HomeMy WebLinkAbout2011-288 AMS - H. M. Kern Corp. for Change Order #7 for Health Dept. Renovations at Whitted Bldg. AIA Document G701 TM 2001 Change Order PROJECT:(Name and address) CHANGE ORDER NUMBER: 007 OWNER❑ Orange Co. Health,; Dept. RenOTATE: August 1, 2011 ARCHITECT❑ Richard L. Whitted Bldg. ARCHITECT'S PROJECT NUMBER1001 Hillsborough, NC CONTRACTOR❑ TO CONTRACTOR:(Name and address) FIELD❑ H. M. Kern Corp. CONTRACT DATE: Feb. 16, 2011 OTHER❑ 160 Thatcher Road CONTRACT FOR: General Construction Greensboro NC 27409 The Contract is changed as follows: (Include, where applicable,any undisputed amount attributable to previously executed Construction Change Directives) Omwc-requested POO-09R: 2nd floor conference groom ; change per RFP +..ADD $14,834.00 The original(Contract Sum)( was $ The net change by previously authorized Change Orders $ -3083 124.00 The(Contract Sum)( ce)prior to this Change Order was $ 1,071,924 00 The(Contract Sum) ice)will be(increased)(&-xDaacft:( * by this Change Order in the amount of $ :14,834.00 The new(Contract Sum) including this Change Order will be $ 1,86,758.00 The Contract Time will be 1xmgxqcA xxA)(unchanged)bjx ( )days The date of Substantial Completion as of the date of this Change Order therefore is August 28, 2011. (Nate: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.) NOT VALID UNTIL SIGNED BY THE ARCHITECT,CONTRACTOR AND OWNER. Carley r ncj 14- M_ Kern_CDrPL_ ARCHITECT(Firm name) CONTRACTOR(Firm name ER OWN ( rrm name 222 Cloister Court 160 1hai tchetr Road PO Box 8181 t^reens}r�rn N(' 7]1}09 H!" 1 Pe ADD S ADDRESS ADD- R 5(Sign ire BY(Signature) BY(Sign�� r�c Gjr'c�ur2cy Get! 111- E_ Redfont. ATA (Typed e) j (Typed name) (Ty bed name) // �_` / DAT DATE DATE CAUTION:You should sign an original AIA Contract Document,on which this text appears in RED.An original assures that changes will not be obscured. AIA Document G701 TM—2001.Copyright ©1979,1987,2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING:This AIA! Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA® Document, or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. Purchasers are permitted to reproduce ten(10)copies of this document when completed.To report copyright violations of AIA Contract Documents,e-mail The American Institute of Architects'legal counsel,copyright@aia.org. s , *=-rA1A Document G701 TM- 2001 Instructions Change Order GENERAL INFORMATION Purpose AIA Document G701 is for implementing changes in the Work agreed to by the Owner,Contractor and Architect. Execution of a completed G701 indicates agreement upon all the terms of the change,including any changes in the Contract Sum(or Guaranteed Maximum Price)and Contract Time. Use of Current Documents Prior to using any AIA Contract Document,users should consult www.aia.org or a local AIA component to verify the most recent edition. Reproductions This document is a copyrighted work and may not be reproduced or excerpted from without the express written permission of the AIA.There is no implied permission to reproduce this document,nor does membership in The