AMENDMENT TO INTERLOCAL AGREEMENT
THIS AGREEMENT is made and entered into by and between the County of Chatham, the
County of Orange, the County of Wake, the Town of Apex, the Town of Cary, the City of
Durham, the Town of Hillsborough, the Town of Morrisville and the Orange Water and Sewer
Authority, to be effective from and after July 1, 2003.
WITNESSETH:
WHEREAS, on August 18, 1988, several local governments in Region J, including the County of
Chatham, the County of Orange, the Town of Apex, the Town of Carrboro, the Town of Cary,
the Town of Chapel Hill, the City of Durham, and the Town of Hillsborough, entered into an
interlocal agreement to establish the Triangle Area Water Supply Water Quality Monitoring
Project (the "Monitoring Project ") applicable to certain surface water supplies in Region J; and
WHEEREAS, the County of Wake and the Town of Morrisville have agreed to enter into the
same interlocal agreement to continue the Monitoring Project; and
WHEREAS, the Orange Water and Sewer Authority has agreed to enter into the same interlocal
agreement on behalf of the Town of Chapel Hill and the Town of Carrboro to continue the
Monitoring Project; and
WHEREAS, the Monitoring Project was initially established for a three -year period, and said
interlocal agreement was subsequently amended to extend the Monitoring Project for Phase II
through June 30, 1991, for Phase III through June 30, 1999, and for Phase IV through June 30,
2003; and
WHEREAS, water quality monitoring activities during Phases I through IV have been funded
through local contributions and a major cost share match through a Joint Funding Agreement
with the U.S. Geological Survey; and
WHEREAS, the primary objectives of the Monitoring Project are to: (a) supplement existing
data on major ions, nutrients, and trace elements to enable determination of long -term water
quality trends; (b) examine the differences in water quality among water supplies within the
region, especially differences among smaller upland sources, large multi - purpose reservoirs, and
run -of -river supplies; (c) provide tributary loading data and in -lake data for predictive modeling;
(d) establish a database for the presence or absence of synthetic organic compounds in surface
waters in the region; and (e) report results of the monitoring program to governmental officials,
the scientific community, and the general public; and
Page 1 of 14
TRIANGLE AREA WATER SUPPLY WATER QUALITY MONITORING PROJECT 5
AMENDMENT TO INTERLOCAL AGREEMENT
WHEREAS, the Monitoring Project will complete its Phase IV monitoring program on June 30,
2003; and
WHEREAS, the local governments participating in the project established a Monitoring Project
Steering Committee to make technical, financial, and administrative recommendations to the
participating local entities; and
WHEREAS, said Committee has determined that additional monitoring is needed and desirable
to meet the objectives of measuring water quality conditions and long -term trends in water
quality.
NOW, THEREFORE, the undersigned units of local government have agreed:
1. That the term of the Interlocal Agreement dated August 8, 1988 and amended July 1, 1991,
July 1, 1995, and July 1, 1999, under which they have operated the Monitoring Project for
certain water supplies in Region J, shall be and is hereby extended until the completion of the
project or June 30, 2007, whichever is earlier, and that the terms and conditions thereof, and
the duties and obligations of the parties thereunder, shall be and remain as set out in the
Interlocal Agreement as amended July 1, 1999, except as hereby specifically modified.
2. That the activities of the Monitoring Project continue to be guided by the goals and
objectives summarized above.
3. That the monitoring program continue as summarized in Attachment A, "Summary of
TAWSMP Work Program for Phase V: FY 2004 — FY 2007."
4. That the annual funding support provided by local participants for Fiscal Years 2004 through
2007 shall be as shown on Attachment B to this Amendment, or as otherwise necessary to
undertake the project as recommended by the Project Steering Committee, provided,
however, the funding level does not exceed the local participants' projected share of annual
costs for FY 2004 -7.
