Apri127, 2003
Pamela Jones
Director of Purchasing and Central Services
Orange County
132 E. King Street
Hillsborough, NC 27278
Ms. Jones:
I look forward to the opportunity to work with Orange County on such a challenging and
exciting project. The sustainable goals put forth by your commissioners for the old Cedar
Grove School are wonderful. I would be very proud to be a part of making them come
true. I thank you for the opportunity.
The following presents a proposed list of optional strategies which Harshad Padia (with
Padia Consulting) and I feel are opportunities which should be analyzed. Depending
upon your budget for this initial work, you could decide upon the level of effort desired.
In our very tentative review, we have also tried to place these option in order, in terms of
relative potential benefit (both energy dollar savings and environmental impact}. We
have also identified a fee associated with each item that would allow us to analyze the
particular item in relationship to the overall project.
To complete the following work, we will, from an energy perspective, require that the
current building be inputted into a total building energy simulation program. To
accomplish this analysis, we use the best program available -DOE II. To additionally
simulate any of the daylighting options, we use a program called DAYLITE which allows
us to simulate the daylighting contribution at numerous points within each individual
room, all day long, 365 days a year. "to determine the actual projected lighting and
cooling savings, this DAYLITE program output is, in turn, input into DOE II, which
accounts for the savings occurring from the particular daylighting option inxelationship
to the other building dynamics. To calculate the rainwater savings, we will utilize a
program developed by Innovative Design, specifically designed for optimizing the size
and design of rainwater catchment systems.
The proposed analysis will determine, for each measure, the energy savings (in dollars as
well as btus), CO2 savings, and nitrogen savings. This will be compared to the projected
cost of each measure.
4
The following outlines the base audit and analysis costs that will occur, regardless of• the
specific measures selected. This scope assumes that there are "As-Built" plans for the
facility and that additional, detailed field work is not required to determine the existing
conditions.
Base Tasks
Task Base 1: Complete audit of the facility
ID 8 hours at $125/hour $ 1,000
12 hours at $90/hour $ 1,080
Padia 6 hours at $125/hour $ 720
8 hours at $90/hour $ 720
Task Base 2: Input of base building into the DOE II
energy simulation
Padia 40 hours at $90/hour $ 3,GU0
Task Base 3: Coordination with Orange County
staff, interim review, information
gathering, and final presentation to Orange
ID 20 hours at $125/hour $ 2,500
30 hours at $90/hour $ 2,700
20 hours at $50/hour $ l ,000
Padia 8 hours at $125/hour $ 1,000
4 hours at $90/hour $ 360
Total Base Costs $14,680
The proposed analysis of sustainable options arc broken down into the categories of
energy, water, and green products and systems.
Energy
Task E1: Daylighting/window strategies
1D 5 strategies x 10 hours x $90/hour $ 4,500
2 hours x $125/hour $ 250
Padia 2 strategies x 4 ]lours x $90/hour $ 720
1 hour x $125/hour $ 125
5
Task E2: Tree shading
ID 3 hours x $90/hour $ 270
1 hours x $125/hour $ 125
Padia 4 hours x $90/hour $ 360
1 hour x $125/hour $ 125
Task E3: Mechanical systcm options (includes
recommendations on IAQ and ventilation)
Padia I S hours x $90/ltour $ I ,350
2 hours x $125/hour $ 250
Task E4: Lighting modifications
Padia 10 hours x $90/hour $ 900
1 hour x $125/hour $ 125
Task E5: Roof/radiant barrier/insulation strategies
ID 2 strategies x 3 hours x $90/hour $ 540
1 hour x $125/hour $ 125
Padia 2 strategies x 4 hours x $90/hour $ 720
1 hour x $125/hour $ 125
Task E6: Natural and fan assist ventilation strategy
ID 3 hours x $90/hour $ 270
1 hour x $125/hour $ 125
Padia 4 hours x $90/hour. $ 360
1 hour x $125/hour $ 125
Task E7: Solar hot water system
ID 2 hours x $90/hour $ l 80
1 hour x $125/hour $ 125
Padia 2 hours x $90/hour $ 180
1 hour x $125hour $ 125
Task E8: Remote PV lights for parking lot, park, walks, and "sign"
ID 2 hours x $90/hour $ 180
1 hour x $ ] 25/hour $ 125
Padia 2 hours x $90/hour $ 180
.,
1 hour x $125hour
Task E9: Unknown (to be determined during audit)
ID 3 hours x $90/hour
1 hour x $125/hour
Padia 4 hours x $90/hour
1 hour x $90/hour
Total Energy Tasks E1-E7
Water
$ 12S
$ 270
$ 125
$ 360
$ 125
$] 3,590
Task W 1: Rainwater catchment system (for toilet flushing
and irrigation. One option would be to just look ai
supplying new toilets required for facility/park and
another would be to modify existing plumbing in
gang toilets). Boih could help in irrigating ball field.
