I look forward to the opportunity to work with Orange County on such a challenging as
well as exciting project. The sustainable goals put forth by your commissioners, for the
old Cedar Grove School, are wonderful. I would be very proud to be a part of making
them come true. I thank you for the opportunity.
The following presents a proposed list of optional strategies which Harshad Padia (with
Padia Consulting) and myself feel are opportunities which should be analyzed.
Depending upon your budget for this initial work, you could decide upon the level of
effort desired. In our very tentative review, we have also tried to place these option in
order in terms of relative potential benefit (both energy dollar savings and environmental
impact). We have also identified a fee associated with each item that would allow us to
analyze the particular item in relationship to the overall project.
To complete the following work we will, from an energy perspective, require that the
current building be input into a total building energy simulation program. To accomplish
this analysis we use the best program available -DOE II. To additionally simulate any
of the daylighting options, we use a program called DAYLITE which allows us to
simulate the daylighting contribution at numerous points within each individual room, all
day long, 365 days a year. To determine the actual projected lighting and cooling
savings, this DAYLITE program output is, in turn, input into DOE II, which accounts for
the savings occurring from the particular daylighting option in relationship to the other
building dynamics. To calculate the rainwater savings we will utilize a program
developed by Innovative Design, specifically designed for optimizing the size and design
of rainwater catchment systems.
The proposed analysis will determine, for each measure, the energy savings (in dollazs as
well as btus), CO2 savings, and nitrogen savings. This will be compazed to the projected
cost of each measure.
[/T[/i
The following outlines the base audit and analysis costs that will occur, regardless of the
specific measures selected. This scope assumes that there are "As-Built" plans for the
facility and that additional, detailed field work is not required to determine the existing
conditions.
Base Tasks
Task Base 1: Complete audit of the facility
ID 8 hours at $125/hour $ 1,000
12 hours at $90/hour $ 1,080
Padia 6 hours at $125/hour $ 720
8 hours at $90/hour $ 720
Task Base 2: Input of base building into the DOE II
energy simulation
Padia 40 hours at $90/hour $ 3,600
Task Base 3: Coordination with Orange County
staff, interim review, information
gathering, and final presentation to Orange
ID 20 hours at $125/hour $ 2,500
30 hours at $90/hour $ 2,700
20 hours at $50/hour $ 1,000
Padia 8 hours at $125/hour $ 1,000
4 hours at $90/hour $ 360
Total Base Costs $14,680
The proposed analysis of sustainable options are broken down into the categories of
energy, water, and green products and systems.
Energy
Task E1: Daylighting/window strategies
ID 5 strategies x 10 hours x $90/hour $ 4,500
2 hours x $125/hour $ 250
Padia 2 strategies x 4 hours x $90/hour $ 720
1 hour x $125/hour $ 125
\~~ ~ r r r
Task E2: Tree shading
ID 3 hours x $90/hour $ 270
1 hours x $125/hour $ 12S
Padia 4 hours x $90/hour $ 360
1 hour x $125/hour $ 125
Task E3: Mechanical system options (includes
recommendations on IAQ and ventilation)
Padia 1S hours x $90/hour $ 1,350
2 hours x $125/hour $ 2S0
Task E4: Lighting modifications
Padia 10 hours x $90/hour $ 900
1 hour x $12S/hour $ 12S
Task ES : Roof/radiant barrier/insulation strategies
ID 2 strategies x 3 hours x $90/hour $ 540
1 hour x $ I25/hour $ 125
Padia 2 strategies x 4 hours x $90/hour $ 720
1 hour x $12S/hour $ 12S
Task E6: Natural and fan assist ventilation strategy
ID 3 hours x $90/hour $ 270
1 hour x $12S/hour $ 12S
Padia 4 hours x $90/hour $ 360
1 hour x $12S/hour $ 12S
Task E7: Solar hot water system
ID 2 hours x $90/hour $ 180
1 hour x $125/hour $ 125
Padia 2 hours x $90/hour $ 180
1 hour x $125hour $ 12S
Task E8: Remote PV lights for parking lot, park, walks, and "sign"
ID 2 hours x $90/hour $ 180
1 hour x $125/hour $ 125
Padia 2 hours x $90/hour $ I80
_ _ ~ ~ i~j6 ~il`~~YH a_ JC: ~1~
1 hour x $125hour
Task E9: Unknown (to be determined during audit)
ID 3 hours x $90/trour
1 hour x $125/hour
Padia 4 hours x $90/hour
1 hour x $90/hour
Total Energy Tasks E1-E7
Water
Task W 1: Rainwater catchment system (for toilet flushing
v~~ ~-w = , - - ~~ ~ -
$ 12S
$ 270
$ 12S
$ 360
$ 12S
$13,590
and irrigation. One option would be to just look at
supplying new toilets required for facility/park and
another would be to modify existing plumbing in
gang toilets). Both could help in imgating ball field.
ID 10 hours x $90/hour $ 900
1 hour x $125/hour $ 12S
Padia 4 hours x $90/hour $ 360
2 hours x $12S/hour $ 250
Task W2: Water Saving Fixtures
Padia 6 hours x $90/hour $ S40
1 hour x $125/hour $ 125
Task W3: Living Machine in comparison to septic
ID 16 hours x $90/hour $ 1,440
3 hours x $12S/hour $ 37S
Padia 16 hours x $90~our $ 1,440
3 hours x $12S/hour $ 37S
Total of Tasks Wl-W3 $ -5,930
Green Products and Systems
Task Gl : Recycling systems
ID 6 hours x $90/hour
1 hour x $125/hour
Task G2: Pervious pavement
ID 3 hours x $90/hour
1 hour x $125/hour
Task G3: Misc. recycled products
ID 10 hours x $90/hour
2 hours x $125
Total Task G1-G3
Total of all tasks
Energy Office Proposal
$ 540
$ 125
$ 2'70
$ 125
$ 900
$ 250
$ 2,210
$36,410
Having looked through the grants requirements and knowing a little bit on what some of
the other follcs will be submitting for, I am suggesting that we pursue the water issues and
concentrate on creating an exemplary environmental solution that will serve as a regional
example of sound water management.
Assuming that you want to go ahead with the majority of this analysis, we will, on your
behalf submit a grant proposal to the energy office for the Living Machine and Rainwater
Catchment Systems. Let me know as soon as possible if this is acceptable and what
percentage of in-kind you want to list (remember that you have to be at least 25% and the
more you put in the better your chances will be). I will also need to work with you pretty
quickly since the applications are due May 13. We will need to coordinate quite a bit on
this and we will need some information from you regarding the application. The
application requirements aze enclosed. Ultimately, you will be the applicant an, in turn,
need to approve everything.
0
I am not certain if this is the scope of services that you were anticipating but, from a goad
quality analysis standpoint, this is what it will take. We could, of course, reduce the
scope but the reliability of the cost estimates and projected savings would then be less.
If we are off base, just let me know and we will adjust if we can. I will be in the office
Tuesday from 8:30 until noon. Then I will be out until late Friday night. However, if
you do want to gn after the grant I will need to work on it that weekend (May 3~d and
4`~. The main time that I can work on the grant will be May 3'~ though May 8~°. I will
try to call you on Tuesday.
Thanks again for the chance to work with you.