Loading...
HomeMy WebLinkAboutAgenda - 06-03-2003 - 9aORANGE COUNTY BOARD OF COUNTY COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: June 3, 2003 SUBJECT: Proposed Master Plan for Little River Regional Park DEPARTMENT: Environment and Resource Conservation; Recreation and Parks Action Agenda Item No. 9 _ a PUBLIC HEARING: (Y /N) No ATTACHMENT(S): INFORMATION CONTACT: Draft Master Plan (Park Entryway Area) Rich Shaw, 245 -2591 Map of Proposed Trail System Lori Taft, 245 -2673 Construction Cost Estimate David Stancil, 245 -2590 TELEPHONE NUMBERS: Hillsborough 732 -8181 Chapel Hill 968 -4501 Durham 688 -7331 Mebane 336- 227 -2031 PURPOSE: To consider a proposed master plan for the Little River Regional Park and Natural Area. BACKGROUND: Establishing the new Little River Regional Park and Natural Area is a cooperative project among the partners Orange County, Durham County, the Triangle Land Conservancy and the Eno River Association. The 391 -acre park will be jointly owned and managed by Orange and Durham counties. In 2001, both the Orange and Durham county boards of commissioners approved a preliminary conceptual plan that incorporates the following elements: entrance road and parking area, picnic shelter, restroom facility, children's play area, group camping area, and trail system (with separate walking /hiking, mountain biking, and equestrian trails). The next important action for Board consideration is to consider and approve a master plan for the layout and construction of the park facilities. Orange County hired a design firm (Haden - Stanziale) in May 2002. Over the past year, Haden - Stanziale has worked with staff from both counties to develop a plan consistent with the previous guidance from both boards of commissioners and the Little River Park Advisory Committee. The Advisory Committee held two public meetings for citizen input. 2 1- The draft master plan was presented to the Little River Park Advisory Committee on May 14. The committee comments were generally favorable about the Master Plan, with a request that a stormwater detention pond be considered for the parking lot area. On May 16, both counties were informed that some remains of prehistoric stone tools were discovered near the park entranceway. Further investigation of those finds by the contractor will determine what affect that may have on the project, and staff will report on June 3. Funding for the park design comes from a grant from the Land and Water Conservation Fund (LWCF), awarded to Orange and Durham counties for developing the Little River Regional Park. The LWCF grant (originally $262,000) is due to expire on September 30, 2003. Staff intends to request an extension (a second and final extension) once the master plan is approved and both counties sign an interlocal agreement. The interlocal agreement will specify a 50 -50 cost -share arrangement between the two counties. These steps, plus a contract for park construction, should enable the LWCF guidelines to be met. Note: In order to obligate the funds in this manner, both boards will need to approve the master plan and inter -local agreement prior to July 1. Following master plan approval by both the Orange and Durham county boards, a site plan will be submitted for approval and the design contractor will prepare construction drawings, which will be used to solicit bids for park construction. Construction is expected to begin in late Fall 2003, and the Little River Regional Park should be open to the public by Spring 2004. The Orange County Recreation and Parks Department will operate and maintain the park consistent with a proposed interlocal agreement between Orange and Durham counties. Construction cost estimates were received from the consultant on Wednesday, May 14. The consultant's initial estimate of $812,000 has been adjusted