ID l0 hours x $90/hour $ 900
1 hour x $125/hour $ 125
Padia 4 hours x $90/hour $ 360
2 hours x $125/hour $ 250
Task WZ: Water Saving Fixtures
Padia 6 hours x $90/hour $ 540
1 hour x $l25/hour $ 125
Task W3: Living Machine in comparison to septic
ID l 6 hours x $90/hour $ 1,440
3 hours x $ i 25/hour $ 375
Padia I6 hours x $90/hour $ 1,440
3 hours x $125/hour $ 37S
Total of Tasks W1-W3 $ 5,930
7
Green Products and Systems
Task G1: Recycling systems
ID 6 hours x $90/hour $ 540
1 hour x $125/hour $ 125
Task G2: Pervious pavement
ID 3 hours x $90/hour $ 270
1 hour x $125/hour $ 125
Task G3: Misc. recycled products
iD 10 hours x $90/hour $ 900
2 hours x $125 $ 250
Total Task Gl-G3 $ 2,210
Total of all tasks $36,410
Energy Office Proposal
Having looked through the grants requirements and knowing a little bit on what some of
the other folks will be submitting for, I am suggesting that we pursue the water issues and
concentrate on creating an exemplary environmental solution that will serve as a regional
example of sound water management.
Assuming that you want to go ahead with the majority of this analysis, we will, on your
behalf submit a grant proposal to the energy office for the Living Machine and Rainwater
Catchment Systems. Let me know as soon as possible if this is acceptable and what
percentage of in-kind you want to list (remember that you have to be at least 25% and the
more you put in the better your chances will be). I will also need to work with you pretty
quickly since the applications are due May 13. We will need to coordinate quite a bit on
this and we will need some information from you regarding the application. The
application requirements are enclosed. Ultimately, you will be the applicant an, in turn,
need to approve everything.
I am not certain if this is the scope of services that you were anticipating but, froth a good
quality analysis standpoint, this is what it will take. We could, of course, reduce the
scope but the reliability of the cost estimates and pr~jeeted savings would then be less.
If we are off base, just let me know and we will adjust if we can. l will be in the office
"fuesday from 8:30 until noon. Then I will be out until late Friday night. 1-lowever, if
you do want to go after the grant I will need to work on it that weekend (May 3`~ and
4th). The main time that I can work on the grant will be May ~`~ though May 8th. 1 will
try to call you on Tuesday.
Thanks again for the chance to work with you.
Sincerely,
~ ,
ke Nicklas, F`AIA
President, Innovative Design
Orangs County - Living Machine Proposal
innovative Design
Design Proposal for a Living Machine at grange
County's Northern Human Services Center
Northern Human Services Center
The site for the project is the Northam Human Services Center, boated off Si6~Mnoaef~~Cedar Grove,
Orange County. Previously an elementary school, the building is now used as government offices by Orange
County. Sited on the southwest comer of the bt EB a softball field, shared with the community.
Orange County wishes to renovate the facility in a manner that h~hlights various sustainable features. and sets an
example fw the region. Several sustalnabis features are currently being evaluated by the County, inducting
daylighttng and energy-eficisnt building shell strategies, energy-efifdent mechanical and electrical systems,
green building produdsR sustainable site design and water conservation and management systems.
As part of the renovation and extension of the facility, the existing wastewater treatment system. that presently
processes 2,700 galbns per day (gpd), is to be expanded to a fatal treatment capacity of 6,000 gpd. To
accomplish this treatment in an environmentaNy sound manner, Orange County is now desiring tD implement an
innovative, natural and biologically diverse wastewater treatment system equal th or equivalent to a Wing
Machine approach. This innovative, natural wastewater and reclamation system uses plants in water gardens to
naturally perform water purification procxsses.
Project Scope
Innovative Design's team will design. assist in biddlttg, and provide construction administration services to Orange
County in implementlng a Living Machine type system capable of treating up to 6,000 gpd of wasth. The water
will be biologically treated through a system of ponds. The tent is to have the treated water disposed of onsite.
