Loading...
HomeMy WebLinkAbout2003 NS Purchasing - Innovative Design for Wastewater Treatment Design Services at NHSC and Feasibility Analysis of Sustainable Design Elements3 ° five Desi n Innova J 850 W. Morgan Street Raleigh, NC 27603 919-832-6303 Fax 919-832-3339 Apri127, 2003 Pamela Jones Director of Purchasing and Central Services Orange County 132 E. King Street Hillsborough, NC 27278 Ms. Jones: I look forward to the opportunity to work with Orange County on such a challenging and exciting project. The sustainable goals put forth by your commissioners for the old Cedar Grove School are wonderful. I would be very proud to be a part of making them come true. I thank you for the opportunity. The following presents a proposed list of optional strategies which Harshad Padia (with Padia Consulting) and I feel are opportunities which should be analyzed. Depending upon your budget for this initial work, you could decide upon the level of effort desired. In our very tentative review, we have also tried to place these option in order, in terms of relative potential benefit (both energy dollar savings and environmental impact}. We have also identified a fee associated with each item that would allow us to analyze the particular item in relationship to the overall project. To complete the following work, we will, from an energy perspective, require that the current building be inputted into a total building energy simulation program. To accomplish this analysis, we use the best program available -DOE II. To additionally simulate any of the daylighting options, we use a program called DAYLITE which allows us to simulate the daylighting contribution at numerous points within each individual room, all day long, 365 days a year. "to determine the actual projected lighting and cooling savings, this DAYLITE program output is, in turn, input into DOE II, which accounts for the savings occurring from the particular daylighting option inxelationship to the other building dynamics. To calculate the rainwater savings, we will utilize a program developed by Innovative Design, specifically designed for optimizing the size and design of rainwater catchment systems. The proposed analysis will determine, for each measure, the energy savings (in dollars as well as btus), CO2 savings, and nitrogen savings. This will be compared to the projected cost of each measure. 4 The following outlines the base audit and analysis costs that will occur, regardless of• the specific measures selected. This scope assumes that there are "As-Built" plans for the facility and that additional, detailed field work is not required to determine the existing conditions. Base Tasks Task Base 1: Complete audit of the facility ID 8 hours at $125/hour $ 1,000 12 hours at $90/hour $ 1,080 Padia 6 hours at $125/hour $ 720 8 hours at $90/hour $ 720 Task Base 2: Input of base building into the DOE II energy simulation Padia 40 hours at $90/hour $ 3,GU0 Task Base 3: Coordination with Orange County staff, interim review, information gathering, and final presentation to Orange ID 20 hours at $125/hour $ 2,500 30 hours at $90/hour $ 2,700 20 hours at $50/hour $ l ,000 Padia 8 hours at $125/hour $ 1,000 4 hours at $90/hour $ 360 Total Base Costs $14,680 The proposed analysis of sustainable options arc broken down into the categories of energy, water, and green products and systems. Energy Task E1: Daylighting/window strategies 1D 5 strategies x 10 hours x $90/hour $ 4,500 2 hours x $125/hour $ 250 Padia 2 strategies x 4 ]lours x $90/hour $ 720 1 hour x $125/hour $ 125 5 Task E2: Tree shading ID 3 hours x $90/hour $ 270 1 hours x $125/hour $ 125 Padia 4 hours x $90/hour $ 360 1 hour x $125/hour $ 125 Task E3: Mechanical systcm options (includes recommendations on IAQ and ventilation) Padia I S hours x $90/ltour $ I ,350 2 hours x $125/hour $ 250 Task E4: Lighting modifications Padia 10 hours x $90/hour $ 900 1 hour x $125/hour $ 125 Task E5: Roof/radiant barrier/insulation strategies ID 2 strategies x 3 hours x $90/hour $ 540 1 hour x $125/hour $ 125 Padia 2 strategies x 4 hours x $90/hour $ 720 1 hour x $125/hour $ 125 Task E6: Natural and fan assist ventilation strategy ID 3 hours x $90/hour $ 270 1 hour x $125/hour $ 125 Padia 4 hours x $90/hour. $ 360 1 hour x $125/hour $ 125 Task E7: Solar hot water system ID 2 hours x $90/hour $ l 80 1 hour x $125/hour $ 125 Padia 2 hours x $90/hour $ 180 1 hour x $125hour $ 125 Task E8: Remote PV lights for parking lot, park, walks, and "sign" ID 2 hours x $90/hour $ 180 1 hour x $ ] 25/hour $ 125 Padia 2 hours x $90/hour $ 180 ., 1 hour x $125hour Task E9: Unknown (to be determined during audit) ID 3 hours x $90/hour 1 hour x $125/hour Padia 4 hours x $90/hour 1 hour x $90/hour