Loading...
HomeMy WebLinkAbout2011-362 Planning - Terracon Consultants, Inc. for Buckhorn Efland Phase 2 Sanitary Sewer Construction Materials Testing .kt c - zi-�i [Departmental Use Only] TITLE Efland Sewer CMT NORTH CAROLINA FY FY2011-12 SERVICES AGREEMENT UNDER $90,000.00 ORANGE COUNTY RFP — NO REIMBURSABLE EXPENSES This Services Agreement (hereinafter "Agreement"), made and entered into this 21st day of November, 2011, ("Effective Date") by and between Orange County, North Carolina a body politic and corporate of the State of North Carolina (hereinafter, the "County") and Terracon Consultants, Inc., (hereinafter,the "Provider"). WITNESSETH: That the County and Provider, for the consideration herein named, do hereby agree as follows: 1. Services a. Scope of Work. i) This Services Agreement ("Agreement") is for professional services to be rendered by Provider to County with respect to (insert type of project): Buckhorn- Efland Phase 2 Sanitary Sewer Construction Materials Testing. ii) By executing this Agreement, the Provider represents and agrees that Provider is qualified to perform and fully capable of performing and providing the services required or necessary under this Agreement in a fully competent, professional and timely manner. iii) Time is of the essence with respect to this Agreement. iv) The services to be performed under this Agreement consist of Basic Services, as described and designated in Section 3 hereof. Compensation to the Provider for Basic Services under this Agreement shall be as set forth herein. 2. Responsibilities of the Provider a. Services to be provided. The Provider shall provide the County with all services required in Section 3 to satisfactorily complete the Project within the time limitations set forth herein and in accordance with the highest professional standards. b. Standard of Care. i) The Provider shall exercise reasonable care and diligence in performing services under this Agreement in accordance with the highest generally accepted standards of this type of Provider practice throughout the United States and in accordance with applicable federal, state and local laws and regulations applicable to the Revised 11/30/11 1 ii) The Basic Services will be performed by the Provider in accordance with the following schedule: (Insert task list and milestone dates) Task Milestone Date 1. Structural Fill Testing throughout project on as as-requested basis 2. Foundation subgrade inspections it " 3. Concrete testing 4. Field asphalt testing it 5. Utility backfilling testing it 6. Engineering&report review it 7. NA 8. NA 9. NA 10. NA iii) Shetild CoupAy Jetefmine that Pfevider- has net met the Milestone Dates established i c + 3( v••) County 1, 11 +•f n a of L failtffe to meet the Milesteiie Da4e. The��.__.. —.._R........r... aaa v��bi Vii J\u.J`llh ----- ---- u iay, at As diser-etliej * le the Pr-evi payment without penalty antil saeh tif=c-fls Pr-e-r'idef-eufes the br-eaeh. in the wider-'s failufe to fneet ffiqy, Milestone Date the Gotmty may edi fJ the Milestone n .e sehedule. oneuld Provider- its 1 cprcacn+u+rvza-fail-to♦illllll JV days, e sehedule, J J J- tefminate this Agfeement in vff4fiiig, widioiat qty eLig +ieff toPfeyidef. This seetion shall + be 4. Duration of Services a. Term. The term of this Agreement shall be from 12/5/2011 to 12/31/2012. 1. aeh-p-di l;,.,. of Se,..,:ee it The Pr-evider- shall t, ,1 le and per-f his „e+;_.:f es in a time,__manaer- so as-to yne t the Milestone Dates l + r C + - 2 • ) Su e ,li the fe .+. deter-mine that the Provider- ks-behind se edul f + may the P..e „ae.. to expedite-and-aeeeler-ate-his e€€et4s, ineluding pr- resetffees--and weFk4ng-evei4i e, as neees to per-fefm his *aeeefdanee v� to appr-eyed pr-eject se caaie at no additional eestte t iii) The-c efii eneeffi +r Date or-the Provider's Basie Ser-yiees shall be 5. Compensation a. Compensation for Basic Services. Compensation for Basic Services shall include all compensation due the Provider from the County for all services under this Agreement. The maximum amount payable for Basic Services is Thirty Five Thousand Two Hundred Ten Dollars Dollars ($35,210). In the event the amount stated on an invoice is Revised 11/30/11 3 C. Limits of Coverage. Minimum limits of insurance coverage shall be as follows: INSURANCE DESCRIPTION MINIMUM REQUIRED COVERAGE • Worker's Compensation Limits for Coverage A- Statutory State of N.C. Coverage B - Employers Liability $500,000 each accident and policy limit and disease each employee • Commercial General Liability $1,000,000 Each Occurrence; $2,000,000 Aggregate. • Automobile Liability Combined Single Limit$500,000 • Professional Liability a ,, D , r a •f appheable. $ 1,000,000 per claim and aggregate. d. Additional Insured. All insurance policies (with the exception of Worker's Compensation and Professional Liability) required under this Agreement shall name the County as an additional insured party. Evidence of such insurance shall be furnished to the County, together with evidence that each policy provides the County with not less than thirty (30) days prior written notice of any cancellation, non-renewal or reduction of coverage. 8. Indemnity a. Indemnity. The Provider agrees to defend, indemnify and hold harmless the County from all loss, liability, claims or expense, including attorney's fees, arising out of or related to the Project and arising from bodily injury including death or property damage to any person or persons caused in whole or in part by the negligence or misconduct of the Provider except to the extent same are caused by the negligence or willful misconduct of the County. It is the intent of this provision to require the Provider to indemnify the County to the fullest extent permitted under North Carolina law. 9. Amendments to the Agreement a. Changes in Basic Services. Changes in the Basic Services and entitlement to additional compensation or a change in duration of this Agreement shall be made by a written Amendment to this Agreement executed by the County and the Provider. The Provider shall proceed to perform the Services required by the Amendment only after receiving a fully executed Amendment from the County. 10. Termination a. Termination for Convenience of the County. This Agreement may be terminated without cause by the County and for its convenience upon seven (7) days prior written notice to the Provider. b. Other Termination. The Provider may terminate this Agreement based upon the County's material breach of this Agreement; provided, the County has not taken all reasonable Revised 11/30/11 5 f. Ownership of Work Product. Should Provider's performance of this Agreement generate documents, items or things that are specific to this Project such documents, items or things shall become the property of the County and may be used on any other project without additional compensation to the Provider. The use of the documents, items or things by the County or by any person or entity for any purpose other than the Project as set forth in this Agreement shall be at the full risk of the County. g. Non-Appropriation. Provider acknowledges that County is a governmental entity, and the validity of this Agreement is based upon the availability of public funding under the authority of its statutory mandate. In the event that public funds are unavailable and not appropriated for the performance of County's obligations under this Agreement, then this Agreement shall automatically expire without penalty to County immediately upon written notice to Provider of the unavailability and non-appropriation of public funds. It is expressly agreed that County shall not activate this non-appropriation provision for its convenience or to circumvent the requirements of this Agreement, but only as an emergency fiscal measure during a substantial fiscal crisis. In the event of a change in the County's statutory authority, mandate and/or mandated functions, by state and/or federal legislative or regulatory action, which adversely affects County's authority to continue its obligations under this Agreement, then this Agreement shall automatically terminate without penalty to County upon written notice to Provider of such limitation or change in County's legal authority. h. Notices. Any notice required by this Agreement shall be in writing and delivered by certified or registered mail, return receipt requested to the following: Orange County Provider's Name &Address Attention: Pam Jones Terracon Consultants, Inc. P.O. Box 8181 5240 Greens Dairy Road Hillsborough,NC 27278 Raleigh,NC 27616 i. Supplemental Terms and Conditions are attached and incorporated herein IN WITNESS WHEREOF, the Parties, by and through their authorized agents, have hereunder set their hands and seal, all as of the day and year first above written. ORANGE COUNTY: PROVIDER: Terracon Co7 ltants, Inc. By: By: -- � -- Frank C ' on, M ag r Printed Name an Title Revised 11/28/11 7 This instrument has been approved as to technical content. AW Pamela Joe Director This instrument has been pre-audited in the manner required by the Local Government Budget and Fiscal Control Act. Ac,, . 