The most 8kely approach to be incorporated for this project is a tidal vertical flow ('iVF). The TVF constructed
wastewater treatrnent wetlands operate by cydic flooding and draining through a media bed wrth cycle periods of
a day or less. The cycle period of a day or less distinguishes these technobgies from other flood and drain
systems. The tertiary LTeated effluent would be discharged into either a (1) sut>surfaoe nitrification fiekd, (2)
subsurface drip irrigatbn system or (3) surface drip irrigation system. The choice of these three options will
depend upon the first phase of tMa project; a detailed assessment of the existing. site and the establishment of
priorities of County.
Orange Coungra t.lvirg FMdr~ n~ur.. ear wowwe wwr
Z 'd 89£t'~N N91S34 3AIldA0NN1 YVdd9~! £OOd '9 '^~N
~~'
Task 1: Evaluation of Optiohs
The efforts surrounding the first task of this work will center around the determination of the key site factors that
will dictate the specific type of approach to be pursued, if there are any unknown technics! reasons that would
prohibit the options from being pursued, and refining the cost estimate based upon the optimum approach. This
work will be completed within 40 days of approval of contract.
Task 1.1 Biting Analyst and Preliminary Layout
Within one week of signing contract, the wuniy will provide our team with the already completed surveys that
locate the existing wells, septic fields, topographic characteristics, flee focadons, buildings, outdoor structures,
utilities, setbacks, property lines, and currant play areas and the ball field. Add'Rionally, they will provide our team
with information on the existing well characteristics (flow rate, depth, water contaminants).
Based upon initial site evaluations, discussions with your county officials, and input from state agencies, we will
identify potential strategies and the corresponding potential krcatbns of the various system components.
Tssk 1.2 Solt. Hydraulk;, and FNk! Layout
This work ir>cludes technical soils and site evaluatbn of the options as they relate to regulations required for
subsurface systems; hydraulic testing of soil using an Arnoozenteter (as required for systems greater than 3,000
gpd); one gsoprobe boring th groundwathr, hydraulic mounding modeNng; and the nitrifiication field layout and
specilk:atlons for the 6,000 gpd system. The evaluation will also address your ooncem regarding any potential
impact the system -might have on the existing trees.
Task 1.3 Evaluation of Exiting PlumbMg and Etctrical
This work wNl consist of a detalted evaluation of the existing plumbing, septic, and well systems in order to
determine the optimum connection points and any n~iping naquirements. The current and anticipated electrical
system will also be evaluated as it relates to the andcipeted electrical service demands. , We wiM provide you with
a report summarizing our conclusions.
Task 1 A Evaluation of Functional and Educational Impacts
We will analyze the site from a fixxdional and an educational standpoint, to determine the best opportunities and
limitations for locating particular components of the system. 1Ne will evaluate the maintenance, security and
safety issues and provide you a report summarizing our recommendations.
Task 1.6 i~nliminary Review with County and Stab Agencies
Although there will not be enough of the design completed at this point to guarantee final acceptance, we will
review the proposed strategy with the appropriate state and county agendas as to determine their general
acceptance- of our appros~ch.
E 'd 89Eti'oN N91S30 3h11dA0NNl Wdl9~l EOOl '9 '^oN
Orange County -Living Machine P~opwai
Task 1.6 Cost EsBmats
Based upon the recommended strategy, we will refine our cx>st estimate.
Task 1.7 Presentation of Recommended Strategy
Once we complete the work listed above, we will make a presentation to the county on the results of this Task 1
work.
Task 2: Construction Documents
Assuming acceptance of Task 1 results and your desire to continue, we will complete the design the system. This
work wiN be completed in two stages and prosented to you for your review at each stage of design. The brat wiN
be at preliminary design and the second will be at+oonstn~tion documerrts.
Task 2.1 Proliminary Desfpn (E4uhnllent oT Dsslign Dwsbpmsnt)
Once the major components of the system aro identified and specificaly bested on the alts and the major
ramMir~tions addressed (issues in Taak 1.1 through 1.4), we wiN submit Design Oevebpment Plans on:
- Main Tidal. Vertical Fbw system (design and spedficationa by Living Machine engineers)
-Plumbing and Electrical modifications and incorporation of TVF plans into over engineering documerrts
(design end spedficatioris by Padia Consulting)
-Architectural, egress, educational, and safety design issues (design and specifications by innovative Design)
- Subsurface design (design and spedficationa by Living Machine engineers, Landis)
Task 2.2 Rwiwv Masfing with County
This meeting would take place to review progross and roceive input from the county. The meeting would take
place after the pn~lirrdnary design plans are roviewed by the county. g the scope has changed, we will also
provide a new anticipated budget
Task 2.3 Construction Documsnb
Once review comments aro taken into account, the Construction Documents will be completed in preparation for
bidding.