twice, once by the consultant (to $712,000) and once by Durham and Orange staff to yield a $624,139 project. The financial impact section below contains scenarios for funding which the Board may wish to discuss. FINANCIAL IMPACT: The full master plan, as designed by the consultant, is projected to cost $712,232. Orange and Durham staffs have deleted some items from the consultant's estimate, and revised the estimate to move some facilities (approximately $45,000) into a second phase — leaving a cost estimate of $624,139. Construction Cost Estimates Source Amount Available Consultant Estimate — 5/14/03 $821,942 Consultant Revised Estimate — 5/14/03 $712,232 Staffs Refined Estimate - 5/21/03 $624,139 Additional facilities that have been designed in the Master Plan (beyond those envisioned in the LWCF grant application) include a park entrance turn lane, a picnic loop walking trail (ADA accessible), caretaker residence, park office and maintenance shed. Some of these additional facilities will be funded from outside sources. Construction of an $85,000 turn lane from Guess Road will be funded by the North Carolina Department of Transportation (NCDOT), but is not included in the master plan cost estimate. Construction of the picnic area loop walking trail is expected to be paid for from a $50,000 grant from the state Recreational Trails Program. Funding for the park has been previously identified from the aforementioned LWCF grant ($262,000) planned as the primary funding source for the park construction. A total of $221,472 from LWCF grant remains (subtracting cost of site design, archaeological survey and topo survey), and the Board has previously authorized $45,000 toward a caretaker residence to be moved to the park from Heritage Hills. Durham County has also budgeted $100,000 to be matched by Orange County toward additional construction costs. Table 1 - Previously ADDroved Revenues Source LWCF grant — remainder Amount $221,472 Trails grant $50,000 Caretaker House relocation — Orange County portion $45,000 SUBTOTAL $316,472 Other Possible Revenue Sources Durham County already allocated — requires Orange County match $100,000 Orange County Payment -in -Lieu funds (not yet authorized, remainder of match is $45,000 in house relocation funds above)? $55,000 TOTAL - ALL SOURCES $471,472 If Orange County were to match Durham County's $100,000 (recommended to be accomplished by allocating $55,000 in additional funds from the Northern District Park Payment -in -Lieu fund), the differential between the staff - revised cost estimate and the available funds is $152,667 (or $76,334 for each jurisdiction). There are two options the Board may wish to consider to address the funding shortfall: Option 1 — Additional Revenue: To address the remaining County portion of the estimated construction cost (assuming Durham County does likewise), the Board could opt to "borrow" $76,334 from one of the County park facility projects funded through the 2001 bond — borrowing from a project that is designated for construction beyond 2004 and replenishing those funds in a future CIP prior to construction of the park. A budget amendment would be prepared identifying the temporary funding source if this option is chosen. Option 2 — Deferral of Facilities: The Board could opt to defer some of the facilities not originally part of the LWCF project. Some options might include: Table 2 — Possible Facilitv Deferrals Even with the deferral of the above facilities (which would lower the project construction cost to $535,139), and the use of the remaining payment -in -lieu funds ($55,000 as shown in the first chart above), an additional $31,834 of County funds would be needed to build the remaining facilities. As detailed in option 1 above, staff recommends that the Park office $35,000 Gravel instead of paved entrance