Loading...
HomeMy WebLinkAboutRES-2003-068 Resolution Initiating the Project to Expand the 1997 Efland Sewer Bond Area System and to Extend Water and Sewer Utilities to Serve the Buckhorn EDD Area and Communityoo~~o~~ ~~ ~~ l~ E S a ORANGE COUNTY BOARD OF COMMISSIONERS A Resolution Initiating the Project to Expand the Efland Sewer System into the Area Defined by the 1997 Efland Sewer Bond and to Extend Water and Sewer Utilities to Serve the Buckhorn Road EDD and Community WHEREAS, Orange County has a central role in protecting public health within the entire County and providing for economic development opportunities in the unincorporated portions of the County; and 1. has developed and continues to own and operate the Efland sewer system which was created to address failing septic tank/public health issues in Efland; and 2. recognizes that there remain unaddressed failing septic tank/public health issues affecting the citizens of central Efland; and 3. has historically committed to addressing the failing septic tank/public health issues in central Efland; and 4. the Orange County voters approved a $1.2 million bond issue in 1997 to help finance an extension of the existing Efland sewer system to address the failing septic tank/public health issues in central Efland; and WHEREAS, Orange County has a role in helping locate schools on appropriate sites having desirable characteristics such as compatibility with County land use planning and having readily available water and sewer utility services; and County elected officials and staff have worked with the County's school boards to identify desirable characteristics of school sites and have developed a collaborative process for identifying and evaluating school sites; and 2. the Orange County School Board has identified the Efland community as the area where a new middle school would best meet the needs of the school population in the district; and 3. the Orange County School Board staff has worked with County Planning and Land Records/GIS Departments to narrow the site search for Orange County Middle School #3 to an area outside of Efland but within the Orange County Service Area of the Water and Sewer Management Planning and Boundary Agreement and Map; and 4. the Orange County School Board has identified a potential school site within the I-85/Buckhorn Road Economic Development District (hereafter "the EDD") and adjacent to the core elements of a proposed wastewater collection system intended to serve the EDD; and 5. the BOCC has approved the Orange County School Board's request for funds to secure options on property for a potential Efland middle school site in the EDD and the Board of Education has in fact acquired these options; and 6. the projected Fall 2006 opening for a new Orange County Schools middle school puts time constraints on school site acquisition, school design, school construction activities and whatever utility construction is required to ensure that water and wastewater utilities are available to the site; and WHEREAS, Orange County has long been involved in the processes of dealing with public health and economic development issues in the Efland-Cheeks community; and the County recognizes that there are failing septic tank/public health issues affecting the citizens residing in the community along Buckhorn Road (hereafter "the Buckhorn Road community"); and 2. the County has agreed to help address the water supply and failing septic tank/public health issues in the Buckhorn Road community; and 3. the County, having recognized the need to diversify its tax base and enhance employment opportunities for its citizens, has created three economic development zones or districts, including the EDD, zoned them for appropriate non-residential uses, and created development standards for each; and 4. the Buckhorn EDD contains approximately 900 acres along the north and south sides of Interstate 85/40 east of the Buckhorn Road interchange; and 5. the zoning and land use aspects of the EDD are consistent with the availability of water distribution and wastewater collection utilities; and 6. the County recognizes that providing at least the core elements of water and sewer infrastructure to the EDD will help promote non-residential development in the Buckhorn EDD, which will in turn help to stabilize and make permanent zoning of the Buckhorn EDD; and 7. the County has secured a $900,000 Environmental Protection Agency (EPA) grant for the construction of portions of a wastewater collection system that could provide the core of wastewater utilities for the EDD and could also provide wastewater collection for the Buckhorn Road community and for the proposed middle school site; and 8. the County's EPA grant is a matching fund grant which the County will match with proceeds from the 1997 Efland Sewer Bond; and 9. the use of the Bond funds as the match for the EPA grant requires that both the bond funded project and the grant funded project be configured such that system design and construction activities be carried out as two sections or phases of a single project and adhere to the rules and requirements of EPA funded utility projects; and 10. Orange County and the City of Mebane have previously cooperated to provide municipal utility service to economic development areas to the mutual benefit of both the City and County; and 11. County officials and staff have held discussions with City of Mebane officials and staff about the engineering feasibility of, and the City's willingness to allow, the extension of City water distribution and wastewater collection utilities to the Buckhorn Road community and the EDD; and 12. City of Mebane and Orange County officials and staff have determined that extending City water distribution and wastewater collection utilities to the Buckhorn Road community and the EDD is feasible and offers significant benefits to the County, the City and the community; and 13. the County wishes to ensure that its adopted development standards for the EDD and the integrity of the County Land Use Plan for the area surrounding the Buckhorn Road community and the EDD remain intact regardless of the availability or ownership of water and wastewater utilities, and: 14. the County wishes to ensure that the integrity of the Efland Community is not compromised and that it remain distinct from the EDD and the Buckhorn Road community; and 15. the City of Mebane desires to secure the right of annexation to property to which it provides municipal utility service and needs to control by virtue of ownership the use, operation, maintenance, rate and fee structure, etc., of the utility infrastructure and service it provides; and 16. accordingly, if the City is to provide water and wastewater service to the EDD and The Buckhorn Road community, it will assume ownership of the completed infrastructure and provide the operation and maintenance of the systems. NOW, THEREFORE, the Orange County Board of Commissioners, does hereby resolve to: 1. Approve the scope of utility planning, development and design work as generally outlined in ATTACHMENT "A" with the addition of cost estimates, as appropriate; and 2. Direct County staff to move forward with the process of soliciting proposals for utility design consultants and selecting a design consultant on the basis of those proposals; and 3. Direct County staff to move forward with the process of developing, negotiating and submitting for Board approval the necessary interlocal utility extension, land use and annexation agreements with the City of Mebane; and 4. Staff to provide a report and Plan to Board of County Commissioners for comment; and 5. Direct the County staff to move forward with developing financing strategies such as utility assessments or acquiring additional grant funding for utility extension costs not addressed by funds available from the EPA grant or Efland Sewer Bond; and 6. Direct the County staff to undertake a public education campaign to advise citizens and property owners who will benefit from the availability of the expansion of utility service in the Efland-Cheeks community about what costs of that expansion that they may be required to bear. This, the 1st day of October, 2003. .`~,A, Margaret Brown, Chair Orange County Board of Commissioners ATTACHMENT "A" General Scope of Work for Engineering Design/Planning Consultant • Preparing Environmental Assessment Reports necessary to meet EPA grant requirements • Providing necessary design and easement surveying • Preparing construction documentation for the Efland Bond area sewer extension • Preparing construction documentation for the Buckhorn Road EDD and Community water and sewer extension • Preparing awater/sewer utility master plan for the Buckhorn EDD • Revising the existing (unapproved) sewer master plan for Efland as necessary to conform to the County's Land Use Plans • Preparing technical documentation necessary to seek additional water/sewer construction grants • Preparing technical documentation necessary to support water utility extension assessment process for Buckhorn EDD • Providing necessary project construction administration and oversight; and