2011-286 AMS - H. M. Kern Corp. for Change Order #5 for Health Dept. Renovations at Whitted Bldg. (Revised)
TM Docume AIA n 701 - 2001 rG t G Change Order PROJECT:(Name and address) CHANGE ORDER NUMBER: 005 (Revised) OWNER❑ Orange Co. Health Dept. Renov*DATE: August 1,"2022' ARCHITECT❑ Richard_ L. Whitted Bldg. Hillsborough, NC ARCHITECT'S PROJECT NUMBER: 1001 CONTRACTOR❑ TO CONTRACTOR:(Name and address) FIELD❑ H. M. Kern Corp. CONTRACT DATE: February 16, 2011 OTHER❑ 160 'Ibatcher Road Greensboro, NC 27409 CONTRACT FOR: General Construction The Contract is changed as follows: (Include, where applicable,any undisputed amount attributable to previously executed Construction Change Directives) Owner-requester) Pfd's; POOH-08: floor,plan changes detailed in RFP 4003 ................ADD $ 9,05'+.00 .. .... PCO--13: modified floor finishes per 5/16/11 email messages: ....ADD 32032_00 - Meal,~-Vech only Pct, g-;l,-p TOTAL ADD: $ 129086.00 The original(Contract Sum)( )was $ 763 800.00 The net change by previously authorized Change Orders $ 26533-14=00— The(Contract Sum)( )prior to this Change Order was $ 1,029,114.00 The(Contract Sum)*8 t=rice)will be(increased)( d) by this Change Order in the amount of $ _ 12 086.00 The new(Contract Sum)( rice)including this Change Order will be $ 1,041,200.00 The Contract Time will be )(unchanged)kj ( )days The date of Substantial Completion as of the date of this Change Order therefore is August 28,2011 (Nate: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.) NOT VALID UNTIL SIGNED BY THE ARCHITECT,CONTRACTOR AND OWNER. Orley Reifoot lack, Inc. H. M. Kern Corp Orange Co., NC ARCHITECT(Firm name) CONTRACTOR(Firm name) OWNER(Firm name) 222 Cloister Court 160 Thatcher Rd PO Box 3181 Chapel Hill, NC 27514 Greensboro, NC 27409 Hillsborough, NC 27278 ADDR S-- - ADDR AD Pignature)BY(S' ature) BY(Signature) BY ; Kenneth R. Red.foot, AIA �CTGiZ 61?C 14u RC-0 I�Typed(Typed na ) (Typed name) name) 1 1w // DATE DATE DATE CAUTION:You should sign an original AIA Contract Document,on which this text appears in RED.An original assures that changes will not be obscured. AIA Document G701 Tm—2001.Copyright ©1979,1987,2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING:This AIA® Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA® Document, or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. Purchasers are permitted to reproduce ten(10)copies of this document when completed.To report copyright violations of AIA Contract Documents,e-mail The American Institute of Architects'legal counsel,copyright@aia.org. ® Document G701 TM- 2001 Instructions Change Order GENERAL INFORMATION Purpose AIA Document G701 is for implementing changes in the Work agreed to by the Owner,Contractor and Architect. Execution of a completed G701 indicates agreement upon all the terms of the change,including any changes in the Contract Sum(or Guaranteed Maximum Price)and Contract Time. Use of Current Documents Prior to using any AIA Contract Document,users should consult www.aia.org or a local AIA component to verify the most recent edition. Reproductions This document is a copyrighted work and may not be reproduced or excerpted from without the express written permission of the AIA.There is no implied permission to reproduce this document,nor does membership