'j, 41— Office of the Finance Director This instrument has been approved as to form and legal sufficiency. Vice of the County Attorney Revised 11/30/11 8 Orange County North Carolina Terracon Consultants, Inc. Suanlemental Terms and Conditions: Consequential Damages. Neither party shall be liable to the other for loss of profits or revenue; loss of use or opportunity; loss of good will; cost of substitute facilities, goods, or services; cost of capital; or for any special, consequential, indirect,punitive, or exemplary damages. TestinL and Observations Client understands that testing and observation are discrete sampling procedures, and that such procedures indicate conditions only at the depths, locations, and times the procedures were performed. Consultant will provide test results and opinions based on tests and field observations only for the work tested. Client understands that testing and observation are not continuous or exhaustive, and are conducted to reduce - not eliminate - project risk. Client agrees to the level or amount of testing performed and the associated risk. Client is responsible(even if delegated to contractor) for requesting services, and notifying and scheduling Consultant so Consultant can perform these Services. Consultant is not responsible for damages caused by services not performed due to a failure to request or schedule Consultant's services. Consultant shall not be responsible for the quality and completeness of Client's contractor's work or their adherence to the project documents, and Consultant's performance of testing and observation services shall not relieve Client's contractor in any way from its responsibility for defects discovered in its work, or create a warranty or guarantee. Consultant will not supervise or direct the work performed by Client's contractor or its subcontractors and is not responsible for their means and methods. Warranty. CONSULTANT MAKES NO WARRANTIES OR GUARANTEES, EXPRESS OR IMPLIED, RELATING TO CONSULTANT'S SERVICES AND CONSULTANT DISCLAIMS ANY IMPLIED WARRANTIES OR WARRANTIES IMPOSED BY LAW, INCLUDING WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. Safe . Consultant will be responsible for supervision and site safety measures for its own employees,but shall not be responsible for the supervision or health and safety precautions for any third parties, including Client's contractors,subcontractors,or other parties present at the site. i ORANGE COUNTY FINANCIAL SERVICES Clarence Grier, Financial Services Director 200 South Cameron Street, Post Office Box 8181 • Hillsborough, NC • 27278 Phone: 919-245-2453 • Fax: 919-644-3324 REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MATERIALS TESTING SERVICES Central Efland/Northern Buckhorn Sewer Extension— RFQ NO. 5178 SUBMITTALS DUE 5:00 PM EST, Wednesday September 21, 2011 Orange County is seeking proposals from qualified consultants to provide professional services for the above referenced project. A selection panel will review and evaluate proposals and submit a recommendation for a single firm for this project. PROJECT DESCRIPTION The project consists of construction of an extension to the Efland sewer system and an extension of the City of Mebane's sewer system into the Northern Buckhorn community. The work for this Project involves the construction of approximately 5,370 linear feet of 8 inch gravity sanitary sewers to serve the Buckhorn Area north of 1-85 and 19,514 linear feet of 8 inch gravity sewers with a 250 G.P.M. Pump Station and 2,460 linear feet of 6 inch ductile iron force main to serve the Efland Community. Specific items to be addressed are listed below: Submittal Information All respondents are requested to provide the information cited below, as well as any supplemental information that provides a comprehensive view of the firm, the proposed project team and the approach to this project. However, information should be presented in a clear and concise manner. Section I - Information About the Firm 1. Project Organization and Staffing a. Listing of all staff to be assigned to the Project, including detailed resumes for all persons on this list. b. Discuss the responsibilities to be fulfilled by each staff member who will be assigned to the Project. c. Identify current weekly contract commitments of staff to be assigned to the Project. d. Construction is scheduled to begin October 1, 2011 with a contract period of 450 days. Please confirm that your firm will be available to begin testing on that date and be available for the duration of the project e. Provide a listing and brief description of four projects of similar scope and size completed by the firm; provide references and phone numbers for each project; identify staff who were involved in each project. f. Subcontractors - Respondents are expected to present their complete project team in the response, including all subcontractors that may be proposed. Since subcontractor qualifications will be evaluated similarly to the proposing firm's own team, please ensure that complete information is included. 1. Consultant Professional Fees a. Provide hourly rates, unit laboratory testing costs, unit prices and any other billable costs for each service anticipated by the Consultants' proposed Quality control program for this project. Is there a minimum charge? Provide unit costs for each specific field and laboratory test Section II: Project Manaaement Approach Each respondent must describe their proposed plan for testing and inspection to assist the designers and Owner in assuring a high standard of quality is achieved. The following key items of work are to be included in the Quality Control Plan along with any additional items deemed appropriate by the testing and inspection consultant. 1. Soils 2. Foundations(Pump Stations) 3. Cast-in-Place Concrete(as required by the proiect specifications) 4. Hot Mix Asphalt Paving(as required by the proiect specifications) Section III: Selection Process 1. Procedures similar to those followed by Orange County in the selection of design consultants will be followed. This will insure the testing and inspection consultant is selected in a fair and uniform manner and that the firm selected for the Project has appropriate qualifications and experience on similar projects. The proposal packages submitted by consultants will be reviewed in detail. If County staff deem it to be in the best interest of the county, interviews may be held with the finalists. A selection committee will evaluate each proposal and make a final selection of the Consultant with whom to enter contract negotiations. In the event negotiations of specific contract terms and conditions proves unsuccessful with this firm, the committee will select another firm with which to begin contract negotiations. 2. Evaluation Criteria The following criteria will be the basis on which consultants will be selected for further consideration: a. Expertise and past performance on similar projects b. Qualifications and experience of consultant's personnel to be assigned to the Project. c. Current workload of consultant's personnel. d. Proposed Quality Control Plan for the Project. e. Proximity to and familiarity with the area where the project is located. f. Consultants unit rates for performing required work. g. Other factors that may be appropriate for the Project. 2 Section IV: SUBMISSION OF PROPOSALS 1. Proposals must be submitted no later than 5:00PM—local time, Wednesday September 21, 2011 to: David E Cannell, Purchasing Agent Financial Services 200 South Cameron Street PO Box 8181 Hillsborough, NC 27278 2. Proposals shall include statements of interest, ability to complete the work within the required time, experience, and qualifications. All qualified firms are invited to submit proposals; one (1) hard copy is required (clearly marked "ORIGINAL") and two (2) copies on either thumb drives or CD's. Hard copy must be bound with printing on both sides of sheet on recycled paper with the exception of tab or divider pages. The electronic file shall be in pdf format and shall be a single file. 3. Proposals received after the set time for receipt shall not be considered and shall be returned unopened to the proposer. 