HomeMy WebLinkAboutAgenda - 03-24-2003 - 10aORANGE COUNTY
BOARD OF COUNTY COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: March 24, 2003
Action Agenda
Item No. ~ (~ -~
SUBJECT: Joint Orange Grove Road Transportation Group
DEPARTMENT: Planning and Inspections PUBLIC HEARING: (Y/N)
ATTACHMENT(S):
1) Executive Summary -Access Management
Awareness Project & Report, Orange Grove Rd.
(Under Separate Cover)
2) JOGRTG Report and Access Management Plan
(Previously Provided at February 4, 2003 BOCC
Meeting)
INFORMATION CONTACT:
Craig Benedict, ext. 2592
Karen Lincoln, ext. 2594
TELEPHONE NUMBERS:
Hillsborough 732-8181
Chapel Hill 968-4501
Durham 688-7331
Mebane (336)227-2031
PURPOSE: To receive a report from the Joint Orange Grove Road Transportation Group.
BACKGROUND: The Orange County Board of Commissioners and Hillsborough Town Board, at a
joint meeting in May of 2002, established the Joint Orange Grove Road Transportation Group
(JOGRTG) as part of a continuing planning cooperative effort. Existing and proposed development
activity as well as existing public facilities such as schools in this corridor prompted a review of
transportation issues and a discussion regarding the range of transportation planning initiatives that
can lead to awell-planned, safer, multimodal transportation system in concert with a coordinated
land use development pattern. The North Carolina Department of Transportation (NCDOT) was
also a partner in the effort.
The JOGRTG found that the crux of many solutions was based in access management. The
Orange Grove Road Access Management Plan is the product of the group's work. The Access
Management Plan will help manage growth in the area, as well as promote safety for motor vehicle,
pedestrian and bicycle traffic. Other groups can use this report and goals to support their efforts in
related areas such as "Walkable Hillsborough" initiatives.
FINANCIAL IMPACT: There is no direct financial impact associated with this item.
RECOMMENDATION(S): The County Manager recommends that the Board receive the report
and consider authorizing staff to pursue the recommendations.
,air ei
V° 6" ~~ T01iG
v st ~
+<<b Caas~`~'
EXECUTIVE SUMMARY
,4 cce~s M avua.~ewient t1 warenea~
f'roject& R~a^E"
Ora~i GravPi Rotxd~
Town of Hillsborough
and
Board of County Commissioners
Orange County, North Carolina
March, 2003
r~3 ~~ o~ coNr~Nrs
Project Phases and Work Products
The Access Management Awareness Project is divided into five work
phases.
^ Phase 1 - Project Background and General
Goals ................................................................ 1
^ Phase II - Orange County
Case Study ....................................................... 5
^ Phase III -Access Management: A Review of Recent
Literature ..........................................................17
^ Phase IV -Access Management: Current Policies
and Regulatory Framework ............................25
^ Phase V - Access Management
Toolkit ..............................................................31
^ APPENDIX
A. Transportation Goals and
Policies .............................................................
B. A Bicycle Transportation
Plan ...................................................................
C. Orange County Proposed Priority Bicycle
Transportation Routes Map (July 1998).........
\ ~"
.l fl ...
~~~~
O NG TpW E RpgD AT -NTER
ARD RRrDGE pvER I-4prpN OF pAKD
ALE DRrVE
5..i ..ttc
~;~if1
I~
:~
4~~
r
~ t ~ ~~
~. ~ ' , d
c ~
~ ~}i.' r. ~ a ~ ~'~ i.~~ i
~, ~
V ~.
