Loading...
HomeMy WebLinkAboutAgenda - 12-05-2011 - Information Item 3Z.n-Foy nnQ-i-i or, Z+em ~;~ _. ~,;,, ~.. ma"r"` ~.ti'a'''~-~~~. «~ , .gar~~~uar~~, ~r~ ~c ~cat=+~~~r~ Memorandum To: Mr. Frank Clifton, County Manager From: David Stancil, DEAPR Director Tom Davis, Water Resources Coordinator Date: November 15, 2011 RE: Surface Water Quality Monitoring On August 30, 2011 the Board of Commissioners requested information regarding the potential monitoring of nutrient loading in surface waters exiting the County at the County line (also known as "jurisdictional loading"). That request was followed-up by a letter from Chair Pelissier to the Board dated September 15, 2011 regarding direction to staff. This memorandum provides background information on this topic and includes discussion of various methods of estimating nutrient loading. Background Interest in measuring water quality and determining the concentrations of nutrients in surface waters in Orange County has been growing for several years. Recent enactment of the state's nutrient management rules in the Triangle Region has certainly heightened interest in this issue. Nutrients, namely nitrogen and phosphorus, are added to surface waters as a result of stormwater runoff from development (including roadways and other impervious surfaces), agricultural activities, point source discharges (including wastewater treatment plants), and atmospheric deposition. Nutrients from other sources such as on-site wastewater systems can be added to groundwater, which can then, in turn, impact surface waters. Finally, forested lands can also be a source of 'The memorandum asked DEAPR staff to "provide an update/memorandum...with background information, analysis, potential monitoring location, potential costs and recommendations." Since this discussion came up as part of the Nutrient Management Rules discussion on August 30, staff interpreted this direction to request a program targeted to monitoring for nutrient loading, as opposed to a more global water monitoring program on all streams and a wider range of water quality parameters. Orange County Department of Environment, Agriculture, Parks & Recreation PO Box 8181, Hillsborough, NC 27278 Phone: (919) 245-2510 Fax: (919) 644-3351 2 nutrients to surface waters. All of these sources can contribute to the total quantity of nutrients carried by surface waters, which is often termed the nutrient "load". In 2004, the state Ecosystem Enhancement Program of NC DENR published the Morgan Creek Local Watershed Plan: Detailed Assessment Report. This publication included estimates of nutrient loading to both University Lake and Jordan Lake from the surrounding watersheds. Nitrogen delivered to Jordan Lake ranged from a low of 1.64- 2.44 pounds/acre/year in the more rural areas of the watershed to 6.31-6.84 pounds/ acre/year in the more developed areas (Chapel Hill and Carrboro). Please note that nutrient loads delivered to Jordan Lake are likely to be slightly lower than the loads exiting the County due to naturally occurring processes including sorption and decay. Estimating Nutrient Loading The simplest method of estimating nutrient loading involves the use of a basic areal loading rate spreadsheet tool. GIS could be used to determine the total area of the county in each of several different categories of land uses, such as medium density residential, etc. Nutrient export rates, such as those included above, could then be assigned to the various land uses and used as input in a spreadsheet, producing nutrient export estimations for each land use type. The estimated values could be summed by watershed, river basin or jurisdiction. This method would be somewhat limited, however, since it does not include naturally occurring processes such as nutrient decay or sorption, for example. • PLOAD (Pollutant Load) is a slightly more involved screening-level GIS-based model, such as that described above, that could be used to determine loading in watersheds.. It is likely that a consultant could use this model to estimate nutrient loading for Orange County for less than $10,000. • Amore complex distributed area model could also be used to estimate County- wide nutrient loading. Such a model would utilize available water quality sampling data as well as stream gage flow information as input. A consultant could use SWAT (Soil and Water Assessment Tool) or a similar model to estimate nutrient loading for Orange County for a fee of approximately $30,000. Another alternative for examining the nutrient load exiting Orange County involves recent activities undertaken by the Upper Neuse River Basin Association (UNRBA). The Falls Lake Nutrient Management Rules (Falls Rules), which became effective in January 2011, include an opportunity for additional information to be provided to the Environmental Management Commission (EMC) by 2024. The UNRBA is currently finalizing the selection of a consultant to begin working on issues that are geared toward modifying Stage II of the Falls Rules. The consultant will be required to compile and review existing water quality data collected in Falls Lake and the surrounding watershed. In addition, the consultant will compare nutrient loading estimates for tributaries and Orange County Department of Environment, Agriculture, Parks & Recreation PO Box 8181, Hillsborough, NC 27278 Phone: (919) 245-2510 Fax: (919) 644-3351 3 jurisdictions in the Falls Lake watershed. This work will be performed so that the consultant can inform the UNRBA members as to which model appears to function best for estimating loading in the Falls Lake tributaries. The consultant will also detail the available methodologies for estimating jurisdictional nutrient loading. Finally, the consultant will use this information to complete, as an option to UNRBA members upon their request, estimates of jurisdictional loading for the baseline year of 2006. It is likely that one end result of this process will be the