American Institute of Architects confer any further rights to reproduce this document. The AIA hereby grants the purchaser a limited license to reproduce a maximum of ten copies of a completed G701,but only for use in connection with a particular project.The AIA will not permit reproduction outside of the limited license for reproduction granted above,except upon written request and receipt of written permission from the AIA. Rights to reproduce the document may vary for users of AIA software. Licensed AIA software users should consult the End User License Agreement(EULA). To report copyright violations of AIA Contract Documents,e-mail The American Institute of Architects'legal counsel,copyright @aia.org. COMPLETING THE G701 FORM Description of Change in the Contract Insert a detailed description of the change or reference specific exhibits describing,in detail,the change to be made in the Contract by this Change Order.Include any drawings,specifications,documents or other supporting data to clarify the scope of the change. Determination of Costs Insert in the blanks provided,or strike out the terms in parentheses that do not apply,the original Contract Sum or Guaranteed Maximum Price;the net change by previously authorized Change Order(note that this does not include changes authorized by Construction Change Directive unless such changes were subsequently agreed to by the Contractor and recorded as a Change Order);the Contract Sum or Guaranteed Maximum Price prior to this Change Order;the amount of increase or decrease,if any,in the Contract Sum or Guaranteed Maximum Price; and the new Contract Sum or Guaranteed Maximum Price as adjusted by this Change Order. Change in Contract Time Insert in the blanks provided,and strike out the unused terms in parentheses,the amount(in days)of the increase or decrease,if any in the Contract Time.Also insert the date of Substantial Completion,including any adjustment effected by this Change Order. EXECUTION OF THE DOCUMENT When the Owner and Contractor,in occurrence with the Architect,have reached agreement on the change to be made in the Contract,including any adjustments in the Contract Sum(or Guaranteed Maximum Price)and Contract Time,the G701 document should be executed in triplicate by the two parties and the Architect,each retaining an original. AIA Document G701 TM—2001.Copyright @ 1979,1987,2000,and 2001 by The American Institute of Architects.All rights reserved.WARNING:This AIA®Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIO Document, or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. Purchasers are permitted to reproduce ten(10)copies of this document when completed.To report copyright violations of AIA contract Documents,e-mail The American Institute of Architects'legal counsel,copyright @aia.org. H. M.KERN CORPORATION 160 THATCHER ROAD ' PO BOX 19424 GREENSBORO,NC 27419 (336)668-3213 FAX: (336)668-2142 PROPOSED CHANGE ORDER PCO-09(REVISED) TO: CORLEY REDFOOT ZACK DATE: JUNE 21,2011 222 CLOISTER COURT CHAPEL HILL,N.C.2514 CC:KURT HICKS ATTENTION:HARRY JENSEN,JR. REFERENCE: ORANGE COUNTY