Total Energy Tasks E1-E7 Water $ 12S $ 270 $ 125 $ 360 $ 125 $] 3,590 Task W 1: Rainwater catchment system (for toilet flushing and irrigation. One option would be to just look ai supplying new toilets required for facility/park and another would be to modify existing plumbing in gang toilets). Boih could help in irrigating ball field. ID l0 hours x $90/hour $ 900 1 hour x $125/hour $ 125 Padia 4 hours x $90/hour $ 360 2 hours x $125/hour $ 250 Task WZ: Water Saving Fixtures Padia 6 hours x $90/hour $ 540 1 hour x $l25/hour $ 125 Task W3: Living Machine in comparison to septic ID l 6 hours x $90/hour $ 1,440 3 hours x $ i 25/hour $ 375 Padia I6 hours x $90/hour $ 1,440 3 hours x $125/hour $ 37S Total of Tasks W1-W3 $ 5,930 7 Green Products and Systems Task G1: Recycling systems ID 6 hours x $90/hour $ 540 1 hour x $125/hour $ 125 Task G2: Pervious pavement ID 3 hours x $90/hour $ 270 1 hour x $125/hour $ 125 Task G3: Misc. recycled products iD 10 hours x $90/hour $ 900 2 hours x $125 $ 250 Total Task Gl-G3 $ 2,210 Total of all tasks $36,410 Energy Office Proposal Having looked through the grants requirements and knowing a little bit on what some of the other folks will be submitting for, I am suggesting that we pursue the water issues and concentrate on creating an exemplary environmental solution that will serve as a regional example of sound water management. Assuming that you want to go ahead with the majority of this analysis, we will, on your behalf submit a grant proposal to the energy office for the Living Machine and Rainwater Catchment Systems. Let me know as soon as possible if this is acceptable and what percentage of in-kind you want to list (remember that you have to be at least 25% and the more you put in the better your chances will be). I will also need to work with you pretty quickly since the applications are due May 13. We will need to coordinate quite a bit on this and we will need some information from you regarding the application. The application requirements are enclosed. Ultimately, you will be the applicant an, in turn, need to approve everything. I am not certain if this is the scope of services that you were anticipating but, froth a good quality analysis standpoint, this is what it will take. We could, of course, reduce the scope but the reliability of the cost estimates and pr~jeeted savings would then be less. If we are off base, just let me know and we will adjust if we can. l will be in the office "fuesday from 8:30 until noon. Then I will be out until late Friday night. 1-lowever, if you do want to go after the grant I will need to work on it that weekend (May 3`~ and 4th). The main time that I can work on the grant will be May ~`~ though May 8th. 1 will try to call you on Tuesday. Thanks again for the chance to work with you. Sincerely, ~ , ke Nicklas, F`AIA President, Innovative Design Orangs County - Living Machine Proposal innovative Design Design Proposal for a Living Machine at grange County's Northern Human Services Center Northern Human Services Center The site for the project is the Northam Human Services Center, boated off Si6~Mnoaef~~Cedar Grove, Orange County. Previously an elementary school, the building is now used as government offices by Orange County. Sited on the southwest comer of the bt EB a softball field, shared with the community. Orange County wishes to renovate the facility in a manner that h~hlights various sustainable features. and sets an example fw the region. Several sustalnabis features are currently being evaluated by the County, inducting daylighttng and energy-eficisnt building shell strategies, energy-efifdent mechanical and electrical systems, green building produdsR sustainable site design and water conservation and management systems. As part of the renovation and extension of the facility, the existing wastewater treatment system. that presently processes 2,700 galbns per day (gpd), is to be expanded to a fatal treatment capacity of 6,000 gpd. To accomplish this treatment in an environmentaNy sound manner, Orange County is now desiring tD implement an innovative, natural and biologically diverse wastewater treatment system equal th or equivalent to a Wing Machine approach. This innovative, natural wastewater and reclamation system uses plants in water gardens to naturally perform water purification procxsses. Project Scope Innovative Design's team will design. assist in biddlttg, and provide construction administration services to Orange County in implementlng a Living Machine type system capable of treating up to 6,000 gpd of wasth. The water will be biologically treated through a system of ponds. The tent is to have the treated water disposed of onsite. The most 8kely approach to be