uniform application of a single advanced model to estimate nutrient loading for the tributaries of Falls Lake as well as for the jurisdictions present in the Falls Lake watershed for the baseline year of 2006. It is expected that the work described herein will be completed in 2012 as a result of the timetable dictated in the Falls, Lake Rules. The cost of completing these tasks will be paid for by UNRBA dues. The optional tasks described above will be completed upon request at an additional cost to UNRBA members. • Similarly, the Nutrient Scientific Advisory Board (NSAB), which is currently tasked with implementing the existing development portion of the Jordan Lake Nutrient Management Rules, is working to determine how best to re-model nutrient export in stormwater in the Jordan Lake watershed. The NSAB expects to select a consultant to complete the updated modeling of this watershed in the very near future. This work is expected to be completed in 2012 and funded by DWQ. Recommendation It is likely that the UNRBA process as described above will produce a very useful estimation of jurisdictional nutrient loading for the Upper Neuse River Basin. Similarly, the NSAB re-modeling of the Jordan Lake watershed should also yield useful nutrient export information for this basin. For these reasons, staff recommends utilizing these on-going efforts as sources of jurisdictional loading information. Please let me know if I can provide further information on this topic. cc: Gwen Harvey Craig Benedict Rich Shaw Orange County Department of Environment, Agriculture, Parks & Recreation PO Box 8181, Hillsborough, NC 27278 Phone: (919) 245-2510 Fax: (919) 644-3351 4 BERNADE 77E PEUSS/ER, CHsVR ORANGE COUNTY BOARD OF COMMISSIONERS STEVE YUHASZ. VICE CHAIR VALERIEP. FDUSHEE POST OFFICE BOX 8181 ALICE M. GORDON 200 SOUTH CAMERON STREET PAM HEMMINGER B.aRRYJACOBS HILLSBOROUGH, NORTH CAROLINA 27'278 EARL MCKEE September 15, 2011 Dear Commissioners, \f~' a~~ At the Board's August 30, 2011 work session, Commissioner Jacobs brought forth two petitions and these were to be reviewed by the ChairNice Chair/Manager at agenda review. The two petitions brought forth were: 1) Review the possibility of the State initiating an update of the Eno River Capacity Use Agreement 2} Review the possibilities of the County initiating a program to monitor water quality of the County line After review of these petitions, the ChairNice Chair/Manager have directed staff to do the following: 1) Engineering staff has been asked to provide a repor#/memorandum to fhe Board on: a) the most recent Eno River Capacity Use Agreement annual stakeholder meeting noting the topics discussed, including possible discussion that may have occurred on an potential Agreement update, IF ANY; b) any challenges that would be encountered to pursue an update; c) potential costs and responsibilities for those costs among the State/parties; and d) any comments/suggestions staff may have regarding the Agreement/potential update/etc. To come back as an Information Item on future regular meeting BOCC agenda. 2) DEAPR staff has been asked provide an update/memorandum to the Board with background information, analysis, potential monitoring locations, potential costs, and recommendations. To come back as an Information Item on future regular meeting BOCC agenda. This fetter will be provided as an Information Item on the September 20 , 2011 agenda for public information. Regards, Bernadette Pelissier, Chair Board of County Commissioners CC: Frank Clifton, County Manager Craig Benedict, David Stancil, Tom Davis, Kevin Lindley, Gwen Harvey, Perdita Holtz www.co.oranae.nc.us Protecting and preserving -- People, Resources, Quatity of Life Orange County, North Carolina -You Count! (919) 245-2130 • FAX (919) 644-0248 5 Attachment B Existing Water Quality Monitoring Programs Currently, several organizations are monitoring surface water quality in Orange County. • The Town of Hillsborough samples the Eno River for a few parameters in order to demonstrate compliance with the National Pollution Discharge Elimination System (NPDES) permit for its wastewater treatment plant. • The Upper Cape Fear River Basin Association conducts routine water quality sampling and analysis of Morgan Creek as part of the Orange Water and Sewer Authority (OWASA) NPDES compliance program. • The City of Durham samples a few locations in Orange County, in addition to many locations within the City limits, to document background water quality conditions. • The United States Geological Survey (USGS) conducts water quality sampling of University Lake, Cane Creek Reservoir and the West Fork on the Eno Reservoir as part of the Triangle Water Supply Monitoring Project (TAWSMP), of which Orange County is a founding member. In addition, the USGS has collected water samples at the stream gage on the Eno River in Hillsborough since the 1930s. Limited sampling is conducted in Orange County by the North Carolina Division of Water Quality (DWQ). DWQ periodically (once every 5 years) samples benthic macroinvertebrates and fish populations at a few locations. This is done to document water quality conditions for Use Support Assessment, which results in the assigning of stream ratings to individual stream segments. Unfortunately, some of the stream monitoring performed by DWQ is actually completed in Chatham County, and the resulting stream rating is projected upstream into Orange County. While DWQ samples at more than 300 locations across the state through their Ambient Monitoring System (AMS), no such sampling locations are present in Orange County. • The Town of Chapel Hill sampled several surface water locations for chemical parameters and macroinvertebrate populations from 1994 through 2008 but is currently sampling only for benthic macroinvertebrates. Orange County Department of Environment, Agriculture, Parks & Recreation PO Box 8181, Hillsborough, NC 27278 Phone: (919) 245-2510 Fax: (919) 644-3351