HEALTH DEPT RENOVATIONS JOB#759 SUBJECT:RFP#004 IN ACCORDANCE WITH OUR CONTRACT WE REQUEST A CHANGE ORDER IN THE AMOUNT OF FORTY FIVE THOUSAND FIVE HUNDRED FIFTY EIGHT ($45,558.00)DOLLARS FOR THE FOLLOWING: FLOG GES DETAILED IN RFP#004. CONFERENCE ROOM CHANGES:$14,834. PLEASE CALL IF YOU HAVE ANY QUESTIONS. TOTAL COST: $ "`,mow TIME IMPACT: DAYS ORIGINATED BY: ACKNOWLEDGED BY: H.M.KERN CORPORATION CORLEY REDFOOT ZACK SIGNED:f��1 SIGNED: BY: PETER UPC CH BY:HARRY JENSEN,JR DATE: JUNE 21,2011 DATE: H.M.Kern Corporation PCO-09(REV 6/2112011 Job#759 ORANGE COUNTY HEALTH DEPARTMENT RENOVATIONS RFP#004 668-3213(p CONFERENCE ROOM 668-2142(f) Phase Descri lion Qtv unit unit S Amoun Labor: 20110 COORDINATION 8 HRS 19.00 152 20810 INSTALL FRAME, DOOR, HARDWARE 8 HRS 15.00 120 20210 REMOVE EXISTING DOOR&FRAME 16 HRS 15.00 240 20180 CLEAN UP 4 HRS 15.00 60 20610 INSTALL WOOD BLOCKING 2 HRS 15.00 30 20210 PATCH FLOOR 2 HRS 15.00 30 0 0.00 0 0 0.00 0 0 0.00 0 Total Labor 632 Materials: 30610 N-C PLYWOOD 1 SHTS 61.00 61 30198 DUMP FEES 1 us 200.00 200 50810 DOOR&ACCESSORIES 1 US 405.00 405 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 Total Materials 666 E ui ment: 10153 DEMO TOOLS 1 US 150.00 150 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 Total Equipment 150 Subcontractors: 40631 PERFECTION PRODUCTS 1 US 1800.00 1,800 40970 PAINTING 1 US 1742.40 1,742 40960 FLOORING 1 us 2942.00 2,942 41610 ELECTRICAL 1 US 2617.80 2,618 41520 HVAC 1 US 2102.00 2,102 0 0.00 0 0 0.00 0 Total Subcontractors 11,204 Total Labor, Materials&Equipment 1,448 Sales Tax Materials&Equipment) 7.75% 63 29160 Labor Burden 40% 253 Subtotal 1,764 898 CO OH&Profit(Labor,Materials&Equipment) 20% 353 Total Subcontractors 11,204 89800 OH&Profit(Subcontractors) 10% 1,165 Subtotal 14,486 62050 Performance&Payment Bond 2% 348 Total Proposed Change Order $14,834 Page 1 PERFECTION PRODUCTS CO. P.O. BOX 14571 GREENSBORO, N.C. 27415 336 - 370 - 1803 336 - 272 - 2817 ( FAX } April 21,2011 RE: RFP#4 - Orange County Add cabinetry in conference room as specified ( 1 /A1.6 ) Price: $ 1.800.QQ • Cabinets are melamine interiors-White Oak Veneer Exteriors with Clear finish • Counters are HPL Thanks, PERFECTION PRODUCTS CO. Ray Sparks Ray Sparks f a ORANGE COUNTY HEALTH CENTER Chapel Hill, NC Tuesday,dune 14,2011 Total$ qty UoM Unit$ $ 1,742.40 Stain/Paint Door 4 EA $ 45,00 $ 180.00 HMF-Sn 4 EA $ 45.00 $ 180.00 Paint PjT Wall 888 SF $ 0.40 $ 355.20 Paint CMU Wall 1712 1 SF $ 0.601$ 1,027.20 CONFERENCE ROOM,CLASS ROOM Scope of Work:Painting Cover floors,material,etc.to protect from paint splatter. Prime and apply two finish coats to HMF frames per spec and plans. Finish all doors per spec and plans. Apply primer and paint on walls per specs and plans Notes:D O O O O Painter to supply all labor,equipment and material needed to complete scope of work. Bid includes an allowance of 8 man hours of touch-up at owner's discretion. All work is to be performed during normal business hours unless otherwise authorized. Bid includes a 12 month limited warranty on labor and materials. This bid is based