in The American Institute of Architects confer any further rights to reproduce this document. The AIA hereby grants the purchaser a limited license to reproduce a maximum of ten copies of a completed G701,but only for use in connection with a particular project.The AIA will not permit reproduction outside of the limited license for reproduction granted above,except upon written request and receipt of written permission from the AIA. Rights to reproduce the document may vary for users of AIA software. Licensed AIA software users should consult the End User License Agreement(EULA). To report copyright violations of AIA Contract Documents,e-mail The American Institute of Architects'legal counsel,copyright @aia.org. COMPLETING THE G701 FORM Description of Change in the Contract Insert a detailed description of the change or reference specific exhibits describing,in detail,the change to be made in the Contract by this Change Order. Include any drawings,specifications,documents or other supporting data to clarify the scope of the change. Determination of Costs Insert in the blanks provided,or strike out the terms in parentheses that do not apply,the original Contract Sum or Guaranteed Maximum Price;the net change by previously authorized Change Order(note that this does not include changes authorized by Construction Change Directive unless such changes were subsequently agreed to by the Contractor and recorded as a Change Order);the Contract Sum or Guaranteed Maximum Price prior to this Change Order;the amount of increase or decrease,if any,in the Contract Sum or Guaranteed Maximum Price; and the new Contract Sum or Guaranteed Maximum Price as adjusted by this Change Order. Change in Contract Time Insert in the blanks provided,and strike out the unused terms in parentheses,the amount(in days)of the increase or decrease,if any in the Contract Time. Also insert the date of Substantial Completion,including any adjustment effected by this Change Order. EXECUTION OF THE DOCUMENT When the Owner and Contractor,in occurrence with the Architect,have reached agreement on the change to be made in the Contract,including any adjustments in the Contract Sum(or Guaranteed Maximum Price)and Contract Time,the G701 document should be executed in triplicate by the two parties and the Architect,each retaining an original. AIA Document G701 TM—2001.Copyright©1979,1987,2000,and 2001 by The American Institute of Architects.All rights reserved.WARNING:This AIA®Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA®Document, or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. Purchasers are permitted to reproduce ten(10)copies of this document when completed.To report copyright violations of AIA Contract Documents,e-mail The American Institute of Architects'legal counsel,copyright @aia.org. H. M. KERN CORPORATION 160 THATCHER ROAD PO BOX 19424 GREENSBORO,NC 27419 (336)668-3213 FAX: (336)668-2142 PROPOSED CHANGE ORDER PCO-08 TO: CORLEY REDFOOT ZACK DATE:MAY 23,2011 222 CLOISTER COURT CHAPEL HILL,N.C. 2514 CC: KURT HICKS ATTENTION: HARRY JENSEN,JR. REFERENCE: ORANGE COUNTY HEALTH DEPT RENOVATIONS JOB#759 SUBJECT: RFP#003 IN ACCORDANCE WITH OUR CONTRACT WE REQUEST A CHANGE ORDER IN THE AMOUNT OF NINE THOUSAND FIFTY FOUR ($9,054.00) DOLLARS FOR THE FOLLOWING: FLOOR PLAN CHANGES