incorporated for this project is a tidal vertical flow ('iVF). The TVF constructed wastewater treatrnent wetlands operate by cydic flooding and draining through a media bed wrth cycle periods of a day or less. The cycle period of a day or less distinguishes these technobgies from other flood and drain systems. The tertiary LTeated effluent would be discharged into either a (1) sut>surfaoe nitrification fiekd, (2) subsurface drip irrigatbn system or (3) surface drip irrigation system. The choice of these three options will depend upon the first phase of tMa project; a detailed assessment of the existing. site and the establishment of priorities of County. Orange Coungra t.lvirg FMdr~ n~ur.. ear wowwe wwr Z 'd 89£t'~N N91S34 3AIldA0NN1 YVdd9~! £OOd '9 '^~N ~~' Task 1: Evaluation of Optiohs The efforts surrounding the first task of this work will center around the determination of the key site factors that will dictate the specific type of approach to be pursued, if there are any unknown technics! reasons that would prohibit the options from being pursued, and refining the cost estimate based upon the optimum approach. This work will be completed within 40 days of approval of contract. Task 1.1 Biting Analyst and Preliminary Layout Within one week of signing contract, the wuniy will provide our team with the already completed surveys that locate the existing wells, septic fields, topographic characteristics, flee focadons, buildings, outdoor structures, utilities, setbacks, property lines, and currant play areas and the ball field. Add'Rionally, they will provide our team with information on the existing well characteristics (flow rate, depth, water contaminants). Based upon initial site evaluations, discussions with your county officials, and input from state agencies, we will identify potential strategies and the corresponding potential krcatbns of the various system components. Tssk 1.2 Solt. Hydraulk;, and FNk! Layout This work ir>cludes technical soils and site evaluatbn of the options as they relate to regulations required for subsurface systems; hydraulic testing of soil using an Arnoozenteter (as required for systems greater than 3,000 gpd); one gsoprobe boring th groundwathr, hydraulic mounding modeNng; and the nitrifiication field layout and specilk:atlons for the 6,000 gpd system. The evaluation will also address your ooncem regarding any potential impact the system -might have on the existing trees. Task 1.3 Evaluation of Exiting PlumbMg and Etctrical This work wNl consist of a detalted evaluation of the existing plumbing, septic, and well systems in order to determine the optimum connection points and any n~iping naquirements. The current and anticipated electrical system will also be evaluated as it relates to the andcipeted electrical service demands. , We wiM provide you with a report summarizing our conclusions. Task 1 A Evaluation of Functional and Educational Impacts We will analyze the site from a fixxdional and an educational standpoint, to determine the best opportunities and limitations for locating particular components of the system. 1Ne will evaluate the maintenance, security and safety issues and provide you a report summarizing our recommendations. Task 1.6 i~nliminary Review with County and Stab Agencies Although there will not be enough of the design completed at this point to guarantee final acceptance, we will review the proposed strategy with the appropriate state and county agendas as to determine their general acceptance- of our appros~ch. E 'd 89Eti'oN N91S30 3h11dA0NNl Wdl9~l EOOl '9 '^oN Orange County -Living Machine P~opwai Task 1.6 Cost EsBmats Based upon the recommended strategy, we will refine our cx>st estimate. Task 1.7 Presentation of Recommended Strategy Once we complete the work listed above, we will make a presentation to the county on the results of this Task 1 work. Task 2: Construction Documents Assuming acceptance of Task 1 results and your desire to continue, we will complete the design the system. This work wiN be completed in two stages and prosented to you for your review at each stage of design. The brat wiN be at preliminary design and the second will be at+oonstn~tion documerrts. Task 2.1 Proliminary Desfpn (E4uhnllent oT Dsslign Dwsbpmsnt) Once the major components of the system aro identified and specificaly bested on the alts and the major ramMir~tions addressed (issues in Taak 1.1 through 1.4), we wiN submit Design Oevebpment Plans on: - Main Tidal. Vertical Fbw system (design and spedficationa by Living Machine engineers) -Plumbing and Electrical modifications and incorporation of TVF plans into over engineering documerrts (design end spedficatioris by Padia Consulting) -Architectural, egress, educational, and