on the inclusions of PDCA Standards. Exclusions Any and all finish on Exterior CMU 1408 Gavin Street Raleigh,NC 27608 919.395.6008 Cell 919.755.1400 Office Zebhadley @yahoo.com L& E CarpetCo., hC. Estimate 107 C reek R dge Road Su Ifo E Date Estimate# G reensboto,NC 27406 5,242011 3TT1 Name 1 Address H M.KERN CORPORATDN P 0.808 19424 GREENSBORO,NC 2T419 ATTN:PETER UPCHURCH Project Terms ORANGE COUNTY HEALTH DEPT. Due on Moe pt Item Descrlption City Rate CARPETTILES FURNONAND NSTALLNBN CARPET T LE FHAW N 2,562.00 CONFERENCE ROOM AND CLASSROOM PER RFP 1" V.C.T. FURN SH AND NSTAU NL3N V C T. t2ROCK) N HALLAND ,mpg STORAGE ROOM PER RFP 0004 COVE BASE FURN BH AND NSTALLNEM RUBBER COVE 380.00 BASE flOHNSON IfE) N CONFERENCE ROOM,CLASSROOM, HALLAND STORAGE PER RFP#004 2,R41, J QUALITY ELECTRIC CO., INC COMMERQALrINDUS'IRIAL'RESIDENTIAL WIRING TELEPHONE: 919-596-8113 FAX- 919-596-8114 3033 WAKE FOREST HWY DURHAM,NORTH CAROLINA 27703 June 20,2011 HK Kern Corp. Peter Upchurch OCHD Subject:Provide electrical for upfit conference room second level. 80' 3/4"EMT conduit w/coup.and corn. $55.00 80' 700 Wiremold surface raceway fitting&boxes $160.00 6 4" sq boxes w/cover $24.18 5 cut-in boxes $16.55 3 20 amp switches $18.00 8 20 amp receptacles $42.00 2 20 amp GFCI receptacles $38.00 2 Type "H"fixtures $160.00 750' Thhn#12 Cu wire $146.25 $659.98 51.15 $711.13 106.67 $817.80 40 man hours a $45 per hour $1,800.0 0 $2,617.80 Sincerely, Douglas V.Painter Page 1 of 1 Comfort Engineers,Inc.-Mechanical Contractors P.O.Box 2955,Durham,North Carolina 27715- 2955 Construction Group ENGINEERS 278 Comfort Lane,Durham,North Carotins 277705 Date: May 2 2011 To: H M KERN From: Curtis Turman Re: Orange Conty Health Dept RFP-004 Major Materials 700.00 Sheetmetal Materials 800.00 Piping Materials Miscellaneous Materials 100.00 Total Mate 1,600.00 NC 124.00 Labor Sheetmetal/Shop 450.00 `02 � Labor Sheetmetal 1 Field 1,060.00 2, Labor Pipefitter Labor Startup Labor Engineering 1 Estimating Labor Project Management Labor Foreman/Supervision Total Labr. 1,510.00 43% Labor Taxes 649.30 Other Direct Cost Subt 3,883.30 15% Overhead&Profit 582.50 Subt 4,465.80 Subcontracts 2,150.00 15% Markup on Subcontracts 322.50 Subt 6,938.30 1% Bond 69.38 f' Total Change Order $ 7,007.68 mhtml:f le://CADocuments and Settingsipupchurch\Local SettingsWemporary Internet Files... 5/3/2011 Work Changes Proposal Request PROJECT: PROPOSAL REQUEST NUMBER: 004 revised Orange County Health Department Renovations DATE OF ISSUANCE: 05/04/2011 300 West Tryon Street Hillsborough, NC 27278 CONTRACT FOR: General Construction OWNER: CONTRACT DATE: 02/16/2011 Orange County 101 West Margaret Lane ARCHITECT'S PROJECT NUMBER: 1001 Hillsborough, NC FROM ARCHITECT: Corley Redfoot Zack, Inc, P.O. Box 2368 Chapel Hill, NC 27515 TO CONTRACTOR: H. M. Kern Corporation P.O. Box 19424 Greensboro, NC 27419 Please submit an itemized proposal for changes in the Contract Sum and Contract Time for proposed modifications to the Contract Documents described herein. Within ten(10) days,the Contractor must submit this proposal or notify