DETAILED IN RFP#003. PLEASE CALL IF YOU HAVE ANY QUESTIONS. TOTAL COST: $ 9,054.00 TEAE IMPACT: DAYS ORIGINATED BY: ACKNOWLEDGED BY: H.M.KERN CORPO72a"14 CORLEY REDFOOT ZACK SIGNED:I�� SIGNED: BY: PETER UPC CH BY:HARRY JENSEN, JR DATE: MAY 23,2011 DATE: H. M.Kern Corporation PCO-08 5/20/2011 Job#759 ORANGE COUNTY HEALTH DEPARTMENT RENOVATIONS RFP#003 668-3213(p 668-2142(f) Phase Descri tiara Qtv unit unit Amount Labor: 20110 COORDINATION 16 HRS 19.00 304 20210 CUT DOOR OPENING 16 HRS 15.00 240 208101 INSTALL FRAME, DOOR, HARDWARE 16 HRS 15.00 240 20180 CLEAN UP 4 HRS 15.00 60 0 0.00 0 0 0.00 0 0 0.00 0 0 0.001 0 0 0.00 0 Total Labor 844 Materials: 30610 N-C PLYWOOD 3 SHTS 61.00 183 30198 DUMP FEES 1 US 250.00 250 50810 DOOR&ACCESSORIES 1 US 805.00 805 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 1 0.00 0 Total Materials 1,238 Equipment: 10153 DEMO TOOLS 1 US 150.00 150 30500 STEEL LENTIL 1 EA 350.00 350 0 0.00 0 0 0.00 0 01 0.00 0 0 0.00 0 Total Equipment 500 Subcontractors: S 4348.59 4 41520 HVAC 1 U 349, 40920 DRYWALL 1 US 339.00 339 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 Total Subcontractors 4,688 Total Labor, Materials&Equipment 2,582 Sales Tax Materials&Equipment) 7.75% 135 29160 Labor Burden 40% 338 Subtotal 3,055 89800 OH& Profit(Labor, Materials & Equipment) 20% 611 Total Subcontractors L4,6881 89800 OH &Profit Subcontractors) 10%Subtotal 62050 Performance&Payment Bond 2%Total Proposed Change Order Page 1 ORANGE COUNTY HEALTH DEPARTMENT RENOVATIONS-RFP#003 HOLLOW METAL: RFP#003-adding(1)3'0"x7'0"KD Hollow Metal Frame $85.00 WOOD DOORS: RFP#003-adding(1)3'0"x7'0"Flush Wood Door $220.00 RFP#003-changing doors 110D& 120 from half glass to full glass $165.00 HARDWARE: RFP#003-adding(1)hardware set per RFP $335.00 TOILET ACCESSORIES: NO CHANGE Page 1 of 1 Peter Upchurch From: Robert Rackley[rrackley96 @yahoo.com] Sent: Friday,May 20,2011 2:01 PM To: Peter Upchurch Subject: Orange County RFP#3 International Drywall * HUB CERTIFIED 4102 Burlington Rd. Greensboro, NC 27405 Office: (336)375-0497 Fax:(336)375-0561 Attn : Estimating Date:5120111 Quote to: H.M. Kern For: Orange County Reno. RFP#003 Tele.Closet 140A We propose to furnish the materials and perform the labor for the completion of matri. labor 2 man hrs.x$25 O.P. total Metal framing $63 $50 $9 $122 matri. labor 4 man hrs.x$25 O.P.+ 7.5% Drywall/Finish $61 $100 $12 $173 matri. labor 1 man hrs.x$25 C.P.+ 7.5% Insulation $16 $25 $3 $44 labor/matrl $339 All material,and work to be in accordance with drawings provided for the sum of:$339 Three Hundred Thirty Nine Dollars and no Cents Excluded: Demo Dumpster EIFS/Stucco Plywood/Blocking Respectfully submitted, Robert Rackley 5/23/2011 Page 1 of 1 Comfort Engineers, Inc.-Mechanical Contractors P.O. Box 2955,Durham,North Carolina 27795- 2955 Construction Group ENGINEERS 4008 Comfort Lane,Durham, North Carolina 27705 Date: May 2 2011 To: H M KERN From: Curtis Turman Re: Orange County Health Dept. RFP-003 Major Materials 0.00 Sheetmetal Materials 823.00, Piping Materials Miscellaneous Materials 100.00 Total Mate 923.00 NC 71.53 Labor Sheetmetal/Shop 200.00 Labor Sheetmetal /Field 595.00 Labor Pipefitter Labor Start-up Labor Engineering/ Estimating Labor Project Management Labor Foreman /Supervision Total Labr 795.00 43% Labor Taxes 341.85 Other Direct Cost Subt 2,131.38 15% Overhead &Profit 319.71 Subt 2,451.09 Subcontracts 1,650.00 15% Markup on Subcontracts 247.50 Subt 4,348.59 1% Bond 0.00 Total Change Order $ 4,348.59 mhtml:file://C:\Documents and Settings\pupchurch\Local Settings\Temporary Internet Files... 