~ ~;~(. ~ t
.~? ^~
NEW GRADY BROWN SCHOOL ROAD BETWEEN ELEMENTARY AND HIGH SCHOOL
LOOKING TOWARD ORANGE GROVE ROAD
PHASE
PROJECT BACKGROUND AND GENERAL GOALS
- TASK FORCE CREATION
- ACCESS MANAGEMENT
- ACCESS MANAGEMENT TASK FORCE MEMBERS
- GENERAL GOALS
- SPECIFIC GOALS
PHASE II
ORANGE COUNTY CASE STUDY
1. BACKGROUND
II. COMPREHENSIVE LAND USE REVIEW
III. ROAD CONNECTIVITY
IV. RECOMMENDATIONS FOR ROAD CONFIGURATION
V. INTERSECTION IMPROVEMENTS AND SIGNALIZATION
VI. ACCESS MANAGEMENT AND RECOMMENDED LAND USE
CONTROLS
VII. RECOMMENDATIONS
5
PHASE III
ACCESS MANAGEMENT: A REVIEW OF RECENT
LITERATURE
I. BACKGROUND
II. DEFINITION OF ACCESS MANAGEMENT
III. SUMMARY OF THE LITERATURE
IV. LITERATURE REVIEW METHODOLOGY AND SOURCES
V. GENERAL MATERIALS ON ACCESS MANAGEMENT
VI. RESEARCH ON ACCESS MANAGEMENT
A. Impacts of Access Management on Traffic Flow and
Congestion
B. Impacts of Access Management on Safety
C. Impacts of Access Management on Business Vitality, Business
Customers, and Area Residents
VII. ACCESS MANAGEMENT CASE STUDIES
VIII. ACCESS MANAGEMENT LAWS AND REGULATIONS
IX. ACCESS MANAGEMENT BEST PRACTICES AND
GUIDELINES
X. ACCESS MANAGEMENT EDUCATIONAL MATERIALS
A. Educational Materials Designed Mainly for the General Public
and Elected Officials
B. Educational Materials Designed Mainly for Professionals
XI. PUBLIC AND STAKEHOLDER INVOLVEMENT MATERIALS
XII. ACCESS MANAGEMENT HOT LINKS
17
PHASE IV
ACCESS MANAGEMENT: CURRENT POLICIES AND
REGULATORY FRAMEWORK
I. BACKGROUND
II. ACCESS MANAGEMENT LAWS AND REGULATIONS
A. LEGAL CONSIDERATIONS
B. PLANNING AND REGULATORY TOOLS
• Land Division
• Subdivision Regulation
• Access Controls
• Zoning Regulations
C. SUMMARY REPORT
III. CONCLUSIONS
25
PHASE V
ACCESS MANAGEMENT TOOLKIT:
ANSWERS TO FREQUENTLY ASKED QUESTIONS
ACCESS MANAGEMENT CONCEPTS
1. Driveway-Related Crashes
2. Driveway Spacing
3. Driveway Density And Driveway Consolidation
4. Intersection Spacing And Traffic Signal Spacing
5. Functional Areas Of Intersections
6. Conflict Points
7. Speed Differential Between Turning Vehicles And Through
Traffic
8. Benefits Of Access Management
9. Economic Impacts Of Access Management
10. Access Management And Pedestrian Safety
COMMON ACCESS MANAGEMENT TREATMENTS
11. Driveway Grade
12. Driveway Width
13. Clearing Driveways Away From Corners
14. Shared/Joint Driveways And/Or Cross Access
15. Continuous Two Way Left-Turn Lanes
31
16. Three-Lane Roadways With Twa-Way Left-Turn Lanes
17. Raised Medians At Intersections
18. Continuous Raised Median
19. Comparison Of Raised Median And Two-Way Left-Turn Lanes
20. Frontage And Backage Roads
21. Dedicated Left And Right Turning Lanes
22. Driveway Turn Radius
23. Internal Circulation In Land Developments
OTHER CORRIDOR DESIGN CONSIDERATIONS
24. Sight Distance
25. Incorporating Aesthetics Into Access Management
26. Clear Zones, Utility Placement And Lighting
32
APPENDIX
A. Transportation Goals, Objectives and Policies
B. A Bicycle Transportat-ion Plan
C. Orange County Proposed Priority Bicycle
Transportation Routes Map (July 1998)
Recommendations
1. Pursue funding to implement recommendations in this study.
The Transportation Improvement Program (TIP), Spot Safety funds and
Small Urban Funds are potential funding sources for roadway
improvements. Small Urban Funds may be used for projects within 1-
mile outside city limits. Both Small Urban and Spot Safety funding
sources are subject to the discretion of the Division's Board of
Transportation (BOT) member, and are generally requested for projects
in the $50,000 to $200,000 range. The local jurisdiction(s) must
request those funds from the BOT member. Transportation
Improvement Program, in general, is used to fund projects that cost
$300,000 or more. There are also some contingency funds that may
be requested through the area's representatives to the State
legislature.