4. Orange County reserves the right to accept or reject any or all proposals, to waive irregularities, and to reissue any request for proposals. 5. Any questions concerning the technical aspects of this project should be directed to: Mr. David Cannell Purchasing Agent PO Box 8181 Hillsborough, NC 27278 (919) 245-2651 Email: dcannell @co.orange.nc.us (PREFERED) 6. By submitting a proposal response, the offeror agrees that it shall not be withdrawn for a period of 90 days following the due date for proposal responses. 3 ,rah' N s D 5240 Green's Dairy Road [919]873 2211 pq f � y }u� c5� 1 a r .y ,z a } r, Nv B Raleigh, • • terracon.com • • f FIFFI UMMI Y September 21, 2011 Irerracon Mr. David Cannell Purchasing Agent Orange County Financial Services 200 South Cameron Street Hillsborough, NC 27278 Re: Statement of Qualifications to Provide Construction Material Testing Services Central Efland/Northern Buckhorn Sewer Extension Orange County, NC Dear Mr. Cannell, Terracon Consultants, Inc. (Terracon) is pleased to submit this Statement of Qualifications to Orange County to provide Construction Material Testing services during construction of the Central Efland/Northern Buckhorn Sewer Extension project. Terracon has over twenty (20) certified technician, inspectors and engineers based out of our Raleigh office. Our technicians and inspectors are certified through the American Concrete institute (ACI), National Institute for Certification of Engineering Technicians (NICET), International Code Council (ICC), North Carolina Department of Transportation (NCDOT), and the American Welding Society (AWS). The materials testing lab of our Raleigh office meets the requirements of ASTM E329, is accredited through AMRL and CCRL for AASHTO R18, and is certified through the United States Corps of Engineers (USCOE) and North Carolina Department of Transportation (NCDOT). Terracon has provided testing services on 1,000's of projects in the Raleigh area. Terracon is familiar with the testing and inspection requirements of the City of Raleigh and Wake County. Terracon has provided testing and inspection services on many of the major projects in the area, such as the City of Raleigh Convention Center and the Wake County Justice Center. Terracon has also provided testing and inspection services on several utility installation projects including: • Bolin Creek Interceptor Phase 3 • SE Beaverdam Creek Interceptor Rehabilitation • Dempsey Benton Phase 3 • Pettigrew Street Sewer Line • Lower Crabtree Creek Interceptor Terracon is also unique in our commitment to report turnaround times. Daily reports will be distributed electronically (via email or project document website). We will distribute all finalized reports within 5 days of the date of service and any reports that document non-conformances within 24 hours or less. We will also maintain a log of non-conforming items at the job site, so that deficient work will not be overlooked or covered, prior to being addressed. Terracon Consultants, Inc. 5240 Greens Dairy Road Raleigh, NC 27616 P [919] 873 2211 F [919] 873 9555 terracon.com Statement of Qualifications for Construction Materials Testing Services Irerracon Central Efland/Northern Buckhorn Sewer Extension a Orange County, NC September 21, 2011 a Terracon Proposal No. P70110416 Our Raleigh office is within 45 minutes of the project site. We will be able to make a quick response should circumstances require us to be on site on short notice. We appreciate the opportunity to submit this Statement of Qualifications to provide services to Orange County, and we value your consideration. If you have any questions or would like additional information, please feel free to contact us at (919) 873-2211. Sincerely, TERRACON CONSULTANTS, INC .0 ' ...Gg� J. Aaron Ezzell, PG, El Aaro C. Layn E Project Manager Senior Associate Office Manager Reliable a Resourceful a Responsive I rerracon TABLE OF CONTENTS PROJECTSTAFF ................................................................................................1 CURRENT CONTRACT COMMITMENTS ...........................................................6 FIRM AVAILABILITY ...........................................................................................6 SIMILAR PROJECT EXPERIENCE.....................................................................7 CONSULTANT PROFESSIONAL FEES..............................................................9 PROJECT MANAGEMENT APPROACH ..........................................................10 PROXIMITY TO AND FAMILIARITY WITH THE PROJECT AREA...................11 Statement of Qualifications for Construction Material Testing Services Irerracon Central Efland/Northem Buckhorn Sewer Extension Orange County,NC September 21,2011 u Terracon Proposal No.P70110416 PROJECT STAFF CONSTRUCTION MATERIALS TESTING PROJECT TEAM Construction services is Terracon's largest in-house service line, and the Raleigh office boasts a staff of over 25 highly trained and experienced technicians, inspectors and professional staff that are familiar and comfortable working with both private and public sector clients. We propose to utilize the following personnel on this contract: J. Aaron Ezzell, PG, El— Mr. Ezzell will serve as the Project Manager for the Terracon project team. Mr. Ezzell is a CMT Project Manager in Terracon's Raleigh office, and he has over ten years of experience managing and performing field and laboratory testing of soils, concrete, and asphalt. Mr. Ezzell has managed materials testing projects for NC State University, the Town of Cary, Wake County, Wake County Public Schools, Wake Technical Community College, and East Carolina University. Mr. Ezzell will be the primary point of contact between Orange County and Terracon, and he will be responsible for the overall administration and execution of the project. The following are brief resume summaries for other key materials testing professionals: Scott Rist—Mr. Rist has over nine years of experience performing construction inspections and testing services and has been involved in the past Buried Utility Installation projects listed in the "Similar Project Experience" section. He is an International Code Council (ICC) certified Reinforced Concrete Special Inspector and is also NICET Level I certified in soils and concrete. He performs general construction inspection and field and laboratory construction materials testing, including monitoring of structural backfill and fill placement. Mr. Rist also performs on- site soil compaction tests using sand-cone, drive-tube and nuclear gauge test methods, and field sampling and testing of fresh concrete. Mr. Rist will serve as the lead engineering technician for this project. David Duffy- Mr. Duffy has over five years of experience in construction materials testing, with specialized laboratory and field testing experience. He is an ICC certified Reinforced Masonry Special Inspector and NICET Level II certified in Soils, Concrete, and Asphalt. Mr. Duffy will serve as a supplemental engineering technician, if needed, for this project. Stephanie Hardison - Ms. Hardison is the Laboratory Manager in Terracon's Raleigh office, and she has over ten years of experience performing construction materials testing and inspection. She manages, coordinates, and/or performs all laboratory testing to supplement the office workload. Ms. Hardison ensures continued certification of the Raleigh laboratory by the North Carolina Department of Transportation (NCDOT), the Army Corps of Engineers (COE), and the American Association of State Highway and Transportation Officials (AASHTO). Ms. Hardison will be responsible for overseeing all laboratory testing for this project. We do not propose to utilize any sub-consultants or sub-contractors for this contract. Reliable n.Resourceful a B.esponsive 1 Y AARON EZZELL, El, PG Irerracon CMT PROJECT MANAGER PROFESSIONAL EXPERIENCE EDUCATION Mr. Ezzell has over 9 years of experience, and serves as a CMT Project Bachelor of Science, Geology, 2000,North Carolina State Manager in Terracon's Raleigh office. His project management experience University includes general construction inspection and field and laboratory construction materials testing, including monitoring and inspections of roadway and bridge construction. REGIS MAVONS Mr. Ezzell is a Professional Geologist and has experience conducting professional Geologist,NC, geotechnical investigations and managing drilling operations. No. 2073 Engineering Intern, NC PROJECT EXPERIENCE Walnut Creek Elementary School, Raleigh, NC: Project Manager for the