5/3/2011 Work Changes Proposal Request PROJECT: PROPOSAL REQUEST NUMBER: 003 Orange County Health Department Renovations DATE OF ISSUANCE: 04/21/2011 300 West Tryon Street Hillsborough, NC 27278 CONTRACT FOR: General Construction OWNER: CONTRACT DATE: 02/16/2011 Orange County 101 West Margaret Lane ARCHITECT'S PROJECT NUMBER: 1001 Hillsborough, NC FROM ARCHITECT: Corley Redfoot Zack, Inc, P.O. Box 2368 Chapel Hill,NC 27515 TO CONTRACTOR: H. M. Kern Corporation P.O. Box 19424 Greensboro, NC 27419 Please submit an itemized proposal for changes in the Contract Sum and Contract Time for proposed modifications to the Contract Documents described herein. Within ten(10)days,the Contractor must submit this proposal or notify the Architect, in writing,of the date on which proposal submission is anticipated. THIS IS NOT A CHANGE ORDER,A FIELD ORDER OR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED IN PROPOSED MODIFICATIONS. DESCRIPTION: Make the following revisions to the Work: • Drawings A1.2 &A1.23: • Subdivide Storage 146 to create Telephone Closet 140A as shown in attached Sketch SDA-001, revised 3/2/11. • Cut masonry opening and install new Door 134F. • Drawing A1.5: Revise Door and Frame Schedule to add new Door 134F,as follows: • 3'-0" by 7'-0"Type A,solid core wood door. • Hollow metal frame. • Hardware: 3 Hinges 5131314-1/2 x 4-1/2 1 Lockset ML2057 LWA M21 1 Closer 4011 REG 1 Kickplate 840010"X 34" 3 Door Silencers GJ64 • Drawing A1.5: Revise Door and Frame Schedule to change Doors 110D and 120, as follows: o 3'-0" by 7'-0"Type E,full glass wood door,as shown on Sketch SDA-003. • Drawing M1.1: Refer to attached Sketch SKM-7. o Shift supply and return diffusers in Storage 141 to match revised layout. o Shift SS-113 to new IT Room 140 location. o Add supply and return diffusers in Telephone Closet 140A. o Relocate existing T-Stat to Telephone Closet 140A. ATTACHMENTS: Sketch SDA-001(rev 3/2/11),SKM-7 REQUESTED BY THE ARCHITECT: 14 4 %—� t IV David L. Browne,AIA CSI CCS LEED AP Project Architect X OWNER X ARCHITECT X CONSULTANT X CONTRACTOR X FIELD X OTHER(inspections) C -1 —TA-4— I TA-2 A-6 SAW CUT EXISTING NEW PLYWD BACKING e PLYWD BACKING PANEL PANELS, 48" HI W/ TOP EDE ALIGNED W/ Q TOP OF EXISTINGB V-3" PANEL - RUN WALL-TO-WALL EA STAFF TA-3 SIDE OF RM STORAGE A TOILET 11-1• 1-4-0-1 TELEPHONE F 39 -Z s 7'-4i. CLOSET ALIGN FACE OF FI-4—OA-1 PROVIDE SOUND BATTS PARTITION W/ EDGE IN,ALL INTERIOR OF EXISTING MASONRY TOILET WALLS AND OPENING ABOVE CEILING — z-° TA-1 3 `= 1348 134E 134A A OOL A -o^ 3'-4^ FLUSH MO INTERVIEW ROOM #3 138 A10 138 A d 3 Staff Toilet # 139 Enlarged Plan Rev. 3/02/2011 Date 2/21/2011 Dwg. SDA-001 A1.3 Scale: 1/2"= 1'-0" BUII,DING A Scale 1/2"=1'-0" Ref.Dwg. A1.3 CORLEY REDFOOT ZACK a. Title Toilet Enlarged Plans Project OrangeCounty Health Department Renovations i I A r!U 1 12 � I �A J- f T f-�tT � n 3 II, F 141 T0� - E 139 135 I 0 - E .6 100 ' U E 11 { ex8L cx 4 � JI N X 6" �' OW RETURN 1 \ �- 12x6 DN TO L_ 0 n x E — C 175 \ ,� 1 j � SON o AM _B