HomeMy WebLinkAboutAgenda - 11-15-2011 - 5gORANGE COUNTY
BOARD OF COUNTY COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: November 15, 2011
Action Agenda
Item No. ~°E,7i
SUBJECT: Comprehensive Plan and Unified Development Ordinance Amendment Outline
and Schedule for Upcoming Master Telecommunications Plan Item
DEPARTMENT: Planning and Inspections PUBLIC HEARING: (YIN) No
ATTACHMENT(S): INFORMATION CONTACT:
Comprehensive Plan and Zoning Atlas Glenn Bowles, Planner II, 245-2577
Amendment Outline Form (UDO/Zoning Craig Benedict, Director, 245-2575
2012-09) - Master Telecommunications
Plan
PURPOSE: To consider adding sites to the Master Telecommunications Plan as a Planning
Director initiated item for the February 27, 2012 quarterly public hearing.
BACKGROUND: One additional item is currently being prepared by Planning staff for the
February 27, 2012 quarterly public hearing. Other items for consideration were approved at the
November 1, 2011 meeting. This item is to add additional tower sites to the adopted Master
Telecommunications Plan Map (see attachment). Each year additional sites may be enrolled
including public sites, non-profits, and private property owners.
FINANCIAL IMPACT: Please refer to Section C.3 of attachment.
RECOMMENDATION(S): The Manager recommends the Board approve the attached
Amendment Outline and direct staff to proceed accordingly.
2
COMPREHENSIVE PLAN /FUTURE LAND USE MAP
AND
UNIFIED DEVELOPMENT ORDINANCE (UDO)
AMENDMENT OUTLINE
UDO /Zoning-2012-09
A. AMENDMENT TYPE
Map Amendments
^ Land Use Element Map:
From:
To:
^ Zoning Map:
From:
To:
® Other: Addition of new telecommunication tower sites to the adopted Master
Telecommunications Plan Map per Section 5.10.2 of the UDO
Text Amendments
^ Comprehensive Plan Text:
Section(s):
^ UDO Text:
^UDO General Text Changes
^UDO Development Standards
^UDO Development Approval Processes
Section(s):
^ Other:
B. RATIONALE
1. Purpose/Mission
Section 5.10.2 of the UDO enables Orange County to develop and adopt a Master
Telecommunications Plan Map (hereafter `MTP'). The purpose of the MTP is to
display properties where owners have expressed interest in allowing wireless
telecommunication facilities to be constructed. The BOCC first reviewed the MTP at '.
its February 29, 2011 Joint Quarterly Public Hearing and adopted it subsequently. !,
1
3
_ ___
According to Sub-section 5.10.2(D)(2) of the UDO. Additions or modifications to the
Plan are reviewed annually, as warranted, by the BOCC at the February Quarterly
Public Hearing. Applications to add to withdraw from or otherwise modify the Plan
are required to be filed with the Planning Director prior to December 1St of each year.
The need for public safety, wireless broadband, and information technology
connectivity continues to be in high demand.
2. Analysis
The MTP essentially serves as a marketing tool to allow the County to provide some
direction on where available properties, suitable for the development of wireless support
structures, are located. Available properties include those where existing property
owners have expressed formal, written, interest in allowing for the development of a
wireless support structure.
It should be remembered that the modification of the MTP does not create an automatic
exemption for the various denoted properties from the review and approval processes as
prescribed by the UDO with respect to the development of wireless support structures.
Based on reports, certain areas show coverage weaknesses and other areas with
coverage often have capacity issues.
3. Comprehensive Plan Linkage (i.e. Principles, Goals and Objectives)
Economic Development Goal 2: Infrastructure that supports desired development
Objective ED-2.11: Establish adequate information networks throughout the
towns and County.
Services and Community Facilities Goal 7:.Efficient and effective public safety
including, police, fire, telecommunications, emergency services, and animal services.
Objective PS-T-6: Develop a mechanism for cooperation with telecommunication
facilities stakeholders regarding the siting and design of towers.