special inspections and materials testing program for the construction of a CERTIFICATIONS new Elementary School in Raleigh, NC. Project includes the construction NCDOT Concrete Field Technician of a new 102,497 SF elementary school consisting of a one-story NCDOT PC Concrete Pavement administration and services wing, and two and three-story classroom wings. Technician NCDOT Conventional Density Wake County Justice Center, Raleigh, NC: Project Manager responsible Technician for supervising the special inspections and materials testing program for a NCDOT Trenching&Shoring new eleven-story Structural steel framed courthouse located in downtown Nuclear Density Gauge Safety& Raleigh. Operations OSHA Lead-Based Paint Exposure Wake County Parking Deck, Raleigh, NC: Project Manager responsible Hazards for supervising the special inspections and materials testing program for a ACI Concrete Field Testing new nine-story cast-in-place concrete parking deck located in downtown Technician Raleigh. Raleigh Convention Center, Raleigh, NC: Acted as Project Professional as part of Terracon project team performing materials testing and inspections on the construction of the new Raleigh Convention Center. WORK HISTORY Mr. Ezzell was responsible for monitoring the materials testing and the Tenacon,Project Manager, 2001- effects of construction on the surrounding property areas. present NCDOT, Geotechnical Unit-2001 Northern Regional Center, Wake Forest, NC: Project Manager for the construction of a new Wake County government center in Wake Forest. Scope included special inspections, soil, asphalt, and concrete testing. Responsible for coordination of technician schedules and laboratory testing. USA Baseball Complex, Cary, NC: Project Manager for the special inspections and materials testing program for the construction of a new baseball complex in Cary. Project included three practice fields, one partially-covered stadium field with associated retail and concession buildings, parking area, and entrance facilities. Costco Wholesale, Columbia, MD: Project Manager responsible for supervising the special inspections and testing program for the construction of a new 140,000 square-foot Costco retail warehouse in Columbia, Maryland. Responsible for coordination of multiple field technicians on-site and managing project deliverables and ensuring project budget. 2 SCOTT RIST Irerracon SPECIAL INSPECTOR/CMT TECHNICIAN PROFESSIONAL EXPERIENCE EDUCATION Associate Degree,Engineering Mr. Rist has over twelve years of experience performing roadway Technology, 1993,State inspection services and general construction materials testing, both in the University of New York College field and laboratory. His roadway inspection experience includes soil and of Technology ABC compaction testing, and asphalt testing. He also has experience performing soil density testing using sand-cone and drive tube methods as well as testing fresh concrete as per ASTM standards. PROJECT EXPERIENCE CERTIFICATIONS Riverbend Elementary chool Raleigh NC: Mr. Rist is serving as Lead ICI Reinforced Concrete Special ry � 9 g Inspector Technician and Special Inspector for this new, two-story, 104,000 square- NICETLevelI—Soils, Concrete, foot Wake County Elementary School and campus. His special inspections Asphalt responsibilities include reinforced concrete and soils. NCDOT Concrete Field Technician NCDOT PC Concrete Pavement Wake Tech Northern Campus Phase IB, Raleigh, NC: Mr. Rist NCDOT Conventional Density performed soil and concrete testing throughout the construction of this Technician latest phase of the Northern Campus of Wake Tech. NCDOTABC sampling Underground Parkin Deck, Raleigh, NC: Mr. Rist served as Lead NCDOT IntroductiontoAsphalt 9 9 9 � Pavements Technician for the testing program on the construction of a new ACI Concrete Field Technician government complex in Wake Forest. His responsibilities included soil, concrete and reinforcing steel testing / inspection and Special Inspections services to the City of Raleigh. Unique aspects of this project include the below ground construction, excavation next to existing structures, and the use of rock anchors to provide additional uplift resistance of a mat WORK HISTORY foundation at the elevator core. Technician, Ten-acon Consultants, Inc., 1998-Present North Regional Center, Wake Forest, NC: Mr. Rist worked with Wake Allied Security, 1998 County and The Town of Holly Springs to conduct special inspections, Doyle Protective Services, 1997- construction materials testing during the construction of the new 1998 government center in Wake Forest. The project consisted of a single-story US Marine Corps, 1993-1997 steel framed building with brick veneer walls. US 17 Bypass, Wilmington, NC: Transportation Technician performing roadway and asphalt inspections on roadways and bridges. Responsibilities included inspecting piles, footings, columns, rebar, bolts, and decking. Performed concrete sampling and testing, and performed ABD thickness &gradation testing. NCDOT Division 5 CEI, Raleigh-Durham, NC: Transportation Technician responsible for inspections and testing of roadways including trench operations, concrete testing, roadway and asphalt inspections and documentation of pay items. New Hope Bridge, Raleigh, NC: Responsible for asphalt inspections and testing of drilled shaft foundation systems per NCDOT and City of Raleigh specifications for bridge construction. EPA Research Facility, Research Triangle Park, NC: Technician responsible for soil, concrete, and roadway inspections and testing. Project included approximately 6000' of new roadway, two parking decks and seven multi-story office/lab structures. Served as on-site laboratory technician. 3 DAVID DUFFY CMT TECHNICIAN II Irerracon PROFESSIONAL EXPERIENCE CERTIFICATIONS Mr. Duffy has over four years of experience in the construction materials NC Introduction to Asphalt Su pe perpave testing, with specialized laboratory and field testing experience. He NCDOT Portland Paving Concrete performs general construction inspection and field and laboratory FACE F-Number Measurement construction materials testing, including monitoring of structural backfill and NICET—Soils—Level l fill placement. Mr. Duffy also performs on-site soil compaction tests using NICET—Concrete—Level I sand-cone, drive-tube and nuclear gauge test methods, and field sampling ACI Concrete Laboratory and testing of fresh concrete. Technician, Grade 1 Mr. Duffy is proficient in soils, concrete, and asphalt laboratory testing. His soils laboratory experience includes triaxial testing, performing standard and modified proctors, and grain size analysis of soils. WORK HISTORY PROJECT EXPERIENCE Terracon, Raleigh,NC, Engineering Technician, 2005- Walnut Creek Elementary School, Raleigh, NC — Mr. Duffy served as a Present Special Inspector and engineering technician responsible for soils, concrete, and masonry inspections and testing for the new 102,497 sq.ft. S&M Engineering Technician,2004- elementary school project. 2005 Riverbend Elementary School, Raleigh, NC -- Mr. Duffy served as a Special Inspector and engineering technician responsible for soils, concrete, and masonry inspections and testing for the new 104,000 sq.ft. elementary school project. Poe Elementary School, Raleigh, NC -- Mr. Duffy served as the Special Inspector and lead engineering technician responsible for soils, concrete, and masonry inspections and testing for the 3,800 sq.ft. elementary school addition and renovation project. Town of Chapel Hill Operations Center, Chapel Hill, NC — This project consists of the construction of 15 separate buildings, roadways and parking lots. Testing included soil density for buildings, roadways and parking lots; soil bearing testing for foundations; concrete for foundations and slabs; and concrete floor flatness and levelness testing. North Regional Center, Wake Forest, NC: Mr. Duffy performed special inspections and construction materials testing during the construction of the new government center in Wake Forest. The project consisted of a single-story steel framed building with brick veneer walls. Costco Wholesale, Columbia, MD: Mr. Duffy served as field technician for the special inspections and testing program for the construction of a new 140,000 square-foot Costco retail warehouse in Columbia, Maryland. Hatteras Secondary School, NC — The project is an approximately 60,000 square foot addition to the existing school. Testing included soil density for buildings, roadways and parking lots; soil bearing testing for foundations; concrete for foundations and slabs; and concrete floor flatness and levelness testing. Case Farms, Calypso, NC — The project is a new feed mill and included slip-formed concrete silo and mill structures. Testing included soil density for structures and roadways; and concrete for slip-formed silos. 