18 1 1 1 Corley Redfoot Zack, Inc. Field Memo/Project Instructions May 27, 2011 Page 1 Telephone 919-401-8586 Telefax 919-493-7306 Job#: 0910 Field Memo#: 004 No. of Pages: I Job Name: Piedmont Food &Agricultural Processing g Orange County,NC Sent to: Dominic Morlando—Morlando Construction From: Chris Ford Please provide a cost proposal for any change in your respective scopes of work as outlined in the field memo documents described below and as attached. Also please notify the Designer in writing if there is no effect by this field memo on your scope of work. Please contact the Designer if you have any questions regarding this field memo. Provide power for the 208-3ph-17.0 kva electric fryer per the data below. There is no plug on either of the two cords. They will have to be added by the installer(county)or wired directly. The two new required circuits should come into the hood equipment chase at the location of the gas fryer which the electric replaces. The 2 fryer breakers will be 3-pole, 25 Amp. Use these circuits from the KI panel: 37, 39,41—fryer#1 with 5#10* wiring in 3/4"conduit 43 —Shunt trip 45,47, 49—fryer#I with 5#10* wiring in 3/4" conduit 51 —Shunt trip Cc: Jeff Thompson David Taylor Richard Drake This Field Memo/Project Instruction does not constitute approval of any additional cost or time which a Contractor feels he may be due as a result of this communication from the Designer. All requests for additional monies or time must be submitted and approved per the Contract Documents for the project referenced above. Chris Ford From: Chris Ford Sent: Thursday,August 04, 2011 1:11 PM To: 'Dominic Morlando'; Timothy Knight Cc: 'Dick Drake' Subject: PFAP Double Fryer-Revised Power Dominic, Below are the revised requirements for power to the double fryer.The wire sizes are larger,so I'm sure Muncy will drop his pricel Let me know how it shakes out, but this should get you going. Thanks. Use these circuits from the K1 panel: Ckts 37,39,41—fryer#1 -60A breaker with 4#6, 1#10"wiring in 1"conduit Ckt 43—shunt trip Ckts 45,47,49—fryer#2-60A breaker with 4#6, 1#10*wiring in 1"conduit Ckt 51 —shunt trip CHRIS FORD CONSTRUCTION ADMINISTRATOR CORLEY REDFOOT ZACK IiNC 222 CLOISTER COURT CHAPEL HILL, NC 27514 (91 9) 201-0892-CELL (91 9)401-8586 EXT. 37-OFFICE (91 9) 493-7306-FAX W W W,CORLEYREDFOO"I-ZAC K.COM UU Ulm CORLEY REDFOOT ZACKINOC ARCHITECTS • ENGINEERS • PLANNERS December 20, 2011 GLENN D.CORLEY,AIA Orange County, NC Chairman Mr. Jeff Thompson KENNETH E.REDFOOT,AIR g President 131 West Margaret Lane MICHAEL L.HAMMERSLEY,PE Hillsborough, NC 27278 Partner ANDREW R.CRUICKSHANK,AIA Re: Piedmont Food and Agricultural Processing Partner Change Order Submittal DAVID M.TAYLOR,AIA Partner KIMBERLY D.BUFF,AIA Dear Mr. Thompson, Associate LAURENCE W.BUNCH,AIA The attached change orders represent the total approved Associate added costs for this project. As you will recall, the initial HARRY te M. change ENSE" Associate items were included in deduct ch a order#1 at the end of KENNETHE.SMITH April, but the contractor agreed to wait and do one deduct Associate change order later to capture all changes. That decision was based on the assumption that that project would be completed during May. Subsequent to that time, additional scope related to the cold-chain has been included in the project as contingency funds became available. It has taken several months to receive an accurate accounting of the costs and that last submission was received in late November.After that time these have been several revisions and adjustments required PO Box 2368 of the contractor to reflect accurate costs, per prior Chapel Hill,NC 27515-2368 agreements. 222 Cloister Court Chapel Hill,NC 27514-2212 Please review and process Change Order#1 and#2. We will return the submitted application for payment#9 and have it resubmitted to include the change order costs. Sincerely YEARS Chris F'or Construction Administrator (919) 401-8586 Telephone (919) 493-7306 Fax www.corleyred.footzack.com