HomeMy WebLinkAboutAgenda - 10-18-2011 - 8bORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: October 18, 2011
Action Agenda
Item Now
SUBJECT: Orange County Comprehensive Transportation Plan
DEPARTMENT: Planning and Inspections PUBLIC HEARING; (Y /N) No
ATTACHMENT(S): INFORMATION CONTACT:
1. Copy of PowerPoint Presentation Tom Altieri, 245 -2579
2. Draft CTP (Four Maps) Craig Benedict, 245 -2592
PURPOSE: To receive a presentation from North Carolina Department of Transportation
(NCDOT) staff and provide Board input prior to a public hearing on the draft Comprehensive
Transportation Plan.
BACKGROUND: Grange County approved a resolution in June 2009 endorsing completion of
a Comprehensive Transportation Plan for rural orange County. The study'is being completed
through a coordinated effort among the Orange Unified Transportation Board, orange County
planning staff, Triangle Area Rural Planning Organization (TARPO), Durham - Chapel Hill-
Carrboro Metropolitan Planning Organization (DCHC MPO), and the North Carolina Department
of Transportation.
WHAT IS THE COMPREHENSIVE TRANSPORTATION PLAN (CTP): The CTP consists of
four- maps: 1) Highway; 2) Public Transportation and Rail; 3) Bicycle; and 4) Pedestrian (See
attached). It is not fiscally constrained and incorporates local interests, community goals, and
statewide needs in a common multi -modal plan.
WHAT AREA DOES THE CTP COVER: The draft Comprehensive Transportation Plan (CTP)
covers the rural portions of the County, generally defined as the area outside of Carrboro,
Chapel Hill, Carrboro, Hillsborough, and Mebane (See attached maps for specifics) .
PROCESS: A Comprehensive Transportation Plan (CTP) Steering Committee, comprised of
representatives of those groups, has coordinated to complete the draft. The following tasks
have been completed:
• Held a public workshop to kick off the process (September 2009)
• Conducted an on -line public survey (October — November 2009); Collected current traffic
data and projected future traffic (August 2010 — October 2010)
• Analyzed traffic growth rates to use in final data projections (November 2010)
• Prepared a highway deficiency analysis (November — December 2010)
• Held a public input meeting on the deficiency analysis (February 2011)
• Developed alternatives and draft recommendations (March - August 2011)
I,
• Held public drop in session and collected County advisory board input (September 2011)
CURRENT SITUATION: NCDOT staff is presenting the draft to the Orange County BOCC to
collect any final input prior to preparation of the draft plan for public hearing.
NEXT STEPS:
1. Receive BOCC input;
2. Steering Committee will address any new input received from the BOCC;
3. Public Hearing (January 2012);
4. Planning Board and Orange Unified Transportation Board formal recommendations
(February 2012);
5. BOCC adoption (March 2012); and
6. Continued coordination with the Durham - Chapel Hill- Carrboro Metropolitan Planning
Organization (DCHC MPO) .during completion of the CTP for the MPO area (through to
its adoption).
ADDITIONAL INFORMATION: Additional information about the CTP process can be found on
the Orange County CTP website: http: / /www.ncdot.orq /�tpb /planning /orangecounty.html
FINANCIAL IMPACT: The Comprehensive Transportation Plan will require planning staff
resources, but can be completed with existing staff.
RECOMMENDATION(S): The Manager recommends the Board:
1. Receive the presentation; and
2. Provide input on the draft CTP.
14#40 d4 M C tV4 i , -
Orange County
Comprehensive Transportation Plan
QF
Rural Area*
NCDOT Transportation
Planning Branch
October 18, 2011
Overview
r.-
tt ,
\ `fir'••
• What is a comprehensive
Transportation Plan?
What • has been
accomplished so far?
-- Goal: get your i -nput on
the recommendations-
*• What are the next steps?
i ffli
n I
Areas
TARPO =
Triangle Area Rural
Planning Organization
www.farpa.org
4
What is a CTP?
(Comprehensive Transportation Plan)
•
4 maps with supporting documentation
• Long -range (25-30-years), multi - modal, fiscally
unconstrained (no funding or priorities)
-- Highway, Public Transportation, Rail, - Bicycle, Pedestrian
• Replaces previous thoroughfare plans
• Proviues a "needs list" for year 2035 (high- level. -planning)
• Developed by steering committee with representation from
NGDOT, Orange County planning, OUTBoard, and Triangle
Area_RPO-
-- Coordination with surrounding MPOs and counties
• -Designed to be easily updated -in order to remain relevant
Typical SequenGe of NCDOT Project Development
:� -- PLANNING . ;
.PROGRAMMING
DESIGN:
RIGHT -OF WAY.,.,
.. CONSTRUCTION:''
..............
CTP STUDY
STIP
DATA
LAND
BIDDING
:........:.....•
PDEA-
COLLECTION
PROCUREMENT
PROCESS
RPO PROJECT
EVALUATION
ALIGNMENT
PRIORITIZATION
SELECTION
EASEMENT
NCDOT BOAR❑
ENVIRONMENTAL
ATTAINMENT
AWARDS
PROJECTS
DOCUMENTS
TRANSPORTATION
CONTRACT
PRESENTED TO
FACILITY DESIGN
PUBLIC
NCDOT BOARD
ALTERNATIVE
ESTIMATES &
ASSISTANCE
CONTRACT
FOR STIP
STUDIES
QUANITIES
LEGAL ACTION
ADMINISTRATION
-
CONSIDERAMON
PUBLIC
COMPLETED
INVOLVEMENT
PROJECT
2 -3 YEARS UP TO 7 1 -2 YEARS 1 -2 YEARS 1 -2 YEARS
YEARS
CTP Progress
Roadway Network Data Collection We are here %_
Public Sum
Traffic G.