the Architect, in writing,of the date on which proposal submission is anticipated. THIS IS NOT A CHANGE ORDER,A FIELD ORDER OR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED IN PROPOSED MODIFICATIONS. DESCRIPTION: Make the following revisions to the Work: • Add two(2)Toilets on 2nd Floor,as shown in attached Sketches. o Toilet partitions shall be overhead-braced phenolic-core panels. Available manufacturers include, but are not limited to,the following: • American Sanitary Partition Co. • Ampco. • Global Partitions. • Partition Systems. • Rockville Partitions. • Remove Vestibule at entrance to 2nd Floor Conference Room, o Add millwork with sink and undercounter icemaker on West wall of Conference Room. (Icemakerto be provided by Owner.) o Provide power for residential refrigerator. (Refrigerator to be provided by Owner.) • Provide power and conduit for data cable to location of ceiling mounted projectors in Conference Room and Classroom.(Projectors to be provided by Owner.) • Create cased opening between two existing offices adjacent to new toilets,as shown on Sketch. • Construct closet at end of corridor in office area adjacent to new toilets,as shown on Sketch. ATTACHMENTS: Sketch SKA2.2(rev 4/27/11),SKP-3,SKP-4,SKP-5,SKM-8,SKE-19 REQUESTED BY THE ARCHITECT: David L. Browne,AIA CSI CCS LEED AP Project Architect X OWNER X ARCHITECT X CONSULTANT X CONTRACTOR X FIELD X OTHER(inspections) STORAGE ELEV #2 Z ■ CL ONFERENCE EFRIGERATOR CLG-MOUNTED n I I ELEV 2 (NIC) PROJECTOR ii . . LOBBY i (NIC) ii I I UNDERCOUNTER PROJECTION T, ICEMAKER SCREEN (NIC)----- ■ 3 ii REPj T u ■ e DOO W/ I ABEL DOOR & FRAME ■ Ic STORAGE STORAGE I ENLTRY I I SAW CUT OPNG IN EXISTING MASONRY WALL, EWC CORRIDOR SEE STRUCT DWGS FOR LINTEL PROJECTION :PTION OFFICE OFFICE HAI I SCREEN (NIC) CLG—MOUNTED PROJECTOR (NIC) r , Option #I Second Level - Ren, DEMOLISH WALL & 3 2 Scale: 1/8" = V-0" PROVIDE FINISHED CASED OPENING WOMEN Revise( CE OFFICE Revise( II Revise( II Date Scat e CORLEY REDFOOT ZACK— Title 73 AR C91 . p . NN6R9 Proje IIi OFFICE EXISTING SINK TO BE REMOVED. PREPARE WASTE, VENT AND SUPPLIES FOR RECONNECTION OF NEW SINK. CONFERENCE i Vf�T II C STORAGE EWC EXISTIN 3 WATER COOLEF TO REMAIN STORAGE OFFICE OFFICE I L __ OFFICE OFFICE OFFICE R MRcece,NolanddS d/POD-th,Inc. � w ��;��W 7N ALT#5 -PLUMBING DEMO PLAN �:Q Not To Scale BUR.DINGA xc�.noou,� E bLf 15.29.3122 E x W TL Q4 ADD NEW SUPPLY FOR ICE MAKER AND REFRIGERATOR IN NEW GUY GRAY #BIM87 SUPPLY BOXES FROM NEW SINK CW SUPPLY. COORD114ATE LgwWEW4/EEQUIPMENT INSTALLATION. (l r NEW 2" JOSAM SERIES 49320A FLOORS K / NICKOLY GRATE AND CLAMPING DEVICE. CONNECT EW 2' WASTE TO EXISTING WASTE WHERE DEMOLISHED SIN WAS. COORDINATE LOCATION W/ EQUIPMENT IN TA TION. EXTEND LINES PREPPED DURING DEMOLITION AND CONNECT TO NEW SINK. NEW 1/2" CW DROP, 2' WASTE ON, 1 1/2- VENT RISE, AND 1/2" HW DROP I STORAGE 3/4" HW DN, 1 1/2" CW 1/2" HW DROP _ DN AND 1/2" CIRC TO r� 2' WASTE DN FLOOR BELOW. CONNECT \1 1/2' VENT RISE E wG TO LINES SERVING /2n—CW--DRO BATHROOM GROUP ON FLOOR BELOW. FIELD VERIFY EXACT LOCATIONS. HALL rvlEr 1/2' = I � NEW CIRCUIT SETTER. 