Page 2 of 14
TRIANGLE AREA WATER SUPPLY WATER QUALITY MONITORING PROJECT 6
AMENDMENT TO INTERLOCAL AGREEMENT
ATTACHMENT A
SUMMARY OF TAWSMP WORK PROGRAM FOR PHASE V:
FY 2004 — FY 2007
Since it began in 1988, the Triangle Area Water Supply Monitoring Project has made significant
progress towards the goals and objectives originally established for the project. Through the
project, participating local governments have worked together to establish a stronger base of
information upon which to determine long -term changes in water quality. The project has also
increased our understanding about the presence or absence of synthetic organic chemicals in the
Triangle Region's drinking water supply sources. This data is important to local and state
agencies responsible for the provision and protection of drinking water supplies.
The Triangle Area Water Supply Monitoring Project Steering Committee, which is composed of
representatives from each participating local government, recommends that this cooperative
monitoring project continue. The Steering Committee recommends the following:
1. that water quality monitoring be continued at the sites and frequencies, and for the
parameters listed on Table 1 of the Triangle Area Water Supply Monitoring Project
Proposal for Phase V (see Attachment C);
2. that stream flow gaging be continued at the sites also shown on Table 1 (see Attachment
C);
3. that data collection at existing tributary sites be increased during high -flow event; and
4. that the presence of emerging water - quality contaminants such as pharmaceutical
compounds and antibiotics be determined at 7 sites near water - supply intakes as shown
on Table 1 (see Attachment C).
5. that a report be published that includes analysis of water - quality trends for data collected
through 2005.
During Phase V, the Steering Committee will work with the U.S. Geological Survey to increase
public awareness and understanding of the Project and the quality of water-supply sources in the
region through periodic progress reports, press releases, presentations, and by maintaining a
Project web site.
Page 12 of 14
TRIANGLE AREA WATER SUPPLY WATER QUALITY MONITORING PROJECT
AMENDMENT TO INTERLOCAL AGREEMENT
ATTACHMENT B
TAWSMP ANNUAL COST SHARES FOR PHASE V:
FY 2004 — FY 2007
The annual cost for Phase V of the Triangle Area Water Supply Monitoring Project is $340,000.
The US Geological Survey will provide a fifty percent cost share match of $170,000. The
Monitoring Project Partners' total annual cost for Phase V is the remaining $170,000, plus
$12,000 for TJCOG services and support. The Monitoring Project Partners' individual annual
cost shares are the sum of a base rate and a variable rate. The base rate is thirty percent of the
total annual Monitoring Project Partners' cost, which is thirty percent of $182,000, divided
equally among the Monitoring Project Partners. The variable rate is seventy percent of the total
annual Monitoring Project Partners' cost, which is seventy percent of $182,000, multiplied by
each Monitoring Project Partners' percentage of the total average annual water use during
Calendar Year 2001 for all Monitoring Project Partners.
Project Partners
Cary
Chatham County
Durham
Hillsborough
County 2
Water and Sewer Authority
Total
Average Annual
Share of Total
Variable Rate
Base Rate
Phase V Annual
Dally Water Use
Water Use
Cost Share
Cost Share
Cost Share
(mgd)'
2.14
3.9%
$ 4,963
$ 6,067
$11,030
10.51
19.1%
$ 24,376
$ 6,067
$30,442
1.040
1.9%
$ 2,411
$ 6,067
$8,478
28.71
52.3%
$ 66,587
$ 6,067
$72,653
1.23
2.2%
$ 2,853
$ 6,067
$8,919
1.20
2.2%
$ 2,783
$ 6,067
$8,850
0.35
0.6%
$ 814
$ 6,067
$6,881
9.44
17.2%
$ 21,894
$ 6,067
$27,961
0.31
0.6%
1 $ 719
$ 6,067
$6,786
54.931
1 100.0%
1 $ 127,4001
$ 54,600
$182,000
Notes:
1. Average Annual Daily Water Use = Average Annual Daily Water Use - System Processes - Sales to Other
Systems. The data are for CY 2001 and reported by the Partners.