Rate
Traffic
Projectic
Capacity
Deficiencies
Public
Drop -in
Dral
Recommer
Adoption- (will go here)
Sheet
.i1 "- SN f'•' tii�"• .2 .. L. r.. fai .�•:S %$
_ .
Public
Transportation1,;,
=.
Rail Map
:. •fix,
_
_
_.
� S
References County's
y
1
_ -
transit/
Meant to be updated
p
__ ....
_ -
_
f
*�-"E ►a+,., .5 s
and R,-i map
•Fi.e�.GSpe,«f ��::.¢+'r43x:Gs-•aMS ?}d'
•
s'
�" r�li'
�� Y.:c++ne wrr.rr 7.af� _, .Y::swy,:
air•r ):FS.MC'+TyF�XNI �w
r.rY i:.sse• yw3.t fwxxvr. "•" � ?.w�ye•.nr±.e;
�
q,.� /1.2•
r�i?
�i+• 1 y .'�`
� � �•
� � ��
orange County
lyre - eh:H»W:;.:.W:;.:x
1[4P�i'ik.�X�Y' IIS'1•
�.iJC[j�.+I�E`�ii�Y�
••,,•� �,�,.� L r..���,oea.e
'Frars�p�r#aYi�n Fzan.
J
Input So Far
Planning Board, September 7
— Make bicycle recommendations connect to Park and
Ride lots on Public Transp. map
-- Discussion of County's, Bicycle Map being more
recreation based, vs. commuter based — possibility of
adding recommendations to NC 54 and NC 88 (and
Coleman Loop -Rd)
Public drop -in session, September 14
-- Questions about the type of bicycle improvements in
the county's p -lan
-- Idea for an on- demand or constant minivan transit
service for rural. areas, could be public - private
partnership, possibly using a taxi service
�� y <:�
Y F • 17
Pedestrian
i:r�
x. ..
r sY
Mapr
kP.k � {d ^+ T^^�! � �` F ��
anti -Y•� ' '
Jf�('..,
M r :V
• incorporates- County
.
pedestrian plan that is
currently under
'`
development
_
r
7
,• ... f S ]. i•
'
arah,Yx. t+s .a
esiriaan MA
'- �1C9Jphv;M'i �++�+''.Yf�P LY!^VyvF
s�rr�w�.�2 5..�}'.C1rC •!N:/XACa'A'a,l:
�
J' +t• S� -�
� ( P� ^� ��
..... a:+.^Yfh�..:hii �j 2•r4Crh'':rR•�+:41'�'• -p
`
Orange Ciunty
..
,...... ' .� �, ,�.� k sRaapsss.oa .
Wlsbd✓ 3.arrr �•?t:3.+•':F
'LTa�l�3Ll1S1E3tS�"4�£-
Trarrk�ri; ian Piet#
Input So Far
Planning Board, September 7
— Make bicycle recommendations connect to Park and
Ride lots on Public Transp. map
-- Discussion of County's, Bicycle Map being more
recreation based, vs. commuter based — possibility of
adding recommendations to NC 54 and NC 88 (and
Coleman Loop -Rd)
Public drop -in session, September 14
-- Questions about the type of bicycle improvements in
the county's p -lan
-- Idea for an on- demand or constant minivan transit
service for rural. areas, could be public - private
partnership, possibly using a taxi service
10
Input So Far
Public comment website, open through September 26
— Nothing so far
Committee meeting, September 21
— Decided not to display Highway and Public- Trans p . in
MPO -area (will have BGMPC map on ha'd and -
provide link)
— Discussion of bicycle reco- mmendation -on old 86, but
decided not to based on information from - bicycle
advocates that the terrain is not suitable for bicyclists
Next Steps
0 Get your input on the recommendations
• CTP committee will review all input on the draft
recommendations for incorporation into the CTP
Adoptions will begin in early 2012
Coordinating with DCHC MPO
-- Possibil -ity for countywide plan to be readopted down
the road when DCHC CTP is fi- nished
11
Thank you! Questions?
Orange County CTP wehsite;
http://www.nedot.org/—tpb/Planning/orangecounty.htmi
Sarah E. Lee
Transportation Engineer
N DOT TPB
(919) 707-0946
selee@ncdot.gov
gov
Tom Altieri
Comprehensive Planning Supervisor
Orange County
(919) 245 -2579
taltieriCcoco. orange. nc. us
Scott Walston
Triangle Unit Supervisor
N -CDOT TPB
(919) 707.0941
swalston gncdot.g -ov
Other committee contacts;
Paul Guthrie
Randy Marshall
Nancy Baker
Tina Love
Matt lay
More info at www.ncdot.org / —tph
tom`',
7
IF
.•kip
ea. I
9 k-4 R
lift
77;
i -
1
n
r
`} I
R
r l 1 r
I Ell.
i
�z
c
A Alm
- '`� �, ' -•• �.. - - � " �L���� � ,,�, cr 'rte r�,�i' - - "�� - -a �� - �''- ;. -�; ,
� MR
77
INV,
14 1
U,
7r
EP
zw
will
SAM
I ED
xi�
Now-
ur
Ifs
30 Eno-
MA II
Q-
44
� . — � III■''
Mill - -- � pil
Ct
I' 9
IT
tV
ii
M1I� •L.
F
iJ _ _ � . I � ' 'mss•' •rte r..r
ism
ki
� 1 ,a �r � ,7•ca -s _ � F s ^� 3~ - �& � Fr till
•_� t � u n �. iS1fa, 4��t Ir lla\ I� Y �i r
A � 1
z15�7.
Mm