04 I 2" VENT RISE SEE HW CIRCULATION 1" CW DROP DETAIL ON SKP-5. F 7 1/2- HW DROP 2" WASTE DN 4" WASTE DN TOE LAS R VENT RISE BASEMENT. CONNECT" 1/2" CW DROP TO EXISTING WASTE- IN BASEM ENT. FIELD = 1 1/2- VERIFY EXACT 2" LOCATIONS ioMEni = — I 2" VENT RISE :E a- VTR " 1" CW DROP 4, 2" VENT RISE 1—" CW DROP Reece,Noland&McElrath,Inc. 409 N°"ff""°°°S" "P° um z ALT#5 -PLUMBING PLAN � IENG�IVFIERS TLQ5 Not To Scale BUILDINGA ■c®nnoer E bLf 15.29.3122 E x h/ TL Q 5 Tcbrfi opdLp!tcbrh Sf d!Ex h/ Q4/1 CORLEY REDFOOT ZACK m. Ujufi Bnf sobLf!$ 6!.!3oe!Qpps!Qrmn cjoh A R ` 11 1 T``T S . ° N C, I " `C R S .R L ° h N r.R S QSPn CILF sbohf!Dpvote!I f bro !E f gbsLn f ou I'O BeT 23fi N.('ha pcl Ilill,fintth Catnl inu 9 19 9 J 2-8586 SfopWxjpot!(]X i jufe!Cvjrejoh 1 jntcpspvhi -!OpsLi !Dbsprjmb NEW CIRCUIT SETTERS NEW CIRCULATION LINE Z Cam— J zz O iv I� z X W 1 HW CIRCULATION DETAIL S7_5 Not To Scale Reece,Noland&McEt=64 Inc. 409 Nm1h Harwood SUN MO eo Hoa sa Wa nwMe,Now60kmVm 73796 Ipwir Date 04-18-2011 Dwg. SKP-5 Scale not to scale Ref. Dwg. P3.0 CORLEY REDFOOT ZACK iNC Title HW Circulation Detail ^ F C " ' T`C T k . ` N ° ' H a`a` •P t " "N`F 5 Project Orange County Health Department pO Bos 2lf k.Chapel bill.North Carolina 919 962-111A Renovations/Whitted Building Hillsborough, North Carolina 1 f -1 L i 1 REF f'IGERATOR (N . c 100 x = Z 8 ffl,5-- _ A REVISION NOTE: DELETE RETURN GRILLE IN — + CONFRENCE ROOM (EXISTING VESTIBULE) AND UPSIZE — — 150 I REMAINING RETURN GRILLE TO SIZE SHOWN. DELETE SUPPLY AND RETURN IN MEN'S TOILET AND ADD 1 n°�, � _8x6_ J 150110::6 EXHAUST GRILLE SHOWN. DELETE RETURN GRILLE IN 3 6 4 2, 1 18>:14 , _ _ f. 1=16x' WOMEN'S TOILET AND ADD EXHAUST GRILLE SHOWN. — — �Xt2- - — 12 1 _ — ADD NEW EXHAUST FAN AND CONNECT TO EXHAUST S x8' -- E — — —g„ � — — — —i . B � 0_ DUCTWORK AS SHOWN. 5 � OI L1,S _3Q0_6_d1 \50 _I I 4x1 11p.- 151 �8"0 6 �� � 150 _01 I co x X x I H— - - II = _ 1 II 11 HALL MEr,1 Ox 300 � 10x$ II I M 6 I FAN SCHEDULE 150 150 FAN f M LOW N a1J S.P. RPU/rs. NN VMT-M MFQ&MODEL sons �OPC.WSW(tom REMAM 00 EFJI EXHNST IAK 350 1/4' 1000 13W 115-10 10 25 N/A 36 1.3.4.6. 10 800 C ff 2 WOUSr 1xM 75 1/4' 950 49w 277-11 cRF�I9mpt 1.6 N A 15 1-3 1 1 �p ( r_%: LFf3 EXWIW CEILNO 110 1/4' 1100 53N 277-10 1A N/A 15 1.3.4.6, 10 5 L F Ex+uusr KNE 200 1/4' 1000 an 115-11 cs�—A2t�o 2D N/A 21 1,3.4.9. 10 1 150 _1 0 150 cl VN NOIE:C011PAR U PRODUCTS BY ACME. NES,COOK,PERM 1.— 17 DODON 1ECT SI M 5.DOOM THEISIOSTAT 9.ROOF(CURB)CAP 111R1 PREFABRICATED CURB 2 M07ONZED DAMPERS L W LL CAP 10.ON PROM CORM(NAIN LOCAL ANU 8 1 l SACKORWr DAMPER 7.MN61AL swrtcH 11.FRMABRIQUED ROOF CURB 4.IIINO9E0 VOW=ISOLATORS 8.CAM MQWX1DE SENSOR 12 ADJUSTABLE PROM SHEAVE x8 UP TO ROOF CAP REVISED DUCTWORK PLAN 5 Date 04-18-2011 DWg. SKM-8 Scale 1/8" = P-0” Ref. Dwg. M3.0 ENGINEERS CORLEY REDFOOT ZACK.,, Title ALT#5 SECOND FLOOR Reece,Noland&McElrath,Inc. A N C I I I T E f T S . G N G I N li f R 5 .P L A N N G R 409 North Haywood Street/PO Box 540 1 , h,. �3.,n. Nnn. .,,, ,o „Z- 5 Project Orange County Health Department Waynesville,North