B _ M #4 r '- 16k � - 175 — - 25 43 - - - I T� J 755 12x6 . ' - =T� REVISED DUCTWORK PLAN 4Q REVISION NOTE: SHIFT SUPPLY AND RETURN DIFFUSERS TO MATCH NEW ROOM / CEILING LAYOUT(ROOM 141). SHIFT SS-1B TO NEW IT ROOM #140 LOCATION. ADD NEW SUPPLY AND RETURN DIFFUSERS TO MATCH NEW ROOM / CEILING LAYOUT IN NEW TELEPHONE CLOSET 140A. RELOCATE EXISTING T-STAT TO TELEPHONE CLOSET 140A. WA R wo Date 04-18-2011 Dwg. SKM-7 Scale 1/8" = P-0" Ref. Dwg. M1.1 = ENGINEERS CORLEY REDFOOT ZACK., Title REVISED STAFF TOILET RM 1.39 Reece,N o l a n d&M c E l r a t h,Inc. A n I Tr-r , . F N ., I N HERN .1' L A N N E R S Project t'u l{.�� 2lI�X.('hnp.l Ilil 1,Nnrh('�r lino "I'r n4]-XSNt� 409 NorthAaywoodStr�et/PO Box 540 , 1 '1 � Orange County Health Department Waynesville,North Carolina 28786 Renovations/Whitted Building WAYN99V M M45&955] PAX M494M ARM=62&151.= 54, M,,, ®,a„ WWWJQ31A�,�,�5.eo55 Hillsborough, North Carolina PXCCRENO.aai49 H. M. KERN CORPORATION 160 THATCHER ROAD PO BOX 19424 GREENSBORO,NC 27419 (336) 668-3213 FAX: (336)668-2142 PROPOSED CHANGE ORDER PCO-13 TO: CORLEY REDFOOT ZACK DATE:MAY 26, 2011 222 CLOISTER COURT CHAPEL HILL,N.C. 2514 CC: KURT HICKS ATTENTION: HARRY JENSEN,JR. REFERENCE: ORANGE COUNTY HEALTH DEPT RENOVATIONS JOB#759 SUBJECT: FLOOR FINISH CHANGES IN ACCORDANCE WITH OUR CONTRACT WE REQUEST A CHANGE ORDER IN THE AMOUNT OF THREE THOUSAND TWO HUNDRED THIRTY NINE ($3,239.00)DOLLARS FOR THE FOLLOWING: MODIFY FLOOR FINISHES PER MAY 16,2011 EMAIL MESSAGE. PLEASE CALL IF YOU HAVE ANY QUESTIONS. TOTAL COST: $ 3,932.00 TIME IMPACT: DAYS ORIGINATED BY: ACKNOWLEDGED BY: H.M.KERN CORPORATION CORLEY REDFOOT ZACK SIGNED: /�? &iix SIGNED: BY: PETER UPC CH BY: HARRY JENSEN, JR DATE:MAY 26,2011 DATE: H.M.Kern Corporation PCO-13 5/26/2011 Job#758 ORANGE COUNTY HEALTH DEPARTMENT RENOVATIONS FLOOR SCHEDULE CHANGES 668-3213(p 668-2142(1) Phase Descri tion Qtv unit unit S Amount Labor: 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 Total Labor 0 Materials: 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 Total Materials 0 E ui ment: 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 Total Equipment 0 Subcontractors: 40965 L&E FLOORING 1 US 2865.00 2,865 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 Total Subcontractors 2,865 Total Labor, Materials&Equipment 0 Sales Tax Materials&Equipment) 7.75% 0 29160 Labor Burden 40% 0 Subtotal 0 89800 OH&Profit(Labor, Materials& Equipment) 20% 0 Total Subcontractors 2,865 89800 OH&Profit Subcontractors 10% 298 Subtotal 3,163 62050 Performance&Payment Bond 2% 76 Total Proposed Change Order $3,239 Page 1 L& E CafpetCo., Inc. Change Order Request 107 C reek R dge Road Su ile E G reensbo m,NC 27406 Date 5/24/2011 Name/Address H.M.KERN CORPORATION P.O.BOX 19424 GREENSBORO,NC 27419 ATTN:PETER UPCHURCH Project ORANGE COUNTY HEALTH DEPT. Item Description Total SHEET VINYL FURNISH NEW MEDINTECH SHEET VINYL IN ALL INTERVIEW ROOMS, 5,617.00 LABORATORY,PHARMACY AND BATHROOMS IN CLINIC SPACE PER FINISH SELECTIONS 5116/2011 ADHESIVE ADHESIVE FOR MEDINTECH SHEET VINYL 209.00 WELDING RODS WELDING RODS FOR MEDINTECH SHEET VINYL 64,00 FREIGHT FREIGHT FOR MEDINTECH SHEET VINYL 52,00 LABOR LABOR TO INSTALL MEDINTECH SHEET VINYL 1,702,00 RUBBER FLOOR CREDIT FOR RUBBER FLOOR FOR ALL INTERVIEW ROOMS,LABORATORY -3,549.00 AND