4 STEPHANIE E. HARDISON LABORATORY MANAGER Irerracon PROFESSIONAL EXPERIENCE EDUCATION Bachelor of Arts,Environmental Ms. Hardison has over nine years of experience performing construction Science, 1998, University of materials testing and inspection. She is the Laboratory Manager in North Carolina at Wilmington Terracon's Raleigh, North Carolina office, and is responsible for managing and/or performing all the testing in that office. Ms. Hardison's specific laboratory experience includes the following: CERTIFICATIONS ACI Field Testing Technician— SOils: Grade 1 Moisture Content NCDOT Nuclear Safety and Atterberg Limits Hazardous Materials Training Particle Size Analysis (Hydrometer) NCDOT Concrete Batch Standard&Modified Proctor Technician California Bearing Ratio NCDOT Concrete Mix Design Fraction Passing No, 200 Sieve by Washing Technician NCDOT Concrete Field Technician Aggregate Testing: ACI Laboratory Testing Technician Moisture Content of Aggregate -Grade I Sieve Analysis on Fine & Coarse Aggregate NICET—Soils Level Ill Specific Gravity on Fine & Coarse Aggregate NICET—Asphalt Level 1 Organic Impurities in Fine Aggregates NICET-Concrete Level 11 Concrete Testing: Strength Testing of Concrete, Grout, &Mortar Specimens Strength Testing of Shotcrete Specimens WORK HISTORY Verification of Concrete Mix Designs Terracon,Laboratory Manager, Raleigh,NC, 2003—present Asphalt Testing: Transportation Technician, Density Testing of Asphalt Cores NCDOT, 1997—2003 Other: Density Testing of Fireproofing Samples Soil Sample Classification according to ASTM&AASHTO Classifications PROJECT EXPERIENCE The following are examples of projects in which Ms. Hardison managed all laboratory testing, either in an on-site mobile laboratory or in the Raleigh office laboratory: • New Raleigh Convention Center-Raleigh, NC • Wake County Parking Deck-Raleigh, NC • Wake County Justice Center-Raleigh, NC • Wake Medical Center Parking Deck-Raleigh, NC • QVC Distribution Center & Warehouse Expansion - Edgecombe County, NC • Raleigh Memorial Auditorium-Raleigh, NC • NC State University College of Engineering II-Raleigh, NC • NC State University Vet School-Raleigh, NC • Seymour Johnson Air Force Base • Camp Lejeune Housing • City of Raleigh Underground Parking Deck 5 Statement of Qualifications for Construction Material Testing Services Central Efland/Northern Buckhorn Sewer Extension a Orange County,NC Irerracon September 21,2011 a Terracon Proposal No.P70110416 CURRENT CONTRACT COMMITMENTS The capacity to accomplish the work in the required time requires strong leadership. Our project team personnel have been selected based on past success, demonstrated leadership capabilities, and the ability to manage resources encompassing a broad range of services. Additionally, Terracon has developed the expertise, resources, technical capabilities, and tracking systems to ensure timely completion of assignments on schedule. The following table lists our key personnel and their current contract commitments as percentages of available time: Personnel Current %Time J. Aaron Ezzell, PG, El Committed 60% Scott Rist 25% David Duffy 25% Stephanie Hardison 50% FIRM AVAILABILITY We understand that construction for this project is scheduled to begin by October 1, 2011 with a duration of 450 days. Terracon's personnel will be available to begin testing on that date and will be available for the duration of the project. We have an experienced staff of 20 technicians and engineers to support the project. Scott Rist, our proposed lead technician, will be committed to the project during all phases of construction and Central Efland/Northern Buckhorn Sewer Extension will be his first priority. The remainder of the staff will be available to provide support during phases that may require additional personnel. Reliable a lies-ours eful Rey?p =zsiv 6 Statement of Qualifications for Construction Material Testing Services Irerracon Central Efland/Northern Buckhorn Sewer Extension n Orange County,NC September 21,2011 m Terracon Proposal No.P70110416 SIMILAR PROJECT EXPERIENCE Bolin Creek Interceptor Phase 3 Date: 2010-present Reference: Park Construction Mr. Eric Olsen (919) 369-2236 Staff Involved. Ezzell, Duffy, Hardison Terracon is currently providing proofrolling and soil density testing services to Park Construction for a sewer line installation project in Chapel Hill. The new sewer line is being installed on the centerline of Umstead Drive in Chapel Hill. Observation and testing services are being performed to-ensure that the utility trench backfill is being installed properly and in accordance with Town of Chapel Hill requirements for roadways. SE Beaverdam Creek Interceptor Rehabilitation Date: 2010 Reference: Park Construction Mr. Eric Olson (919) 369-2236 Staff Involved. Ezzell, Rist, Duffy, Hardison Terracon provided soil density testing services to Park Construction for a sewer line installation in Raleigh near Hathaway Street. The project included the lining or replacement of 8,600 If of existing sewer lines. Dempsey Benton Phase 3 Date: 2009 Reference: Park Construction Mr. Toby Chamberlain (919) 812-2615 Staff Involved: Ezzell, Rist, Duffy, Hardison Terracon provided soil and stone aggregate density testing services to Park Construction for utility installation servicing the new City of Raleigh Dempsey Benton Water Treatment Plant. Reliable n Resourceful w Responsive 7 Statement of Qualifications for Construction Material Testing Services Irerracon Central Efland/Northern Buckhom Sewer Extension Orange County,NC September 21,2011 z Terracon Proposal No.P70110416 Black Creek Terminal Date: 2011-Present Reference: Kelley Construction Mr. Jason Fischer (502) 479-6527 Staff Involved. Ezzell, Rist, Duffy, Hardison Terracon is providing soil and stone aggregate density and concrete testing services to Kelley Construction for the new Black Creek Terminal in Wilson, NC. The project consists of the construction of new asphalt storage tanks and the installation of associated rail lines for the new terminal. 8 Statement of Qualifications for Construction Material Testing Services Irerracon Central Efland/Northern Buckhorn Sewer Extension n Orange County,NC September 21,2011 z Terracon Proposal No.P70110416 CONSULTANT PROFESSIONAL FEES Construction Materials Testing Services Raleigh, NC 2011-2012 UNIT RATE FEE SCHEDULE PERSONNEL/FIELD SERVICES 1. Engineering Technician, per hour..........................................................................................$ 40.00 2. Field Special Inspector, per hour...........................................................................................$ 65.00 3. Nuclear Density Gauge, per day............................................................................................$ 35.00 4. Certified Welding Inspector, per hour....................................................................$ 85.00 5. Ultrasonic Testing, per hour................................................................................$ 90.00 6. Coring Crew, per hour(Concrete/Asphalt, includes equipment)..........................................$ 105.00 7. Asphalt Lab or Roadway Technician, per hour.....................................................................$ 65.00 8. Floor Flatness and Levelness testing (Operator and equipment)...................................$ 75.00 9. Project Engineer, per hour.....................................................................................................$ 115.00 10. Project Manager, per hour.....................................................................................................$ 95.00 11. Senior Project Manager, per hour.........................................................................................$ 105.00 12. Principal, per hour..................................................................................................................$ 125.00 SeniorPrincipal, per hour......................................................................................................$ 145.00 14. Clerical, per hour....................................................................................................................$ 45.00 15. Direct Expenses.....................................................................................................................