2. Orange County's Average Annual Daily Water Use is based on the percentage of the Orange- Alamance
Water System service area located within Orange County, as indicated in their 1997 Local Water Supply
Plan.
Page 13 of 14
TRIANGLE AREA WATER SUPPLY WATER QUALITY MONITORING PROJECT
AMENDMENT TO INTERLOCAL AGREEMENT
ATTACHMENT C
TABLE 1- WATER QUALITY SAMPLING SITES AND CONSTITUENTS
1 USGS storm - runoff site; maximum of 2 samples collected per year per site and maximum of 10 samples per year among
all sites; site selection varies among years
Z Discharge from a nearby gage, site 02097517
3 USGS sampling to be discontinued after June 2003
4 Discharge computed from other gaged sites or data sources
Page 14 of 14
No. USGS samples
er year
Major
Chloro-
Near a
Stream-
USGS
Sampled
supply
flow
ions,
phyll
Trace
number
Site Name
by
intake
gage
nutrients
lakes
metals
02085000
Eno River near Hillsborough, NC
USGS
es
yes
6
--
2
NCDWQ
02085070 1
Eno River near Durham, NC
USGS
I
yes
21
--
21
Little River at SR 1461 near
NCDWQ
0208521324
Orange Factory, NC
USGS'
yes
21
--
21
Little River Reservoir at Dam
0208524845
near Bahama, NC
USGS
yes
n/a
4
4
.2
NCDWQ
02085500
Flat River at Bahama, NC
USGS'
yes
21
--
21
Lake Michie at Dam near
02086490
Bahama, NC
USGS
es
n/a
4
4
2
Cane Creek near Orange Grove,
02096846
NC
USGS
yes
6
--
2
Cane Cr Reservoir at Dam near
0209684980
1 White Cross, NC
USGS
yes
n/a
4
4
2
yes,
NCDWQ
funded
02096960
Haw River near Bynum NC
USGS'
--
by COE
2'
--
21
Jordan Lake, Haw River Arm ab
0209719700
B. Everett Jordan dam, NC
USGS
--
n/a
4
4
2
New Hope Creek near Blands,
NCDWQ
02097314
NC
USGS'
yes
21
--
21
Northeast Creek at Sr 1100 near
NCDWQ
0209741955
Genlee, NC
USGS'
yes
21
--
21
Morgan Creek near White Cross,
02097464
NC
USGS
yes
6
--
2
University Lake at Intakes near
0209749990
Chapel Hill, NC
USGS
yes
n/a
4
4
2
Morgan Creek near Farrington,
NCDWQ
02097521
NC
USGS'
yes 2
21
--
21
Jordan Lake at Buoy. 12 at
0209768310
Farrington, NC
USGS
--
n/a
4
4
2
White Oak Cr at Green Level,
0209782520
NC'
USGS
yes
6
--
2
Jordan Lake above U.S. Highway
0209799150
64 near Wilsonville, NC
USGS
yes
n/a
4
4
2
Jordan Lake at Bells Landing near
0209801100
Griffins Crossroads, NC
USGS
yes
n/a
4
4
2
Haw R Below B. Everett Jordan
02098198
Dam near Moncure, NC'
USGS'
--
no
21
--
21
0210140200
Deep River at Carbonton, NC
NCDWQ
--
no
Cape Fear River at State Highway
0210215985
42 near Brickhaven, NC
USGS3
--
no4
--
--
_
1 USGS storm - runoff site; maximum of 2 samples collected per year per site and maximum of 10 samples per year among
all sites; site selection varies among years
Z Discharge from a nearby gage, site 02097517
3 USGS sampling to be discontinued after June 2003
4 Discharge computed from other gaged sites or data sources
Page 14 of 14
TRIANGLE AREA WATER SUPPLY WATER QUALITY MONITORING PROJECT
AMENDMENT TO INTERLOCAL AGREEMENT
ATTEST:
John M. Link, Jr., County Manager
Orange County
Page 4 of 14