PHARMACY LABOR CREDIT FOR LABOR TO INSTALL RUBBER FLOOR -1,080.00 ADHESIVE CREDIT FOR ADHESIVE FOR RUBBER FLOOR -150.00 Thank you for your business. Total $2,865.00 harry jensen From: Wayne Sherman [wsherman@co.orange.nc.us] Sent: Monday, May 16, 2011 9:58 AM To: hjensen @corleyredfootzack.com Subject: FW: Revision to RFP-004-added 2nd fl chgs+colors&floor finishes-Medintech Attachments: 2nd floor requst 0001.pdf Harry, This is the e-mail I think you were looking for per your voice mail this morning. It has the breakdown of choices for flooring, etc. Wayne From: Rosemary Summers Sent: Thursday, April 21, 20112:16 PM To: 'harry jensen' Cc: Jeff Thompson; Wayne Sherman; KEN REDFOOT; 'Dave Browne' Subject: RE: Revision to RFP-004-Conference Room casework relocation Harry, This is in follow up to our meeting Tuesday. Sorry it has taken me so long to get to this. I am also requesting the following for the second floor A Building 1)addition of a standard ice maker under the counter next to the sink in the 2nd floor conference room 2)opening the wall with the widest cased opening possible between the office immediately to the west of the new bathroom closest to the south wall. It's fine to leave both office doors. See attachment with note on Option #1 additional sketch 3)electrical service and computer connections in the ceiling of both the classroom and the conference room for a ceiling mounted LCD projector(second floor A Building) B Building Please note for the B Building that there will need to be plumbing and a dryer vent next to the break room on the ground floor for a home sized washer and dryer. Also please ensure that the plans for the B Building dental mechanical room have extra sound baffling/absorption for the larger equipment that will be in that space. As requested, please find our materials and color selections for floors and countertop laminate. Rubber the in A Building ground floor hall replacement: Texture: Crackle Design type 982; Colors: 174 (Smoke) and 187 (Blue) in a pattern lay out similar to that of the current halls. Base/Shoe Mold: color 187 (blue). All Offices, Medical Records, Break Room,Waiting Room, workroom, and the main portion of the clinic vinyl mondo smooth HAS 85 (light blue) base/shoe mold: Roppe RubberNinyl 154(Salem Blue) All Counter tops S3036T Textured (Impressionist Blue) Medentec in all interview rooms, exam rooms, laboratory, pharmacy, and bathrooms in clinic space, 2nd floor A Building all offices, classroom and conference room in 70145 Patina carpet. 1 Please repaint all walls. Thanks, I gave Kurt keys for the work tomorrow. Thanks to all for how smoothly this has progressed! Rosemary Rosemary L. Summers, DrPH Orange County Health Director 300 West Tryon Street Hillsborough, NC 27278 (919)245-2411 (919)644-3007 (fax) www.co.orange.nc.us rsummers(a)_co.orange.nc.us CONFIDENTIALITY NOTICE:All email messages,including any attachments,generated from or received by this site are the property of Orange County Government and as such are considered public domain and are subject to the North Carolina Public Record Law. The Orange County Health Department does not transmit clienttpatient medical information via email.Certain other confidential information may be transmitted and any unauthorized review,use,disclosure or distribution