road $30,000 Picnic Shelter $24,000 TOTAL Deferred $89,000 Even with the deferral of the above facilities (which would lower the project construction cost to $535,139), and the use of the remaining payment -in -lieu funds ($55,000 as shown in the first chart above), an additional $31,834 of County funds would be needed to build the remaining facilities. As detailed in option 1 above, staff recommends that the 4 ' Board consider borrowing funds from another park facility project that is not yet ready for construction. RECOMMENDATION(S): The Manager recommends that the Board: a) Discuss and approve the proposed Little River Park master plan with revisions as needed; b) Discuss the two funding options as listed above and select a method of funding; c) Authorize ERCD and Recreation & Parks to submit the master plan for Planning Department site plan review and approval; and d) Develop construction drawings necessary to solicit bids for park construction in accordance with the approved plan. 10 _ �TRAIL TORIVER I I i LITTLE RIVER ADA ACCESSIBLE ! / / -� .�`\. LOOP TRAIL i PARK a I NaR esT `. fy�' ^��*RYY \ I � /i I danp w-I NoM (:aioliru I II /,. GROUP PICNIC SHELTER (30'X 60') i^'•. i %' �s SEPTIC FIELD FOR .i RESTROOMS \ FAMILY PICNIC AREA - ; GROUP PICNIC SHELTER (30'X 609 TO EQUESTRIAN I I JAILS •i TRAIL TO PARK OFFICE ! RESTROOMS I " - -" - -' -- LOOP TRAIL ! TRAIL HEAD GATEWAY f� TO 810 i - - - -- - -- - - — - - -- - - -... - - - -- - - -- - (RELOCATED CORN CRIB) CARETAKER'S 34 CAR PAVED ill couNry DURHAM HOUSE PARKING LOT III � AND ADVENTURE (i ORANGE COUNTY PLAYGROUND 1JJ /if -------------__.- Cpd1ATNlEY I HadenStanziale EXISTING t ^ ' / : �.' a.�_'i. `A- ftw"`� FARMHOUSE J"" f f \ 29 CAR GRASSY -_. -� PARKING LOT OVERSIZE VEHICLE ARKING SPACES - f' �� ., � 1. •, �y` �l X11 'i` -- -' --- -- SEE INSET OO n T LOOP: p„ OPEN PLAY 1 r IL e w no m MRM MEADOW "� *� ,'` / .. � f :: (LYE: 1'�SO• RO MRA16l: (RQE f = S AFF PARKIN nu NAAY: \ PARK OFFICE '`"F Amovm: vE MAINTAINED ~ MAINTENANCE/ ORAGE MEADOW _ _ _ (CONVERTED TOBACCO BARN) MASTER SEPTIC FIELD FOR .. - PLAN CARETAKER'S RESIDENCE L SHEET: P•1.0 0 Little River Regional Park - Proposed Trail Network /^\/ Bike Trail 5.42 miles • Archaeological Sites /\v/ ' . `• a r `° /\v/ m Hardsurface Walkway .35 mile Streas N Horseback Riding Trails 3.43 Miles little River Regional Park Boundary •,,, N Hiking Trails 7.12 miles Parcel Boundary 300 0 300 600 Feet 6 Contours C—Vao—g. Dv k. , conmrv�m r Park Entrance Facilities shown on separate site plan. 912W 7 LITTLE RIVER PARK CONSTRUCTION BUDGET SUMMARY Phase 1 Improvements Cost INFRASTRUCTURE/ SITE WORK & UTILITIES $ 15,000 Stabilize existing farm house @ entrance $ 10,000 Relocate /repair /remove Corn crib, Packhouse, Chicken house $ 7,300 Repair Tobacco barn for re -use as Maintenance Shed $ 6,000 Park Office $ 35,000 Restroom Facility $ 48,000 Group Picnic Shelter (30x60) $ 26,625 Septic systems/ fields $ 37,000 Well, Utilities, Site Clearing, Culverts etc. Road grading, gravel base, mat & seal coating $ $ 47,780 106,436 HARDSCAPE - Gravel parking, striping, gates, bollards, picnic pads $ 9,235 CARETAKER RESIDENCE $ 90,000 SITE FURNISHINGS- Trash receptacles, water fountain, grills, picnic tables $ 28,105 SIGNAGE - Entrance sign, directional & regulatory signage $ 16,000 NATURE TRAILS (signage, bridges, culverts) $ 36,000 ADA PICNIC LOOP TRAIL $ 43,418 LANDSCAPING - flowering trees, shrubs, screening plant, grassed a $ 20,500 Construction Subtotal $ 567,399 10 % Contingency $ 56,740 ESTIMATE OF PROBABLE CONSTRUCTION $ 624,139 *Note: ESTIMATE OF PROBABLE CONSTRUCTION COST BASED ON PLAN TITLED "LITTLE RIVER PARK" - MASTER PLAN Phase 2 Additions Second Group Picnic Shelter (20 X 30) $ 15,000 Grills and picnic tables for shelter $ 4,700 Childrens play area $ 25,000 Phase 2 Total $ 44,700