Carolina 28786 Renovations/Whitted Building WAYNNV=R, CoM c®2011 WWWMI-E CDM Hillsborough,North Carolina NCceu.No.cm4v i ur A A A CONNECT TO SPARE 20A DT ' N SINGLE-POLE CIRCUIT0 I` CONFERENCE �� OT- EXISTING NE1 .1"J&TNE Ij ■ II i ii I II I i I I II D� ONNECT TO SPAR'2 F A A A II INGLE-POLE CIRCUITJ %N III i- -J XISTING NEARBY 0AN CONNECT TO EXISTING �� I I� LIGFMNG CIRCUIT I II I III H u �' ■ A A A CONNECT TO SPARE 20A P SINGLE-POLE CIRCUIT ON EXISTING NEARBY PANEL 6 —Iq C NNEC�To SPAR 20A SrORAGE 81 GLE-POLE CIRCL I ON STORAGE E���jj(���jjjggggggT NG NEARBY NEL z Conference Rm-Lt Plan CONNECT O S'RCU'T O G SINGLE-P LECIRCUIT ON KE-19 Not To Scale Building A,2nd Floor EXISTING NEARBY PANEL ` EWC kND DRYER-CONNECT OS'RE OA SINGLE-POLE GFI CIRCUtF)N EX STING NEARBY PANEL LI_ u CONNECT TO SPARE 20A SINGLE-POLE CIRCUIT ON EXISTING NEARBY PANEL ND DRYE VNECT TO ARE 20 SI E-POLE DT G t STING -( , r NEARBY-R EL °I \,�F_ CLA . P.00� CONNECTTO[FF E 20 SINGLE-POLEQJB TON -- FXI NG-NNEAR wANEL GFl C> AND RECEPTACLE I AND DATA OUTLET FOR PROJECTOR D -COORDINATE W/OWNER(TYP.) —E I Reece,Noland&McElmlh,Inc. 40 Na a m ffy dShy«/P0B.Sw 1 Conference Rm&New Toilets -Lt Plan /� wayanvale xntbC.,dw 28786 KE-19 Not To Scale Building A,2nd Floor FJVGINFERS �M�p� m. Date 05-02-2011 Dwg. SKE-19 Scale not to scale Ref. Dwg. E3.0 CORLEY REDFOOT ZACK,N� Title Alternate #5, 2nd Floor Power .n R C it I T C:C T S . E N G I N E F R 5 .P L A N\ER' Project Orange County Health Department Po oos z:en.�a,p.i e;u.noon c­,u., n i o n a z-Ksxry Renovations/Whitted Building Hillsborough, North Carolina Harry Jensen From: Dave Browne[dbrowne @corleyredfootzack.com] Sent: Monday, May 23, 20114:28 PM To: 'Peter Upchurch; 'Kurt Hicks' Cc: 'harry jensen';jethompson @co.orange.nc.us Subject: RE: OC Health Dept Renovations-RFP-004 Revised Peter, Walls: All areas- Paint Floors: • Conference Room &Classroom—Carpet Tile, Rubber Base • Toilets—Ceramic Tile,thin-set on WP membrane,setting method TCNA F122A • Hall &Storage Closet: VCT, Rubber Base Ceilings: All areas—Acoustical Panels David L. Browne,AIA CSI CCS LEED AP Corley Redfoot Zack PO Box 2368 Chapel Hill, NC 27515 222 Cloister Court Chapel Hill, NC 27514 Telephone 919.401.8586 Fax 919.493.7306 dbrowne @corlevredfootzack.com From: Peter Upchurch Imailto:pupchurch @hmkern.com] Sent: Monday, May 23, 2011 3:46 PM To: Dave Browne; Kurt Hicks Cc: harry jensen Subject: RE: OC Health Dept Renovations - RFP-004 Revised Dave, What about the finishes? Flooring? I've assumed painted walls. Thanks, Peter Upchurch H M Kern Corporation p:(336) 668-3213 f.•(336) 668-2142 From: Dave Browne [mailto:dbrowne @ corleyredfootzack.coml Sent: Wednesday, May 04, 20119:57 AM To: Peter Upchurch; Kurt Hicks Cc: 'Jeff Thompson'; 'harry jensen'; 'Steve Kaufman'; 'Dick Drake'; "Ken Redfoot" Subject: OC Health Dept Renovations - RFP-004 Revised Please see attachment. 1 David L. Browne,AIA CSI CCS LEED AP Corley Redfoot Zack PO Box 2368 Chapel Hill, NC 27515 222 Cloister Court Chapel Hill, NC 27514 Telephone 919.401.8586 Fax 919.493.7306 dbrowne @corleyredfootzack.com 2