Objective PS-T-7: Manage the number of future wireless telecommunication
facilities by identifying preferred locations capable of accommodating service
Countywide.
Objective PS-T-8: Encourage the expansion of affordable, high-speed internet
access, fiber-optic lines, and other high-speed communication networks to rural and
underserved areas.
Objective PS-9: Maintain a radio communication system that ensures reliable
notification and oversight of emergency assets, such as personnel vehicles, and
response equipment throughout Orange County and inter-operability of
communication among jurisdictions.
4. New Statutes and Rules
Not applicable.
C. PROCESS
2
4
1. TIMEFRAME/MILESTONES/DEADLINES
a. BOCC Authorization to Proceed
__
November 15, 2012
b. Quarterly Public Hearing
_ _ _ __ _ _
February 27, 2011
c. BOCC .Updates/Checkpoints
February Quarterly Public. Hearing legal ad approved on February 7, 2012.
d. Other
_ _ __
Requests for modifications by staff received on or before December 1, 2011
2. PUBLIC INVOLVEMENT PROGRAM
Mission/Scope: Public Hearing process consistent with NC State Statutes and
Orange County ordinance requirements..
3. FISCAL IMPACT
Expenditures for this project will be paid using Departmental funds budgeted for the
specific activity. Expenditures include the legal advertisement of the public hearing.
Existing Planning staff included in the Departmental staffing budget will accomplish
the work required to process this amendment.
It should be noted that Orange County may receive,co-location rents from private
3
5
broadband access providers if facilities are located on County owned properties.
Building tower facilities, with public communication technologies, on County or other
similar quasi-public properties (i.e. OWASA sites, fire stations, etc.) will forego the
need for providers to purchase additional private property to accomplish the same
task.
__ _ _
D. AMENDMENT IMPLICATIONS
__ _
__ _ -
__
The MTP will be updated with a listing of additional properties that are available for the
potential location of wireless telecommunication facilities to address under- and un-
.served portions of Orange County.
_ _ __
E. SPECIFIC AMENDMENT LANGUAGE
There is no specific amendment language required. Please refer to the attached map
denoting the proposed amendments to the MTP.
Primary Staff Contact:
Glenn R. Bowles, Planner II
Planning and Inspections Department
919 245 2577
g bowies@co. orange. nc. us
4
-___
Telecommunication Plan Map Sites
I (E-1) -----------------j
Piedmont Electric Tower
I
(P-2) Cedar ~
(P-1) Cedar as Grove Park
Grove Fire
Department 15 (P-3) Caldwell
Fire Department
I' /
1
~.
(P~)
' Future Northeast
(P-15) Scott Property Pam
,.
5
I. ''
(P-7) Buckhorn Road (P-5) Walnut
Grove SW Site
'~
~l ` (P-6) Eno Fire and
~y (E-2) Emergency Services
70 Occoneechee Tower
•~t .
4 (E-3) ~•
EMS Tower
~°
~'
~~' (I'-e) County
f Soccer Fields (E-4) ~,~
~ PiedmoM Electric
Tower (P-9) Piedmont Electric Tower
(P-11) ID X
OWASA - ,- °
Properly j`
1
1 ~
(P-10) County Park Site
~I ~ ~ 501
t 15
t ~ i
12 j
(P- )
1 American Storms 1
Quarry
L` ~
~ !' -
1 ~ ~ `~ r
``, 501 t
t...__
-.n.-~._._._.-_---- 15
-_
(P-13) White ----- ---~_---------- ---- _ _VJ
Cross Fire
Department (P-14) Mellot Property
Existing Tower Locations
Proposed Tower Locations
Approved Tower Locations
2 Mile Buffer
6
•''~ . 'J~' N 1 Inch = 32 miles
o ~ a arules
,..,..,•
Orange County P~nning and lnspectbns Department
crs Map prepared ty &ian arson. io/vnoti