safety design issues (design and specifications by innovative Design) - Subsurface design (design and spedficationa by Living Machine engineers, Landis) Task 2.2 Rwiwv Masfing with County This meeting would take place to review progross and roceive input from the county. The meeting would take place after the pn~lirrdnary design plans are roviewed by the county. g the scope has changed, we will also provide a new anticipated budget Task 2.3 Construction Documsnb Once review comments aro taken into account, the Construction Documents will be completed in preparation for bidding. -Main Tidal, Vertical Fbw system, including all connections bade into buildh-g and subsurface design (design and spedficatiorrs by Pad'ra with review try Cluing Machine engineers and Landis) - Plumbing and Electrical modilicatbns (design and specifications by Padfa Consulting) - Architectural, egress, educational, and safety design issues (design and specifications by Innovative Design) Ow~p~CounlysuvinpfyMd+ina wwr.~~w~~adro~•r t 'd 89Eti'oN N9IS3~ 3A11d110NN1 WdlS~l EOOl '9 '^~N ~~~ Tssk 2r4 Review Meeting with County This meeting would take place to review progress and receive input from the County. The meeting would take place after the construction documents plans are reviewed by the county. if the scope has changed, we will also provide a new anticipated budgets Task 2.3 Coordinatbn with Review Agencies This work would include up fA 12 meetings total with the folbwing approving agencies: - Concept with Orange County Health Department -Concept with DENR Regional Sofl Specialist - Concept with DENR On-Site Wastewater Program -Site approval wilt Orange County Health Department -Site approval with DENR Regional Shc Specialist - S'de hydraulic approval with DENR On-Site Wastewater Program Engineer -Engineering design approval with DENR OnSite Wastewater Program Engineer - Preliminary Ad~E review with County -Final AbE review with County Any meetings required, beyond 12 would be considered additional services. Task 3: Bidding The task wig involve assisting the county in conducting normal Bidding the project Task 4: Construction Administration This task will invohre tasks normally involved in Construction Administratbn, includMg the review of shop drawings, processing payment n3quests and change orders, grid conducting site visits. Task 5: Commissioning Once the project has been completed the engineers from the t.iving Machine will make a speaflc commissioning trip that will include an operational instruction session. The Living Machine engineers will also assist the county in locating optional maintenance personnel, help the county to evaluate their suitability, and assist the county in creating a fair makrtenar>ce contract with the profemed maintenance provider. Optional Eco-Educational Task This system wiN serve as en innovative environmental waste water treatment strategy, can function as a unique educational tool for ec~-education. As a optbn to our basic servkies, we win provide educational signage and a display that e~lains the system's operation. 5 'd 89E~'oN N91S30 3A11'dAONNI WdZS~I EOOl '9 '^~N i3 Orange County -Living Machine Proposal Design Team: The design ~m will be lead by Innovative Design and include the following: Innovative Design Padia Consulting Landis, Inc. Living Machine, Inc. If the option to develop educational displays and signage is exercised, ow team will be joined by: Design Dimensions Budget: Labor Task 1: C-valustfon of Optlons Task 2: Construction Documents Task 3: Bidding Task 4: Construction Administration Task 5: Comrr~ssloninglTroining Total Basic Services Optional Eco-Educatbnal Task Reimbursable Exaenses $24,000 539,750 $ 2,000 5 s,5oo 5 5,5ao ~ ~~j,, C ' 1/"! N~ The foHoMring reimbtusable expenses wlil be blued at the following rates: Postage/Ovtiimight Mail Telephone Airfarelhotel Mileage Faxes CARD pants Additional Services at cost at cost at cost (ahticipate 3 trips by Living Machine engineer) $.30/mils 57.251page 53.001prlnt Additional services will be billed hotuly at the following rates: Prinapal Architect or Engineer $125Thour Assodate Arrhhect Or Engineer $ 90Thour CADD $ 70fiour Administration S 40/hour Billir~t . VNe wi» t>B monittly for the worts compbbed to that point, wltit amounts not >b exceed those listed by phase. Amounts biNed wt~ be due within 30 days. or.rq. Cangfs Lhrip AMcMna ~~~~~ [: 9 'd 89Et'~N N91S3a 3A11dA0NNl WdZ~~I EOOZ '9 '^~N Nov. 6. 2003 1:53PM 1NNOVATIUE DESIGN No•4368 P. 7 a :a3ea :pano~ddy u6~ an enouul '~ueP~d IM3 'ssPl~!N W ~O '~ya~ulS •suua) uodn paaiBe asay~ sapnpu! pa41 ~uau,aai0~d VIt1 PJepue}s a ~tq PaMOII~ a4 II!M auaur~Be slyl, •pa~ee~s ia6 use en- Pus Mgaq u8ts aseald olge3da~e s! s!~p ~l ~' ~(