is prohibited.If you are not the intended recipient,please contact the sender by reply email and destroy all copies of the original message. H you believe there has been an inappropriate disclosure,please contact Carla Julian at ciulian(a)_co.orange.nc.us,the Health Department Privacy Officer. From: harry jensen [mailto:hjensen @corleyredfootzack.com] Sent: Thursday,April 21, 2011 12:51 PM To: 'Peter Upchurch'; 'Kurt Hicks' Cc: Jeff Thompson; Wayne Sherman; Rosemary Summers; KEN REDFOOT; 'Dave Browne' Subject: FW: Revision to RFP-004 - Conference Room casework relocation Peter/Kurt: Please review and distribute the attached revised sketch of the 2"d floor Confrence Room to your Staff& subcontractors for coordination&compliance. This change for the relocation of the casework& refrigerator was discussed at the end of the 4/19/11 job meeting. Contact our Office if you have any questions. Harry M.Jensen,Jr. -Const.Adm. Corley Redfoot Zack, Inc. 222 Cloister Court Chapel Hill, NC 27514 919.401.8586 919.880.1865 Mobile hjensen @corleyredfootzack.com From: Dave Browne [mailto:dbrowne @corleyredfootzack.com] Sent: Thursday, April 21, 2011 11:48 AM To: 'harry jensen' Subject: Revision to RFP-004 Harry, 2 Please distribute attached revised Sketch. Thanks David L. Browne,AIA CSI CCS LEED AP Corley Redfoot Zack PO Box 2368 Chapel Hill, NC 27515 222 Cloister Court Chapel Hill, NC 27514 Telephone 919.401.8586 Fax 919.493.7306 dbrowne @corievredfootzack.com 3 harry jensen From: Dave Browne[dbrowne @corieyredfootzack.com] Sent: Tuesday, May 31, 2011 8:25 AM To: 'harry jensen' Subject: FW: SUBMITTAL FOR CARPET, BASE&SHEET FLOORING + PAINT COLORS From: harry jensen [mailto:hjensen @corleyredfootzack.com] Sent: Monday, May 16, 2011 11:09 AM To: 'Peter Upchurch'; 'Kurt Hicks' Cc: 'Jeff Thompson'; rsummers @co.orange.nc.us; 'Wayne Sherman'; 'Wayne Fenton'; KEN REDFOOT; 'Dave Browne' Subject: SUBMITTAL FOR CARPET, BASE &SHEET FLOORING + PAINT COLORS Peter/Kurt: The following information that has been received from the Owner is to be used to provide the finishes for this project in the"A" building. 1. Ground floor hall replacement—Rubber floor tile—Texture: Crackle Design type 982; Colors: 174(Smoke) and 187 (Blue) in a pattern similar to current hall layout Base/Shoe Mold: Color 187(blue). 2. All Offices, Medical Records, Break Room,workroom and the main portion of the clinic -Flooring:Vinyl mondo smooth HAS 85 (light blue). Base/Shoe Mold: Roppe Rubber/Vinyl 154 (Salem Blue). 3. Medintech by Armstrong#87448(Blue Skies) in all interview rooms, laboratory, pharmacy and bathrooms in clinic spaces. Provide color sheet/sample for Owner approval! 4. Second Floor Carpet: -All offices, classrooms&conference rooms—stile 70145 Patina (grey/blue). 5. Paint all walls&trim to match existing: Walls:SHERWIN WILLIAMS, PM200 LTX SG EX WH, Product# B31W2251, Color name Sky High,Color#:SW6504, Finish: semi-gloss. Trim:SHERWIN WILLIAMS, IND EN VOC PURE WHT, Product# B54WZ101,Color name:Vast Sky,Color#:SW6506, Finish:enamel. 6. All Counter tops are S3036T Textured (Impressionist Blue). Contact our Office if you have any questions! Harry M.Jensen,Jr.-Const.Adm. Corley Redfoot Zack, Inc. 222 Cloister Court Chapel Hill, NC 27514 919.401.8586 919.880.1865 Mobile hiensen@corlevredfootzack.com 1