$ 125% 16. Mileage, per mile.................................................................................................................... No Charge LABORATORY SERVICES 1. Percent Fines(Wash 200 sieve), each.................................................................................$ 75.00 2. Sieve Analysis,each..............................................................................................................$ 100.00 3. Particle Size Analysis(With Hydrometer), each....................................................................$ 150.00 4. Natural Moisture Content Test, each.....................................................................................$ 10.00 5. Atterberg Limits Test, each....................................................................................................$ 95.00 6. Standard Proctor Compaction Test, each.............................................................................$ 160.00 7. Modified Proctor Compaction Test, each..............................................................................$ 185.00 8. Standard Proctor Compaction Test(with Rock Correction), each........................................$ 185.00 9. CBR Testing, per point..........................................................................................................$ 200.00 10. Concrete: a) Compressive Strength Testing of 4"x 8"or 6"x 12"Concrete Cylinders,each............$ 14.00 b) Flexural Strength Testing of Concrete Beams...............................................................$ 50.00 c) Compressive Strength Testing of 2"x 2"Mortar Cubes, each......................................$ 14.00 d) Compressive Strength Testing of Grout Prisms, each...................................................$ 50.00 e) Compressive Strength Testing of Concrete Cores, each..............................................$ 50.00 11. Asphalt: a) Thickness and Density Testing, per sample..................................................................$ 50.00 NOTE: A minimum of 2 hours will be charged for all field technician time. Overtime, at a rate of 1.5 time the standard rate, is charged for technician services for time over 8.0 hours per day,hours prior to 8:00 AM and past 5:00 PM and for Saturdays, Sundays, and holidays. Overtime is not applicable to engineering rates. Project administration rates are for report review, etc. The mileage charge includes vehicle mileage between Terracon's Raleigh office and the job site. The quoted rates will be effective from January 1,2011 to December 31,2012. Reliable a Resourceful n Responsive 9 Statement of Qualifications for Construction Material Testing Services Irerracon Central Efland/Northern Buckhorn Sewer Extension in Orange County,NC y September 21,2011 a Terracon Proposal No.P70110416 PROJECT MANAGEMENT APPROACH Signify Presence and Responsibilities at the job site. If required by the building official, Terracon personnel will sign in on the appropriate form posted with the building permit. Observe Assigned Work. Terracon personnel will inspect work for which they are responsible and aware of for conformance with the building department approved (stamped) plans and specifications and applicable provisions of the applicable North Carolina Building Code. Our testing and observation services will be scheduled by the Owner's or Contractor's representative and performed on a part-time, as-requested basis. This scheduling practice in itself will result in lower fees as compared to a full-time site technician. We propose to utilize the listed procedures during testing and observation of the following elements to ensure a high standard of quality control and efficiency: • Soils — The Terracon technician will perform soil density testing using nuclear density gauges. This will reduce site visit durations and result in lower fees. • Foundations & Cast-in-Place Concrete — The same Terracon technician performing foundation testing can also inspect the reinforcing steel and test the concrete, eliminating the need for multiple technician site visits. • Hot Mix Asphalt Paving —The Terracon technician will utilize a nuclear density gauge to test the compaction of in-place hot mix asphalt at the time of placement, eliminating the need for a follow-up coring visit. Fees for mileage and equipment (trip charges)will be included in the hourly personnel rates. Provide Qualified Personnel. Terracon will provide qualified personnel to perform the assigned work. Our proposed staff has the appropriate certifications including: [CC (International Code Council), NICET (National Institute for Certification of Engineering Technologies), ACI (American Concrete Institute), PTI (Post Tension Institute), NCDOT (North Carolina Department of Transportation). Report Nonconforming Items. Terracon personnel will bring nonconforming items to the immediate attention of the contractor. If any such item is not resolved in a timely manner or is about to be incorporated into the work, the design team, the owner and the building official will be notified immediately and the item noted in Terracon's written report. Terracon personnel will write a separate report to be posted at the job site, if requested, regarding noted discrepancies. The report will contain, as a minimum, the following information about each nonconforming item: • Description and exact location • Reference to applicable detail of approved plans/specification • Name and title of each individual notified and method of notification • Resolution or corrective action taken. In addition to communicating non-conformance issues immediately to the designated parties, any non-conformance item that cannot be corrected the same day will be recorded in a non- 10 Statement of Qualifications for Construction Material Testing Services Irerracon Central Efland/Northern Buckhorn Sewer Extension a Orange County,NC September 21,2011 a Terracon Proposal No.P70110416 conformance punch list log. The log will document the date and description of the non-conformance, associated report number of when the non-conformance was noted, action required to clear the item and the date when the item was corrected and cleared. The log will be maintained and tracked by our Project Manager and will be distributed regularly to the designated parties to assure that all items are cleared in a timely fashion. This log will help prevent non-conformances from lingering to a point where they become difficult to correct due to additional construction or obstruct the ability to receive a certificate of occupancy. When all items on our nonconformance log have been resolved, our Project Manager will issue final documentation of compliance for the items covered in our inspection program. Our project manager will track and compile the progress of our testing and inspection activities and submit an interim report. The weekly to bi-weekly report will include a summary of all testing and inspection services performed for the period, any non-conforming items and resolutions, the non-conformance log, copies of testing and inspections reports, and a concrete compressive strength test summary. - Provide Timely Reports. Terracon personnel will complete written inspection reports for each inspection visit and provide the reports on a timely basis. Terracon personnel will furnish these reports directly to the building official, the design team, and others as'designated. These reports will be organized on a daily format and will be electronically submitted every 2 to 5 days. Reports documenting non-conformances will be distributed within 24 hours. These reports will: • Describe inspection and tests made, with applicable location • Indicate how nonconforming items were resolved • List unresolved items, parties notified, time and method of notification In order to achieve better communication and faster turnaround of reporting, we propose to utilize our automated Construction Materials Engineering Laboratory Management System (CMELMSTM) on this project. Data and reports will be electronically entered by field staff each day. A hardcopy of the report can then be printed and personally delivered, sent electronically via e-mail and, if requested, may be posted to a project web site that can be accessed only by approved users. CMELMSTM will also track the budget and produce real-time budget reports. PROXIMITY TO AND FAMILIARITY WITH THE PROJECT AREA Terracon's Raleigh office is located off of Capital Boulevard in North Raleigh, convenient to both 1-440 and 1-540. This contract will be executed by the staff located in our Raleigh office and thus travel time to the project site will be no more than 45 minutes. The majority of our professionals have worked in and around