The local jurisdictions should pursue funding to advance the following
improvements in the Orange Grove Road corridor.
1.1 Pursue funding to widen the bridge on Orange Grove Road over
Interstate 40 to include bicycle and pedestrian facilities. North
Carolina Department of Transportation estimates the cost to add
bicycle and pedestrian facilities to the bridge is approximately
$750,000.
1.2 Pursue funding and work with NCDOT to install a crosswalk with
a flashing light to warn vehicles of the pedestrian crossing at the
bus driveway entrance at Cedar Ridge High School.
1.3 Pursue funding and work with NCDOT to investigate installing a
traffic light at the intersection of Oakdale Drive and Orange
Grove Road, and to provide right turn lanes on both Oakdale
Drive and Orange Grove Road to assist traffic flow through the
intersection.
Recommendations
2. Provide pedestrian facilities along Orange Grove Road.
2.1 Research actual, right-of--way along Orange Grove Road
throughout the corridor study area through land records and
pursue feasibility of obtaining the recommended 80' right-of-
way through dedication or acquiring easements.
2.2 Investigate installing sidewalks along the north side of Orange
Grove Road in the corridor study area including determining the
feasibility of construction with respect to changes in elevation
along the road and with respect to cost.
2.3 After technical report has been received by both the
Hillsborough Town Board and the Orange County Board of
Commissioners, if the data indicates that construction of a
sidewalk on the north side of Orange Grove Road is not
financially feasible, pursue widening Orange Grove Road to 12'
lanes with, at a minimum, 4' paved shoulders and preferably
with 6' or 8' paved shoulders to allow for a shared
bicycle/pedestrian facility.
2.4 Coordinate with the School Board to pursue installation of
sidewalks along Orange Grove Road adjacent to the school
property, along New Grady Brown School Road and from the
proposed crosswalk on New Grady Brown School Road to the
Grady Brown .School and to Cedar Ridge High School.
Recommendations
3. Implement recommendations into local plans and regulations.
3.1 Include recommendations in this study in the development of
Multi-modal Transportation Plans for Orange County and the
Town of Hillsborough.
3.2 Adopt recommended cross section for Orange Grove Road into
Orange County and Town of Hillsborough zoning ordinances
and subdivision regulations.
3.3 Amend each jurisdictions respective land use regulations to
support and/or implement recommendations in this study
including a provision that any development having
ingress/egress off Orange Grove Road in the study area either
construct its fair share of recommended improvements or
provide payment in lieu of for such improvements.
3.4 Support TIP Project R2825, South Churton Street
improvements, by continuing to assign a high priority to that
project as a transportation need in the biennial update of the
TIP.
Recommendations
4. The following items are recommended for Future Studies.
4.1 Work with the business community through the Economic
Development Commission and the Orange County/Hillsborough
Chamber of Commerce to implement the recommendations in
the Feasibility Study for South Churton Street concerning
Daniel Boone Village and to develop access management for
other businesses in the South Churton Street corridor.
4.2 Pursue a future study for the Oakdale Drive corridor.
5. Distribute Orange Grove Road Study and Access Management
Plan to community groups for comments.
.~ w.sa ~w r+oro sae.... aw u+ro~
ar~~.rr.~ae:rsas •mw.ws
.y..~sr~•••aw.
~~Me>~Pr VwuKwO~ ~~.•a~s aw
Legend
ZONING '~~ MNor ROWS PrOpowO Strseh
HI ~~ ~~ Rapotatl TrMk Liph4 ~ ~~ Str~b
~P•ro•1e •EtlWiq Tr•MC LIOhI• PrWO.~WO &Wpe ChMps
R1
RB Propo•edConneGOn
0 250 SOD 7,OOD 7,500 2,000 2500 3000
F•sl
a•'' K ~~
.w
!< Q
+~ ti !•••~~,
a•ny. ea.q PWNrp.•e Yspwtler• O•••ron•i•
018 •N• Pn••M Oy D•rM A. •M•u OMMw 10. 0002
Piq•tlien: 8YY PYM
0••••: N•rN Mnwb• 10.1
Orange Grove Parcels