-Main Tidal, Vertical Fbw system, including all connections bade into buildh-g and subsurface design (design
and spedficatiorrs by Pad'ra with review try Cluing Machine engineers and Landis)
- Plumbing and Electrical modilicatbns (design and specifications by Padfa Consulting)
- Architectural, egress, educational, and safety design issues (design and specifications by Innovative Design)
Ow~p~CounlysuvinpfyMd+ina wwr.~~w~~adro~•r
t 'd 89Eti'oN N9IS3~ 3A11d110NN1 WdlS~l EOOl '9 '^~N
~~~
Tssk 2r4 Review Meeting with County
This meeting would take place to review progress and receive input from the County. The meeting would take
place after the construction documents plans are reviewed by the county. if the scope has changed, we will also
provide a new anticipated budgets
Task 2.3 Coordinatbn with Review Agencies
This work would include up fA 12 meetings total with the folbwing approving agencies:
- Concept with Orange County Health Department
-Concept with DENR Regional Sofl Specialist
- Concept with DENR On-Site Wastewater Program
-Site approval wilt Orange County Health Department
-Site approval with DENR Regional Shc Specialist
- S'de hydraulic approval with DENR On-Site Wastewater Program Engineer
-Engineering design approval with DENR OnSite Wastewater Program Engineer
- Preliminary Ad~E review with County
-Final AbE review with County
Any meetings required, beyond 12 would be considered additional services.
Task 3: Bidding
The task wig involve assisting the county in conducting normal Bidding the project
Task 4: Construction Administration
This task will invohre tasks normally involved in Construction Administratbn, includMg the review of shop
drawings, processing payment n3quests and change orders, grid conducting site visits.
Task 5: Commissioning
Once the project has been completed the engineers from the t.iving Machine will make a speaflc commissioning
trip that will include an operational instruction session. The Living Machine engineers will also assist the county in
locating optional maintenance personnel, help the county to evaluate their suitability, and assist the county in
creating a fair makrtenar>ce contract with the profemed maintenance provider.
Optional Eco-Educational Task
This system wiN serve as en innovative environmental waste water treatment strategy, can function as a unique
educational tool for ec~-education. As a optbn to our basic servkies, we win provide educational signage and a
display that e~lains the system's operation.
5 'd 89E~'oN N91S30 3A11'dAONNI WdZS~I EOOl '9 '^~N
i3
Orange County -Living Machine Proposal
Design Team:
The design ~m will be lead by Innovative Design and include the following:
Innovative Design
Padia Consulting
Landis, Inc.
Living Machine, Inc.
If the option to develop educational displays and signage is exercised, ow team will be joined by:
Design Dimensions
Budget:
Labor
Task 1: C-valustfon of Optlons
Task 2: Construction Documents
Task 3: Bidding
Task 4: Construction Administration
Task 5: Comrr~ssloninglTroining
Total Basic Services
Optional Eco-Educatbnal Task
Reimbursable Exaenses
$24,000
539,750
$ 2,000
5 s,5oo
5 5,5ao ~
~~j,, C
' 1/"! N~
The foHoMring reimbtusable expenses wlil be blued at the following rates:
Postage/Ovtiimight Mail
Telephone
Airfarelhotel
Mileage
Faxes
CARD pants
Additional Services
at cost
at cost
at cost (ahticipate 3 trips by Living Machine engineer)
$.30/mils
57.251page
53.001prlnt
Additional services will be billed hotuly at the following rates:
Prinapal Architect or Engineer $125Thour
Assodate Arrhhect Or Engineer $ 90Thour
CADD $ 70fiour
Administration S 40/hour
Billir~t .
VNe wi» t>B monittly for the worts compbbed to that point, wltit amounts not >b exceed those listed by phase.
Amounts biNed wt~ be due within 30 days.
or.rq. Cangfs Lhrip AMcMna
~~~~~
[:
9 'd 89Et'~N N91S3a 3A11dA0NNl WdZ~~I EOOZ '9 '^~N
Nov. 6. 2003 1:53PM 1NNOVATIUE DESIGN
No•4368 P. 7
a
:a3ea :pano~ddy
u6~ an enouul '~ueP~d
IM3 'ssPl~!N W
~O
'~ya~ulS
•suua) uodn paaiBe asay~ sapnpu! pa41 ~uau,aai0~d
VIt1 PJepue}s a ~tq PaMOII~ a4 II!M auaur~Be slyl, •pa~ee~s ia6 use en- Pus Mgaq u8ts aseald olge3da~e s! s!~p ~l
~' ~(