central North Carolina their entire careers and thus are very familiar with the local geography, soils, and corresponding concerns for projects in the area. Reliable a Resourceful a Responsive 11 Y � a N A N WAR' Irerracon Offices Nationwide Employee-Owned October 27, 2011 Mr. David Cannell Irerracon Purchasing Agent Orange County Financial Services 200 South Cameron Street Hillsborough, NC 27278 Re: Proposal to Provide Construction Material Testing Services Central Efland/Northern Buckhorn Sewer Extension Orange County, NC Terracon Proposal No.: P70110416 Dear Mr. Cannell, Terracon Consultants, Inc. (Terracon) is pleased to submit this proposal to Orange County Financial Services to provide Construction Material Testing services during construction of the Central Efland/Northern Buckhorn Sewer Extension project. Terracon has over twenty (20) certified technicians, inspectors and engineers based out of our Raleigh office. Our technicians and. inspectors are certified through the ,American Concrete institute (ACI), National Institute for Certification of Engineering Technicians (NICET),. International Code Council (ICC), North Carolina Department of Transportation (NCDOT), and the American Welding Society(AWS). The materials testing lab of our Raleigh office meets the requirements of ASTM C 1077, E 329, D 3740 and D3666, is accredited through AMRL and CCRL for AASHTO R18, and is certified through the United States Corps of Engineers (USCOE) and North Carolina Department of Transportation (NCDOT). Terracon has provided testing services on 1,00Us of projects in the Raleigh area. Terracon is familiar with the testing and inspection requirements of the City of Raleigh and Wake County. Terracon has provided testing and inspection services on many of the major projects in the area, such as the City of Raleigh Convention Center and the Wake County Justice Center. Terracon has also provided testing and inspection services on several utility installation projects including: • Bolin Creek interceptor Phase 3 • SE Beaverdam Creek Interceptor Rehabilitation • Dempsey Benton Phase 3 • Pettigrew Street Sewer Line Lower Crabtree Creek Interceptor Terracon is also unique in our commitment to report turnaround times. Daily reports will be distributed electronically (via email or project document website). We will distribute all finalized reports within 5 days of the date of service and any reports that document non-conformances within 24 hours or less. We will also maintain a log of non-conforming items at the,job site, so that deficient work will not be overlooked or covered, prior to being addressed. Terracon Consultants, Inc. 5240 Greens Dairy Road Raleigh,NC 27616 P [919] 873 2211 F [919]873 9555 terracon.com Proposal for CMT Services Central Efland/Northern Buckhorn Sewer Extension n Orange County, NC Irerracon October 27, 2011 n Terracon Proposal No. P70110416 Our Raleigh office is within 45 minutes of the project site. We will be able to make a quick response should circumstances require us to be on site on short notice, This proposal includes the following: Exhibit A—PROJECT INFORMATION Exhibit B--PROPOSED SCOPE OF SERVICES Exhibit C—COST ESTIMATE Exhibit D—CERTIFICATE OF INSURANCE SPECIMEN We appreciate the opportunity to submit this proposal to provide services to Orange County Financial Services, and we value your consideration. If you have any questions or would like additional information, please feel free to contact us at(919) 873-2211. Sincerely, TERRACON CONSULTANTS, INC qAa—ron�Ezze( G, El Aaron C. PE Project Manager Senior Associate Office Manager Reliable £aa Resourceful n Responsive err Un EXHIBIT A PROJECT INFORMATION Central Eftand/!Northern Buckhorn Sewer Extension Orange County, NC Terracon understands that the project consists of construction of an extension to the Eftand sewer system and an extension of the City of Mebane's sewer system into the Northern Buckhorn community. Work will include the installation of approximately 5,370 linear feet of 8 inch gravity sanitary sewers to serve the Buckhorn areas north of 1-40/85 and 19,514 linear feet of 8 inch gravity sewers with a 250 GPM pump station and 2,460 linear feet of 6 inch ductile iron force main to serve the Eftand community. Irerralcon EXHIBIT B PROPOSED SCOPE OF SERVICES Central Efland/Northern Buckhorn Sewer Extension Orange County, NC Based on our understanding of the project information and our experience with similar projects, we anticipate providing the services listed below. Field and laboratory test procedures will follow ASTM and AWS standards. Terracon will maintain a record of observations and tests and deviations from the Contract Documents. The reports will be in writing and will be provided to the contractor and owner's agent for each day an inspection is made. Terracon will inform the contractor's on-site representative of deviations from the Contract Documents. Any deviations, which are not corrected will be included in the daily reports and added to the project deviation log. Terracon is not authorized to revoke, alter, relax, enlarge, or release any requirements of specifications, nor to approve, reject, or accept any portion of work. The testing program will generally include: 1. Structural fill— Terracon will obtain bulk samples of on-site cut and/or borrow material for soil laboratory testing. Soil laboratory testing will consist of a standard Proctor test (ASTM D 698),Atterberg Limits test, sieve analysis and a natural moisture content test. Terracon will perform density testing on the structural fill placed in the utility trenches using the sand cone density test method (ASTM D 1556), drive tube test method (ASTM D 2937) and/or the nuclear gauge density test method (ASTM D 2922). The percent compaction will be calculated by comparing the field density to the maximum dry density as determined by the standard Proctor test result. 2, Asphalt Paving— Terracon will provide a coring crew as requested to determine the thickness and density of the new asphalt pavement. Thickness testing will be performed in accordance to ASTM D 3549. Density testing will be performed in accordance with ASTM D 1188 or ASTM D 2726 (Target specific gravity of HMA provided by supplier). 3. Concrete— Terracon will provide an AGI certified engineering technician to perform slump, air content, unit weight and temperature tests during concrete placement. The technician will mold 5 concrete compression test specimens for each concrete mix placed each day. Concrete samples will be taken at the point of discharge wherever possible. One slump test will be performed for each strength test. Additional slump tests may be performed if the concrete consistency changes. One air content test will be performed for each strength test for air-entrained concrete. Temperature testing will be performed for each strength test and hourly when the air temperature is below 40 degrees F or above 90 degrees F. The lab-cured concrete specimens will be transported to our laboratory and placed in a controlled curing environment. From each set of 5 cylinders, 1 will be tested at 7 days and 3 will be tested at 28 days for compressive strength. The 5t'cylinder will be held in reserve. 4. Foundations— Verify foundation bearing capacity with a Dynamic Cone Penetrometer(DCP)in hand auger boreholes. Scheduling We understand that our services will be provided on an as-requested basis with scheduling by the contractor or the owner's representative. Terracon will not be responsible for scheduling our services and will not be responsible for tests that are not performed due to a failure to schedule our services on the project. It is the contractor's responsibility to inform us of work that is being conducted on-site that may require our services. Please also note Terracon must be notified at least 24 hours in advance of the next scheduled workday or must be notified that work has been cancelled prior to our site visit. Our services specifically exclude job site safety responsibility, and our services do not relieve any contractor/subcontractor from complying with project specifications. rerracan EXHIBIT C ESTIMATE OF COSTS AND FEE SCHEDULE Central Efland/Northern Buckhorn Sewer Extension Orange County, NC Our total fees will be highly dependent upon the contractor's actual construction schedule. We have included the attached proposed cost estimate summary based on our understanding of your needs and our experience with similar projects. The provided cost is only an estimate and the project will be billed on a time and materials basis. Some fluctuation should be anticipated in the final cost of the proposed materials testing budget. Overtime is defined as all hours in excess of eight hours per day, Monday through Friday, hours worked before 6:00 a.m. and after 6:00 p.m. and all hours worked on weekends and holidays. Overtime rates will be billed at 1.5 times the hourly rate quoted. For all work scheduled or cancelled after arrival to the site, a two-hour minimum charge is required. You will be invoiced on a monthly basis for services actually performed. Irerracon Construction Materials Testing Services Raleigh, NC 2011-2012 UNIT RATE FEE SCHEDULE PERSONNEL/FIELD SERVICES 1. Engineering Technician, per hour....... .......... $ 40.00 2: Field Special Inspector,per hour........ ......... ......... ......... ...............................$ 65.00 3. Nuclear Density Gauge,per day..................... ......... .......:.......................... ............$ 35.00 4. Certified Welding Inspector, per hour......................................... ......... ...........$ 85.00 5. Ultrasonic Testing,per hour.. .... .... $ 90.00 6. Coring Crew,per hour(Concrete/Asphalt,Includes equipment) .............$ 105.00 7. Asphalt Lab or Roadway Technician, per hour ..................... .......,> .I...............$ 65.00 8. Floor Flatness and Levelness testing(Operator and equipment)................................... 75.00 9. Project Engineer,per hour...... ........ .......................$ 115.00 10. Project Manager,per hour.................... ..w...... .....,... $ 95.00 11. Senior Project Manager, per hour.................... ......... ......... ..........................................$ 105.00 12. Principal,per hour...... ........ ............._...................._.........................................................$ 125.00 13. Senior Principal, per hour............................................. .....:.... .........................................$ 145.00 14. Clerical,per hour..........................................,.... .....:.................,...:...............*.................I.....$ 45.00 15. Direct Expenses...................... .....,.......................... ......;..................................$ 125% 16. Mileage,per mile......... ......... ........ ......... ......... ......... ........_ ............................. No Charge LABORATORY SERVICES 1. Percent Fines(Wash 200 sieve),each ......... ......... .......... ......... ......... .......$ 75.00 2. Sieve Analysis,each.......................................... ..$ 100.00 3. Particle Size Analysis(With Hydrometer),each ........ ,.......: ......... ................$ 150.00 4. Natural Moisture Content Test,each... ..................... ......... :.................... ..:.............$ 10.00 5. Atterberg Limits Test,each...... .... ..............$ 95.00 6. Standard Proctor Compaction Test, each........ ..I.....I........_... .......... $ 160.00 7. Modified Proctor Compaction Test,each .......: .............I....... ..... ....a......... ................$ 185.00 8. Standard Proctor Compaction Test(with Rock Correction),each........................................$ 185.00 9. CBR Testing, per point.................................................. .............................::.......................-$ 200.00 10. Concrete: a) Compressive Strength Testing of 4"x 8"or 6"x 12"Concrete Cylinders,each............$ 14.00 b) Flexural Strength Testing of Concrete Beams............................................. ..............,$ 50.00 c) Compressive Strength Testing of 2"x 2"Mortar Cubes,each........ ..:...... ...............$ 14.00 d) Compressive Strength Testing of Grout Prisms,each....... .. ...........$ 50.00 e) Compressive Strength Testing of Concrete Cores,each... ......... ............................$ 50.00 11. Asphalt: a) Thickness and Density Testing,per sample....................... . .......................................... 50.00 NOTE: A minimum of 2 hours will be charged for all field technician time, Overtime,at a rate of 1.5 time the standard rate,is charged for technician services for time over 8.0 hours per day,hours prior to 8:00 AM and past 5:00 PM and for Saturdays,Sundays,and holidays. Overtime is not applicable to engineering rates. Project administration rates are for report review,etc. The mileage charge includes vehicle mileage between Terracon's Raleigh office and the job site. The quoted rates will be effective from January 1,2011 to December 31,2012, � ' | COST ESTIMATE Construction Materials Testing Services Central Efland I Northern Buckhorn Sewer Extension Orange County, NC Terracon Proposal No.P70110416 SERVICES RATES TOTAL Field and Laboratory Services Structural Fill and Utility Backfilling Atterberg Limits Test $95.00 4pertest i rOO'tests 10 $950.00 Percent Fines $75.00 per test 101tests 10 $750.00 10 $1,600.00 Standard Proctor Test-4"Mold $160.00 ;per test 10'tests Engineering Technician $40.OD per hour 80IN4sits 6ihours/%Asit 480 $19,200.00 80 $2,800.00 Nuclear Density Gauge $35.00 ;per trip 801V[sits Trip Charges $0.00 per trip 801*visits Subtotal $25,300.00 Foundation Subgrades %A hAsit Engineering Technician $40.00 per hour 2': sits 6hours Trip Charges $0.00 pertrip 2:\4sits 2 $0.00 Subtotal | Concrete Testing Engineering Technician $40.00 'Per hour 5\Wts 61hourshAsit 30 Concrete Cylinders-Comp.Strength $14.00 :each 6!sets 5'cylinders/sel 25 $350.00 Trip Charges $0.00 per trip 51\Asits 5 $0.00 Subtotal $1,550.00 Field Asphalt Testing Coring Crew $105.00 tper hour 2z\isits 6:hoursAAslt 12 $1,260.00 Asphalt Cores $50.00 each 61cores 6 $300.00 Trip Charges $0.00 "per trip 21visits Subtotal $1,560.00 Engineering Report Review Project Engineer $115.00 'Ver hour 16';hours 16 $1,840.00 Project Manager $95.00 per hour 32fturs 32 $3,040.00 Clerical $45.00 ::per hour 32,hou rs 32 $1,440.00, 7! Subtotal $6,320.001 ,q►� CERTIFICATE OF LIABILITY INSURANCE DATE(MWDDNYYY) [THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE!CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. the MPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must be endorsed. If SUBROGATION IS WAIVED,subject to forms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the ertificate holder in lieu of such endorsement(s). PRODUCER Lockton Companies,LLC-I Kansas City C TACT 444 W.47th Street,Suite 900 N e PHONE F Kansas City MO 64112-1906 AIC No (816)960-9000 ADD INSURERS AFFORDING COVERAGE NAiC/ INSURERA:(' S' E NS.CO.** 1 TERRACON CONSULTANTS,INC. INSURER B:** 13312$129 91 18001 W. 106TH STREET,SUITE 300 OLAT14E KS 66061 INSURER C:Travelers Property Casualty Co of America 25674 INSURER D:The Travelers Indenmity ConivaLay 25658 INSURER E:Lexington Insurance Company 19437 COVERAGES TERCO01 PC CERTIFICATE NUMBER: 11281774 RERF, REVISION NUMBER: XXX}{XXX THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR At3D SUER LTR TYPE OF INSURANCE I R POLICY NUMBER PwDDYyr MOMILDICY E:� LIMITS A GENERAL LtABRITY N N PROP3779274 1/1/2011 1/1/2012 MMERCIAL GENE ILITY PREMISES(t RENTED o nee S 300 QQQ CLAIMS-MADE OCCUR X CONTR'L LIABILITY MED EXP(Any one rson s PERSONAL S ADV INJURY $ 1,000 a 000 GENERAL AGGREGATE $GENL AGGREGATE LIMIT APPLIES PER PRODUCTS-OOMP/OP AGG S POLICY nX P�O" LOC S C AUTOMOBILE LIABILITY N N TC2J-CAP-131J3858 1/1/2011 1/12FO12 TJBAP]3)J3895 1/1/2011 1/1/2012 (Eaacctdent) S �_ JX AN Y AUTO BODILYINJURY(Perperson) S { {} {ALL OWNED SCHEDULED AUTOS AUTOS BODILY INJURY Per accident S { HIRED AUTOS X NONOSWNED PRO('ERTY DAMAGE s XXXXXXX A L4 UMBRELLA LIAB RE �{ OCCUR N N PROU1920977 I/I/2011 1/1/2012 EACH OCCURNCE sXXXXXXX S A X EXCESS Luis CLAIMS-MADE (EXCLUDES PROF.LIAB.) 5.000.000 AGGREGATE S 0 DEO I I RETENTIONS WORKERSCOMPENSATION S U AND EMPLOYERS' YIN YIN N TRJ-U3-l31J3846(AZ OR,NV1) 1/1/2011 1/1/2012 X TORV LIMIT ER ANY PROPRI£foR/PARTNERlEXECUTNE TC2KUB131J3742(AdS) 111/2011 1/)/2012 OFFICE,UEMS REXCLUDED7 NIA EL.EACH ACCIDENT $ 1,000.0 0. (Mandatory f yes.d H) E.L.DISEASE-EA EMPLOYE S 1 000 000 If yyeess desedba under DESCRI-ION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ 1,000,000 E PROFESSIONAL N N 026030216 1/1/2011 1/1/2012 51,000,000 EACH CLAIM& LIABILITY S 1,000,000 ANNUAL AGGREGATE DESCRIPTION OF OPERATIONS I LOCATIONS/VEHICLES(Attach ACORD 101,Additional Remarks Schedule,if more space Is required) FOR INFORMATIONAL PURPOSES ONLY.EXCESS LIABILITY SITS ON TOP OF GENERAL AND AUTO LIABILITY. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS, 11281774 AUTHORIZED REPRESENTATIVE SPECIMEN ACORD 25(2010/05) The ACORD name and logo are registered marks of ACORD 988-2010 AJOWCORPORATION.All rights reserved err EXHIBIT D CERTIFICATE OF INSURANCE SPECIMEN Central Efland/Northern Buckhorn Sewer Extension Orange County, NC